AS-STAKED QUANTITIES

FOR THE

#REF!

Improvement/Upgrading (Gravel to Concrete) of Road


Sitio Pasog - Licup - Tagbitan-ag - Sitio Tagluna
Leading to Puting Bato and Canibad Resort, Brgy.
Aundanao, Island Garden City of Samal, Sta.
1515+200 to 1519+200, Davao Del Norte

Submitted by:

ULTICON BUILDERS, INC.


Contractor
SUMMARY OF QUANTITITES
Item
ORIGINAL AS-STAKED VARIANCE FROM
Description Unit REMARKS
No. QUANTITY QUANTITY ORIGINAL CONTRACT

Part A. FACILITIES FOR ENGINEER


A.1.1(3) Camphouse w/ 2 CR for Female and Male ls 1.00 1.00 - NO CHANGES
A.1.1(5) Vehicle for the Engineer (based on DO 3 s 2010) 4 x 4 pick up 2500 CC M/T diesel w/ aircon, stere month 9.00 9.00 - NO CHANGES
A.1.1(16) Assistance to the Engineer month 9.00 9.00 -
Part B. OTHER GENERAL REQUIREMENT
B.4(1) Construction Survey and Staking km 6.00 6.00 - NO CHANGES
B.5 Project Billboard each 2.00 2.00 - NO CHANGES
B.7 Construction Safety & Health month 9.00 9.00 - NO CHANGES
B.8 Traffic Management month 9.00 9.00 - NO CHANGES
B.9 Mobilization & Demobilization ls 1.00 1.00 - NO CHANGES
Part C. EARTHWORKS
100(1) Clearing & Grubbing ha 6.12 6.12 - NO CHANGES
102(2) Surplus Common Excavation cu m 118,714.00 118,714.00 - NO CHANGES
102(3)a Surplus Rock Excavation (Rippable) cu m 38,425.00 38,425.00 - NO CHANGES
103(1)a Sructural Excavation (Common Soil) cu m 68.30 68.30 - NO CHANGES
103(3) Foundation Fill cu m 76.30 76.30 - NO CHANGES
103(6)a Pipe Culvert and Drain Excavation cu m 1,423.70 1,423.70 - NO CHANGES
104(1)a Embankment (from Excavation) cu m 29,287.00 29,287.00 - NO CHANGES
105(1)a Subgrade Preparation sq m 39,821.17 39,821.17 - NO CHANGES
Part D. SUB-BASE & BASE COURSE
200(1) Aggregate Subbase Course cu m 11,310.00 11,310.00 - NO CHANGES
Part E. SURFACE COURSES
311(1)c1 PCC Pavement (Unreinforced), 200mm THK. sq m 13,592.77 13,592.77 - NO CHANGES
PART F. DRAINAGE CONSTRUCTION (BOX CULVERT)
404(1)a Reinforcing Steel, Grade 40 kg 8,103.00 8,103.00 - NO CHANGES
405(1)a3 Structural Concrete, Class A cu m 121.00 121.00 - NO CHANGES
PART G. DRAINAGE & SLOPE PROTECTION STRUCTURE
500(1)b3 Pipe Culverts, 910mm ø, Class IV ln m 228.00 228.00 - NO CHANGES
500(1)b5 Pipe Culverts, 1220mm ø, Class IV ln m 23.00 23.00 - NO CHANGES
505(1)b6 Pipe Culverts, 1520mm ø, Class IV ln m 41.00 41.00 - NO CHANGES
505(2)a Grouted Riprap, Class “A” cu m 1,411.70 1,411.70 - NO CHANGES
506(1) Stone Masonry cu m 170.70 170.70 - NO CHANGES
508(1) HandLaid Rock Embankment cu m 33.90 33.90 - NO CHANGES
PART H. MISCELLANEOUS STRUCTURE
603(3)a1 Metal Guardrail (Metal Beam) including Post ln m 2,350.77 2,350.77 - NO CHANGES
603(4)b Metal Beam End Piece (Bull Nose) each 32.00 32.00 - NO CHANGES
612(1) Reflectorized Thermoplastic Pavement markings (White) sq m 889.33 889.33 - NO CHANGES
620(1)a1 Chevron Signs (450mm x 600mm) each 182.00 182.00 - NO CHANGES
622(2)c Coco-Logs / Fascine ln m 2,691.00 2,691.00 - NO CHANGES
622(3)b Vegetation sq m 13,586.80 13,586.80 - NO CHANGES
WE HEREBY CERTIFY THAT THE STATEMENT OF WORK ACCOMPLISHED ON THIS PAGE IS TRUE AND CORRECT
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : A.1.1(3) Original Quantity : 1.000 ls


Description : Camphouse w/ 2 CR for Female and Male Revised Quantity : 1.000 ls

Camp House w/ 2 CR for Female and Male : 1.000 ls

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name :
Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.

Item : A.1.1(5) Original Quantity : 9.000 month


Description : Vehicle for the Engineer (based on DO 3 s 2010) 4 x 4 pick up 2500 CC M/T Revised Quantity : 9.000 month
diesel w/ aircon, stereo, megawheels, stepboard, bed liner, GPS, rustproof

Vehicle for the Engineer (based on DO 3 s 2010) 4 x 4 pick : 9.000 month


up 2500 CC M/T diesel w/ aircon, stereo, megawheels,
stepboard, bed liner, GPS, rustproof

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : A.1.1(16) Original Quantity : 9.000 month


Description : A. Operations & Maintenance of Field Office for the Engineer Revised Quantity : 9.000 month

A. Operations & Maintenance of Field Office for the Engineer : 9.000 month

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : B.4(1) Original Quantity : 6.000 km.


Description : Construction Survey and Staking Revised Quantity : 6.000 km.

Construction Survey and Staking : 6.000 km.

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : B.5 Original Quantity : 2.000 each


Description : Project Billboard Revised Quantity : 2.000 each

Project Billboard : 2.000 each

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : B.7 Original Quantity : 9.000 month


Description : Construction Safety & Health Revised Quantity : 9.000 month

Construction Safety & Health : 9.000 month

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : B.8 Original Quantity : 9.000 month


Description : Traffic Management Revised Quantity : 9.000 month

Traffic Management : 9.000 month

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : B.9 Original Quantity : 1.000 l.s.


Description : Mobilization & Demobilization Revised Quantity : 1.000 l.s.

Mobilization & Demobilization : 1.000 l.s.

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 100(1) Original Quantity : 6.120 ha


Description : Clearing & Grubbing Revised Quantity : 6.170 ha

Clearing & Grubbing : 6.170 ha (see earthworks back-up quantity sheet)

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 102(2) Original Quantity : 118,714.000 cu m


Description : Surplus Common Excavation Revised Quantity : 149,896.530 cu m

Surplus Common Excavation : 149,896.530 cu m (see earthworks back-up quantity sheet)

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 102(3)a Original Quantity : 38,425.000 cu m


Description : Surplus Rock Excavation (Rippable) Revised Quantity : 38,425.000 cu m

Surplus Rock Excavation (Rippable) : 38,425.000 ha (see earthworks back-up quantity sheet)

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 103(1)a Original Quantity : 68.300 cu m


Description : Sructural Excavation (Common Soil) Revised Quantity : 68.300 cu.m

STATION (SECTION 1) DESCRIPTION cu m

STATION 4+098.113
0004+098.113 INSTALL 1 - 3.0m x 3.0m x 13.0 LN. M W/WINGWALL ON BOTHSIDES. 27.00
PROVIDED WINGWALL AT B/S. IE = 123.258
STATION 4+580.032
0004+580.032 INSTALL 1 - 1.8m x 1.8m x 10.00 LN. M W/WINGWALL ON 41.25
BOTHSIDES. PROVIDED WINGWALL AT B/S. IE = 120.437
TOTAL 68.25
SAY 68.3

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency : Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 103(3) Original Quantity : 76.30 cu.m.


Description : Foundation Fill Revised Quantity : 76.30 cu.m.

LENGTH
VOLUME
STATION (at the base of Headwall) REMARKS
OF RCPC
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE
HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
1 + 198.423 10.00 1.53 GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+198.423, IE =
260.068
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE
HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
1 + 420.000 11.00 1.64 GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+420.000, IE =
254.438
INSTALL 1-LINE 1520mmØ x 13.0 LN. M. RCPC PROVIDE
HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
1 + 638.945 13.00 3.09 GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+638.945 IE =
242.607
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE
HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
1 + 818.079 10.00 1.53 GROUTED RIPRAP CATCH BASIN AT L/S STATTION 1+818.079 IE =
251.610
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE
HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
2 + 058.998 11.00 1.64 GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+058.998 IE =
256.766
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE
2 + 289.120 11.00 1.64 HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+289.120 IE =
254.105
TOTAL QUANTITY AT THIS PAGE 11.07 cu.m.

Submitted by: Checked and Verified by:

Page 27 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH

Quantity Calculations
Agency : Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 103(3) Original Quantity : 76.30 cu.m.


Description : Foundation Fill Revised Quantity : 76.33 cu.m.

LENGTH VOLUME
STATION (at the base of Headwall) REMARKS
OF RCPC

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
2 + 338.178 10.00 1.53 GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+338.178 IE =
253.256

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
2 + 511.858 10.00 1.53 GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+511.858 IE =
261.836

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
2 + 747.488 11.00 1.64 GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+747.488 IE =
261.090

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
2 + 937.363 10.00 1.53 GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+937.363 IE =
239.842

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
3 + 219.129 11.00 1.64 GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+219.129 IE =
227.816

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
3 + 578.929 11.00 1.64 GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+578.929 IE =
197.911

INSTALL 1-LINE 910mmØ x 12.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
3 + 836.368 12.00 1.75 GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+836.368 IE =
164.817

STATION 4+098.113
4 + 098.113 13.00 12.75 INSTALL 1 - 3.0m x 3.0m x 13.0 LN. M W/WINGWALL ON
BOTHSIDES. PROVIDED WINGWALL AT B/S. IE = 123.258

STATION 4+580.032
4 + 580.032 10.00 12.71 INSTALL 1 - 1.8m x 1.8m x 10.00 LN. M W/WINGWALL ON
BOTHSIDES. PROVIDED WINGWALL AT B/S. IE = 120.437

STATION 4+687.000
INSTALL 1-LINE 1520mmØ x 14.00 LN. M RCPC PROVIDED
4 + 687.000 14.00 4.04 HEADWALL AT B/S AND DUMPED STONE PROTECTION AT B/S,
IE = 120.688

STATION 4+783.492
INSTALL 1-LINE 1220mmØ x 12.00 LN. M RCPC PROVIDED
4 + 783.492 12.00 2.74 HEADWALL AT B/S AND DUMPED STONE PROTECTION AT R/S,
IE = 122.372

INSTALL 1-LINE 1520mmØ x 14.0 LN. M. RCPC PROVIDE


4 + 960.000 14.00 4.04 HEADWALL AT B/S AND DUMPED STONE PROTECTION AT L/S
STATION 4+960.000, IE = 124.852

TOTAL QUANTITY AT THIS PAGE 47.54 cu.m


CUMULATIVE QUANTITY 58.61 cu.m

Page 28 of 105
Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH

Quantity Calculations
Agency : Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 103(3) Original Quantity : 76.30 cu.m.


Description : Foundation Fill Revised Quantity : 76.33 cu.m.

LENGTH
STATION VOLUME REMARKS
OF RCPC (at the base of Headwall)

INSTALL 1-LINE 910mmØ x 13.0 LN. M. RCPC PROVIDE


3 + 977.097 13.00 1.86 HEADWALL WITH DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S STATION 3+977.097 IE = 143.495

STATION 5+260.000
INSTALL 1-LINE 910mmØ x 11.00 LN. M RCPC PROVIDED
5 + 260.000 11.00 1.75 HEADWALL WITH DUMPED STONE AT R/S AND GROUTED
RIPRAP CATCH BASIN AT L/S. IE = 162.347

STATION 5+560.000
INSTALL 1-LINE 910mmØ x 13.00 LN. M RCPC PROVIDED
5 + 560.000 13.00 1.86 HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND
GROUTED RIPRAP CATCH BASIN AT R/S. IE = 165.848

STATION 5+780.000
5 + 780.000 12.00 2.88 INSTALL 1-LINE 1220mmØ x 12.00 LN. M RCPC PROVIDED
HEADWALL AT B/S AND DUMPED STONE AT L/S, IE = 149.117

STATION 6+040.000
6 + 040.000 12.00 2.15 INSTALL 1-LINE 910mmØ x 12.00 LN. M RCPC PROVIDED
HEADWALL AT B/S AND DUMPED STONE AT R/S, IE = 160.795

STATION 6+260.000
INSTALL 1-LINE 910mmØ x 12.00 LN. M RCPC PROVIDED
6 + 260.000 12.00 1.75 HEADWALL WITH AND DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S, IE = 180.496

STATION 6+760.000
INSTALL 1-LINE 910mmØ x 12.00 LN. M RCPC PROVIDED
6 + 760.000 12.00 1.75 HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND
GROUTED RIPRAP CATCH BASIN AT R/S, IE = 181.623

STATION 6+960.000
INSTALL 1-LINE 910mmØ x 13.00 LN. M RCPC PROVIDED
6 + 960.000 13.00 1.86 HEADWALL WITH DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S, IE = 174.153

STATION 7+160.000
INSTALL 1-LINE 910mmØ x 13.00 LN. M RCPC PROVIDED
7 + 160.000 13.00 1.86 HEADWALL WITH DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S, IE = 151.311

TOTAL QUANTITY AT THIS PAGE 17.72 cu.m

CUMULATIVE QUANTITY 76.33 cu.m

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH

Page 29 of 105
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 103(6)a Original Quantity : 1,423.700 cu m


Description : Pipe Culvert and Drain Excavation Revised Quantity : 1,423.700 cu m

VOLUME
STATION DESCRIPTION REMARKS
(Cu.m.)

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH


1 + 198.423 DUMPED STONE AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN 11.02
AT L/S STATION 1+198.423, IE = 260.068

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH


1 + 420.000 DUMPED STONE AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN 42.45
AT L/S STATION 1+420.000, IE = 254.438

INSTALL 1-LINE 1520mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH


1 + 638.945 DUMPED STONE AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN 86.38
AT L/S STATION 1+638.945 IE = 242.607

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH


1 + 818.079 DUMPED STONE AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN 6.52
AT L/S STATTION 1+818.079 IE = 251.610

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH


2 + 058.998 DUMPED STONE AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN 21.40
AT L/S STATION 2+058.998 IE = 256.766

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH


2 + 289.120 DUMPED STONE AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN 33.60
AT L/S STATION 2+289.120 IE = 254.105

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH


2 + 338.178 DUMPED STONE AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN 20.87
AT L/S STATION 2+338.178 IE = 253.256

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH


2 + 511.858 DUMPED STONE AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN 38.94
AT L/S STATION 2+511.858 IE = 261.836

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH


2 + 747.488 DUMPED STONE AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN 85.52
AT L/S STATION 2+747.488 IE = 261.090

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH


2 + 937.363 DUMPED STONE AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN 13.62
AT L/S STATION 2+937.363 IE = 239.842

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH


3 + 219.129 DUMPED STONE AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN 51.77
AT L/S STATION 3+219.129 IE = 227.816

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH


3 + 578.929 DUMPED STONE AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN 35.34
AT L/S STATION 3+578.929 IE = 197.911

INSTALL 1-LINE 910mmØ x 12.0 LN. M. RCPC PROVIDE HEADWALL WITH


3 + 836.368 DUMPED STONE AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN 97.32
AT L/S STATION 3+836.368 IE = 164.817

STATION 4+098.113 INSTALL 1 -


4 + 098.113 3.0m x 3.0m x 13.0 LN. M W/WINGWALL ON BOTHSIDES. PROVIDED 8.06
WINGWALL AT B/S. IE = 123.258

PAGE TOTAL 552.81


TOTAL QUANTITY 552.81

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 103(6)a Original Quantity : 1,423.700 cu m


Description : Pipe Culvert and Drain Excavation Revised Quantity : 1,423.700 cu m

VOLUME
STATION DESCRIPTION REMARKS
(Cu.m.)

STATION 4+580.032 INSTALL 1 -


4 + 580.032 1.8m x 1.8m x 10.00 LN. M W/WINGWALL ON BOTHSIDES. PROVIDED 20.76
WINGWALL AT B/S. IE = 120.437

STATION 4+687.000 INSTALL 1-


4 + 687.000 LINE 1520mmØ x 14.00 LN. M RCPC PROVIDED HEADWALL AT B/S AND 6.27
DUMPED STONE PROTECTION AT B/S, IE = 120.688

STATION 4+783.492 INSTALL 1-


4 + 783.492 LINE 1220mmØ x 12.00 LN. M RCPC PROVIDED HEADWALL AT B/S AND 122.34
DUMPED STONE PROTECTION AT R/S, IE = 122.372

INSTALL 1-LINE 1520mmØ x 14.0 LN. M. RCPC PROVIDE HEADWALL AT B/S


4 + 960.000 AND DUMPED STONE PROTECTION AT L/S STATION 4+960.000, IE = 124.852 33.50

INSTALL 1-LINE 910mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH


3 + 977.097 DUMPED STONE AT L/S AND GROUTED RIPRAP CATCH BASIN AT R/S 59.30
STATION 3+977.097 IE = 143.495

STATION 5+260.000 INSTALL 1-


5 + 260.000 LINE 910mmØ x 11.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED 38.83
STONE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S. IE = 162.347

STATION 5+560.000 INSTALL 1-


LINE 910mmØ x 13.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED
5 + 560.000 STONE PROTECTION AT L/S AND GROUTED RIPRAP CATCH BASIN AT R/S. IE 116.97
= 165.848

STATION 5+780.000 INSTALL 1-


5 + 780.000 LINE 1220mmØ x 12.00 LN. M RCPC PROVIDED HEADWALL AT B/S AND 76.71
DUMPED STONE AT L/S, IE = 149.117

STATION 6+040.000 INSTALL 1-


6 + 040.000 LINE 910mmØ x 12.00 LN. M RCPC PROVIDED HEADWALL AT B/S AND 58.55
DUMPED STONE AT R/S, IE = 160.795

STATION 6+260.000 INSTALL 1-


LINE 910mmØ x 12.00 LN. M RCPC PROVIDED HEADWALL WITH AND
6 + 260.000 DUMPED STONE AT L/S AND GROUTED RIPRAP CATCH BASIN AT R/S, IE = 120.26
180.496

STATION 6+760.000 INSTALL 1-


LINE 910mmØ x 12.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED
6 + 760.000 STONE PROTECTION AT L/S AND GROUTED RIPRAP CATCH BASIN AT R/S, IE 48.52
= 181.623

STATION 6+960.000 INSTALL 1-


6 + 960.000 LINE 910mmØ x 13.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED 66.14
STONE AT L/S AND GROUTED RIPRAP CATCH BASIN AT R/S, IE = 174.153

STATION 7+160.000 INSTALL 1-


7 + 160.000 LINE 910mmØ x 13.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED 102.78
STONE AT L/S AND GROUTED RIPRAP CATCH BASIN AT R/S, IE = 151.311

PAGE TOTAL 870.93


TOTAL QUANTITY 1423.74

Submitted by: Checked and Verified by:


ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 101(4)a Original Quantity : 29,287.000 ln.m.


Description : Embankment (from Excavation) Revised Quantity : 30,712.200 ln.m.

Embankment (from Excavation) : 30,712.200 ha (see earthworks back-up quantity sheet)

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 105(1)a Original Quantity : 39,821.170 sq m


Description : Subgrade Preparation Revised Quantity : 39,946.450 sq m

Subgrade Preparation : 39,946.450 sq m (see earthworks back-up quantity sheet)

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 200(1) Original Quantity : 11,310.000 cu m


Description : Aggregate Subbase Course Revised Quantity : 11,380.260 cu m

Aggregate Subbase Course : 11,380.260 cu m (see earthworks back-up quantity sheet)

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 311(1)c1 Original Quantity : 13,592.770 sq m


Description : PCC Pavement (Unreinforced), 200mm THK. Revised Quantity : 12,624.060 sq.m.

REPLACE INSERTED PICTURE, DOESN'T MATCH WIDTH OF


ROAD, THICKNESS OF PCCP AND GRAVELING IN PLAN

NORMAL WIDTH
STATION LENGTH WIDTH AREA REMARKS
FROM TO (m) (m) (sq.m.)

0001 + 000.000 0003 + 899.436 2,899.436 5.000 14,497.180 2 LANES

TOTAL QUANTITY (Normal Width) 14,497.180 sq m

EQUATIONS
STATION LENGTH WIDTH AREA REMARKS
BACK AHEAD (m) (m) (sq.m.)
0001 + 367.093 0001 + 407.750 -40.657 5.000 -203.290 2 LANES
0001 + 708.895 0001 + 737.814 -28.919 5.000 -144.600 2 LANES
0001 + 961.125 0001 + 983.137 -22.012 5.000 -110.060 2 LANES
0002 + 606.046 0002 + 651.683 -45.637 5.000 -228.190 2 LANES
0002 + 958.515 0003 + 000.765 -42.250 5.000 -211.250 2 LANES
0003 + 438.798 0003 + 440.770 -1.972 5.000 -9.860 2 LANES
0004 + 540.148 0004 + 531.928 8.220 5.000 41.100 2 LANES
0004 + 634.197 0004 + 639.474 -5.277 5.000 -26.390 2 LANES
0004 + 824.309 0004 + 820.155 4.154 5.000 20.770 2 LANES
0004 + 902.405 0004 + 902.674 -0.269 5.000 -1.350 2 LANES
TOTAL QUANTITY (EQUATION) -174.619 -873.120 sq m

Submitted by: Checked and Verified by:

Page 40 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH

Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
###
ULTICON BUILDERS, INC.

Item : 311(1)c1 Original Quantity : 13,592.770 sq m


Description : PCC Pavement (Unreinforced), 200mm THK. Revised Quantity : 12,624.060 sq.m.

EXCEPTION
STATION LENGTH WIDTH AREA REMARKS
BACK AHEAD (m) (m) (sq.m.)
0004 + 220.000 0004 + 420.000 -200.000 5.000 -1,000.000 2 LANES
TOTAL QUANTITY (EQUATION) -200.000 -1,000.000

TOTAL QUANTITY FOR ITEM 311 (1) : 12,624.06 Sq.m.

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH

Page 41 of 105
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
###
ULTICON BUILDERS, INC.

Item : 404(1)a Original Quantity : 8,103.000 ln m


Description : Reinforcing Steel, Grade 40 Revised Quantity : 8,103.000 ln m

QUANTITY PER METER OF SINGLE


CLEAR
BARREL
STATION
SPAN HEIGHT CONCRETE REINFORCEMENT
s h (cu m) (kg)

4098.113 3000 3000 88.00 5848.00

4580.032 1800 1800 33.00 2255.00

TOTAL 8103.00
SAY 8103.00

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
###
ULTICON BUILDERS, INC.

Item : 405(1)a3 Original Quantity : 121.000 ln m


Description : Structural Concrete, Class A Revised Quantity : 121.000 ln m

QUANTITY PER METER OF SINGLE


CLEAR BARREL
STATION
SPAN HEIGHT REINFORCEMENT CONCRETE
s h (kg) (cu m)

4098.113 3000 3000 5848.00 88.00

4580.032 1800 1800 2255.00 33.00

TOTAL 121.00

SAY 121.00

Submitted by: Checked and Verified by:


ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 500(1)b3 Original Quantity : 228.000 ln m


Description : Pipe Culverts, 910mm ø, Class IV Revised Quantity : 228.000 ln m

LENGTH

STATION PIPE SIZE REMARKS

(ln.m.)
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 198.423 10.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+198.423, IE =
260.068

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 420.000 11.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+420.000, IE =
254.438

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 818.079 10.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATTION 1+818.079 IE =
251.610

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 058.998 11.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+058.998 IE =
256.766

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 289.120 11.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+289.120 IE =
254.105

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 338.178 10.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+338.178 IE =
253.256

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 511.858 10.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+511.858 IE =
261.836

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 747.488 11.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+747.488 IE =
261.090

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 937.363 10.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+937.363 IE =
239.842

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 219.129 11.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+219.129 IE =
227.816

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 578.929 11.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+578.929 IE =
197.911

INSTALL 1-LINE 910mmØ x 12.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 836.368 12.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+836.368 IE =
164.817

INSTALL 1-LINE 910mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AT
3 + 977.097 13.00 910mmØ L/S AND GROUTED RIPRAP CATCH BASIN AT R/S STATION 3+977.097 IE = 143.495

STATION 5+260.000 INSTALL 1-LINE 910mmØ x


5 + 260.000 12.00 910mmØ 11.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE AT R/S AND GROUTED
RIPRAP CATCH BASIN AT L/S. IE = 162.347

PAGE TOTAL 153.00 Ln m


TOTAL QUANTITY 153.00 Ln m

Submitted by: Checked and Verified by:


ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH

Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 500(1)b3 Original Quantity : 228.000 ln m


Description : Pipe Culverts, 910mm ø, Class IV Revised Quantity : 228.000 ln m

LENGTH

STATION PIPE SIZE REMARKS

(ln.m.)
STATION 5+560.000 INSTALL 1-LINE 910mmØ x
5 + 560.000 13.00 910mmØ 13.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND
GROUTED RIPRAP CATCH BASIN AT R/S. IE = 165.848

STATION 6+040.000 INSTALL 1-LINE 910mmØ x


6 + 040.000 12.00 910mmØ 12.00 LN. M RCPC PROVIDED HEADWALL AT B/S AND DUMPED STONE AT R/S, IE = 160.795

STATION 6+260.000 INSTALL 1-LINE 910mmØ x


6 + 260.000 12.00 910mmØ 12.00 LN. M RCPC PROVIDED HEADWALL WITH AND DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S, IE = 180.496

STATION 6+760.000 INSTALL 1-LINE 910mmØ x


6 + 760.000 12.00 910mmØ 12.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND
GROUTED RIPRAP CATCH BASIN AT R/S, IE = 181.623

STATION 6+960.000 INSTALL 1-LINE 910mmØ x


6 + 960.000 13.00 910mmØ 13.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S, IE = 174.153

STATION 7+160.000 INSTALL 1-LINE 910mmØ x


7 + 160.000 13.00 910mmØ 13.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S, IE = 151.311

PAGE TOTAL 75.00 Ln m


COMMULATIVE 228.00 Ln m
QUANTITY

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 500(1)b5 Original Quantity : 23.000 ln m


Description : Pipe Culverts, 1220mm ø, Class IV Revised Quantity : 23.000 ln m

LENGTH

STATION PIPE SIZE REMARKS

(ln.m.)
STATION 4+783.492 INSTALL 1-LINE
4 + 783.492 11.00 1220mmØ 1220mmØ x 12.00 LN. M RCPC PROVIDED HEADWALL AT B/S AND DUMPED
STONE PROTECTION AT R/S, IE = 122.372

STATION 5+780.000 INSTALL 1-LINE


5 + 780.000 12.00 1220mmØ 1220mmØ x 12.00 LN. M RCPC PROVIDED HEADWALL AT B/S AND DUMPED
STONE AT L/S, IE = 149.117
PAGE TOTAL 23.00 Ln m
TOTAL QUANTITY 23.00 Ln m

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 505(1)b6 Original Quantity : 41.000 ln m


Description : Pipe Culverts, 1520mm ø, Class IV Revised Quantity : 41.000 ln m

LENGTH

STATION PIPE SIZE REMARKS

(ln.m.)
INSTALL 1-LINE 1520mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 638.945 13.00 1520mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+638.945 IE =
242.607

STATION 4+687.000 INSTALL 1-LINE 1520mmØ x


4 + 687.000 14.00 1520mmØ 14.00 LN. M RCPC PROVIDED HEADWALL AT B/S AND DUMPED STONE PROTECTION AT B/S,
IE = 120.688

INSTALL 1-LINE 1520mmØ x 14.0 LN. M. RCPC PROVIDE HEADWALL AT B/S AND DUMPED
4 + 960.000 14.00 1520mmØ STONE PROTECTION AT L/S STATION 4+960.000, IE = 124.852

PAGE TOTAL 41.00 Ln m


TOTAL QUANTITY 41.00 Ln m

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name :
Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.

Item : 505(5) Original Quantity : 1,411.700 Cu.m.


Description : Grouted Riprap, Class "A" Revised Quantity : 1,484.600 Cu.m.

GROUTED RIPRAP CATCH BASIN

STATION Volume REMARKS


(cu.m.)
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 198.423 41.67 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+198.423, IE =
260.068
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 420.000 14.90 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+420.000, IE =
254.438
INSTALL 1-LINE 1520mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 638.945 28.00 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+638.945 IE =
242.607
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 818.079 27.43 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATTION 1+818.079 IE =
251.610
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 058.998 29.10 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+058.998 IE =
256.766
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 289.120 14.90 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+289.120 IE =
254.105
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 338.178 14.90 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+338.178 IE =
253.256

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 511.858 14.90 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+511.858 IE =
261.836
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 747.488 14.90 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+747.488 IE =
261.090

PAGE TOTAL 200.70


TOTAL QUANTITY 200.70

Submitted by: Checked and Verified by:

Page 49 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH

Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name :
Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.

Item : 505(5) Original Quantity : 1,411.700 Cu.m.


Description : Grouted Riprap, Class "A" Revised Quantity : 1,484.600 Cu.m.

Volume
STATION (cu.m.) REMARKS

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 937.363 41.09 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+937.363 IE =
239.842
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 219.129 14.90 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+219.129 IE =
227.816
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 578.929 14.90 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+578.929 IE =
197.911

INSTALL 1-LINE 910mmØ x 12.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 836.368 14.90 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+836.368 IE =
164.817

INSTALL 1-LINE 910mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AT
3 + 977.097 14.90 L/S AND GROUTED RIPRAP CATCH BASIN AT R/S STATION 3+977.097 IE = 143.495

STATION 5+260.000 INSTALL 1-LINE 910mmØ x


5 + 260.000 14.90 11.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE AT R/S AND GROUTED
RIPRAP CATCH BASIN AT L/S. IE = 162.347
STATION 5+560.000 INSTALL 1-LINE 910mmØ x
5 + 560.000 14.90 13.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND
GROUTED RIPRAP CATCH BASIN AT R/S. IE = 165.848

STATION 6+260.000 INSTALL 1-LINE 910mmØ x


6 + 260.000 14.90 12.00 LN. M RCPC PROVIDED HEADWALL WITH AND DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S, IE = 180.496

STATION 6+760.000 INSTALL 1-LINE 910mmØ x


6 + 760.000 14.90 12.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND
GROUTED RIPRAP CATCH BASIN AT R/S, IE = 181.623
STATION 6+960.000 INSTALL 1-LINE 910mmØ x
6 + 960.000 14.90 13.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S, IE = 174.153

STATION 7+160.000 INSTALL 1-LINE 910mmØ x


7 + 160.000 14.90 13.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S, IE = 151.311

PAGE TOTAL 190.09


TOTAL QUANTITY 390.80

Page 50 of 105
Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH

Page 51 of 105
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : ### Contractor :
Project Name :
#REF!
ULTICON BUILDERS, INC.

Item : 505(5) Original Quantity : 1,411.700 cu.m.


Description : Grouted Riprap, Class A Revised Quantity : 1,484.600 cu.m.

Grouted Riprap Lined Canal:

Area = [ 0.50 ( 1.668 + 1.068 )( 1.200 ) ] - [ 0.50 ( 0.600 + 1.050 )( 0.900 ) ]

Area = 0.90 sq.m.

SCHEDULE OF GROUTED RIPRAP LINED CANAL


STATION LENGTH AREA Volume
(m) (cu.m.) Location
FROM TO (sq.m.)
0003 + 300.122 0003 + 577.429 277.31 0.900 249.580 RIGHT SIDE
0003 + 580.429 0003 + 834.868 254.44 0.900 229.000 RIGHT SIDE
0003 + 837.868 0003 + 899.436 61.57 0.900 55.410 RIGHT SIDE
0003 + 300.122 0003 + 577.429 277.31 0.900 249.580 LEFT SIDE
0003 + 837.868 0003 + 899.436 61.57 0.900 55.410 LEFT SIDE
0003 + 738.624 0003 + 834.868 96.24 0.900 86.620 LEFT SIDE
0002 + 748.988 0002 + 935.863 186.88 0.900 168.190 LEFT SIDE

TOTAL QUANTITY 1,093.790 cu.m.

Total Quantity for Grouted Riprap (Class A) = Quantity for Catch Basin + Quantity for Lined Canal
Total Quantity for Grouted Riprap (Class A) = 1,484.590 cu.m.
SAY, 1,484.600 cu.m.

Submitted by: Checked and Verified by:

Page 52 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH

Page 53 of 105
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 506 Original Quantity : 170.700 cu.m.


Description : Stone Masonry Revised Quantity : 170.700 cu.m.

TABLE FOR STRAIGHT "S" TYPE HEADWALL


DIA. & THK. OF PIPE DIMENSIONS (mm) SINGLE PIPE DOUBLE PIPE
I.D. t
AREA OF VOL. AREA OF VOL.
A B H W WATERWAY (cu.m.) W WATERWAY (cu.m.)
(mm)
(mm)
910 110 610 1080 1830 3660 0.510 3.98 5180 1.030 5.25
1220 110 810 1180 2340 4880 0.910 7.25 6910 1.820 6.70
1520 130 1010 1280 2830 6050 1.410 11.62 8610 2.820 15.32
Volume
STATION PIPE SIZE REMARKS
(cu.m.) INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 198.423 3.98 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+198.423, IE =
260.068
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 420.000 3.98 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+420.000, IE =
254.438
INSTALL 1-LINE 1520mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 638.945 11.62 1520mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+638.945 IE =
242.607
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 818.079 3.98 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATTION 1+818.079 IE =
251.610
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 058.998 3.98 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+058.998 IE =
256.766
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 289.120 3.98 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+289.120 IE =
254.105
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 338.178 3.98 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+338.178 IE =
253.256
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 511.858 3.98 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+511.858 IE =
261.836
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 747.488 3.98 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+747.488 IE =
261.090
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 937.363 3.98 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+937.363 IE =
239.842
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 219.129 3.98 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+219.129 IE =
227.816
PAGE TOTAL 51.42 cu.m.
CUMULATIVE 51.42 cu.m.

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 506 Original Quantity : 170.700 cu.m.


Description : Stone Masonry Revised Quantity : 170.700 cu.m.

Volume
STATION PIPE SIZE REMARKS
(cu.m.) INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 578.929 3.98 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+578.929 IE =
197.911
INSTALL 1-LINE 910mmØ x 12.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 836.368 3.98 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+836.368 IE =
164.817
STATION 4+687.000 INSTALL 1-LINE 1520mmØ x
4 + 687.000 23.24 1520mmØ 14.00 LN. M RCPC PROVIDED HEADWALL AT B/S AND DUMPED STONE PROTECTION AT B/S,
IE = 120.688
STATION 4+783.492 INSTALL 1-LINE 1220mmØ x
4 + 783.492 14.50 1220mmØ 12.00 LN. M RCPC PROVIDED HEADWALL AT B/S AND DUMPED STONE PROTECTION AT R/S,
IE = 122.372

INSTALL 1-LINE 1520mmØ x 14.0 LN. M. RCPC PROVIDE HEADWALL AT B/S AND DUMPED
4 + 960.000 23.24 1520mmØ STONE PROTECTION AT L/S STATION 4+960.000, IE = 124.852

INSTALL 1-LINE 910mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AT
3 + 977.097 3.98 910mmØ L/S AND GROUTED RIPRAP CATCH BASIN AT R/S STATION 3+977.097 IE = 143.495

STATION 5+260.000 INSTALL 1-LINE 910mmØ x


5 + 260.000 3.98 910mmØ 11.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE AT R/S AND GROUTED
RIPRAP CATCH BASIN AT L/S. IE = 162.347
STATION 5+560.000 INSTALL 1-LINE 910mmØ x
5 + 560.000 3.98 910mmØ 13.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND
GROUTED RIPRAP CATCH BASIN AT R/S. IE = 165.848

STATION 5+780.000 INSTALL 1-LINE 1220mmØ x


5 + 780.000 14.50 1220mmØ 12.00 LN. M RCPC PROVIDED HEADWALL AT B/S AND DUMPED STONE AT L/S, IE = 149.117

STATION 6+040.000 INSTALL 1-LINE 910mmØ x


6 + 040.000 7.96 910mmØ 12.00 LN. M RCPC PROVIDED HEADWALL AT B/S AND DUMPED STONE AT R/S, IE = 160.795

STATION 6+260.000 INSTALL 1-LINE 910mmØ x


6 + 260.000 3.98 910mmØ 12.00 LN. M RCPC PROVIDED HEADWALL WITH AND DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S, IE = 180.496
STATION 6+760.000 INSTALL 1-LINE 910mmØ x
6 + 760.000 3.98 910mmØ 12.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND
GROUTED RIPRAP CATCH BASIN AT R/S, IE = 181.623
STATION 6+960.000 INSTALL 1-LINE 910mmØ x
6 + 960.000 3.98 910mmØ 13.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S, IE = 174.153
STATION 7+160.000 INSTALL 1-LINE 910mmØ x
7 + 160.000 3.98 910mmØ 13.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S, IE = 151.311
PAGE TOTAL 119.26 cu.m.
CUMULATIVE 170.70 cu.m.

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 508 Original Quantity : 33.900 cu.m.


Description : Handlaid Rock Embankment Revised Quantity : 33.900 cu.m.

VOLUME910mm = [ 1/2 ( 2.000 + 1.500 ) x ( 0.500 ) ] x [ ( 1.300 ) ]


VOLUME910mm = 1.140 cu.m.

VOLUME1220mm = [ 1/2 ( 2.000 + 1.500 ) x ( 0.500 ) ] x [ ( 1.600 ) ]


VOLUME1220mm = 1.400 cu.m.

VOLUME1520mm = [ 1/2 ( 2.000 + 1.500 ) x ( 0.500 ) ] x [ ( 1.900 ) ]


VOLUME1520mm = 1.660 cu.m.

Volume
STATION PIPE SIZE REMARKS
(cu.m.)
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
1 + 198.423 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+198.423, IE = 260.068

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
1 + 420.000 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+420.000, IE = 254.438

INSTALL 1-LINE 1520mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
1 + 638.945 1.66 1520mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+638.945 IE = 242.607

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
1 + 818.079 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATTION 1+818.079 IE = 251.610

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
2 + 058.998 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+058.998 IE = 256.766

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
2 + 289.120 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+289.120 IE = 254.105

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
2 + 338.178 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+338.178 IE = 253.256

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
2 + 511.858 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+511.858 IE = 261.836

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
2 + 747.488 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+747.488 IE = 261.090

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
2 + 937.363 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+937.363 IE = 239.842

PAGE TOTAL 11.92 cu.m.

CUMULATIVE 11.92 cu.m.

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 508 Original Quantity : 33.900 cu.m.


Description : Handlaid Rock Embankment Revised Quantity : 33.900 cu.m.

Volume
STATION PIPE SIZE REMARKS
(cu.m.)
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
3 + 219.129 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+219.129 IE = 227.816

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
3 + 578.929 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+578.929 IE = 197.911

INSTALL 1-LINE 910mmØ x 12.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
3 + 836.368 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+836.368 IE = 164.817

STATION 4+687.000 INSTALL 1-LINE 1520mmØ x 14.00


4 + 687.000 3.33 1520mmØ LN. M RCPC PROVIDED HEADWALL AT B/S AND DUMPED STONE PROTECTION AT B/S, IE = 120.688

STATION 4+783.492 INSTALL 1-LINE 1220mmØ x 12.00


4 + 783.492 1.40 1220mmØ LN. M RCPC PROVIDED HEADWALL AT B/S AND DUMPED STONE PROTECTION AT R/S, IE = 122.372

INSTALL 1-LINE 1520mmØ x 14.0 LN. M. RCPC PROVIDE HEADWALL AT B/S AND DUMPED STONE
4 + 960.000 3.33 1520mmØ PROTECTION AT L/S STATION 4+960.000, IE = 124.852

INSTALL 1-LINE 910mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AT L/S
3 + 977.097 1.14 910mmØ AND GROUTED RIPRAP CATCH BASIN AT R/S STATION 3+977.097 IE = 143.495

STATION 5+260.000 INSTALL 1-LINE 910mmØ x 11.00


5 + 260.000 1.14 910mmØ LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE AT R/S AND GROUTED RIPRAP CATCH
BASIN AT L/S. IE = 162.347
STATION 5+560.000 INSTALL 1-LINE 910mmØ x 13.00 LN.
5 + 560.000 1.14 910mmØ M RCPC PROVIDED HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND GROUTED RIPRAP
CATCH BASIN AT R/S. IE = 165.848

STATION 5+780.000 INSTALL 1-LINE 1220mmØ x 12.00


5 + 780.000 1.40 1220mmØ LN. M RCPC PROVIDED HEADWALL AT B/S AND DUMPED STONE AT L/S, IE = 149.117

STATION 6+040.000 INSTALL 1-LINE 910mmØ x 12.00 LN.


6 + 040.000 1.14 910mmØ M RCPC PROVIDED HEADWALL AT B/S AND DUMPED STONE AT R/S, IE = 160.795

STATION 6+260.000 INSTALL 1-LINE 910mmØ x 12.00 LN.


6 + 260.000 1.14 910mmØ M RCPC PROVIDED HEADWALL WITH AND DUMPED STONE AT L/S AND GROUTED RIPRAP CATCH
BASIN AT R/S, IE = 180.496
STATION 6+760.000 INSTALL 1-LINE 910mmØ x 12.00 LN.
6 + 760.000 1.14 910mmØ M RCPC PROVIDED HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND GROUTED RIPRAP
CATCH BASIN AT R/S, IE = 181.623
STATION 6+960.000 INSTALL 1-LINE 910mmØ x 13.00 LN.
6 + 960.000 1.14 910mmØ M RCPC PROVIDED HEADWALL WITH DUMPED STONE AT L/S AND GROUTED RIPRAP CATCH BASIN
AT R/S, IE = 174.153
STATION 7+160.000 INSTALL 1-LINE 910mmØ x 13.00 LN.
7 + 160.000 1.14 910mmØ M RCPC PROVIDED HEADWALL WITH DUMPED STONE AT L/S AND GROUTED RIPRAP CATCH BASIN
AT R/S, IE = 151.311

PAGE TOTAL 22.00 cu.m.

CUMULATIVE 33.90 cu.m.

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 603(3)a1 Original Quantity : 2,350.770 ln m


Description : Metal Guardrail (Metal Beam) including Post Revised Quantity : 2,350.770 ln m

GUARDRAILS SCHEDULE

STATION LIMITS STATION EQUATIONS TOTAL


LENGTH LOCATION
FROM TO BACK AHEAD

1 + 009.985 1 + 250.015 240.030 RIGHT SIDE

1 + 318.227 1 + 621.774 1 + 367.093 1 + 407.750 262.890 RIGHT SIDE

1 + 668.866 1 + 831.135 1 + 708.895 1 + 737.814 133.350 RIGHT SIDE

1 + 948.984 2 + 131.016 1 + 961.125 1 + 983.137 160.020 RIGHT SIDE

2 + 319.045 2 + 360.955 41.910 RIGHT SIDE

2 + 429.995 2 + 510.005 80.010 RIGHT SIDE

2 + 559.082 2 + 680.919 2 + 606.046 2 + 651.683 76.200 RIGHT SIDE

2 + 788.330 2 + 841.670 53.340 RIGHT SIDE

3 + 078.325 3 + 211.675 133.350 LEFT SIDE

4 + 019.510 4 + 240.490 220.980 RIGHT SIDE

4 + 459.552 4 + 700.449 4 + 540.148 4 + 531.928 243.840 RIGHT SIDE

4 + 634.197 4 + 639.474

4 + 019.510 4 + 240.490 220.980 LEFT SIDE

4 + 459.552 4 + 700.449 4 + 540.148 4 + 531.928 243.840 LEFT SIDE

4 + 634.197 4 + 639.474

4 + 918.330 4 + 971.670 53.340 RIGHT SIDE

4 + 918.330 4 + 971.670 53.340 LEFT SIDE

4 + 968.325 5 + 101.675 133.350 LEFT SIDE

TOTAL QUANTITY 2350.770 Ln.m

GRAND TOTAL 2350.770 Ln.m

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 603(4)b Original Quantity : 32.000 ln m


Description : Metal Beam End Piece (Bull Nose) Revised Quantity : 32.000 ln m

GUARDRAILS SCHEDULE

STATION LIMITS STATION EQUATIONS TOTAL


NO. OF
LENGTH LOCATION BULLNOSE
FROM TO BACK AHEAD

1 + 009.985 1 + 250.015 240.030 RIGHT SIDE 2

1 + 318.227 1 + 621.774 1 + 367.093 1 + 407.750 262.890 RIGHT SIDE 2

1 + 668.866 1 + 831.135 1 + 708.895 1 + 737.814 133.350 RIGHT SIDE 2

1 + 948.984 2 + 131.016 1 + 961.125 1 + 983.137 160.020 RIGHT SIDE 2

2 + 319.045 2 + 360.955 41.910 RIGHT SIDE 2

2 + 429.995 2 + 510.005 80.010 RIGHT SIDE 2

2 + 559.082 2 + 680.919 2 + 606.046 2 + 651.683 76.200 RIGHT SIDE 2

2 + 788.330 2 + 841.670 53.340 RIGHT SIDE 2

3 + 078.325 3 + 211.675 133.350 LEFT SIDE 2

4 + 019.510 4 + 240.490 220.980 RIGHT SIDE 2

4 + 459.552 4 + 700.449 4 + 540.148 4 + 531.928 243.840 RIGHT SIDE 2

4 + 634.197 4 + 639.474

4 + 019.510 4 + 240.490 220.980 LEFT SIDE 2

4 + 459.552 4 + 700.449 4 + 540.148 4 + 531.928 243.840 LEFT SIDE 2

4 + 634.197 4 + 639.474

4 + 918.330 4 + 971.670 53.340 RIGHT SIDE 2

4 + 918.330 4 + 971.670 53.340 LEFT SIDE 2

4 + 968.325 5 + 101.675 133.350 LEFT SIDE 2

TOTAL QUANTITY 32

GRAND TOTAL 32

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : ### Contractor :
Project Name :
#REF!
ULTICON BUILDERS, INC.

Item : 612(1) Original Quantity : 889.330 sq m


Description : Revised Quantity : 929.046 sq m
Reflectorized Thermoplastic Pavement markings (White)

PAVEMENT MARKINGS DETAIL


LENGTH
STATION EQUATIONS BROKEN No. of
STATION LIMITS SOLID LINES strips AREA
(W=0.15m) (sq.m.)
(3.0 x 0.15 @ 6.00)
BACK AHEAD (W=0.1m)
1 + 000.000 1 + 179.939 179.94 20.00 38.988
1 + 179.939 1 + 863.863 1 + 367.093 1 + 407.750 614.35 614.35 215.023
1 + 708.895 1 + 737.814
1 + 863.863 1 + 955.934 92.07 10.00 19.914
1 + 955.934 2 + 748.192 1 + 961.125 1 + 983.137 724.61 724.61 253.613
2 + 606.046 2 + 651.683
2 + 742.192 2 + 802.654 60.46 7.00 13.142
2 + 802.654 3 + 149.921 2 + 958.515 3 + 000.765 305.02 305.02 106.756
3 + 149.921 3 + 234.641 84.72 9.00 18.294
3 + 234.641 3 + 595.538 3 + 438.798 3 + 440.770 358.93 358.93 125.624
3 + 595.538 3 + 787.739 192.20 21.00 41.590
3 + 787.739 3 + 876.691 88.95 88.95 31.133
3 + 876.691 3 + 955.359 78.67 9.00 17.084
3 + 955.359 4 + 079.740 124.38 124.38 43.533
4 + 079.740 4 + 100.000 20.26 2.00 4.352
TOTAL QUANTITY 929.046

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. #REF!


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : ### Contractor :
Project Name :
#REF!
ULTICON BUILDERS, INC.

Item : 620(1)a1 Original Quantity : 182.000 each


Description : Chevron Signs (450mm x 600mm) Revised Quantity : 182.000 each

SCHEDULE FOR CHEVRON SIGNS

STATION LIMITS STATION EQUATIONS


NO. OF
CHEVRON LOCATION
FROM TO BACK AHEAD
1 + 151.873 1 + 300.991 5 RIGHT SIDE
1 + 459.011 1 + 563.638 7 RIGHT SIDE
1 + 592.705 1 + 707.925 8 RIGHT SIDE
1 + 757.024 1 + 867.609 8 RIGHT SIDE
1 + 974.200 2 + 066.931 6 RIGHT SIDE
2 + 110.270 2 + 225.755 8 RIGHT SIDE
2 + 282.344 2 + 389.418 7 RIGHT SIDE
2 + 430.903 2 + 524.695 6 RIGHT SIDE
2 + 514.610 2 + 625.055 8 RIGHT SIDE
2 + 664.591 2 + 747.627 5 RIGHT SIDE
2 + 796.473 2 + 898.027 7 RIGHT SIDE
2 + 888.021 3 + 024.765 10 RIGHT SIDE
3 + 030.573 3 + 102.966 5 RIGHT SIDE
3 + 084.650 3 + 160.605 5 RIGHT SIDE
3 + 230.895 3 + 328.904 7 RIGHT SIDE
3 + 377.000 3 + 464.770 6 RIGHT SIDE
3 + 450.359 3 + 532.780 5 RIGHT SIDE
3 + 515.609 3 + 606.365 6 RIGHT SIDE
3 + 761.753 3 + 902.677 4 RIGHT SIDE
3 + 927.293 4 + 107.806 6 RIGHT SIDE
4 + 101.417 4 + 276.649 3 RIGHT SIDE
4 + 388.033 4 + 501.163 8 RIGHT SIDE
4 + 548.199 4 + 663.474 8 RIGHT SIDE
4 + 700.086 4 + 799.254 7 RIGHT SIDE
4 + 843.368 4 + 926.674 5 RIGHT SIDE
5 + 230.878 5 + 394.807 5 RIGHT SIDE
5 + 395.620 5 + 553.428 5 RIGHT SIDE
5 + 519.144 5 + 613.266 6 RIGHT SIDE
5 + 599.885 5 + 867.716 6 RIGHT SIDE
TOTAL QUANTITY 182 each

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 622(2)c Original Quantity : 2,691.00 ln m


Description : Coco-Logs / Fascine Revised Quantity : 2,020.99 ln m

NO. OF TOTAL LENGTH OF


INCLUSIVE STATION Distance COCO LOGS COCO-LOGS REMARKS
(m)
(ln.m.)
(pcs)
1+110.366 TO 1+188.348
0001 + 110.366 3.00 RIGHT SIDE
30.391 106.37
0001 + 140.757 4.00 RIGHT SIDE
18.639 46.60
0001 + 159.396 1.00 RIGHT SIDE
28.952 43.43
0001 + 188.348 2.00 RIGHT SIDE
SUB-TOTAL 196.40

2+397.387 TO 2+560.378
0002 + 397.387 5.00 LEFT SIDE
30.273 181.64
0002 + 427.660 7.00 LEFT SIDE
20.458 122.75
0002 + 448.118 5.00 LEFT SIDE
21.898 76.64
0002 + 470.016 2.00 LEFT SIDE
21.796 32.69
0002 + 491.812 1.00 LEFT SIDE
20.046 20.05
0002 + 511.858 1.00 LEFT SIDE
20.000 40.00
0002 + 531.858 3.00 LEFT SIDE
28.520 85.56
0002 + 560.378 3.00 LEFT SIDE
SUB-TOTAL 559.33
TOTAL THIS PAGE 755.73

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. #REF!


Contractor Project Engineer - DPWH

Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.

Item : 622(2) Original Quantity : 2,691.00 ln.m.


Description : Coco-Logs/Fascine Revised Quantity : 2,020.99 ln.m.

Page 67 of 105
Page 68 of 105
NO. OF
Distance COCO LOGS TOTAL LENGTH OF
INCLUSIVE STATION COCO-LOGS REMARKS
(m) (ln.m.)
(pcs)
3+308.092 TO 3+450.000
0003 + 308.092 3.00 RIGHT SIDE
30.973 77.43
0003 + 339.065 2.00 RIGHT SIDE
19.993 49.98
0003 + 359.058 3.00 RIGHT SIDE
19.870 59.61
0003 + 378.928 3.00 RIGHT SIDE
20.014 70.05
0003 + 398.942 4.00 RIGHT SIDE
19.563 68.47
0003 + 418.505 3.00 RIGHT SIDE
31.495 78.74
0003 + 450.000 2.00 RIGHT SIDE
SUB-TOTAL 404.28
3+748.633 TO 3+809.460
0003 + 748.633 2.00 LEFT SIDE
60.827 182.48
0003 + 778.089 4.00 LEFT SIDE
31.371 62.74
0003 + 809.460 4.00 LEFT SIDE
SUB-TOTAL 245.22
3+768.089 TO 3+899.436
0003 + 778.089 4.00 RIGHT SIDE
21.371 96.17
0003 + 799.460 4.00 RIGHT SIDE
19.786 39.57
0003 + 819.246 3.00 RIGHT SIDE
17.122 25.68
0003 + 836.368 3.00 RIGHT SIDE
21.761 32.64
0003 + 858.129 6.00 RIGHT SIDE
21.176 63.53
0003 + 879.305 6.00 RIGHT SIDE
20.131 60.39
0003 + 899.436 5.00 RIGHT SIDE
SUB-TOTAL 317.98
3+848.129 TO 3+899.436
0003 + 848.129 6.00 LEFT SIDE
31.176 187.06
0003 + 879.305 6.00 LEFT SIDE
20.131 110.72
0003 + 899.436 5.00 LEFT SIDE
SUB-TOTAL 297.78
TOTAL THIS PAGE 1,265.26

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. #REF!


Contractor Project Engineer - DPWH

Page 69 of 105
DRAINAGE SCHEDULE
103(1)a 103(3) 103(6)a 404(1)a 405(1)a3 500(1)b3 500(1)b5 505(1)b6 505(2)a 506(1) 508(1) 622(2)c 622(3)b DESIGN PARAMETERS
STATION DESCRIPTION REMARKS
cu.m. cu.m. cu.m. kgs. cu.m. cu.m. ln.m. ln.m. ln.m. ln.m. cu.m. cu.m. cu.m. Q(cu.m./s.) A(has.) v(m/s)

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
0001 + 198.423 GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+198.423, IE
1.53 11.02 10.00 41.67 3.98 1.14 2.285 5.947 3.514
= 260.068

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
0001 + 420.000 GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+420.000, IE
1.64 42.45 11.00 14.90 3.98 1.14 2.285 5.947 3.514
= 254.438

INSTALL 1-LINE 1520mmØ x 13.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
0001 + 638.945 GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+638.945 IE =
3.09 86.38 13.00 28.00 11.62 1.66 8.975 5.976 4.946
242.607

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
0001 + 818.079 GROUTED RIPRAP CATCH BASIN AT L/S STATTION 1+818.079 IE
1.53 6.52 10.00 27.43 3.98 1.14 2.285 6.016 3.514
= 251.610

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
0002 + 058.998 GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+058.998 IE =
1.64 21.40 11.00 29.10 3.98 1.14 2.285 4.367 3.514
256.766

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
0002 + 289.120 GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+289.120 IE =
1.64 33.60 11.00 14.90 3.98 1.14 2.285 2.760 3.514
254.105

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
0002 + 338.178 GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+338.178 IE =
1.53 20.87 10.00 14.90 3.98 1.14 2.285 5.049 3.514
253.256

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
0002 + 511.858 GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+511.858 IE =
1.53 38.94 10.00 14.90 3.98 1.14 2.285 5.329 3.514
261.836

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
0002 + 747.488 GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+747.488 IE =
1.64 85.52 11.00 14.90 3.98 1.14 2.285 5.305 3.514
261.090

INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
0002 + 937.363 GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+937.363 IE =
1.53 13.62 10.00 41.09 3.98 1.14 2.285 6.070 3.514
239.842

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
0003 + 219.129 GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+219.129 IE =
1.64 51.77 11.00 14.90 3.98 1.14 2.285 2.505 3.514
227.816

INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
0003 + 578.929 GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+578.929 IE =
1.64 35.34 11.00 14.90 3.98 1.14 2.285 5.849 3.514
197.911

INSTALL 1-LINE 910mmØ x 12.0 LN. M. RCPC PROVIDE


HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
0003 + 836.368 GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+836.368 IE =
1.75 97.32 12.00 14.90 3.98 1.14 2.285 5.913 3.514
164.817

STATION 4+098.113
0004 + 098.113 INSTALL 1 - 3.0m x 3.0m x 13.0 LN. M W/WINGWALL 27.00 12.75 8.06 5848.00 88.00 26.833 65.436 2.981
ON BOTHSIDES. PROVIDED WINGWALL AT B/S. IE = 123.258

STATION 4+580.032
0004 + 580.032 INSTALL 1 - 1.8m x 1.8m x 10.00 LN. M W/WINGWALL 41.25 12.71 20.76 2255.00 33.00 6.872 17.600 2.121
ON BOTHSIDES. PROVIDED WINGWALL AT B/S. IE = 120.437

STATION 4+687.000
INSTALL 1-LINE 1520mmØ x 14.00 LN. M RCPC PROVIDED
0004 + 687.000 HEADWALL AT B/S AND DUMPED STONE PROTECTION AT B/S,
4.04 6.27 14.00 23.24 3.33 8.975 3.313 4.946
IE = 120.688
STATION 4+783.492
INSTALL 1-LINE 1220mmØ x 12.00 LN. M RCPC PROVIDED
0004 + 783.492 HEADWALL AT B/S AND DUMPED STONE PROTECTION AT R/S,
2.74 122.34 11.00 14.50 1.40 4.994 2.988 4.272
IE = 122.372
INSTALL 1-LINE 1520mmØ x 14.0 LN. M. RCPC PROVIDE
0004 + 960.000 HEADWALL AT B/S AND DUMPED STONE PROTECTION AT L/S 4.04 33.50 14.00 23.24 3.33 8.975 12.291 4.946
STATION 4+960.000, IE = 124.852

INSTALL 1-LINE 910mmØ x 13.0 LN. M. RCPC PROVIDE


0003 + 977.097 HEADWALL WITH DUMPED STONE AT L/S AND GROUTED RIPRAP 1.86 59.30 13.00 14.90 3.98 1.14 2.285 4.358 3.514
CATCH BASIN AT R/S STATION 3+977.097 IE = 143.495

STATION 5+260.000
INSTALL 1-LINE 910mmØ x 11.00 LN. M RCPC
0005 + 260.000 PROVIDED HEADWALL WITH DUMPED STONE AT R/S AND
1.75 38.83 12.00 14.90 3.98 1.14 2.285 3.716 3.514
GROUTED RIPRAP CATCH BASIN AT L/S. IE = 162.347

STATION 5+560.000
INSTALL 1-LINE 910mmØ x 13.00 LN. M RCPC PROVIDED
0005 + 560.000 HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND
1.86 116.97 13.00 14.90 3.98 1.14 2.285 5.575 3.514
GROUTED RIPRAP CATCH BASIN AT R/S. IE = 165.848

STATION 5+780.000
0005 + 780.000 INSTALL 1-LINE 1220mmØ x 12.00 LN. M RCPC PROVIDED 2.88 76.71 12.00 14.50 1.40 4.994 12.466 4.272
HEADWALL AT B/S AND DUMPED STONE AT L/S, IE = 149.117

STATION 6+040.000
0006 + 040.000 INSTALL 1-LINE 910mmØ x 12.00 LN. M RCPC PROVIDED 2.15 58.55 12.00 7.96 1.14 2.285 6.153 3.514
HEADWALL AT B/S AND DUMPED STONE AT R/S, IE = 160.795

STATION 6+260.000
INSTALL 1-LINE 910mmØ x 12.00 LN. M RCPC PROVIDED
0006 + 260.000 HEADWALL WITH AND DUMPED STONE AT L/S AND GROUTED
1.75 120.26 12.00 14.90 3.98 1.14 2.285 5.035 3.514
RIPRAP CATCH BASIN AT R/S, IE = 180.496

STATION 6+760.000
INSTALL 1-LINE 910mmØ x 12.00 LN. M RCPC PROVIDED
0006 + 760.000 HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND
1.75 48.52 12.00 14.90 3.98 1.14 2.285 6.291 3.514
GROUTED RIPRAP CATCH BASIN AT R/S, IE = 181.623

STATION 6+960.000
INSTALL 1-LINE 910mmØ x 13.00 LN. M RCPC PROVIDED
0006 + 960.000 HEADWALL WITH DUMPED STONE AT L/S AND GROUTED RIPRAP
1.86 66.14 13.00 14.90 3.98 1.14 2.285 5.994 3.514
CATCH BASIN AT R/S, IE = 174.153

STATION 7+160.000
INSTALL 1-LINE 910mmØ x 13.00 LN. M RCPC PROVIDED
0007 + 160.000 HEADWALL WITH DUMPED STONE AT L/S AND GROUTED
1.86 102.78 13.00 14.90 3.98 1.14 2.285 5.952 3.514
RIPRAP CATCH BASIN AT R/S, IE = 151.311

3+300.122 TO 3+577.429 277.31 LN. M GROUTED RIPRAP LINED CANAL 232.94 RIGHT SIDE 1.529 4.936 4.217

3+580.429 TO 3+834.868 254.44 LN. M GROUTED RIPRAP LINED CANAL 213.73 RIGHT SIDE 1.538 5.038 4.242

3+837.868 TO 3+899.436 61.57 LN. M GROUTED RIPRAP LINED CANAL 51.72 RIGHT SIDE 1.529 5.768 4.217

3+300.122 TO 3+577.429 277.31 LN. M GROUTED RIPRAP LINED CANAL 232.94 LEFT SIDE 1.529 5.768 4.217

3+837.868 TO 3+899.436 61.57 LN. M GROUTED RIPRAP LINED CANAL 51.75 LEFT SIDE 1.160 1.281 3.201

3+738.624 TO 3+834.868 96.24 LN. M GROUTED RIPRAP LINED CANAL 80.84 LEFT SIDE 1.538 2.483 4.242

2+748.988 TO 2+935.863 186.88 LN. M GROUTED RIPRAP LINED CANAL 156.98 LEFT SIDE 0.802 2.579 2.212

1+110.366 TO 1+188.348 COCO LOG 184.68 1,195.66 RIGHT SIDE

2+397.387 TO 2+560.378 COCO LOG 543.26 2,786.04 LEFT SIDE

3+308.092 TO 3+450.000 COCO LOG 395.29 1,758.68 RIGHT SIDE

3+748.633 TO 3+809.460 COCO LOG 111.65 550.62 LEFT SIDE

3+768.089 TO 3+899.436 COCO LOG 332.88 1,555.40 RIGHT SIDE

3+848.129 TO 3+899.436 COCO LOG 184.68 1,195.66 LEFT SIDE

TOTAL QUANTITY 68.25 76.33 1,423.74 8,103.00 121.00 228.00 23.00 41.00 1,411.69 170.68 33.92 1,752.44 9,042.06

3+300.122 TO 3+577.429 68.00 76.33 1,423.74 8,103.00 121.00 228.00 23.00 41.00 1,412.00 171.00 34.00 1,752.00 9,042.00

2690.99 13586.78
Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. Project Engineer


Contractor Project Engineer - DPWH
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE REGIONAL DIRECTOR
Region XI, Davao City

Project ID : 17L0-0191
Project Name :
Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte

Contractor : ULTICON BUILDERS, INC.


ITEMIZED COST OF REVISION
VARIATION ORDER NO. 1
Unit Price
Original VARIANCE REVISED CONTRACT
Item Original
Contract AS-STAKED AMOUNT DUE TO
Description Unit in Contract AMOUNT REMARKS
No. QUANTITY V.O. # 1
Cost QUANTITY
Quantity POSITVE NEGATIVE (AS-STAKED)
Pesos
Part A - Facilities for the Engineers
A.1.1(3) Camphouse w/ 2 CR for Female and Male ls 1.00 196,425.69 196,425.69 1.00 - 196,425.69
Vehicle for the Engineer (based on DO 3 s 2010) 4 x 4 pick up 2500 CC M/T diesel w/ aircon, month 9.00 111,384.00 1,002,456.00 9.00 - 1,002,456.00
A.1.1(5)
stereo, megawheels, stepboard, bed liner, GPS, rustproof
Assistance to the Engineer month 9.00 17,627.96 158,651.64 9.00 158,651.64
A.1.1(16)
A. Operations & Maintenance of Field Office for the Engineer -
Part B - Other General Requirements
B.4(1) ### Construction Survey and Staking km 6.00 21,955.50 131,733.00 6.00 - 131,733.00
B.5 ### Project Billboard each 2.00 4,737.60 9,475.20 2.00 - 9,475.20
B.7 ### Construction Safety & Health month 9.00 23,436.00 210,924.00 9.00 - 210,924.00
B.8 ### Traffic Management month 9.00 19,362.00 174,258.00 9.00 - 174,258.00
B.9 ### Mobilization & Demobilization ls 1.00 351,798.09 351,798.09 1.00 - 351,798.09
Part C - Earthworks
100(1) Clearing & Grubbing ha 6.12 142,923.53 874,692.00 6.17 0.05 881,838.18
102(2) Surplus Common Excavation cu m 118,714.00 311.08 36,929,551.12 149,896.53 31,182.53 46,629,812.55
102(3)a Surplus Rock Excavation (Rippable) cu m 38,425.00 504.68 19,392,329.00 38,425.00 - 19,392,329.00
103(1)a Sructural Excavation (Common Soil) cu m 68.30 338.96 23,150.97 68.30 - 23,150.97
103(3) Foundation Fill cu m 76.30 2,141.01 163,359.06 76.30 - 163,359.06
103(6)a Pipe Culvert and Drain Excavation cu m 1,423.70 310.22 441,660.21 1,423.70 - 441,660.21
104(1)a Embankment (from Excavation) cu m 29,287.00 423.84 12,413,002.08 30,712.20 1,425.20 13,017,058.85
105(1)a Subgrade Preparation sq m 39,821.17 19.50 776,512.82 39,946.45 125.28 778,955.78
Part D: Subbase and Base Course
200(1) Aggregate Subbase Course cu m 11,310.00 2,045.77 23,137,658.70 11,380.26 70.26 23,281,394.50
Part E: Surface Course
311(1)c1 PCC Pavement (Unreinforced), 200mm THK. sq m 13,592.77 1,979.58 26,907,975.64 12,624.06 (968.71) 24,990,336.69
Part F. Drainage Construction (Box Culvert)
404(1)a Reinforcing Steel, Grade 40 cu m 8,103.00 76.64 621,013.92 8,103.00 - 621,013.92
405(1)a3 Structural Concrete, Class A sq m 121.00 12,407.96 1,501,363.16 121.00 - 1,501,363.16
Part G - Drainage and Slope Protection Structure
500(1)b3 Pipe Culverts, 910mm ø, Class IV ln m 228.00 8,207.20 1,871,241.60 228.00 - 1,871,241.60
500(1)b5 Pipe Culverts, 1220mm ø, Class IV ln m 23.00 13,576.99 312,270.77 23.00 - 312,270.77
505(1)b6 Pipe Culverts, 1520mm ø, Class IV ln m 41.00 18,670.86 765,505.26 41.00 - 765,505.26
505(2)a Grouted Riprap, Class “A” cu m 1,411.70 4,201.01 5,930,565.82 1,484.60 72.90 6,236,819.45
506(1) Stone Masonry cu m 170.70 5,660.77 966,293.44 170.70 - 966,293.44
508(1) HandLaid Rock Embankment cu m 33.90 2,276.55 77,175.05 33.90 - 77,175.05
Part H - Miscellaneous Structures
603(3)a1 Metal Guardrail (Metal Beam) including Post ln m 2,350.77 2,987.55 7,023,042.91 2,350.77 - 7,023,042.91
603(4)b Metal Beam End Piece (Bull Nose) each 32.00 21,097.13 675,108.16 32.00 - 675,108.16
612(1) Reflectorized Thermoplastic Pavement markings (White) sq m 889.33 897.75 798,396.01 929.05 39.72 834,051.14
620(1)a1 Chevron Signs (450mm x 600mm) each 182.00 12,294.00 2,237,508.00 182.00 - 2,237,508.00
622(2)c Coco-Logs / Fascine ln m 2,691.00 502.90 1,353,303.90 2,020.99 (670.01) 1,016,355.87
622(3)b Vegetation sq m 13,586.80 162.98 2,214,376.66 8,494.29 (5,092.51) 1,384,399.38

TOTAL 149,642,777.88 - - 157,357,765.52


Original Contract Amount : Php 149,642,777.88
Variation Order No. 1 Amount (As-staked) : Php 157,357,765.52
Difference in cost this V.O. # 1 from Original Contract : Php 7,714,987.64
Percent Cost of Change from Original Contract Amount : 0.05
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

START OF S1 AND
0001+000.000 - 6.870 - - 9.700 2.540 -
CONCRETING

20.000 - - 6.120 122.400 - - - - 6.610 132.200 6.290 125.800 2.540 50.800 - -

0001+020.000 - 5.370 - 13.220 2.880 2.540 -

20.000 - - 2.690 53.800 - - - - 28.420 568.400 1.440 28.800 2.540 50.800 - -

0001+040.000 - - - - 43.610 - 2.540 -

20.000 - - - - - - - - 70.430 1,408.600 - - 2.540 50.800 - -

0001+060.000 - - - - 97.240 - 2.540 -

20.000 - - - - - - - - 52.100 1,042.000 - - 2.540 50.800 - -

0001+080.000 - - - - 6.950 - 2.540 -

20.005 2.200 44.010 4.720 94.420 - - - - 3.480 69.620 4.850 97.020 2.540 50.810 - -

0001+100.005 4.390 9.430 - - - - 9.700 2.540 -

20.361 2.200 44.790 13.680 278.540 - - - - 16.030 326.390 8.880 180.810 2.540 51.720 - -

0001+120.366 - 17.920 - - - 32.050 8.060 2.540 -

20.391 2.620 53.420 15.960 325.440 - - - - 52.540 1,071.340 6.870 140.090 2.540 51.790 - -

0001+140.757 5.230 13.990 - - - 73.030 5.670 2.540 -

18.639 7.670 142.960 20.380 379.860 - - - - 37.080 691.130 7.380 137.560 2.540 47.340 - -

0001+159.396 10.100 26.770 - - - 1.120 9.090 2.540 -

18.952 6.830 129.440 17.860 338.480 - - - - 22.450 425.470 5.970 113.140 2.560 48.520 - -

0001+178.348 3.550 8.950 - - - 43.780 2.840 2.580 -

20.075 3.330 66.850 8.350 167.630 - - - - 47.460 952.760 2.470 49.590 2.560 51.390 - -

0001+198.423 3.110 7.740 - - - 51.140 2.100 2.540 -

20.033 5.680 113.790 20.890 418.490 - - - - 30.910 619.220 5.250 105.170 2.550 51.080 - -

0001+218.456 8.250 34.040 - - 10.680 8.400 2.550 -

9.348 6.880 64.310 28.280 264.360 - - - - 5.370 50.200 8.540 79.830 2.550 23.840 - -

0001+227.804 5.510 22.510 - 0.060 8.680 2.550 -

5.119 6.320 32.350 41.860 214.280 - - - - 0.030 0.150 9.210 47.150 2.550 13.050 - -

0001+232.923 7.120 61.200 - - - 9.740 2.550 -

37.028 19.010 703.900 201.060 7,444.850 - - - - - - 9.720 359.910 2.550 94.420 - -

0001+269.951 30.900 340.920 - - - 9.700 2.540 -

17.149 27.350 469.030 268.580 4,605.880 - - - - - - 9.700 166.350 2.540 43.560 - -

0001+287.100 23.790 196.240 - - - 9.700 2.540 -

28.004 20.710 579.960 138.260 3,871.830 - - - - - - 9.700 271.640 2.540 71.130 - -

0001+315.104 17.630 80.270 - - - 9.700 2.540 -

TOTAL THIS PAGE 2,444.810 18,580.260 - - 7,357.480 1,902.860 801.850 -

CUMULATIVE 2,444.810 18,580.260 - - 7,357.480 1,902.860 801.850 -

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH

Page 75 of 105
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0001+315.104 17.630 80.270 - - - 9.700 2.540 -

23.686 12.960 306.970 48.550 1,149.960 - - - - - - 9.710 229.990 2.540 60.160 - -

0001+338.790 8.290 16.820 - - - 9.710 2.540 -

20.56 4.150 85.320 9.860 202.710 - - - - 0.520 10.690 6.330 130.140 2.550 52.430 - -

0001+359.349 - 2.890 - - 1.040 2.950 2.550 -

7.74 - - 5.040 39.030 - - - - 0.520 4.030 6.330 49.020 1.280 9.910 - -

0001+367.093 BK - 7.190 - - - 9.700 - -

EQUATION -40.657

0001+407.750 AH - 2.890 - - 1.040 2.950 2.550 -

12.25 - - 5.040 61.740 - - - - 0.520 6.370 6.330 77.540 1.280 15.680 - -

0001+420.000 - 7.190 - - - 9.700 - -

20.00 2.640 52.800 6.720 134.400 - - - - 0.050 1.000 8.650 173.000 1.220 24.400 - -

0001+440.000 5.280 6.240 - - 0.100 7.590 2.440 -

20.000 4.710 94.200 6.960 139.200 - - - - 0.100 2.000 7.680 153.600 2.490 49.800 - -

0001+460.000 4.140 7.680 - - 0.100 7.760 2.540 -

20.815 2.070 43.090 6.730 140.080 - - - - 0.130 2.710 8.230 171.310 2.490 51.830 - -

0001+480.815 - 5.780 - - 0.160 8.700 2.440 -

22.892 - - 3.520 80.580 - - - - 11.830 270.810 4.350 99.580 2.500 57.230 - -

0001+503.707 - 1.260 - - 23.490 - 2.550 -

20.137 8.160 164.320 33.720 679.020 - - - - 11.750 236.610 4.870 98.070 2.550 51.350 - -

0001+523.844 16.310 66.180 - - - 9.740 2.550 -

21.756 12.650 275.210 43.190 939.640 - - - - - - 9.720 211.470 2.550 55.480 - -

0001+545.600 8.980 20.190 - - - 9.700 2.540 -

22.9 12.100 276.650 45.580 1,042.140 - - - - - - 9.700 221.780 2.540 58.070 - -

0001+568.464 15.220 70.960 - - - 9.700 2.540 -

22.865 19.670 449.750 144.490 3,303.760 - - - - - - 9.700 221.790 2.540 58.080 - -

0001+591.329 24.120 218.020 - - - 9.700 2.540 -

23.158 18.580 430.280 124.180 2,875.760 - - - - - - 9.720 225.100 2.550 59.050 - -

0001+614.487 13.030 30.330 - - - 9.730 2.550 -

24.458 6.520 159.470 15.170 371.030 - - - - 13.500 330.180 4.870 119.110 2.560 62.610 - -

0001+638.945 - - - - 26.990 - 2.560 -

11.286 6.870 77.530 9.730 109.810 - - - - 13.500 152.360 4.880 55.080 2.560 28.890 - -

0001+650.231 13.740 19.460 - - - 9.750 2.560 -

TOTAL THIS PAGE 2,415.590 11,268.860 - - 1,016.760 2,236.580 694.970 -

CUMULATIVE 4,860.400 29,849.120 - - 8,374.240 4,139.440 1,496.820 -

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH

Page 76 of 105
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0001+650.231 13.740 19.460 - - - 9.750 2.560 -

20.235 16.370 331.250 82.980 1,679.100 - - - - - - 9.760 197.490 2.560 51.800 - -

0001+670.466 19.000 146.500 - - - 9.760 2.560 -

18.928 9.500 179.820 74.980 1,419.220 - - - - 4.830 91.420 5.350 101.260 2.560 48.460 - -

0001+689.394 - 3.450 - - 9.660 0.940 2.550 -

19.501 - - 2.280 44.460 - - - - 9.140 178.240 0.870 16.970 2.550 49.730 - -

0001+708.895 BK - 1.110 - - 8.620 0.790 2.540 -

EQUATION -28.919

0001+737.814 AH - 3.450 - - 9.660 0.940 2.550 -

2.186 - - 2.280 4.980 - - - - 9.140 19.980 0.870 1.900 2.550 5.570 - -

0001+740.000 - 1.110 - - 8.620 0.790 2.540 -

20.000 1.790 35.800 4.170 83.400 - - - - 4.840 96.800 2.960 59.200 2.520 50.400 - -

0001+760.000 3.570 7.230 - - 1.060 5.130 2.490 -

20.000 1.790 35.800 6.370 127.400 - - - - 1.570 31.400 7.170 143.400 2.520 50.400 - -

0001+780.000 - 5.510 - - 2.080 9.200 2.550 -

20.247 4.510 91.310 13.030 263.820 - - - - 1.040 21.060 9.470 191.740 2.550 51.630 - -

0001+800.247 9.010 20.540 - - - 9.740 2.550 -

17.832 4.510 80.420 13.330 237.700 - - - - 14.110 251.610 6.590 117.510 2.550 45.470 - -

0001+818.079 - 6.120 - 28.220 3.440 2.550 -

25.530 6.660 170.030 28.260 721.480 - - - - 14.110 360.230 6.590 168.240 2.550 65.100 - -

0001+843.609 13.310 50.400 - - - 9.730 2.550 -

18.877 14.810 279.570 64.570 1,218.890 - - - - - - 9.720 183.480 2.550 48.140 - -

0001+862.486 16.300 78.740 - - - 9.700 2.540 -

20.400 16.800 342.720 77.120 1,573.250 - - - - - - 9.700 197.880 2.540 51.820 - -

0001+882.886 17.290 75.490 - - - 9.700 2.540 -

14.301 18.640 266.570 98.120 1,403.210 - - - - - - 9.700 138.720 2.540 36.320 - -

0001+897.187 19.990 120.750 - - - 9.700 2.540 -

19.260 18.550 357.270 82.850 1,595.690 - - - - - - 9.700 186.820 2.540 48.920 - -

0001+916.447 17.110 44.950 - - - 9.700 2.540 -

20.905 12.990 271.560 22.480 469.940 - - - - - - 9.700 202.780 2.540 53.100 - -

0001+937.352 8.860 - - - - 9.700 2.540 -

20.636 6.660 137.440 4.140 85.430 - - - - 0.730 15.060 6.510 134.340 2.540 52.420 - -

0001+957.988 4.450 8.280 - - 1.450 3.310 2.540 -

TOTAL THIS PAGE 2,579.560 10,927.970 - - 1,065.800 2,041.730 709.280 -

CUMULATIVE 7,439.960 40,777.090 - - 9,440.040 6,181.170 2,206.100 -

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.

Page 77 of 105
Contractor Project Engineer - DPWH

QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0001+957.988 4.450 8.280 - - 1.450 3.310 2.540 -

3.137 4.310 13.520 8.230 25.820 - - - - 2.300 7.220 2.670 8.380 2.520 7.910 - -

0001+961.125 BK 4.160 8.170 - - 3.140 2.020 2.490 -

EQUATION -22.012

0001+983.137 AH 4.450 8.280 - - 1.450 3.310 2.540 -

16.864 4.310 72.680 8.230 138.790 - - - - 2.300 38.790 2.670 45.030 2.520 42.500 - -

0002+000.001 4.160 8.170 - - 3.140 2.020 2.490 -

19.452 7.670 149.200 20.660 401.880 - - - - 1.830 35.600 3.530 68.670 2.520 49.020 - -

0002+019.453 11.180 33.150 - - 0.520 5.040 2.550 -

19.522 8.280 161.640 21.360 416.990 - - - - 0.580 11.320 5.170 100.930 2.550 49.780 - -

0002+038.975 5.370 9.560 - - 0.640 5.290 2.550 -

20.023 2.690 53.860 7.760 155.380 - - - - 17.000 340.390 3.110 62.270 2.550 51.060 - -

0002+058.998 - 5.960 - - 33.350 0.920 2.540 -

19.841 2.470 49.010 7.080 140.470 - - - - 16.960 336.500 3.430 68.050 2.540 50.400 - -

0002+078.839 4.940 8.190 - - 0.570 5.930 2.540 -

20.172 5.710 115.180 12.130 244.690 - - - - 0.290 5.850 7.820 157.750 2.540 51.240 - -

0002+099.011 6.470 16.060 - - - 9.700 2.540 -

20.001 7.330 146.610 19.690 393.820 - - - - - - 9.700 194.010 2.540 50.800 - -

0002+119.012 8.190 23.310 - - - 9.700 2.540 -

20.016 7.190 143.920 28.200 564.450 - - - - - - 9.720 194.560 2.550 51.040 - -

0002+139.028 6.180 33.080 - - - 9.730 2.550 -

17.610 12.070 212.550 74.760 1,316.520 - - - - - - 9.740 171.520 2.560 45.080 - -

0002+156.638 17.950 116.430 - - - 9.740 2.560 -

15.178 18.820 285.650 115.130 1,747.440 - - - - - - 9.740 147.830 2.560 38.860 - -

0002+171.816 19.680 113.830 - - - 9.740 2.560 -

17.398 14.140 246.010 77.080 1,341.040 - - - - - - 9.740 169.460 2.560 44.540 - -

0002+189.214 8.590 40.320 - - - 9.740 2.560 -

19.867 8.110 161.120 39.050 775.810 - - - - - - 9.720 193.110 2.550 50.660 - -

0002+209.081 7.620 37.780 - - - 9.690 2.540 -

20.016 6.570 131.510 35.760 715.770 - - - - - - 9.700 194.160 2.540 50.840 - -

0002+229.097 5.520 33.740 - - - 9.700 2.540 -

20.015 6.880 137.700 42.730 855.240 - - - - - - 9.700 194.150 2.540 50.840 - -

0002+249.112 8.230 51.710 - - - 9.700 2.540 -

TOTAL THIS PAGE 2,080.160 9,234.110 - - 775.670 1,969.880 684.570 -

CUMULATIVE 9,520.120 50,011.200 - - 10,215.710 8,151.050 2,890.670 -

Submitted by: Checked and Verified by:

Page 78 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH

QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0002+249.112 8.230 51.710 - - - 9.700 2.540 -

19.019 11.170 212.440 73.080 1,389.910 - - - - - - 9.700 184.480 2.540 48.310 - -

0002+268.131 14.110 94.450 - - - 9.700 2.540 -

20.989 11.930 250.400 62.780 1,317.690 - - - - - - 9.700 203.590 2.540 53.310 - -

0002+289.120 9.740 31.110 - - - 9.700 2.540 -

26.002 13.020 338.550 44.580 1,159.170 - - - - - - 9.720 252.740 2.550 66.310 - -

0002+315.122 16.300 58.050 - - - 9.730 2.550 -

15.064 15.120 227.770 44.950 677.130 - - - - - - 9.740 146.720 2.550 38.410 - -

0002+330.186 13.940 31.850 - - - 9.740 2.550 -

7.992 11.230 89.750 26.910 215.060 - - - - - - 9.740 77.840 2.550 20.380 - -

0002+338.178 8.510 21.960 - - - 9.740 2.550 -

15.132 10.420 157.680 20.600 311.720 - - - - 3.020 45.700 9.290 140.580 2.560 38.740 - -

0002+353.310 12.330 19.230 - - 6.030 8.840 2.560 -

21.926 11.730 257.190 30.650 672.030 - - - - 3.020 66.220 9.270 203.250 2.550 55.910 - -

0002+375.236 11.130 42.070 - - - 9.690 2.540 -

21.163 13.640 288.660 54.620 1,155.920 - - - - - - 9.700 205.280 2.540 53.750 - -

0002+396.399 16.150 67.160 - - - 9.700 2.540 -

10.988 20.150 221.410 158.470 1,741.270 - - - - - - 9.700 106.580 2.540 27.910 - -

0002+407.387 24.140 249.780 - - - 9.700 2.540 -

20.273 26.080 528.720 266.110 5,394.850 - - - - - - 9.700 196.650 2.540 51.490 - -

0002+427.660 28.010 282.430 - - - 9.700 2.540 -

20.458 24.430 499.790 231.760 4,741.350 - - - - 0.130 2.660 8.940 182.890 2.540 51.960 - -

0002+448.118 20.850 181.080 - - 0.260 8.180 2.540 -

21.898 14.430 315.990 101.160 2,215.200 - - - - 2.000 43.800 5.720 125.260 2.550 55.840 - -

0002+470.016 8.010 21.240 - - 3.740 3.250 2.550 -

21.796 8.370 182.430 22.740 495.640 - - - - 1.870 40.760 6.100 132.960 2.550 55.580 - -

0002+491.812 8.720 24.230 - - - 8.940 2.550 -

20.046 9.770 195.850 36.370 729.070 - - - - - - 9.310 186.630 2.550 51.120 - -

0002+511.858 10.820 48.510 - - - 9.680 2.540 -

20.000 15.340 306.800 70.660 1,413.200 - - - - - - 9.690 193.800 2.540 50.800 - -

0002+531.858 19.860 92.800 - - - 9.700 2.540 -

18.520 14.900 275.950 72.240 1,337.880 - - - - - - 9.730 180.200 2.550 47.230 - -

0002+550.378 9.940 51.680 - - - 9.750 2.560 -

TOTAL THIS PAGE 4,349.380 24,967.090 - - 199.140 2,719.450 767.050 -

CUMULATIVE 13,869.500 74,978.290 - - 10,414.850 10,870.500 3,657.720 -

Submitted by: Checked and Verified by:

Page 79 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH

QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume P Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0002+550.378 9.940 51.680 - - - 9.750 2.560 -

21.435 11.690 250.580 32.720 701.350 - - - - - - 9.740 208.780 2.560 54.870 - -

0002+571.813 13.430 13.760 - - - 9.730 2.550 -

22.093 13.390 295.830 13.380 295.600 - - - - - - 9.740 215.190 2.550 56.340 - -

0002+593.906 13.350 12.990 - - - 9.740 2.550 -

12.140 10.720 130.140 19.600 237.940 - - - - - - 9.710 117.880 2.550 30.960 - -

0002+606.046 BK 8.080 26.210 - - - 9.680 2.540 -

EQUATION -45.637

0002+651.683 AH 13.350 12.990 - - - 9.740 2.550 -

8.317 10.720 89.160 19.600 163.010 - - - - - - 9.710 80.760 2.550 21.210 - -

0002+660.000 8.080 26.210 - - - 9.680 2.540 -

20.000 7.280 145.600 23.520 470.400 - - - - 9.230 184.600 9.210 184.200 2.540 50.800 - -

0002+680.000 6.470 20.830 - - 18.450 8.740 2.540 -

20.939 10.230 214.210 61.750 1,292.980 - - - - 9.230 193.270 9.240 193.480 2.550 53.390 - -

0002+700.939 13.990 102.660 - - - 9.740 2.560 -

21.229 17.470 370.870 51.330 1,089.680 48.720 1,034.280 - - - - 9.740 206.770 2.560 54.350 - -

0002+722.168 20.940 - 97.440 - - 9.730 2.550 -

25.320 18.230 461.580 13.360 338.280 48.720 1,233.590 - - - - 9.720 246.110 2.550 64.570 - -

0002+747.488 15.520 26.720 - - - 9.700 2.540 -

18.582 15.330 284.860 41.130 764.280 - - - - - - 9.330 173.370 2.470 45.900 - -

0002+766.070 15.140 55.530 - - - 8.950 2.390 -

23.315 16.740 390.290 59.920 1,397.030 - - - - - - 8.950 208.670 2.390 55.720 - -

0002+789.385 18.340 64.310 - - - 8.950 2.390 -

20.472 16.220 332.060 43.230 885.000 - - - - - - 8.780 179.740 2.390 48.930 - -

0002+809.857 14.090 22.140 - - - 8.610 2.390 -

20.301 14.710 298.630 19.390 393.640 - - - - 1.260 25.580 7.580 153.880 2.390 48.520 - -

0002+830.158 15.320 16.640 - - 2.510 6.540 2.390 -

22.913 16.450 376.920 41.700 955.470 - - - - 1.260 28.870 7.730 177.120 2.390 54.760 - -

0002+853.071 17.570 66.760 - - - 8.920 2.390 -

17.436 18.980 330.940 90.600 1,579.700 - - - - - - 8.940 155.880 2.390 41.670 - -

0002+870.507 20.390 114.430 - - - 8.950 2.390 -

21.197 15.290 324.100 71.140 1,507.950 - - - - 0.050 1.060 8.980 190.350 2.390 50.660 - -

0002+891.704 10.180 27.850 - - 0.100 9.010 2.390 -

TOTAL THIS PAGE 4,295.770 12,072.310 2,267.870 - 433.380 2,692.180 732.650 -

CUMULATIVE 18,165.270 87,050.600 2,267.870 - 10,848.230 13,562.680 4,390.370 -

Submitted by: Checked and Verified by:

Page 80 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH

QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0002+891.704 10.180 27.850 - - 0.100 9.010 2.390 -

21.230 5.090 108.060 13.930 295.730 - - - - 2.490 52.860 4.510 95.750 2.470 52.440 - -

0002+912.934 - - - - 4.880 - 2.550 -

24.429 - - 2.650 64.740 - - - - 21.720 530.600 2.500 61.070 2.560 62.540 - -

0002+937.363 - 5.290 - - 38.550 4.990 2.560 -

20.387 7.000 142.710 14.940 304.580 - - - - 19.280 393.060 7.370 150.250 2.650 54.030 - -

0002+957.750 14.000 24.590 - - - 9.740 2.740 -

0.765 15.550 11.900 49.410 37.800 - - - - - - 9.720 7.440 2.640 2.020 - -

0002+958.515 BK 17.090 74.220 - - - 9.700 2.540 -

EQUATION -42.250

0003+000.765 AH 14.000 24.590 - - - 9.740 2.740 -

19.235 15.550 299.100 49.410 950.400 - - - - - - 9.720 186.960 2.640 50.780 - -

0003+020.000 17.090 74.220 - - - 9.700 2.540 -

20.000 17.620 352.400 92.030 1,840.600 - - - - - - 9.700 194.000 2.540 50.800 - -

0003+040.000 18.150 109.840 - - - 9.700 2.540 -

20.000 19.450 389.000 67.250 1,345.000 - - - - - - 9.720 194.400 2.550 51.000 - -

0003+060.000 20.750 24.650 - - - 9.730 2.550 -

19.851 22.700 450.620 104.640 2,077.210 - - - - - - 9.720 192.950 2.550 50.620 - -

0003+079.851 24.650 184.620 - - - 9.700 2.540 -

19.990 22.570 451.170 154.920 3,096.850 - - - - - - 9.460 189.110 2.540 50.770 - -

0003+099.841 20.480 125.220 - - - 9.210 2.540 -

19.889 19.950 396.790 114.410 2,275.500 - - - - - - 9.470 188.350 2.550 50.720 - -

0003+119.730 19.420 103.590 - - - 9.730 2.550 -

18.560 9.710 180.220 55.010 1,020.990 - - - - - - 9.720 180.400 2.550 47.330 - -

0003+138.290 - 6.420 - - - 9.700 2.540 -

20.000 - - 5.710 114.200 - - - - 5.350 107.000 8.560 171.200 2.540 50.800 - -

0003+158.290 - 5.000 - - 10.700 7.420 2.540 -

20.000 - - 3.310 66.200 - - - - 5.470 109.400 8.310 166.200 2.540 50.800 - -

0003+178.290 - 1.620 - - 0.230 9.200 2.540 -

20.000 2.640 52.800 8.240 164.800 - - - - 0.190 3.800 9.030 180.600 2.520 50.400 - -

0003+198.290 5.280 14.860 - - 0.150 8.850 2.490 -

20.839 10.850 226.100 32.930 686.230 - - - - 0.080 1.670 9.280 193.390 2.520 52.510 - -

0003+219.129 16.410 50.990 - - - 9.700 2.540 -

TOTAL THIS PAGE 3,060.870 14,340.830 - - 1,198.390 2,352.070 727.560 -

CUMULATIVE 21,226.140 101,391.430 2,267.870 - 12,046.620 15,914.750 5,117.930 -

Submitted by: Checked and Verified by:

Page 81 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH

QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0003+219.129 16.410 50.990 - - - 9.700 2.540 -

22.603 16.990 384.020 64.740 1,463.320 - - - - - - 9.690 219.020 2.540 57.410 - -

0003+241.732 17.570 78.490 - - - 9.680 2.540 -

8.270 15.450 127.770 86.420 714.690 - - - - - - 9.700 80.220 2.540 21.010 - -

0003+250.002 13.320 94.350 - - - 9.710 2.540 -

26.311 12.390 325.990 65.400 1,720.740 - - - - 0.140 3.680 9.230 242.850 2.550 67.090 - -

0003+276.313 11.450 36.450 - - 0.270 8.750 2.550 -

23.809 14.050 334.520 56.220 1,338.540 - - - - 0.140 3.330 8.480 201.900 2.400 57.140 - -

0003+300.122 16.640 75.980 - - - 8.200 2.240 -

17.970 19.060 342.510 118.140 2,122.980 - - - - - - 8.200 147.350 2.240 40.250 - -

0003+318.092 21.480 160.300 - - - 8.200 2.240 -

20.973 19.390 406.670 136.250 2,857.570 - - - - - - 8.200 171.980 2.240 46.980 - -

0003+339.065 17.290 112.200 - - - 8.200 2.240 -

19.993 18.910 378.070 135.700 2,713.050 - - - - - - 8.200 163.940 2.240 44.780 - -

0003+359.058 20.530 159.200 - - - 8.200 2.240 -

19.870 21.520 427.600 174.940 3,476.060 - - - - - - 8.200 162.930 2.240 44.510 - -

0003+378.928 22.510 190.680 - - - 8.200 2.240 -

20.014 22.070 441.710 186.400 3,730.610 - - - - - - 8.200 164.110 2.240 44.830 - -

0003+398.942 21.620 182.120 - - - 8.200 2.240 -

19.563 20.080 392.830 161.650 3,162.360 - - - - - - 8.200 160.420 2.240 43.820 - -

0003+418.505 18.540 141.170 - - - 8.200 2.240 -

20.293 18.130 367.910 126.160 2,560.160 - - - - - - 8.200 166.400 2.240 45.460 - -

0003+438.798 BK 17.710 111.150 - - - 8.200 2.240 -

EQUATION -1.972

0003+440.770 AH 18.540 141.170 - - - 8.200 2.240 -

-0.770 18.130 (13.960) 126.160 (97.140) - - - - - - 8.200 (6.310) 2.240 (1.720) - -

0003+440.000 17.710 111.150 - - - 8.200 2.240 -

20.000 16.530 330.600 86.000 1,720.000 - - - - - - 8.200 164.000 2.240 44.800 - -

0003+460.000 15.340 60.840 - - - 8.200 2.240 -

20.004 14.160 283.260 50.800 1,016.200 - - - - - - 8.200 164.030 2.240 44.810 - -

0003+480.004 12.970 40.760 - - - 8.200 2.240 -

20.358 12.920 263.030 35.980 732.480 - - - - - - 8.200 166.940 2.240 45.600 - -

0003+500.362 12.870 31.190 - - - 8.200 2.240 -

TOTAL THIS PAGE 4,792.530 29,231.620 - - 7.010 2,369.780 646.770 -

CUMULATIVE 26,018.670 130,623.050 2,267.870 - 12,053.630 18,284.530 5,764.700 -

Page 82 of 105
Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH

QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0003+500.362 12.870 31.190 - - - 8.200 2.240 -

20.127 13.510 271.920 37.220 749.130 - - - - - - 8.200 165.040 2.240 45.080 - -

0003+520.489 14.140 43.240 - - - 8.200 2.240 -

19.881 13.710 272.570 45.450 903.590 - - - - - - 8.200 163.020 2.240 44.530 - -

0003+540.370 13.270 47.650 - - - 8.200 2.240 -

19.677 14.420 283.740 55.360 1,089.320 - - - - - - 8.200 161.350 2.240 44.080 - -

0003+560.047 15.560 63.060 - - - 8.200 2.240 -

18.882 16.060 303.240 59.670 1,126.690 - - - - - - 8.960 169.180 2.400 45.320 - -

0003+578.929 16.550 56.280 - - - 9.720 2.550 -

20.006 16.470 329.500 61.620 1,232.770 - - - - - - 9.340 186.860 2.470 49.410 - -

0003+598.935 16.380 66.950 - - - 8.950 2.390 -

20.039 15.640 313.410 52.020 1,042.430 - - - - - - 8.950 179.350 2.390 47.890 - -

0003+618.974 14.900 37.090 - - - 8.950 2.390 -

20.027 7.450 149.200 24.490 490.460 - - - - - - 8.950 179.240 2.390 47.860 - -

0003+639.001 - 11.890 - - - 8.950 2.390 -

20.024 - - 8.620 172.610 - - - - - - 8.950 179.210 2.390 47.860 - -

0003+659.025 - 5.350 - - - 8.950 2.390 -

19.979 - - 2.680 53.540 - - - - 3.480 69.530 4.480 89.510 2.390 47.750 - -

0003+679.004 - - - - 6.950 - 2.390 -

19.458 7.280 141.650 21.950 427.100 - - - - 3.480 67.710 4.480 87.170 2.390 46.500 - -

0003+698.462 14.560 43.890 - - - 8.950 2.390 -

20.043 13.610 272.790 31.970 640.770 - - - - - - 8.950 179.380 2.390 47.900 - -

0003+718.505 12.650 20.040 - - - 8.950 2.390 -

19.119 14.280 273.020 44.020 841.620 - - - - - - 8.580 164.040 2.320 44.360 - -

0003+737.624 15.910 68.000 - - - 8.200 2.240 -

21.009 17.000 357.150 99.010 2,080.100 - - - - - - 8.200 172.270 2.240 47.060 - -

0003+758.633 18.090 130.020 - - - 8.200 2.240 -

19.456 18.630 362.470 155.740 3,030.080 - - - - - - 8.200 159.540 2.240 43.580 - -

0003+778.089 19.160 181.450 - - - 8.200 2.240 -

21.371 19.510 416.950 175.360 3,747.620 - - - - - - 8.200 175.240 2.240 47.870 - -

0003+799.460 19.850 169.260 - - - 8.200 2.240 -

19.786 19.380 383.450 131.220 2,596.320 - - - - - - 8.200 162.250 2.250 44.520 - -

0003+819.246 18.900 93.170 - - - 8.200 2.250 -

TOTAL THIS PAGE 4,131.060 20,224.150 - - 137.240 2,572.650 741.570 -

Page 83 of 105
CUMULATIVE 30,149.730 150,847.200 2,267.870 - 12,190.870 20,857.180 6,506.270 -

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH

QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0003+819.246 18.900 93.170 - - - 8.200 2.250 -

17.122 19.420 332.510 104.110 1,782.570 - - - - - - 8.970 153.580 2.400 41.090 - -

0003+836.368 19.930 115.040 - - - 9.730 2.550 -

21.761 21.310 463.730 164.120 3,571.420 - - - - - - 8.970 195.200 2.400 52.230 - -

0003+858.129 22.690 213.200 - - - 8.200 2.240 -

21.176 22.770 482.180 212.550 4,500.960 - - - - - - 8.200 173.640 2.240 47.430 - -

0003+879.305 22.850 211.890 - - - 8.200 2.240 -

20.131 21.440 431.610 182.340 3,670.690 - - - - - - 8.090 162.860 2.240 45.090 - -

0003+899.436 END OF CONC. 20.030 152.780 - - - 7.970 2.240 -

19.021 21.050 400.390 172.100 3,273.510 - - - - - - 8.490 161.490 1.820 34.620 - -

0003+918.457 22.060 191.410 - - - 9.000 1.400 -

20.096 18.020 362.130 125.840 2,528.880 - - - - - - 9.000 180.860 1.400 28.130 - -

0003+938.553 13.980 60.270 - - - 9.000 1.400 -

19.668 13.490 265.320 48.440 952.720 - - - - - - 9.000 177.010 1.400 27.540 - -

0003+958.221 13.000 36.600 - - - 9.000 1.400 -

18.876 6.500 122.690 19.210 362.610 - - - - 9.790 184.800 5.660 106.840 1.400 26.430 - -

0003+977.097 - 1.820 - - 19.580 2.320 1.400 -

19.618 - - 0.910 17.850 - - - - 16.540 324.480 1.160 22.760 1.400 27.470 - -

0003+996.715 - - - - 13.500 - 1.400 -

20.523 7.360 151.050 14.630 300.250 - - - - 6.750 138.530 4.500 92.350 1.400 28.730 - -

0004+017.238 14.720 29.260 - - - 9.000 1.400 -

9.660 14.000 135.240 22.690 219.190 - - - - - - 9.000 86.940 1.400 13.520 - -

0004+026.898 13.270 16.120 - - - 9.000 1.400 -

10.538 6.640 69.970 8.060 84.940 - - - - 15.830 166.820 4.500 47.420 1.400 14.750 - -

0004+037.436 - - - - 31.650 - 1.400 -

20.089 - - - - - - - - 52.800 1,060.700 - - 1.400 28.120 - -

0004+057.525 - - - - 73.940 - 1.400 -

20.471 - - - - - - - - 80.080 1,639.320 - - 1.400 28.660 - -

0004+077.996 - - - - 86.220 - 1.400 -

20.117 - - - - - - - - 72.390 1,456.270 - - 1.400 28.160 - -

0004+098.113 - - - - 58.560 - 1.400 -

20.025 - - - - - - - - 43.150 864.080 - - 1.400 28.030 - -

0004+118.138 - - - - 27.740 - 1.400 -

Page 84 of 105
TOTAL THIS PAGE 3,216.820 21,265.590 - - 5,835.000 1,560.950 500.000 -

CUMULATIVE 33,366.550 172,112.790 2,267.870 - 18,025.870 22,418.130 7,006.270 -

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH

QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0004+118.138 - - - - 27.740 - 1.400 -

19.860 - - - - - - - - 19.870 394.620 - - 1.400 27.800 - -

0004+137.998 - - - - 12.000 - 1.400 -

9.931 - - - - - - - - 21.090 209.440 - - 1.400 13.900 - -

0004+147.929 - - - - 30.180 - 1.400 -

10.010 - - - - - - - - 20.150 201.700 - - 1.400 14.010 - -

0004+157.939 - - - - 10.110 - 1.400 -

20.017 - - - - - - - - 9.990 199.970 - - 1.400 28.020 - -

0004+177.956 - - - - 9.860 - 1.400 -

19.803 - - - - - - - - 10.670 211.300 - - 1.400 27.720 - -

0004+197.759 - - - - 11.470 - 1.400 -

19.892 - - - - - - - - 12.740 253.420 - - 1.400 27.850 - -

0004+217.651 - - - - 14.010 - 1.400 -

20.018 - - - - - - - - 23.740 475.230 - - 1.400 28.030 - -

0004+237.669 - - - - 33.470 - 1.400 -

20.018 - - - - - - - - 33.660 673.810 - - 1.400 28.030 - -

0004+257.687 - - - - 33.840 - 1.400 -

-30.078 - - - - - - - - 23.040 (693.000) - - 1.400 (42.110) - -

0004+227.609 - - - - 12.230 - 1.400 -

69.987 - - - - - - - - 10.050 703.370 - - 1.400 97.980 - -

0004+297.596 - - - - 7.870 - 1.400 -

20.014 - - 2.380 47.630 - - - - 3.940 78.860 4.500 90.060 1.400 28.020 - -

0004+317.610 END OF S1 - 4.760 - - - 9.000 1.400 -

START OF S2 AND
0004+420.878 - 4.590 - - - 9.000 1.400 -
GRAVELING

24.106 - - 2.300 55.440 - - - - 1.350 32.540 4.500 108.480 1.400 33.750 - -

0004+444.984 - - - - 2.700 - 1.400 -

21.801 - - - - - - - - 6.790 148.030 - - 1.400 30.520 - -

0004+466.785 - - - - 10.870 - 1.400 -

20.392 - - - - - - - - 12.120 247.150 - - 1.400 28.550 - -

0004+487.177 - - - - 13.370 - 1.400 -

Page 85 of 105
20.577 - - - - - - - - 13.940 286.840 - - 1.400 28.810 - -

0004+507.754 - - - - 14.500 - 1.400 -

TOTAL THIS PAGE - 103.070 - - 3,423.280 198.540 400.880 -

CUMULATIVE 33,366.550 172,215.860 2,267.870 - 21,449.150 22,616.670 7,407.150 -

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH

QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0004+507.754 - - - - 14.500 - 1.400 -

20.437 - - - - - - - - 14.460 295.520 - - 1.400 28.610 - -

0004+528.191 - - - - 14.410 - 1.400 -

11.809 - - - - - - - - 15.090 178.200 - - 1.400 16.530 - -

0004+540.000 - - - - 15.770 - 1.400 -

0.148 - - - - - - - - 16.900 2.500 - - 1.400 0.210 - -

0004+540.148 BK - - - - 18.020 - 1.400 -

EQUATION 8.220

0004+531.928 AH - - - - 15.770 - 1.400 -

28.072 - - - - - - - - 16.900 474.420 - - 1.400 39.300 - -

0004+560.000 - - - - 18.020 - 1.400 -

20.032 - - - - - - - - 18.460 369.790 - - 1.400 28.040 - -

0004+580.032 - - - - 18.900 - 1.400 -

18.984 - - - - - - - - 17.120 325.010 - - 1.400 26.580 - -

0004+599.016 - - - - 15.340 - 1.400 -

15.177 - - 0.220 3.340 - - - - 9.800 148.730 0.240 3.640 1.400 21.250 - -

0004+614.193 - 0.430 - - 4.260 0.470 1.400 -

20.004 - - 0.220 4.400 - - - - 7.440 148.830 0.240 4.800 1.400 28.010 0.250 5.000

0004+634.197 BK - - - - 10.610 - 1.400 0.500

EQUATION -5.277

0004+639.474 AH - 0.430 - - 4.260 0.470 1.400 -

0.526 - - 0.220 0.120 - - - - 7.440 3.910 0.240 0.130 1.400 0.740 0.250 0.130

0004+640.000 - - - - 10.610 - 1.400 0.500

20.000 - - - - - - - - 9.300 186.000 - - 1.400 28.000 0.250 5.000

0004+660.000 - - - - 7.990 - 1.400 -

20.000 - - - - - - - - 11.550 231.000 - - 1.400 28.000 - -

0004+680.000 - - - - 15.110 - 1.400 -

7.000 - - - - - - - - 25.110 175.770 - - 1.400 9.800 - -

0004+687.000 - - - - 35.110 - 1.400 -

13.000 - - - - - - - - 23.110 300.430 - - 1.400 18.200 - -

0004+700.000 - - - - 11.100 - 1.400 -

Page 86 of 105
20.007 - - 0.230 4.600 - - - - 9.110 182.260 - - 1.400 28.010 - -

0004+720.007 - 0.450 - - 7.120 - 1.400 -

TOTAL THIS PAGE - 12.460 - - 3,022.370 8.570 301.280 10.130

CUMULATIVE 33,366.550 172,228.320 2,267.870 - 24,471.520 22,625.240 7,708.430 10.130

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH

Page 87 of 105
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0004+720.007 - 0.450 - - 7.120 - 1.400 -

21.406 - - 2.320 49.660 - - - - 3.560 76.210 4.170 89.260 1.400 29.970 - -

0004+741.413 - 4.180 - - - 8.330 1.400 -

21.855 - - 4.760 104.030 - - - - - - 8.670 189.480 1.400 30.600 - -

0004+763.268 - 5.340 - - - 9.000 1.400 -

20.224 - - 2.670 54.000 - - - - 3.910 79.080 4.500 91.010 1.400 28.310 - -

0004+783.492 - - - - 7.820 - 1.400 -

20.393 - - 0.280 5.710 - - - - 7.970 162.530 0.240 4.890 1.400 28.550 - -

0004+803.885 - 0.550 - - 8.110 0.470 1.400 -

16.115 5.880 94.760 0.850 13.700 - - - - 5.240 84.440 1.240 19.980 1.400 22.560 - -

0004+820.000 11.750 1.140 - - 2.360 2.010 1.400 -

4.309 10.950 47.180 0.570 2.460 - - - - 3.260 14.050 1.010 4.350 1.400 6.030 - -

0004+824.309 BK 10.150 - - - 4.150 - 1.400 -

EQUATION 4.154

0004+820.155 AH 11.750 1.140 - - 2.360 2.010 1.400 -

19.845 10.950 217.300 0.570 11.310 - - - - 3.260 64.690 1.010 20.040 1.400 27.780 - -

0004+840.000 10.150 - - - 4.150 - 1.400 -

20.000 10.810 216.200 - - - - - - 6.420 128.400 - - 1.400 28.000 - -

0004+860.000 11.470 - - - 8.690 - 1.400 -

19.931 11.370 226.620 - - - - - - 8.480 169.010 - - 1.400 27.900 - -

0004+879.931 11.260 - - - 8.260 - 1.400 -

19.798 11.290 223.520 - - - - - - 8.650 171.250 - - 1.400 27.720 - -

0004+899.729 11.320 - - - 9.040 - 1.400 -

2.676 11.900 31.840 - - - - - - 11.480 30.720 - - 1.400 3.750 - -

0004+902.405 BK 12.480 - - - 13.920 - 1.400 -

EQUATION -0.269

0004+902.674 AH 11.320 - - - 9.040 - 1.400 -

17.326 11.900 206.180 - - - - - - 11.480 198.900 - - 1.400 24.260 - -

0004+920.000 12.480 - - - 13.920 - 1.400 -

20.000 12.840 256.800 - - - - - - 15.400 308.000 - - 1.400 28.000 - -

0004+940.000 13.190 - - - 16.880 - 1.400 -

20.000 15.460 309.200 - - - - - - 26.760 535.200 - - 1.400 28.000 - -

0004+960.000 17.730 - - - 36.630 - 1.400 -

TOTAL THIS PAGE 1,829.600 240.870 - - 2,022.480 419.010 341.430 -

CUMULATIVE 35,196.150 172,469.190 2,267.870 - 26,494.000 23,044.250 8,049.860 10.130

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH

Page 88 of 105
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0004+960.000 17.730 - - - 36.630 - 1.400 -

20.000 16.600 332.000 - - - - - - 27.260 545.200 - - 1.400 28.000 - -

0004+980.000 15.470 - - - 17.880 - 1.400 -

20.000 13.020 260.400 9.030 180.600 - - - - 9.190 183.800 3.040 60.800 1.400 28.000 - -

0005+000.000 10.570 18.060 - - 0.490 6.070 1.400 -

20.000 11.300 226.000 19.450 389.000 - - - - 5.670 113.400 5.840 116.800 1.400 28.000 - -

0005+020.000 12.020 20.830 - - 10.840 5.600 1.400 -

20.000 6.010 120.200 10.420 208.400 - - - - 32.120 642.400 2.800 56.000 1.400 28.000 - -

0005+040.000 - - - - 53.390 - 1.400 -

20.000 - - - - - - - - 36.290 725.800 - - 1.400 28.000 - -

0005+060.000 - - - - 19.180 - 1.400 -

20.000 6.240 124.800 0.870 17.400 - - - - 18.460 369.200 0.660 13.200 1.360 27.200 - -

0005+080.000 12.480 1.740 - - 17.730 1.320 1.320 -

20.000 13.030 260.600 7.290 145.800 - - - - 8.870 177.400 1.360 27.200 1.360 27.200 - -

0005+100.000 13.570 12.830 - - - 1.400 1.400 -

20.000 13.700 274.000 11.990 239.800 - - - - - - 5.200 104.000 1.400 28.000 - -

0005+120.000 13.830 11.150 - - - 9.000 1.400 -

20.000 13.930 278.600 12.210 244.200 - - - - - - 9.000 180.000 1.400 28.000 - -

0005+140.000 14.030 13.260 - - - 9.000 1.400 -

20.000 11.010 220.200 9.010 180.200 - - - - 0.390 7.800 7.050 141.000 1.400 28.000 - -

0005+160.000 7.980 4.760 - - 0.770 5.100 1.400 -

20.000 7.470 149.400 3.760 75.200 - - - - 1.900 38.000 4.160 83.200 1.400 28.000 - -

0005+180.000 6.960 2.750 - - 3.030 3.210 1.400 -

20.000 6.860 137.200 2.470 49.400 - - - - 2.870 57.400 3.090 61.800 1.400 28.000 - -

0005+200.000 6.760 2.180 - - 2.710 2.970 1.400 -

20.000 6.620 132.400 1.750 35.000 - - - - 2.720 54.400 2.570 51.400 1.400 28.000 - -

0005+220.000 6.470 1.310 - - 2.720 2.170 1.400 -

20.000 12.270 245.400 23.200 464.000 - - - - 1.360 27.200 5.590 111.800 1.400 28.000 - -

0005+240.000 18.070 45.080 - - - 9.000 1.400 -

20.000 9.040 180.800 22.950 459.000 - - - - 1.780 35.600 5.090 101.800 1.400 28.000 - -

0005+260.000 - 0.820 - - 3.550 1.170 1.400 -

20.000 4.210 84.200 2.140 42.800 - - - - 1.920 38.400 3.620 72.400 1.400 28.000 - -

0005+280.000 8.410 3.460 - - 0.280 6.070 1.400 -

TOTAL THIS PAGE 3,026.200 2,730.800 - - 3,016.000 1,181.400 446.400 -

CUMULATIVE 38,222.350 175,199.990 2,267.870 - 29,510.000 24,225.650 8,496.260 10.130

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH

Page 89 of 105
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0005+280.000 8.410 3.460 - - 0.280 6.070 1.400 -

20.000 9.600 192.000 1.730 34.600 - - - - 3.400 68.000 3.040 60.800 1.400 28.000 - -

0005+300.000 10.790 - - - 6.510 - 1.400 -

20.000 11.830 236.600 - - - - - - 10.480 209.600 - - 1.400 28.000 - -

0005+320.000 12.870 - - - 14.440 - 1.400 -

20.000 12.190 243.800 - - - - - - 11.610 232.200 - - 1.400 28.000 - -

0005+340.000 11.510 - - - 8.780 - 1.400 -

20.000 9.000 180.000 0.670 13.400 - - - - 5.690 113.800 1.130 22.600 1.400 28.000 - -

0005+360.000 6.480 1.340 - - 2.590 2.250 1.400 -

20.000 10.000 200.000 5.470 109.400 - - - - 1.300 26.000 5.630 112.600 1.400 28.000 - -

0005+380.000 13.520 9.590 - - - 9.000 1.400 -

20.000 11.950 239.000 6.570 131.400 - - - - 0.010 0.200 8.560 171.200 1.400 28.000 - -

0005+400.000 10.370 3.540 - - 0.020 8.120 1.400 -

20.000 11.410 228.200 3.180 63.600 - - - - 0.010 0.200 8.620 172.400 1.400 28.000 - -

0005+420.000 12.450 2.820 - - - 9.110 1.400 -

20.000 10.030 200.600 2.520 50.400 - - - - 0.080 1.600 7.340 146.800 1.400 28.000 - -

0005+440.000 7.600 2.220 - - 0.160 5.560 1.400 -

20.000 8.360 167.200 2.620 52.400 - - - - 0.080 1.600 6.370 127.400 1.400 28.000 - -

0005+460.000 9.120 3.010 - - - 7.180 1.400 -

20.000 7.170 143.400 2.300 46.000 - - - - 0.580 11.600 5.210 104.200 1.400 28.000 - -

0005+480.000 5.210 1.580 - - 1.150 3.240 1.400 -

20.000 4.910 98.200 1.480 29.600 - - - - 1.450 29.000 2.950 59.000 1.400 28.000 - -

0005+500.000 4.600 1.380 - - 1.750 2.660 1.400 -

20.000 3.760 75.200 1.070 21.400 - - - - 2.400 48.000 1.910 38.200 1.400 28.000 - -

0005+520.000 2.910 0.760 - - 3.050 1.150 1.400 -

20.000 4.040 80.800 1.200 24.000 - - - - 2.210 44.200 2.150 43.000 1.400 28.000 - -

0005+540.000 5.160 1.640 - - 1.370 3.150 1.400 -

20.000 9.060 181.200 3.790 75.800 - - - - 0.690 13.800 6.080 121.600 1.400 28.000 - -

0005+560.000 12.950 5.930 - - - 9.000 1.400 -

20.000 12.620 252.400 3.880 77.600 - - - - - - 9.000 180.000 1.400 28.000 - -

0005+580.000 12.280 1.820 - - - 9.000 1.400 -

20.000 6.140 122.800 1.760 35.200 - - - - - - 9.000 180.000 1.400 28.000 - -

0005+600.000 - 1.700 - - - 9.000 1.400 -

TOTAL THIS PAGE 2,841.400 764.800 - - 799.800 1,539.800 448.000 -

CUMULATIVE 41,063.750 175,964.790 2,267.870 - 30,309.800 25,765.450 8,944.260 10.130

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.

Contractor Project Engineer - DPWH

Page 90 of 105
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0005+600.000 - 1.700 - - - 9.000 1.400 -

20.000 - - 2.000 40.000 - - - - - - 9.000 180.000 1.400 28.000 - -

0005+620.000 - 2.300 - - - 9.000 1.400 -

20.000 - - 5.060 101.200 - - - - - - 9.000 180.000 1.400 28.000 - -

0005+640.000 - 7.810 - - - 9.000 1.400 -

20.000 6.800 136.000 9.090 181.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0005+660.000 13.600 10.360 - - - 9.000 1.400 -

20.000 13.420 268.400 9.140 182.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0005+680.000 13.230 7.920 - - - 9.000 1.400 -

20.000 12.800 256.000 5.130 102.600 - - - - - - 9.000 180.000 1.400 28.000 - -

0005+700.000 12.360 2.340 - - - 9.000 1.400 -

20.000 12.340 246.800 2.220 44.400 - - - - - - 9.000 180.000 1.400 28.000 - -

0005+720.000 12.320 2.090 - - - 9.000 1.400 -

20.000 12.280 245.600 1.850 37.000 - - - - - - 9.000 180.000 1.400 28.000 - -

0005+740.000 12.240 1.600 - - - 9.000 1.400 -

20.000 6.120 122.400 0.800 16.000 - - - - 1.320 26.400 4.500 90.000 1.400 28.000 - -

0005+760.000 - - - - 2.640 - 1.400 -

20.000 - - - - - - - - 2.950 59.000 - - 1.400 28.000 - -

0005+780.000 - - - - 3.260 - 1.400 -

20.000 - - 0.800 16.000 - - - - 1.630 32.600 4.500 90.000 1.400 28.000 - -

0005+800.000 - 1.600 - - - 9.000 1.400 -

20.000 - - 1.480 29.600 - - - - - - 9.000 180.000 1.400 28.000 - -

0005+820.000 - 1.360 - - - 9.000 1.400 -

20.000 - - 0.680 13.600 - - - - 1.700 34.000 4.500 90.000 1.400 28.000 - -

0005+840.000 - - - - 3.400 - 1.400 -

20.000 - - - - - - - - 2.410 48.200 - - 1.400 28.000 - -

0005+860.000 - - - - 1.420 - 1.400 -

20.000 6.180 123.600 1.170 23.400 - - - - 0.710 14.200 4.500 90.000 1.400 28.000 - -

0005+880.000 12.360 2.340 - - - 9.000 1.400 -

20.000 12.610 252.200 3.920 78.400 - - - - - - 9.000 180.000 1.400 28.000 - -

0005+900.000 12.860 5.500 - - - 9.000 1.400 -

20.000 13.130 262.600 7.250 145.000 - - - - - - 9.000 180.000 1.400 28.000 - -

0005+920.000 13.400 9.000 - - - 9.000 1.400 -

TOTAL THIS PAGE 1,913.600 1,011.800 - - 214.400 2,160.000 448.000 -

CUMULATIVE 42,977.350 176,976.590 2,267.870 - 30,524.200 27,925.450 9,392.260 10.130

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.

Page 91 of 105
Contractor Project Engineer - DPWH

QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0005+920.000 13.400 9.000 - - - 9.000 1.400 -

20.000 12.810 256.200 5.240 104.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0005+940.000 12.220 1.480 - - - 9.000 1.400 -

20.000 6.110 122.200 0.950 19.000 - - - - 0.740 14.800 4.500 90.000 1.400 28.000 - -

0005+960.000 - 0.420 - - 1.480 - 1.400 -

20.000 6.160 123.200 1.210 24.200 - - - - 0.740 14.800 4.500 90.000 1.400 28.000 - -

0005+980.000 12.310 1.990 - - - 9.000 1.400 -

20.000 12.640 252.800 4.110 82.200 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+000.000 12.970 6.220 - - - 9.000 1.400 -

20.000 12.920 258.400 5.840 116.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+020.000 12.860 5.450 - - - 9.000 1.400 -

20.000 12.840 256.800 5.290 105.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+040.000 12.810 5.130 - - - 9.000 1.400 -

20.000 12.770 255.400 4.830 96.600 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+060.000 12.720 4.520 - - - 9.000 1.400 -

20.000 12.690 253.800 3.840 76.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+080.000 12.650 3.160 - - - 9.000 1.400 -

20.000 13.070 261.400 6.350 127.000 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+100.000 13.480 9.530 - - - 9.000 1.400 -

20.000 13.570 271.400 10.120 202.400 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+120.000 13.650 10.710 - - - 9.000 1.400 -

20.000 13.220 264.400 7.860 157.200 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+140.000 12.790 5.010 - - - 9.000 1.400 -

20.000 12.570 251.400 3.610 72.200 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+160.000 12.340 2.210 - - - 9.000 1.400 -

20.000 12.440 248.800 2.780 55.600 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+180.000 12.530 3.350 - - - 9.000 1.400 -

20.000 12.630 252.600 3.950 79.000 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+200.000 12.720 4.550 - - - 9.000 1.400 -

20.000 12.810 256.200 5.080 101.600 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+220.000 12.890 5.600 - - - 9.000 1.400 -

20.000 12.930 258.600 5.870 117.400 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+240.000 12.970 6.130 - - - 9.000 1.400 -

TOTAL THIS PAGE 3,843.600 1,538.600 - - 29.600 2,700.000 448.000 -

CUMULATIVE 46,820.950 178,515.190 2,267.870 - 30,553.800 30,625.450 9,840.260 10.130

Submitted by: Checked and Verified by:

Page 92 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.

Contractor Project Engineer - DPWH

QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0006+240.000 12.970 6.130 - - - 9.000 1.400 -

20.000 13.010 260.200 6.400 128.000 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+260.000 13.050 6.660 - - - 9.000 1.400 -

20.000 12.980 259.600 6.540 130.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+280.000 12.900 6.410 - - - 9.000 1.400 -

20.000 12.110 242.200 5.030 100.600 - - - - - - 8.480 169.600 1.400 28.000 - -

0006+300.000 11.310 3.640 - - - 7.950 1.400 -

20.000 11.420 228.400 3.370 67.400 - - - - 0.130 2.600 6.960 139.200 1.400 28.000 - -

0006+320.000 11.520 3.100 - - 0.260 5.960 1.400 -

20.000 11.500 230.000 3.450 69.000 - - - - 0.130 2.600 7.480 149.600 1.400 28.000 - -

0006+340.000 11.470 3.800 - - - 7.480 1.400 -

20.000 12.500 250.000 6.680 133.600 - - - - - - 8.240 164.800 1.400 28.000 - -

0006+360.000 13.520 9.550 - - - 9.000 1.400 -

20.000 14.320 286.400 15.240 304.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+380.000 15.120 20.920 - - - 9.000 1.400 -

20.000 15.170 303.400 20.780 415.600 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+400.000 15.210 20.630 - - - 9.000 1.400 -

20.000 13.900 278.000 13.830 276.600 - - - - 0.150 3.000 8.020 160.400 1.400 28.000 - -

0006+420.000 12.590 7.030 - - 0.290 7.040 1.400 -

20.000 12.170 243.400 4.850 97.000 - - - - 0.430 8.600 5.680 113.600 1.400 28.000 - -

0006+440.000 11.750 2.660 - - 0.570 4.310 1.400 -

20.000 12.650 253.000 6.210 124.200 - - - - 0.290 5.800 6.660 133.200 1.400 28.000 - -

0006+460.000 13.540 9.750 - - - 9.000 1.400 -

20.000 14.430 288.600 16.060 321.200 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+480.000 15.310 22.370 - - - 9.000 1.400 -

20.000 15.260 305.200 21.760 435.200 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+500.000 15.200 21.140 - - - 9.000 1.400 -

20.000 14.660 293.200 17.250 345.000 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+520.000 14.120 13.350 - - - 9.000 1.400 -

20.000 13.660 273.200 10.240 204.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+540.000 13.200 7.130 - - - 8.990 1.400 -

20.000 12.560 251.200 6.420 128.400 - - - - - - 8.410 168.200 1.400 28.000 - -

0006+560.000 11.910 5.710 - - - 7.820 1.400 -

TOTAL THIS PAGE 4,246.000 3,282.200 - - 22.600 2,638.600 448.000 -

CUMULATIVE 51,066.950 181,797.390 2,267.870 - 30,576.400 33,264.050 10,288.260 10.130

Submitted by: Checked and Verified by:

Page 93 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.

Contractor Project Engineer - DPWH

QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0006+560.000 11.910 5.710 - - - 7.820 1.400 -

20.000 11.820 236.400 5.700 114.000 - - - - - - 7.820 156.400 1.400 28.000 - -

0006+580.000 11.730 5.690 - - - 7.810 1.400 -

20.000 11.820 236.400 5.750 115.000 - - - - - - 7.880 157.600 1.400 28.000 - -

0006+600.000 11.900 5.800 - - - 7.940 1.400 -

20.000 11.900 238.000 5.860 117.200 - - - - - - 7.810 156.200 1.400 28.000 - -

0006+620.000 11.890 5.920 - - - 7.670 1.400 -

20.000 11.850 237.000 5.860 117.200 - - - - - - 7.940 158.800 1.400 28.000 - -

0006+640.000 11.800 5.790 - - - 8.210 1.400 -

20.000 11.780 235.600 5.760 115.200 - - - - - - 8.610 172.200 1.400 28.000 - -

0006+660.000 11.750 5.730 - - - 7.840 1.400 -

20.000 12.630 252.600 8.150 163.000 - - - - - - 8.420 168.400 1.400 28.000 - -

0006+680.000 13.510 10.560 - - - 9.000 1.400 -

20.000 13.820 276.400 11.690 233.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+700.000 14.120 12.820 - - - 9.000 1.400 -

20.000 14.140 282.800 12.900 258.000 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+720.000 14.150 12.980 - - - 9.000 1.400 -

20.000 14.040 280.800 12.240 244.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+740.000 13.930 11.500 - - - 9.000 1.400 -

20.000 13.380 267.600 8.080 161.600 - - - - 0.670 13.400 6.930 138.600 1.400 28.000 - -

0006+760.000 12.820 4.660 - - 1.330 4.850 1.400 -

20.000 12.440 248.800 5.370 107.400 - - - - 0.720 14.400 6.250 125.000 1.400 28.000 - -

0006+780.000 12.060 6.070 - - 0.100 7.650 1.400 -

20.000 12.070 241.400 6.830 136.600 - - - - 0.050 1.000 8.130 162.600 1.400 28.000 - -

0006+800.000 12.070 7.590 - - - 8.600 1.400 -

20.000 12.190 243.800 6.850 137.000 - - - - 0.130 2.600 7.810 156.200 1.400 28.000 - -

0006+820.000 12.300 6.110 - - 0.250 7.010 1.400 -

20.000 12.370 247.400 5.200 104.000 - - - - 0.600 12.000 6.060 121.200 0.700 14.000 - -

0006+840.000 12.430 4.280 - - 0.950 5.100 - -

20.000 12.480 249.600 5.610 112.200 - - - - 1.170 23.400 4.800 96.000 0.700 14.000 - -

0006+860.000 12.520 6.930 - - 1.380 4.500 1.400 -

20.000 12.520 250.400 5.360 107.200 - - - - 1.370 27.400 4.470 89.400 1.400 28.000 - -

0006+880.000 12.510 3.780 - - 1.360 4.430 1.400 -

TOTAL THIS PAGE 4,025.000 2,344.200 - - 94.200 2,398.600 420.000 -

CUMULATIVE 55,091.950 184,141.590 2,267.870 - 30,670.600 35,662.650 10,708.260 10.130

Page 94 of 105
Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.

Contractor Project Engineer - DPWH

QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0006+880.000 12.510 3.780 - - 1.360 4.430 1.400 -

20.000 12.520 250.400 4.870 97.400 - - - - 0.930 18.600 5.440 108.800 1.400 28.000 - -

0006+900.000 12.520 5.960 - - 0.500 6.450 1.400 -

20.000 12.550 251.000 6.700 134.000 - - - - 0.360 7.200 6.900 138.000 0.700 14.000 - -

0006+920.000 12.570 7.440 - - 0.210 7.340 - -

20.000 13.310 266.200 9.880 197.600 - - - - 0.110 2.200 8.170 163.400 0.700 14.000 - -

0006+940.000 14.050 12.320 - - - 9.000 1.400 -

20.000 14.020 280.400 12.060 241.200 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+960.000 13.980 11.790 - - - 9.000 1.400 -

20.000 13.920 278.400 11.340 226.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0006+980.000 13.850 10.890 - - - 9.000 1.400 -

20.000 13.810 276.200 10.580 211.600 - - - - - - 9.000 180.000 1.400 28.000 - -

0007+000.000 13.760 10.260 - - - 9.000 1.400 -

20.000 14.020 280.400 12.040 240.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0007+020.000 14.270 13.810 - - - 9.000 1.400 -

20.000 14.250 285.000 13.580 271.600 - - - - - - 9.000 180.000 1.400 28.000 - -

0007+040.000 14.220 13.350 - - - 9.000 1.400 -

20.000 13.410 268.200 11.480 229.600 - - - - - - 8.740 174.800 1.400 28.000 - -

0007+060.000 12.590 9.610 - - - 8.480 1.400 -

20.000 12.560 251.200 7.460 149.200 - - - - 0.340 6.800 7.180 143.600 1.400 28.000 - -

0007+080.000 12.530 5.300 - - 0.670 5.880 1.400 -

20.000 12.620 252.400 4.770 95.400 - - - - 0.340 6.800 7.100 142.000 1.400 28.000 - -

0007+100.000 12.700 4.240 - - - 8.310 1.400 -

20.000 13.420 268.400 9.000 180.000 - - - - - - 8.660 173.200 1.400 28.000 - -

0007+120.000 14.130 13.750 - - - 9.000 1.400 -

20.000 14.500 290.000 16.390 327.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0007+140.000 14.860 19.020 - - - 9.000 1.400 -

20.000 14.610 292.200 17.160 343.200 - - - - - - 9.000 180.000 1.400 28.000 - -

0007+160.000 14.350 15.300 - - - 9.000 1.400 -

20.000 13.620 272.400 9.980 199.600 - - - - - - 9.000 180.000 1.400 28.000 - -

0007+180.000 12.890 4.650 - - - 9.000 1.400 -

20.000 12.870 257.400 4.970 99.400 - - - - - - 9.000 180.000 1.400 28.000 - -

0007+200.000 12.840 5.290 - - - 9.000 1.400 -

TOTAL THIS PAGE 4,320.200 3,245.200 - - 41.600 2,663.800 420.000 -

Page 95 of 105
CUMULATIVE 59,412.150 187,386.790 2,267.870 - 30,712.200 38,326.450 11,128.260 10.130

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.

Contractor Project Engineer - DPWH

QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City

Project ID : 17L0-0191 Contractor :


Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
-

Item 100(1) Item 105(1) Item 200 Item 300


COMMON EXCAVATION RIPPABLE EXCAVATION SOLID EXCAVATION FILL
Clearing & Grubbing Subgrade Preparation Aggregate Sub-base Course Aggregate Surface Course
Station Dist.
Ave. Area End Ave.End Volume End Ave.End Volume End Ave.End Volume End Ave.End Volume Ave. Area End Ave.End Volume End Ave.End Volume
Width Width
Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Area Area (cu.m.) Width (sq. m.) Area Area (cu.m.) Area Area (cu.m.)

0007+200.000 12.840 5.290 - - - 9.000 1.400 -

20.000 12.800 256.000 5.050 101.000 - - - - - - 9.000 180.000 1.400 28.000 - -

0007+220.000 12.760 4.810 - - - 9.000 1.400 -

20.000 12.700 254.000 4.440 88.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0007+240.000 12.640 4.060 - - - 9.000 1.400 -

20.000 12.590 251.800 3.690 73.800 - - - - - - 9.000 180.000 1.400 28.000 - -

0007+260.000 12.530 3.320 - - - 9.000 1.400 -

20.000 12.580 251.600 3.610 72.200 - - - - - - 9.000 180.000 1.400 28.000 - -

0007+280.000 12.620 3.890 - - - 9.000 1.400 -

40.000 12.890 515.600 5.620 224.800 - - - - - - 9.000 360.000 1.400 56.000 - -

0007+300.000 12.920 5.800 - - - 9.000 1.400 -

20.000 13.040 260.800 6.580 131.600 - - - - - - 9.000 180.000 1.400 28.000 - -

0007+320.000 13.160 7.350 - - - 9.000 1.400 -

20.000 12.790 255.800 5.010 100.200 - - - - - - 9.000 180.000 1.400 28.000 - -

0007+340.000 12.790 4.890 - - - 9.000 1.400 -

20.000 12.610 252.200 3.780 75.600 - - - - - - 9.000 180.000 1.400 28.000 - -

END OF
0007+360.000 12.420 2.660 - - - 9.000 1.400 -
GRAVELING

TOTAL THIS PAGE 2,297.800 868.000 - - - 1,620.000 252.000 -

CUMULATIVE 61,709.950 188,254.790 2,267.870 - 30,712.200 39,946.450 11,380.260 10.130

SUMMARY :

Item 100(1) Clearing & Grubbing Item 104 (1) Embankment (from Common Excavation)

Total Quantity = 6.17 Ha. Total Quantity = 30,712.20 cu.m.

Item 102(2) Surplus Common Excavation Item 105 (1) Subgrade Preparation

Total Quantity = COMMON EXCAVATION - 1.25(FILL) Total Quantity = 39,946.45 sq.m.

= 188,254.790 - 1.25 ( 30,712.200 )

Total Quantity = 149,896.53 cu.m. Item 200 Aggregate Subbase Course

Total Quantity = 11,380.26 cu.m.

Item 102(3) Surplus Rock Excavation (Rippable)

Total Quantity = 2,267.87 cu.m. Item 300 Aggregate Surface Course

Total Quantity = 10.13 cu.m.

Page 96 of 105
Item 102(3) Surplus Rock Excavation (Solid)

Total Quantity = - cu.m.

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH

Page 97 of 105
Contract ID : 17L0-0191
Name of Project : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
Location : Kapalong, Davao del Norte

Appropriation : 17L0-0191
ABC :
-3.08%
154,400,000.00
Duration : 269.00 days
Dropping : October 10, 2017

ITEM NO. DESCRIPTION UNIT QUANTITY


Contrac
Unit Cost
Part A. FACILITIES FOR ENGINEER
A.1.1(3) Camphouse w/ 2 CR for Female and Male ls 1.00 196,425.69
Vehicle for the Engineer (based on DO 3 s 2010) 4 x 4 pick up 2500 CC M/T diesel w/ aircon,
A.1.1(5) month 9.00 111,384.00
stereo, megawheels, stepboard, bed liner, GPS, rustproof
Assistance to the Engineer month 9.00 17,627.96
A.1.1(16)
A. Operations & Maintenance of Field Office for the Engineer
Part B. OTHER GENERAL REQUIREMENT
B.4(1) Construction Survey and Staking km 6.00 21,955.50
B.5 Project Billboard each 2.00 4,737.60
B.7 Construction Safety & Health month 9.00 23,436.00
B.8 Traffic Management month 9.00 19,362.00
B.9 Mobilization & Demobilization ls 1.00 351,798.09
Part C. EARTHWORKS
100(1) Clearing & Grubbing ha 6.12 142,923.53
102(2) Surplus Common Excavation cu m 118,714.00 311.08
102(3)a Surplus Rock Excavation (Rippable) cu m 38,425.00 504.68
103(1)a Sructural Excavation (Common Soil) cu m 68.30 338.96
103(3) Foundation Fill cu m 76.30 2,141.01
103(6)a Pipe Culvert and Drain Excavation cu m 1,423.70 310.22
104(1)a Embankment (from Excavation) cu m 29,287.00 423.84
105(1)a Subgrade Preparation sq m 39,821.17 19.50
Part D. SUB-BASE & BASE COURSE
200(1) Aggregate Subbase Course cu m 11,310.00 2,045.77
Part E. SURFACE COURSES
311(1)c1 PCC Pavement (Unreinforced), 200mm THK. sq m 13,592.77 1,979.58
PART F. DRAINAGE CONSTRUCTION (BOX CULVERT)
404(1)a Reinforcing Steel, Grade 40 kg 8,103.00 76.64
405(1)a3 Structural Concrete, Class A cu m 121.00 12,407.96
PART G. DRAINAGE & SLOPE PROTECTION STRUCTURE
500(1)b3 Pipe Culverts, 910mm ø, Class IV ln m 228.00 8,207.20
500(1)b5 Pipe Culverts, 1220mm ø, Class IV ln m 23.00 13,576.99
505(1)b6 Pipe Culverts, 1520mm ø, Class IV ln m 41.00 18,670.86
505(2)a Grouted Riprap, Class “A” cu m 1,411.70 4,201.01
506(1) Stone Masonry cu m 170.70 5,660.77
508(1) HandLaid Rock Embankment cu m 33.90 2,276.55
PART H. MISCELLANEOUS STRUCTURE
603(3)a1 Metal Guardrail (Metal Beam) including Post ln m 2,350.77 2,987.55
603(4)b Metal Beam End Piece (Bull Nose) each 32.00 21,097.13
612(1) Reflectorized Thermoplastic Pavement markings (White) sq m 889.33 897.75
620(1)a1 Chevron Signs (450mm x 600mm) each 182.00 12,294.00
622(2)c Coco-Logs / Fascine ln m 2,691.00 502.90
622(3)b Vegetation sq m 13,586.80 162.98

T O TAL
AB C
17L0-0191
-3.08%

Contract
Amount

196,425.69

1,002,456.00

158,651.64

131,733.00
9,475.20
210,924.00
174,258.00
351,798.09

874,692.00
36,929,551.12
19,392,329.00
23,150.97
163,359.06
441,660.21
12,413,002.08
776,512.82

23,137,658.70

26,907,975.64

621,013.92
1,501,363.16

1,871,241.60
312,270.77
765,505.26
5,930,565.82
966,293.44
77,175.05

7,023,042.91
675,108.16
798,396.01
2,237,508.00
1,353,303.90
2,214,376.66

PHP 149,642,777.88
154,400,000.00
(4,757,222.12)
-3.08%
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 15L0-0180 Contractor :
Project Name :
#REF!
Sta.8 + 680.00 – Sta.1526 + 800 (with equation)
ULTICON BUILDERS, INC.

Item : 612(1) Original Quantity : #REF! ###


Description : Reflectorized Thermoplastic Pavement Markings White Revised Quantity : 1,004.883 ###

PAVEMENT MARKINGS DETAIL


CENTER LINE
STATION EQUATIONS LENGTH
STATION LIMITS SOLID BROKEN AREA
(EDGE LINE) (sq.m.)
BACK AHEAD
1474 + 981.500 1475 + 127.171 145.67 16 31.534
1475 + 127.171 1475 + 175.234 48.06 48.06 16.821
1475 + 175.234 1475 + 363.018 187.78 187.78 65.723
1475 + 363.018 1475 + 471.536 108.52 11.00 23.354
1475 + 471.536 1475 + 513.102 41.57 41.57 14.550
1475 + 513.102 1475 + 817.661 304.56 304.56 106.596
1475 + 817.661 1476 + 345.479 1475 + 859.554 1475 + 860.000 526.10 58.00 113.920
1476 + 238.728 1476 + 240.000
1476 + 345.479 1476 + 647.802 302.32 302.32 105.812
1476 + 647.802 1476 + 968.147 320.35 35.00 69.320
1476 + 968.147 1477 + 580.298 612.15 612.15 214.253
1477 + 580.298 1477 + 685.781 105.48 11.00 22.746
1477 + 685.781 1477 + 844.950 1477 + 832.770 1477 + 844.950 146.99 146.99 51.447
TOTAL QUANTITY 874.473

PROVISION OF STOP BAR

STATION LIMITS LOCATION LENGTH WIDTH NO. OF STOP AREA


BAR (sq.m.)

1474 + 981.500 LEFT SIDE 3.35 0.30 1.00 1.01


1475 + 127.171 RIGHT SIDE 3.35 0.3 1.00 1.01
TOTAL QUANTITY 2.010

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.


Contractor Project Engineer - DPWH

Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 15L0-0180 Contractor :
Project Name :
#REF!
ULTICON BUILDERS, INC.
Sta.8 + 680.00 – Sta.1526 + 800 (with equation)

Item : 612(1) Original Quantity : #REF! ###


Description : Reflectorized Thermoplastic Pavement Markings White Revised Quantity : 1,004.883 sq.m.

PROVISION OF PEDESTRIAN CROSSING

NO. OF STOP AREA


STATION LIMITS LOCATION LENGTH WIDTH
BAR (sq.m.)

1474 + 981.500 LEFT SIDE 4.00 0.30 11.00 13.20


1505 + 406.739 RIGHT SIDE 4.00 0.3 11.00 13.20
1505 + 440.000 4.00 0.30 17.00 20.40
1505 + 500.000 4.00 0.3 17.00 20.40
1505 + 610.000 4.00 0.30 17.00 20.40
1505 + 830.000 4.00 0.3 17.00 20.40
1505 + 900.000 4.00 0.3 17.00 20.40
TOTAL QUANTITY 128.400

REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS AREA

PAVEMENT MARKINGS 874.47

PROVISION OF STOP BAR 2.01

PROVISION OF PEDESTRIAN CROSSING 128.40

TOTAL QUANTITY 1,004.88 sq m

Submitted by: Checked and Verified by:


ULTICON BUILDERS, INC. #REF!
Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : ### Contractor :
Project Name :
#REF!
ULTICON BUILDERS, INC.

Item : 622(3)b Original Quantity : 13,586.80 sq m


Description : Vegetation Revised Quantity : 8,494.29 sq m

Distance SLOPE LENGTH AREA


INCLUSIVE STATION (m) (m) (sq.m.) REMARKS

1+110.366 TO 1+188.348
0001 + 110.366 17.58 RIGHT SIDE
30.391 630.92
0001 + 140.757 23.94 RIGHT SIDE
18.639 303.26
0001 + 159.396 8.60 RIGHT SIDE
28.952 321.66
0001 + 188.348 13.62 RIGHT SIDE
SUB-TOTAL 1,255.84

2+397.387 TO 2+560.378
0002 + 397.387 21.01 LEFT SIDE
30.273 768.03
0002 + 427.660 29.73 LEFT SIDE
20.458 553.39
0002 + 448.118 24.37 LEFT SIDE
21.898 366.03
0002 + 470.016 9.06 LEFT SIDE
21.796 165.21
0002 + 491.812 6.10 LEFT SIDE
20.046 129.90
0002 + 511.858 6.86 LEFT SIDE
20.000 220.60
0002 + 531.858 15.20 LEFT SIDE
28.520 403.27
0002 + 560.378 13.08 LEFT SIDE
SUB-TOTAL 2,606.43
Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. #REF!


Contractor Project Engineer - DPWH

Page 103 of 105


Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : ### Contractor :
Project Name :
#REF!
ULTICON BUILDERS, INC.

Item : 622(3)b Original Quantity : 13,586.800 sq m


Description : Vegetation Revised Quantity : 8,494.290 sq m

Distance SLOPE LENGTH AREA


INCLUSIVE STATION (m) (m) (sq.m.) REMARKS

3+308.092 TO 3+450.000
0003 + 308.092 12.96 RIGHT SIDE
30.973 321.96
0003 + 339.065 7.83 RIGHT SIDE
19.993 197.03
0003 + 359.058 11.88 RIGHT SIDE
19.870 259.01
0003 + 378.928 14.19 RIGHT SIDE
20.014 299.81
0003 + 398.942 15.77 RIGHT SIDE
19.563 252.66
0003 + 418.505 10.06 RIGHT SIDE
31.495 276.53
0003 + 450.000 7.50 RIGHT SIDE
SUB-TOTAL 1,607.00

3+748.633 TO 3+809.460
0003 + 748.633 9.84 LEFT SIDE
60.827 663.01
0003 + 778.089 15.43 LEFT SIDE
31.371 242.03
0003 + 809.460 11.96 LEFT SIDE
SUB-TOTAL 905.04

3+768.089 TO 3+899.436
0003 + 778.089 15.43 RIGHT SIDE
21.371 356.04
0003 + 799.460 16.77 RIGHT SIDE
19.786 165.91
0003 + 819.246 11.96 RIGHT SIDE
17.122 264.11
0003 + 836.368 12.18 RIGHT SIDE
21.761 132.52
0003 + 858.129 18.89 RIGHT SIDE
21.176 200.01
0003 + 879.305 14.75 RIGHT SIDE
20.131 148.47
0003 + 899.436 17.89 RIGHT SIDE
SUB-TOTAL 1,267.06

3+848.129 TO 3+899.436
0003 + 848.129 18.89 LEFT SIDE
31.176 524.38

Page 104 of 105


0003 + 879.305 14.75 LEFT SIDE
20.131 328.54
0003 + 899.436 17.89 LEFT SIDE
SUB-TOTAL 852.92
TOTAL QUANTITY 8,494.29

Submitted by: Checked and Verified by:

ULTICON BUILDERS, INC. #REF!


Contractor Project Engineer - DPWH

Page 105 of 105