Item No. Description Qty. Unit Item No. Description Qty. Unit
Part B – Other General Requirements Part B – Other General Requirements
B.4(1) Construction Survey and Staking 1.00 Km B.4(1) Construction Survey and Staking 2.88 Km
B.5 Project Billboard/ Signboard 1.00 Each B.5 Project Billboard/ Signboard 2.00 Each
Part G – Drainage and Slope Protection Structures Part G – Drainage and Slope Protection Structures
508(1) Handlaid Rock Embankment 1,035.00 Cu.m 508(1) Handlaid Rock Embankment 1,665.00 Cu.m
Part J – Flood Control and Drainage Part J – Flood Control and Drainage
1700(1) Clearing and Grubbing 13,007.00 Sq.m 1700(1) Clearing and Grubbing 19,619.85 Sq.m
1701(2) Surplus Common 13,918.00 Cu.m 1701(2) Surplus Common 30,134.00 Cu.m
1701(3) Surplus Rock Excavation 36,241.00 Cu.m 1701(3) Surplus Rock Excavation 14,780.00 Cu.m
1702(1)a Structure Excavation (Soft Rock) 2,861.00 Cu.m 1702(1)a Structure Excavation (Soft Rock) 4,991.00 Cu.m
1704(1)b Embankment (from Borrow) 17,858.00 Cu.m 1704(1)b Embankment (from Borrow) DELETED
1704(1)a Embankment from 23,190.00 Cu.m
Excavation (Common Soil)
1712(2) Concrete, Slope Protection 3,356.00 Cu.m 1712(2) Concrete, Slope Protection 5,423.00 Cu.m
Part C – Earthworks Part C – Earthworks
100(1) Clearing and Grubbing 0.70 Ha 100(1) Clearing and Grubbing DELETED
102(2) Surplus Common Excavation 11,604.14 Cu.m 102(2) Surplus Common Excavation 399.00 Cu.m
103(1)a Structure Excavation (Common 1,454.00 Cu.m 103(1)a Structure Excavation (Common 50.00 Cu.m
Soil) Soil)
104(1)a Embankment from Roadway 2,364.67 Cu.m 104(1)a Embankment from Roadway 5,902.00 Cu.m
Excavation (Common Soil) Excavation (Common Soil)
103(2)a Bridge Excavation (Common 115.90 Cu.m 103(2)a Bridge Excavation (Common DELETED
Soil) Soil)
104(2)a Embankment from Borrow 24.08 Cu.m 104(2)a Embankment from Borrow 231.24 Cu.m
(Common Soil) (Common Soil)
105(1)a Subgrade Preparation (Common 3,649.43 Sq.m 105(1)a Subgrade Preparation (Common 1,198.84 Sq.m
Material) Material)
Part D – Subbase and Base Course Part D – Subbase and Base Course
200(1) Aggregate Subbase Course 1,372.80 Cu.m 200(1) Aggregate Subbase Course 476.00 Cu.m
Part F – Bridge Construction Part F – Bridge Construction
404(1)a Reinforcing Steel, Grade 40 15,736.00 Kg 404(1)a Reinforcing Steel, Grade 40 17,675.00 Kg
404(1)b Reinforcing Steel, Grade 60 21,345.00 Kg 404(1)b Reinforcing Steel, Grade 60 17,944.00 Kg
405(1)b3 Structural Concrete, 27.58Mpa, 101.25 Cu.m 405(1)b3 Structural Concrete, 27.58Mpa, 234.150 Cu.m
Class A, 28 days Class A, 28 days
406(1)e8 Prestresses Structural Concrete 1.00 Each 406(1)e8 Prestresses Structural Concrete 4.00 Each
Members, 35.00m., type V, I- Members, 35.00m., type V, I-
Girders Girders
407(8) Lean Concrete, Class “B” (16.50 2.28 Cu.m 407(8) Lean Concrete, Class “B” (16.50 2.88 Cu.m
Mpa) Mpa)
411(2) Paint (Concrete Structures) 245.84 Sq.m 411(2) Paint (Concrete Structures) 412.18 Sq.m
412(1) Elastomeric Bearing Pads (Duro 1.00 Each 412(1) Elastomeric Bearing Pads (Duro 8.00 Each
60, 42mm x 500mm x 711mm) 60, 42mm x 500mm x 711mm)
418(1) Bridge Steel Deck 1.00 Sq.m 418(1) Bridge Steel Deck DELETED
Part G – Drainage and Slope Protection Structures Part G – Drainage and Slope Protection Structures
510(2) Concrete, Slope Protection 53.72 Cu.m 510(2) Concrete, Slope Protection DELETED
511(2)a1 Mattresses, Metallic Coated 108.00 Cu.m 511(2)a1 Mattresses, Metallic Coated 50.00 Cu.m
(0.3mx 2m x 6m) (0.3mx 2m x 6m)
511(3) Filter Cloth 360.00 Sq.m 511(3) Filter Cloth 168.00 Sq.m
517(1)a Drain Pipe, Galvanized (150mm 4.20 Lm 517(1)a Drain Pipe, Galvanized (150mm 6.24 Lm
Ø) Ø)
Page 1 of 2
.
All other scope of works not included in this revision remains the same. This Supplemental Bulletin shall form an integral
part of the said Bidding Documents.
RONALD B. CARIAGA
BAC Chairperson