Republic of the Philippines

Department of Public Works & Highways


OFFICE OF THE DISTRICT ENGINEER
Davao del Sur 2nd Engineering District Office
Malita, Davao del Sur

October 31, 2010

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : Construction of Marabatuan Bridge and Approaches @ Marabatuan


Jose Abad Santos, Davao del Sur
CONTRACTOR: FFJJ
CONSTRUCTION

We hereby certify that we have conducted an inspection and verification on works accomplished
on the above - mentioned project for the period October 23-31, 2010 We further certify that we have found the
the quality of materials in the following item of works corresponding to the quantity accomplished conforms with the
Standard Specifications and Special Provisions of the Contract, viz:

Item No. Description of Work Quantity This Week To Date %


Accomp.
Part B Other General Requirements
2.2 Construct, maintain & remove detour l.s. - 1.00 100
2.5 Project sign board 2.00 each - 2.00 each 100
Part C Earthwork
100-1-a Clearing & grubbing 0.52ha. - 0.52ha. 100
102-1 Unsuitable excavation 147.00cu.m. - 147.00cu.m. 100
104-1 Embankment (from excavation) 106.00cu.m. - 106.00cu.m. 100
104-6 Embankment (from borrow) 12,219.00cu.m. - 12,219.00cu.m. 100
105-2 Subgrade preparation 200.00 sq.m. - 200.00 sq.m. 100
Part D Subbase & base course
200 Aggregate subbase course 357.00 cu.m. - 357.00 cu.m. 100
Part C Earthwork
103-2-a Structure excavation, above OWL 2,829.00 cu.m. - 2,829.00 cu.m. 100
103-2-b Structure excavation, below OWL 1,024.00 cu.m. - 1,024.00 cu.m. 100
103-3-b Gravel fill 75.00 cu.m. - 75.00 cu.m. 100
Part F Bridge Construction
401-2 Bridge railing assembly 12.80 m. - - -
404 Reinforcing steel 151,023.00 kgs. - 151,023.00 kgs. 100
405-1 Structural conc. class “A” 450.00 cu.m. - 450.00 cu.m. 100
405-1-a Structural conc. class “A” (modified) 346.00 cu.m. - 346.00 cu.m. 100
405-1-b Structural conc. class “A” , 27.6 MPa 169.00 cu.m. - 169.00 cu.m. 100
405-6 Lean concrete 32.00 cu.m. - 32.00 cu.m. 100
415-1 Hauling & transportation of WB 120,312.00 kgs. - 120,312.00 kgs. 100
Modular steel bridge
415-2 Installation/erection of WB modular 120,312.00 kgs. - 120,312.00 kgs. 100
Steel struc., etc.
SPL 4-1 Performed elastometric joint seal 43.80 m. - 43.80 m. 100
Part G Drainage & slope protection
504-5b Grouted riprap, Side drain 16.00 cu.m. - - -
504-5c Grouted riprap, Pen dike 214.00 cu.m. - - -
506-2 Loose boulders/dry riprap 345.00 cu.m. - - -
509-1 Gabion scour protection 265.00 cu.m. - - -
509-2 Matress scour protection 265.00 cu.m. - - -
510.1 Rubble concrete slope protection 177.00 cu.m. - - -
Part H
608-1 Topsoil 19.00 cu.m. - - -
610-1 Sodding 463.00 sq.m. - - -
SPL-I Camphouse 36.00 sq.m. - 36.00 sq.m. 100
SPL-II Const. safety & health l.s. - 0.70 70

CARLO L. AGUHOB ANDREW A. PANGAN


Materials Quality Control Engineer Project Engineer

Note : to be submitted every quarter of the month.


1st Report 1-7
2nd Report 8-15
3rd Report 16-22
4th Report 23-30/31 October 23-31, 2010
October 31, 2010

October 23-31, 2010

October 1-7, 2010 September 16-22, 2010


September 8-15, 201 September 23-30, 2010