AS-STAKED QUANTITIES
FOR THE
#REF!
Submitted by:
A. Operations & Maintenance of Field Office for the Engineer : 9.000 month
Surplus Rock Excavation (Rippable) : 38,425.000 ha (see earthworks back-up quantity sheet)
STATION 4+098.113
0004+098.113 INSTALL 1 - 3.0m x 3.0m x 13.0 LN. M W/WINGWALL ON BOTHSIDES. 27.00
PROVIDED WINGWALL AT B/S. IE = 123.258
STATION 4+580.032
0004+580.032 INSTALL 1 - 1.8m x 1.8m x 10.00 LN. M W/WINGWALL ON 41.25
BOTHSIDES. PROVIDED WINGWALL AT B/S. IE = 120.437
TOTAL 68.25
SAY 68.3
LENGTH
VOLUME
STATION (at the base of Headwall) REMARKS
OF RCPC
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE
HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
1 + 198.423 10.00 1.53 GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+198.423, IE =
260.068
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE
HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
1 + 420.000 11.00 1.64 GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+420.000, IE =
254.438
INSTALL 1-LINE 1520mmØ x 13.0 LN. M. RCPC PROVIDE
HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
1 + 638.945 13.00 3.09 GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+638.945 IE =
242.607
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE
HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
1 + 818.079 10.00 1.53 GROUTED RIPRAP CATCH BASIN AT L/S STATTION 1+818.079 IE =
251.610
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE
HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
2 + 058.998 11.00 1.64 GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+058.998 IE =
256.766
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE
2 + 289.120 11.00 1.64 HEADWALL WITH DUMPED STONE AND CHUTE AT R/S AND
GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+289.120 IE =
254.105
TOTAL QUANTITY AT THIS PAGE 11.07 cu.m.
Page 27 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH
Quantity Calculations
Agency : Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.
LENGTH VOLUME
STATION (at the base of Headwall) REMARKS
OF RCPC
STATION 4+098.113
4 + 098.113 13.00 12.75 INSTALL 1 - 3.0m x 3.0m x 13.0 LN. M W/WINGWALL ON
BOTHSIDES. PROVIDED WINGWALL AT B/S. IE = 123.258
STATION 4+580.032
4 + 580.032 10.00 12.71 INSTALL 1 - 1.8m x 1.8m x 10.00 LN. M W/WINGWALL ON
BOTHSIDES. PROVIDED WINGWALL AT B/S. IE = 120.437
STATION 4+687.000
INSTALL 1-LINE 1520mmØ x 14.00 LN. M RCPC PROVIDED
4 + 687.000 14.00 4.04 HEADWALL AT B/S AND DUMPED STONE PROTECTION AT B/S,
IE = 120.688
STATION 4+783.492
INSTALL 1-LINE 1220mmØ x 12.00 LN. M RCPC PROVIDED
4 + 783.492 12.00 2.74 HEADWALL AT B/S AND DUMPED STONE PROTECTION AT R/S,
IE = 122.372
Page 28 of 105
Submitted by: Checked and Verified by:
Quantity Calculations
Agency : Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.
LENGTH
STATION VOLUME REMARKS
OF RCPC (at the base of Headwall)
STATION 5+260.000
INSTALL 1-LINE 910mmØ x 11.00 LN. M RCPC PROVIDED
5 + 260.000 11.00 1.75 HEADWALL WITH DUMPED STONE AT R/S AND GROUTED
RIPRAP CATCH BASIN AT L/S. IE = 162.347
STATION 5+560.000
INSTALL 1-LINE 910mmØ x 13.00 LN. M RCPC PROVIDED
5 + 560.000 13.00 1.86 HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND
GROUTED RIPRAP CATCH BASIN AT R/S. IE = 165.848
STATION 5+780.000
5 + 780.000 12.00 2.88 INSTALL 1-LINE 1220mmØ x 12.00 LN. M RCPC PROVIDED
HEADWALL AT B/S AND DUMPED STONE AT L/S, IE = 149.117
STATION 6+040.000
6 + 040.000 12.00 2.15 INSTALL 1-LINE 910mmØ x 12.00 LN. M RCPC PROVIDED
HEADWALL AT B/S AND DUMPED STONE AT R/S, IE = 160.795
STATION 6+260.000
INSTALL 1-LINE 910mmØ x 12.00 LN. M RCPC PROVIDED
6 + 260.000 12.00 1.75 HEADWALL WITH AND DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S, IE = 180.496
STATION 6+760.000
INSTALL 1-LINE 910mmØ x 12.00 LN. M RCPC PROVIDED
6 + 760.000 12.00 1.75 HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND
GROUTED RIPRAP CATCH BASIN AT R/S, IE = 181.623
STATION 6+960.000
INSTALL 1-LINE 910mmØ x 13.00 LN. M RCPC PROVIDED
6 + 960.000 13.00 1.86 HEADWALL WITH DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S, IE = 174.153
STATION 7+160.000
INSTALL 1-LINE 910mmØ x 13.00 LN. M RCPC PROVIDED
7 + 160.000 13.00 1.86 HEADWALL WITH DUMPED STONE AT L/S AND GROUTED
RIPRAP CATCH BASIN AT R/S, IE = 151.311
Page 29 of 105
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.
VOLUME
STATION DESCRIPTION REMARKS
(Cu.m.)
VOLUME
STATION DESCRIPTION REMARKS
(Cu.m.)
NORMAL WIDTH
STATION LENGTH WIDTH AREA REMARKS
FROM TO (m) (m) (sq.m.)
EQUATIONS
STATION LENGTH WIDTH AREA REMARKS
BACK AHEAD (m) (m) (sq.m.)
0001 + 367.093 0001 + 407.750 -40.657 5.000 -203.290 2 LANES
0001 + 708.895 0001 + 737.814 -28.919 5.000 -144.600 2 LANES
0001 + 961.125 0001 + 983.137 -22.012 5.000 -110.060 2 LANES
0002 + 606.046 0002 + 651.683 -45.637 5.000 -228.190 2 LANES
0002 + 958.515 0003 + 000.765 -42.250 5.000 -211.250 2 LANES
0003 + 438.798 0003 + 440.770 -1.972 5.000 -9.860 2 LANES
0004 + 540.148 0004 + 531.928 8.220 5.000 41.100 2 LANES
0004 + 634.197 0004 + 639.474 -5.277 5.000 -26.390 2 LANES
0004 + 824.309 0004 + 820.155 4.154 5.000 20.770 2 LANES
0004 + 902.405 0004 + 902.674 -0.269 5.000 -1.350 2 LANES
TOTAL QUANTITY (EQUATION) -174.619 -873.120 sq m
Page 40 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
###
ULTICON BUILDERS, INC.
EXCEPTION
STATION LENGTH WIDTH AREA REMARKS
BACK AHEAD (m) (m) (sq.m.)
0004 + 220.000 0004 + 420.000 -200.000 5.000 -1,000.000 2 LANES
TOTAL QUANTITY (EQUATION) -200.000 -1,000.000
Page 41 of 105
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
###
ULTICON BUILDERS, INC.
TOTAL 8103.00
SAY 8103.00
TOTAL 121.00
SAY 121.00
LENGTH
(ln.m.)
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 198.423 10.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+198.423, IE =
260.068
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 420.000 11.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+420.000, IE =
254.438
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 818.079 10.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATTION 1+818.079 IE =
251.610
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 058.998 11.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+058.998 IE =
256.766
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 289.120 11.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+289.120 IE =
254.105
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 338.178 10.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+338.178 IE =
253.256
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 511.858 10.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+511.858 IE =
261.836
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 747.488 11.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+747.488 IE =
261.090
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 937.363 10.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+937.363 IE =
239.842
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 219.129 11.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+219.129 IE =
227.816
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 578.929 11.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+578.929 IE =
197.911
INSTALL 1-LINE 910mmØ x 12.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 836.368 12.00 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+836.368 IE =
164.817
INSTALL 1-LINE 910mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AT
3 + 977.097 13.00 910mmØ L/S AND GROUTED RIPRAP CATCH BASIN AT R/S STATION 3+977.097 IE = 143.495
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.
LENGTH
(ln.m.)
STATION 5+560.000 INSTALL 1-LINE 910mmØ x
5 + 560.000 13.00 910mmØ 13.00 LN. M RCPC PROVIDED HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND
GROUTED RIPRAP CATCH BASIN AT R/S. IE = 165.848
LENGTH
(ln.m.)
STATION 4+783.492 INSTALL 1-LINE
4 + 783.492 11.00 1220mmØ 1220mmØ x 12.00 LN. M RCPC PROVIDED HEADWALL AT B/S AND DUMPED
STONE PROTECTION AT R/S, IE = 122.372
LENGTH
(ln.m.)
INSTALL 1-LINE 1520mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
1 + 638.945 13.00 1520mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+638.945 IE =
242.607
INSTALL 1-LINE 1520mmØ x 14.0 LN. M. RCPC PROVIDE HEADWALL AT B/S AND DUMPED
4 + 960.000 14.00 1520mmØ STONE PROTECTION AT L/S STATION 4+960.000, IE = 124.852
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 511.858 14.90 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+511.858 IE =
261.836
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 747.488 14.90 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+747.488 IE =
261.090
Page 49 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name :
Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
ULTICON BUILDERS, INC.
Volume
STATION (cu.m.) REMARKS
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
2 + 937.363 41.09 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+937.363 IE =
239.842
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 219.129 14.90 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+219.129 IE =
227.816
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 578.929 14.90 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+578.929 IE =
197.911
INSTALL 1-LINE 910mmØ x 12.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 836.368 14.90 AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+836.368 IE =
164.817
INSTALL 1-LINE 910mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AT
3 + 977.097 14.90 L/S AND GROUTED RIPRAP CATCH BASIN AT R/S STATION 3+977.097 IE = 143.495
Page 50 of 105
Submitted by: Checked and Verified by:
Page 51 of 105
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : ### Contractor :
Project Name :
#REF!
ULTICON BUILDERS, INC.
Total Quantity for Grouted Riprap (Class A) = Quantity for Catch Basin + Quantity for Lined Canal
Total Quantity for Grouted Riprap (Class A) = 1,484.590 cu.m.
SAY, 1,484.600 cu.m.
Page 52 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH
Page 53 of 105
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.
Volume
STATION PIPE SIZE REMARKS
(cu.m.) INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 578.929 3.98 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+578.929 IE =
197.911
INSTALL 1-LINE 910mmØ x 12.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE
3 + 836.368 3.98 910mmØ AND CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+836.368 IE =
164.817
STATION 4+687.000 INSTALL 1-LINE 1520mmØ x
4 + 687.000 23.24 1520mmØ 14.00 LN. M RCPC PROVIDED HEADWALL AT B/S AND DUMPED STONE PROTECTION AT B/S,
IE = 120.688
STATION 4+783.492 INSTALL 1-LINE 1220mmØ x
4 + 783.492 14.50 1220mmØ 12.00 LN. M RCPC PROVIDED HEADWALL AT B/S AND DUMPED STONE PROTECTION AT R/S,
IE = 122.372
INSTALL 1-LINE 1520mmØ x 14.0 LN. M. RCPC PROVIDE HEADWALL AT B/S AND DUMPED
4 + 960.000 23.24 1520mmØ STONE PROTECTION AT L/S STATION 4+960.000, IE = 124.852
INSTALL 1-LINE 910mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AT
3 + 977.097 3.98 910mmØ L/S AND GROUTED RIPRAP CATCH BASIN AT R/S STATION 3+977.097 IE = 143.495
Volume
STATION PIPE SIZE REMARKS
(cu.m.)
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
1 + 198.423 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+198.423, IE = 260.068
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
1 + 420.000 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+420.000, IE = 254.438
INSTALL 1-LINE 1520mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
1 + 638.945 1.66 1520mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 1+638.945 IE = 242.607
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
1 + 818.079 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATTION 1+818.079 IE = 251.610
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
2 + 058.998 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+058.998 IE = 256.766
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
2 + 289.120 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+289.120 IE = 254.105
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
2 + 338.178 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+338.178 IE = 253.256
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
2 + 511.858 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+511.858 IE = 261.836
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
2 + 747.488 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+747.488 IE = 261.090
INSTALL 1-LINE 910mmØ x 10.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
2 + 937.363 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 2+937.363 IE = 239.842
Volume
STATION PIPE SIZE REMARKS
(cu.m.)
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
3 + 219.129 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+219.129 IE = 227.816
INSTALL 1-LINE 910mmØ x 11.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
3 + 578.929 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+578.929 IE = 197.911
INSTALL 1-LINE 910mmØ x 12.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AND
3 + 836.368 1.14 910mmØ CHUTE AT R/S AND GROUTED RIPRAP CATCH BASIN AT L/S STATION 3+836.368 IE = 164.817
INSTALL 1-LINE 1520mmØ x 14.0 LN. M. RCPC PROVIDE HEADWALL AT B/S AND DUMPED STONE
4 + 960.000 3.33 1520mmØ PROTECTION AT L/S STATION 4+960.000, IE = 124.852
INSTALL 1-LINE 910mmØ x 13.0 LN. M. RCPC PROVIDE HEADWALL WITH DUMPED STONE AT L/S
3 + 977.097 1.14 910mmØ AND GROUTED RIPRAP CATCH BASIN AT R/S STATION 3+977.097 IE = 143.495
GUARDRAILS SCHEDULE
4 + 634.197 4 + 639.474
4 + 634.197 4 + 639.474
GUARDRAILS SCHEDULE
4 + 634.197 4 + 639.474
4 + 634.197 4 + 639.474
TOTAL QUANTITY 32
GRAND TOTAL 32
2+397.387 TO 2+560.378
0002 + 397.387 5.00 LEFT SIDE
30.273 181.64
0002 + 427.660 7.00 LEFT SIDE
20.458 122.75
0002 + 448.118 5.00 LEFT SIDE
21.898 76.64
0002 + 470.016 2.00 LEFT SIDE
21.796 32.69
0002 + 491.812 1.00 LEFT SIDE
20.046 20.05
0002 + 511.858 1.00 LEFT SIDE
20.000 40.00
0002 + 531.858 3.00 LEFT SIDE
28.520 85.56
0002 + 560.378 3.00 LEFT SIDE
SUB-TOTAL 559.33
TOTAL THIS PAGE 755.73
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 17L0-0191 Contractor :
Project Name : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del
Norte
ULTICON BUILDERS, INC.
Page 67 of 105
Page 68 of 105
NO. OF
Distance COCO LOGS TOTAL LENGTH OF
INCLUSIVE STATION COCO-LOGS REMARKS
(m) (ln.m.)
(pcs)
3+308.092 TO 3+450.000
0003 + 308.092 3.00 RIGHT SIDE
30.973 77.43
0003 + 339.065 2.00 RIGHT SIDE
19.993 49.98
0003 + 359.058 3.00 RIGHT SIDE
19.870 59.61
0003 + 378.928 3.00 RIGHT SIDE
20.014 70.05
0003 + 398.942 4.00 RIGHT SIDE
19.563 68.47
0003 + 418.505 3.00 RIGHT SIDE
31.495 78.74
0003 + 450.000 2.00 RIGHT SIDE
SUB-TOTAL 404.28
3+748.633 TO 3+809.460
0003 + 748.633 2.00 LEFT SIDE
60.827 182.48
0003 + 778.089 4.00 LEFT SIDE
31.371 62.74
0003 + 809.460 4.00 LEFT SIDE
SUB-TOTAL 245.22
3+768.089 TO 3+899.436
0003 + 778.089 4.00 RIGHT SIDE
21.371 96.17
0003 + 799.460 4.00 RIGHT SIDE
19.786 39.57
0003 + 819.246 3.00 RIGHT SIDE
17.122 25.68
0003 + 836.368 3.00 RIGHT SIDE
21.761 32.64
0003 + 858.129 6.00 RIGHT SIDE
21.176 63.53
0003 + 879.305 6.00 RIGHT SIDE
20.131 60.39
0003 + 899.436 5.00 RIGHT SIDE
SUB-TOTAL 317.98
3+848.129 TO 3+899.436
0003 + 848.129 6.00 LEFT SIDE
31.176 187.06
0003 + 879.305 6.00 LEFT SIDE
20.131 110.72
0003 + 899.436 5.00 LEFT SIDE
SUB-TOTAL 297.78
TOTAL THIS PAGE 1,265.26
Page 69 of 105
DRAINAGE SCHEDULE
103(1)a 103(3) 103(6)a 404(1)a 405(1)a3 500(1)b3 500(1)b5 505(1)b6 505(2)a 506(1) 508(1) 622(2)c 622(3)b DESIGN PARAMETERS
STATION DESCRIPTION REMARKS
cu.m. cu.m. cu.m. kgs. cu.m. cu.m. ln.m. ln.m. ln.m. ln.m. cu.m. cu.m. cu.m. Q(cu.m./s.) A(has.) v(m/s)
STATION 4+098.113
0004 + 098.113 INSTALL 1 - 3.0m x 3.0m x 13.0 LN. M W/WINGWALL 27.00 12.75 8.06 5848.00 88.00 26.833 65.436 2.981
ON BOTHSIDES. PROVIDED WINGWALL AT B/S. IE = 123.258
STATION 4+580.032
0004 + 580.032 INSTALL 1 - 1.8m x 1.8m x 10.00 LN. M W/WINGWALL 41.25 12.71 20.76 2255.00 33.00 6.872 17.600 2.121
ON BOTHSIDES. PROVIDED WINGWALL AT B/S. IE = 120.437
STATION 4+687.000
INSTALL 1-LINE 1520mmØ x 14.00 LN. M RCPC PROVIDED
0004 + 687.000 HEADWALL AT B/S AND DUMPED STONE PROTECTION AT B/S,
4.04 6.27 14.00 23.24 3.33 8.975 3.313 4.946
IE = 120.688
STATION 4+783.492
INSTALL 1-LINE 1220mmØ x 12.00 LN. M RCPC PROVIDED
0004 + 783.492 HEADWALL AT B/S AND DUMPED STONE PROTECTION AT R/S,
2.74 122.34 11.00 14.50 1.40 4.994 2.988 4.272
IE = 122.372
INSTALL 1-LINE 1520mmØ x 14.0 LN. M. RCPC PROVIDE
0004 + 960.000 HEADWALL AT B/S AND DUMPED STONE PROTECTION AT L/S 4.04 33.50 14.00 23.24 3.33 8.975 12.291 4.946
STATION 4+960.000, IE = 124.852
STATION 5+260.000
INSTALL 1-LINE 910mmØ x 11.00 LN. M RCPC
0005 + 260.000 PROVIDED HEADWALL WITH DUMPED STONE AT R/S AND
1.75 38.83 12.00 14.90 3.98 1.14 2.285 3.716 3.514
GROUTED RIPRAP CATCH BASIN AT L/S. IE = 162.347
STATION 5+560.000
INSTALL 1-LINE 910mmØ x 13.00 LN. M RCPC PROVIDED
0005 + 560.000 HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND
1.86 116.97 13.00 14.90 3.98 1.14 2.285 5.575 3.514
GROUTED RIPRAP CATCH BASIN AT R/S. IE = 165.848
STATION 5+780.000
0005 + 780.000 INSTALL 1-LINE 1220mmØ x 12.00 LN. M RCPC PROVIDED 2.88 76.71 12.00 14.50 1.40 4.994 12.466 4.272
HEADWALL AT B/S AND DUMPED STONE AT L/S, IE = 149.117
STATION 6+040.000
0006 + 040.000 INSTALL 1-LINE 910mmØ x 12.00 LN. M RCPC PROVIDED 2.15 58.55 12.00 7.96 1.14 2.285 6.153 3.514
HEADWALL AT B/S AND DUMPED STONE AT R/S, IE = 160.795
STATION 6+260.000
INSTALL 1-LINE 910mmØ x 12.00 LN. M RCPC PROVIDED
0006 + 260.000 HEADWALL WITH AND DUMPED STONE AT L/S AND GROUTED
1.75 120.26 12.00 14.90 3.98 1.14 2.285 5.035 3.514
RIPRAP CATCH BASIN AT R/S, IE = 180.496
STATION 6+760.000
INSTALL 1-LINE 910mmØ x 12.00 LN. M RCPC PROVIDED
0006 + 760.000 HEADWALL WITH DUMPED STONE PROTECTION AT L/S AND
1.75 48.52 12.00 14.90 3.98 1.14 2.285 6.291 3.514
GROUTED RIPRAP CATCH BASIN AT R/S, IE = 181.623
STATION 6+960.000
INSTALL 1-LINE 910mmØ x 13.00 LN. M RCPC PROVIDED
0006 + 960.000 HEADWALL WITH DUMPED STONE AT L/S AND GROUTED RIPRAP
1.86 66.14 13.00 14.90 3.98 1.14 2.285 5.994 3.514
CATCH BASIN AT R/S, IE = 174.153
STATION 7+160.000
INSTALL 1-LINE 910mmØ x 13.00 LN. M RCPC PROVIDED
0007 + 160.000 HEADWALL WITH DUMPED STONE AT L/S AND GROUTED
1.86 102.78 13.00 14.90 3.98 1.14 2.285 5.952 3.514
RIPRAP CATCH BASIN AT R/S, IE = 151.311
3+300.122 TO 3+577.429 277.31 LN. M GROUTED RIPRAP LINED CANAL 232.94 RIGHT SIDE 1.529 4.936 4.217
3+580.429 TO 3+834.868 254.44 LN. M GROUTED RIPRAP LINED CANAL 213.73 RIGHT SIDE 1.538 5.038 4.242
3+837.868 TO 3+899.436 61.57 LN. M GROUTED RIPRAP LINED CANAL 51.72 RIGHT SIDE 1.529 5.768 4.217
3+300.122 TO 3+577.429 277.31 LN. M GROUTED RIPRAP LINED CANAL 232.94 LEFT SIDE 1.529 5.768 4.217
3+837.868 TO 3+899.436 61.57 LN. M GROUTED RIPRAP LINED CANAL 51.75 LEFT SIDE 1.160 1.281 3.201
3+738.624 TO 3+834.868 96.24 LN. M GROUTED RIPRAP LINED CANAL 80.84 LEFT SIDE 1.538 2.483 4.242
2+748.988 TO 2+935.863 186.88 LN. M GROUTED RIPRAP LINED CANAL 156.98 LEFT SIDE 0.802 2.579 2.212
TOTAL QUANTITY 68.25 76.33 1,423.74 8,103.00 121.00 228.00 23.00 41.00 1,411.69 170.68 33.92 1,752.44 9,042.06
3+300.122 TO 3+577.429 68.00 76.33 1,423.74 8,103.00 121.00 228.00 23.00 41.00 1,412.00 171.00 34.00 1,752.00 9,042.00
2690.99 13586.78
Submitted by: Checked and Verified by:
Project ID : 17L0-0191
Project Name :
Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
START OF S1 AND
0001+000.000 - 6.870 - - 9.700 2.540 -
CONCRETING
20.005 2.200 44.010 4.720 94.420 - - - - 3.480 69.620 4.850 97.020 2.540 50.810 - -
20.361 2.200 44.790 13.680 278.540 - - - - 16.030 326.390 8.880 180.810 2.540 51.720 - -
20.391 2.620 53.420 15.960 325.440 - - - - 52.540 1,071.340 6.870 140.090 2.540 51.790 - -
18.639 7.670 142.960 20.380 379.860 - - - - 37.080 691.130 7.380 137.560 2.540 47.340 - -
18.952 6.830 129.440 17.860 338.480 - - - - 22.450 425.470 5.970 113.140 2.560 48.520 - -
20.075 3.330 66.850 8.350 167.630 - - - - 47.460 952.760 2.470 49.590 2.560 51.390 - -
20.033 5.680 113.790 20.890 418.490 - - - - 30.910 619.220 5.250 105.170 2.550 51.080 - -
9.348 6.880 64.310 28.280 264.360 - - - - 5.370 50.200 8.540 79.830 2.550 23.840 - -
5.119 6.320 32.350 41.860 214.280 - - - - 0.030 0.150 9.210 47.150 2.550 13.050 - -
Page 75 of 105
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
20.56 4.150 85.320 9.860 202.710 - - - - 0.520 10.690 6.330 130.140 2.550 52.430 - -
EQUATION -40.657
20.00 2.640 52.800 6.720 134.400 - - - - 0.050 1.000 8.650 173.000 1.220 24.400 - -
20.000 4.710 94.200 6.960 139.200 - - - - 0.100 2.000 7.680 153.600 2.490 49.800 - -
20.815 2.070 43.090 6.730 140.080 - - - - 0.130 2.710 8.230 171.310 2.490 51.830 - -
20.137 8.160 164.320 33.720 679.020 - - - - 11.750 236.610 4.870 98.070 2.550 51.350 - -
24.458 6.520 159.470 15.170 371.030 - - - - 13.500 330.180 4.870 119.110 2.560 62.610 - -
11.286 6.870 77.530 9.730 109.810 - - - - 13.500 152.360 4.880 55.080 2.560 28.890 - -
Page 76 of 105
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
18.928 9.500 179.820 74.980 1,419.220 - - - - 4.830 91.420 5.350 101.260 2.560 48.460 - -
EQUATION -28.919
20.000 1.790 35.800 4.170 83.400 - - - - 4.840 96.800 2.960 59.200 2.520 50.400 - -
20.000 1.790 35.800 6.370 127.400 - - - - 1.570 31.400 7.170 143.400 2.520 50.400 - -
20.247 4.510 91.310 13.030 263.820 - - - - 1.040 21.060 9.470 191.740 2.550 51.630 - -
17.832 4.510 80.420 13.330 237.700 - - - - 14.110 251.610 6.590 117.510 2.550 45.470 - -
25.530 6.660 170.030 28.260 721.480 - - - - 14.110 360.230 6.590 168.240 2.550 65.100 - -
20.636 6.660 137.440 4.140 85.430 - - - - 0.730 15.060 6.510 134.340 2.540 52.420 - -
Page 77 of 105
Contractor Project Engineer - DPWH
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
3.137 4.310 13.520 8.230 25.820 - - - - 2.300 7.220 2.670 8.380 2.520 7.910 - -
EQUATION -22.012
16.864 4.310 72.680 8.230 138.790 - - - - 2.300 38.790 2.670 45.030 2.520 42.500 - -
19.452 7.670 149.200 20.660 401.880 - - - - 1.830 35.600 3.530 68.670 2.520 49.020 - -
19.522 8.280 161.640 21.360 416.990 - - - - 0.580 11.320 5.170 100.930 2.550 49.780 - -
20.023 2.690 53.860 7.760 155.380 - - - - 17.000 340.390 3.110 62.270 2.550 51.060 - -
19.841 2.470 49.010 7.080 140.470 - - - - 16.960 336.500 3.430 68.050 2.540 50.400 - -
20.172 5.710 115.180 12.130 244.690 - - - - 0.290 5.850 7.820 157.750 2.540 51.240 - -
Page 78 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
15.132 10.420 157.680 20.600 311.720 - - - - 3.020 45.700 9.290 140.580 2.560 38.740 - -
21.926 11.730 257.190 30.650 672.030 - - - - 3.020 66.220 9.270 203.250 2.550 55.910 - -
20.458 24.430 499.790 231.760 4,741.350 - - - - 0.130 2.660 8.940 182.890 2.540 51.960 - -
21.898 14.430 315.990 101.160 2,215.200 - - - - 2.000 43.800 5.720 125.260 2.550 55.840 - -
21.796 8.370 182.430 22.740 495.640 - - - - 1.870 40.760 6.100 132.960 2.550 55.580 - -
Page 79 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
EQUATION -45.637
20.000 7.280 145.600 23.520 470.400 - - - - 9.230 184.600 9.210 184.200 2.540 50.800 - -
20.939 10.230 214.210 61.750 1,292.980 - - - - 9.230 193.270 9.240 193.480 2.550 53.390 - -
21.229 17.470 370.870 51.330 1,089.680 48.720 1,034.280 - - - - 9.740 206.770 2.560 54.350 - -
25.320 18.230 461.580 13.360 338.280 48.720 1,233.590 - - - - 9.720 246.110 2.550 64.570 - -
20.301 14.710 298.630 19.390 393.640 - - - - 1.260 25.580 7.580 153.880 2.390 48.520 - -
22.913 16.450 376.920 41.700 955.470 - - - - 1.260 28.870 7.730 177.120 2.390 54.760 - -
21.197 15.290 324.100 71.140 1,507.950 - - - - 0.050 1.060 8.980 190.350 2.390 50.660 - -
Page 80 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
21.230 5.090 108.060 13.930 295.730 - - - - 2.490 52.860 4.510 95.750 2.470 52.440 - -
20.387 7.000 142.710 14.940 304.580 - - - - 19.280 393.060 7.370 150.250 2.650 54.030 - -
EQUATION -42.250
20.000 2.640 52.800 8.240 164.800 - - - - 0.190 3.800 9.030 180.600 2.520 50.400 - -
20.839 10.850 226.100 32.930 686.230 - - - - 0.080 1.670 9.280 193.390 2.520 52.510 - -
Page 81 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
Contractor Project Engineer - DPWH
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
26.311 12.390 325.990 65.400 1,720.740 - - - - 0.140 3.680 9.230 242.850 2.550 67.090 - -
23.809 14.050 334.520 56.220 1,338.540 - - - - 0.140 3.330 8.480 201.900 2.400 57.140 - -
EQUATION -1.972
Page 82 of 105
Submitted by: Checked and Verified by:
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
19.458 7.280 141.650 21.950 427.100 - - - - 3.480 67.710 4.480 87.170 2.390 46.500 - -
Page 83 of 105
CUMULATIVE 30,149.730 150,847.200 2,267.870 - 12,190.870 20,857.180 6,506.270 -
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
18.876 6.500 122.690 19.210 362.610 - - - - 9.790 184.800 5.660 106.840 1.400 26.430 - -
20.523 7.360 151.050 14.630 300.250 - - - - 6.750 138.530 4.500 92.350 1.400 28.730 - -
10.538 6.640 69.970 8.060 84.940 - - - - 15.830 166.820 4.500 47.420 1.400 14.750 - -
Page 84 of 105
TOTAL THIS PAGE 3,216.820 21,265.590 - - 5,835.000 1,560.950 500.000 -
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
START OF S2 AND
0004+420.878 - 4.590 - - - 9.000 1.400 -
GRAVELING
Page 85 of 105
20.577 - - - - - - - - 13.940 286.840 - - 1.400 28.810 - -
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
EQUATION 8.220
20.004 - - 0.220 4.400 - - - - 7.440 148.830 0.240 4.800 1.400 28.010 0.250 5.000
EQUATION -5.277
0.526 - - 0.220 0.120 - - - - 7.440 3.910 0.240 0.130 1.400 0.740 0.250 0.130
Page 86 of 105
20.007 - - 0.230 4.600 - - - - 9.110 182.260 - - 1.400 28.010 - -
Page 87 of 105
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
16.115 5.880 94.760 0.850 13.700 - - - - 5.240 84.440 1.240 19.980 1.400 22.560 - -
4.309 10.950 47.180 0.570 2.460 - - - - 3.260 14.050 1.010 4.350 1.400 6.030 - -
EQUATION 4.154
19.845 10.950 217.300 0.570 11.310 - - - - 3.260 64.690 1.010 20.040 1.400 27.780 - -
EQUATION -0.269
Page 88 of 105
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
20.000 13.020 260.400 9.030 180.600 - - - - 9.190 183.800 3.040 60.800 1.400 28.000 - -
20.000 11.300 226.000 19.450 389.000 - - - - 5.670 113.400 5.840 116.800 1.400 28.000 - -
20.000 6.010 120.200 10.420 208.400 - - - - 32.120 642.400 2.800 56.000 1.400 28.000 - -
20.000 6.240 124.800 0.870 17.400 - - - - 18.460 369.200 0.660 13.200 1.360 27.200 - -
20.000 13.030 260.600 7.290 145.800 - - - - 8.870 177.400 1.360 27.200 1.360 27.200 - -
20.000 11.010 220.200 9.010 180.200 - - - - 0.390 7.800 7.050 141.000 1.400 28.000 - -
20.000 7.470 149.400 3.760 75.200 - - - - 1.900 38.000 4.160 83.200 1.400 28.000 - -
20.000 6.860 137.200 2.470 49.400 - - - - 2.870 57.400 3.090 61.800 1.400 28.000 - -
20.000 6.620 132.400 1.750 35.000 - - - - 2.720 54.400 2.570 51.400 1.400 28.000 - -
20.000 12.270 245.400 23.200 464.000 - - - - 1.360 27.200 5.590 111.800 1.400 28.000 - -
20.000 9.040 180.800 22.950 459.000 - - - - 1.780 35.600 5.090 101.800 1.400 28.000 - -
20.000 4.210 84.200 2.140 42.800 - - - - 1.920 38.400 3.620 72.400 1.400 28.000 - -
Page 89 of 105
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
20.000 9.600 192.000 1.730 34.600 - - - - 3.400 68.000 3.040 60.800 1.400 28.000 - -
20.000 9.000 180.000 0.670 13.400 - - - - 5.690 113.800 1.130 22.600 1.400 28.000 - -
20.000 10.000 200.000 5.470 109.400 - - - - 1.300 26.000 5.630 112.600 1.400 28.000 - -
20.000 11.950 239.000 6.570 131.400 - - - - 0.010 0.200 8.560 171.200 1.400 28.000 - -
20.000 11.410 228.200 3.180 63.600 - - - - 0.010 0.200 8.620 172.400 1.400 28.000 - -
20.000 10.030 200.600 2.520 50.400 - - - - 0.080 1.600 7.340 146.800 1.400 28.000 - -
20.000 8.360 167.200 2.620 52.400 - - - - 0.080 1.600 6.370 127.400 1.400 28.000 - -
20.000 7.170 143.400 2.300 46.000 - - - - 0.580 11.600 5.210 104.200 1.400 28.000 - -
20.000 4.910 98.200 1.480 29.600 - - - - 1.450 29.000 2.950 59.000 1.400 28.000 - -
20.000 3.760 75.200 1.070 21.400 - - - - 2.400 48.000 1.910 38.200 1.400 28.000 - -
20.000 4.040 80.800 1.200 24.000 - - - - 2.210 44.200 2.150 43.000 1.400 28.000 - -
20.000 9.060 181.200 3.790 75.800 - - - - 0.690 13.800 6.080 121.600 1.400 28.000 - -
Page 90 of 105
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
20.000 6.120 122.400 0.800 16.000 - - - - 1.320 26.400 4.500 90.000 1.400 28.000 - -
20.000 6.180 123.600 1.170 23.400 - - - - 0.710 14.200 4.500 90.000 1.400 28.000 - -
Page 91 of 105
Contractor Project Engineer - DPWH
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
20.000 6.110 122.200 0.950 19.000 - - - - 0.740 14.800 4.500 90.000 1.400 28.000 - -
20.000 6.160 123.200 1.210 24.200 - - - - 0.740 14.800 4.500 90.000 1.400 28.000 - -
Page 92 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
20.000 11.420 228.400 3.370 67.400 - - - - 0.130 2.600 6.960 139.200 1.400 28.000 - -
20.000 11.500 230.000 3.450 69.000 - - - - 0.130 2.600 7.480 149.600 1.400 28.000 - -
20.000 13.900 278.000 13.830 276.600 - - - - 0.150 3.000 8.020 160.400 1.400 28.000 - -
20.000 12.170 243.400 4.850 97.000 - - - - 0.430 8.600 5.680 113.600 1.400 28.000 - -
20.000 12.650 253.000 6.210 124.200 - - - - 0.290 5.800 6.660 133.200 1.400 28.000 - -
Page 93 of 105
ULTICON BUILDERS, INC. ANACLETO V. CALAMBA, JR.
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
20.000 13.380 267.600 8.080 161.600 - - - - 0.670 13.400 6.930 138.600 1.400 28.000 - -
20.000 12.440 248.800 5.370 107.400 - - - - 0.720 14.400 6.250 125.000 1.400 28.000 - -
20.000 12.070 241.400 6.830 136.600 - - - - 0.050 1.000 8.130 162.600 1.400 28.000 - -
20.000 12.190 243.800 6.850 137.000 - - - - 0.130 2.600 7.810 156.200 1.400 28.000 - -
20.000 12.370 247.400 5.200 104.000 - - - - 0.600 12.000 6.060 121.200 0.700 14.000 - -
20.000 12.480 249.600 5.610 112.200 - - - - 1.170 23.400 4.800 96.000 0.700 14.000 - -
20.000 12.520 250.400 5.360 107.200 - - - - 1.370 27.400 4.470 89.400 1.400 28.000 - -
Page 94 of 105
Submitted by: Checked and Verified by:
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
20.000 12.520 250.400 4.870 97.400 - - - - 0.930 18.600 5.440 108.800 1.400 28.000 - -
20.000 12.550 251.000 6.700 134.000 - - - - 0.360 7.200 6.900 138.000 0.700 14.000 - -
20.000 13.310 266.200 9.880 197.600 - - - - 0.110 2.200 8.170 163.400 0.700 14.000 - -
20.000 12.560 251.200 7.460 149.200 - - - - 0.340 6.800 7.180 143.600 1.400 28.000 - -
20.000 12.620 252.400 4.770 95.400 - - - - 0.340 6.800 7.100 142.000 1.400 28.000 - -
Page 95 of 105
CUMULATIVE 59,412.150 187,386.790 2,267.870 - 30,712.200 38,326.450 11,128.260 10.130
QUANTITY CALCULATIONS
Agency : Department of Public Works and Highways
AS-STAKED QUANTITIES
Regional Office XI, Davao City
END OF
0007+360.000 12.420 2.660 - - - 9.000 1.400 -
GRAVELING
SUMMARY :
Item 100(1) Clearing & Grubbing Item 104 (1) Embankment (from Common Excavation)
Item 102(2) Surplus Common Excavation Item 105 (1) Subgrade Preparation
Page 96 of 105
Item 102(3) Surplus Rock Excavation (Solid)
Page 97 of 105
Contract ID : 17L0-0191
Name of Project : Concreting of Sitio Tawngatok, Brgy. Gupitan - Loreto Boundary, Davao del Norte
Location : Kapalong, Davao del Norte
Appropriation : 17L0-0191
ABC :
-3.08%
154,400,000.00
Duration : 269.00 days
Dropping : October 10, 2017
T O TAL
AB C
17L0-0191
-3.08%
Contract
Amount
196,425.69
1,002,456.00
158,651.64
131,733.00
9,475.20
210,924.00
174,258.00
351,798.09
874,692.00
36,929,551.12
19,392,329.00
23,150.97
163,359.06
441,660.21
12,413,002.08
776,512.82
23,137,658.70
26,907,975.64
621,013.92
1,501,363.16
1,871,241.60
312,270.77
765,505.26
5,930,565.82
966,293.44
77,175.05
7,023,042.91
675,108.16
798,396.01
2,237,508.00
1,353,303.90
2,214,376.66
PHP 149,642,777.88
154,400,000.00
(4,757,222.12)
-3.08%
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 15L0-0180 Contractor :
Project Name :
#REF!
Sta.8 + 680.00 – Sta.1526 + 800 (with equation)
ULTICON BUILDERS, INC.
Quantity Calculations
Agency: Department of Public Works and Highways
Region XI, Davao City
AS-STAKED QUANTITY
Project ID : 15L0-0180 Contractor :
Project Name :
#REF!
ULTICON BUILDERS, INC.
Sta.8 + 680.00 – Sta.1526 + 800 (with equation)
1+110.366 TO 1+188.348
0001 + 110.366 17.58 RIGHT SIDE
30.391 630.92
0001 + 140.757 23.94 RIGHT SIDE
18.639 303.26
0001 + 159.396 8.60 RIGHT SIDE
28.952 321.66
0001 + 188.348 13.62 RIGHT SIDE
SUB-TOTAL 1,255.84
2+397.387 TO 2+560.378
0002 + 397.387 21.01 LEFT SIDE
30.273 768.03
0002 + 427.660 29.73 LEFT SIDE
20.458 553.39
0002 + 448.118 24.37 LEFT SIDE
21.898 366.03
0002 + 470.016 9.06 LEFT SIDE
21.796 165.21
0002 + 491.812 6.10 LEFT SIDE
20.046 129.90
0002 + 511.858 6.86 LEFT SIDE
20.000 220.60
0002 + 531.858 15.20 LEFT SIDE
28.520 403.27
0002 + 560.378 13.08 LEFT SIDE
SUB-TOTAL 2,606.43
Submitted by: Checked and Verified by:
3+308.092 TO 3+450.000
0003 + 308.092 12.96 RIGHT SIDE
30.973 321.96
0003 + 339.065 7.83 RIGHT SIDE
19.993 197.03
0003 + 359.058 11.88 RIGHT SIDE
19.870 259.01
0003 + 378.928 14.19 RIGHT SIDE
20.014 299.81
0003 + 398.942 15.77 RIGHT SIDE
19.563 252.66
0003 + 418.505 10.06 RIGHT SIDE
31.495 276.53
0003 + 450.000 7.50 RIGHT SIDE
SUB-TOTAL 1,607.00
3+748.633 TO 3+809.460
0003 + 748.633 9.84 LEFT SIDE
60.827 663.01
0003 + 778.089 15.43 LEFT SIDE
31.371 242.03
0003 + 809.460 11.96 LEFT SIDE
SUB-TOTAL 905.04
3+768.089 TO 3+899.436
0003 + 778.089 15.43 RIGHT SIDE
21.371 356.04
0003 + 799.460 16.77 RIGHT SIDE
19.786 165.91
0003 + 819.246 11.96 RIGHT SIDE
17.122 264.11
0003 + 836.368 12.18 RIGHT SIDE
21.761 132.52
0003 + 858.129 18.89 RIGHT SIDE
21.176 200.01
0003 + 879.305 14.75 RIGHT SIDE
20.131 148.47
0003 + 899.436 17.89 RIGHT SIDE
SUB-TOTAL 1,267.06
3+848.129 TO 3+899.436
0003 + 848.129 18.89 LEFT SIDE