Total Number of test
Item Minimum Number of % of Work
Materials Estimated Accomplishe
No. Required Test On File Balance d
Quanitity
PART II OTHER GENERAL REQUIREMENTS
B.7 Occupational Safety and Health Program 3.00 mo. P.E. Certification P.E. Certification 100%
B.5 Project Billboard/Signboard 2.00 mo. P.E. Certification P.E. Certification 100%
PART A EARTHWORKS
803 STRUCTURE EXCAVATION
803(1)a Structure Excavation 62.19 cu.m P.E. Certification P.E. Certification 100%
804 EMBANKMENT
804(1)a Embankment (from roadway/structure excavation) 30.34 cu.m GPC-1 D-3 GPC-1 D-3 100%
804(2)a Selected Borrow for Topping (Case 1) 22.94 cu.m GPC-1 D-3 GPC-1 D-3 100%
804(4) Gravel Fill 5.85 cu.m P.E. Certification P.E. Certification 100%
PART B PLAIN AND REINFORCED CONCRETE
900 REINFORCED CONCRETE
900 Structural Concrete (Class "A" - 28 days) 50.36 cu.m 100%
1. Cement 453.00 bags Q-1 Q-1 None
2. Coarse Aggregates 50.00 cu.m G-1, Q-1 G-1, Q-1 None
3. Fine Aggregates 25.00 cu.m G-1, Q-1 G-1, Q-1 None
4. RSB (10mm dia.) Q-included in item 902(1)a1 Q-included in item 902(1)a1 None
5. Water - P.E. Certification P.E. Certification None
6. Concrete Cylinder 50.00 cu.m 3-sets 3-sets None
902 REINFORCING STEEL
902(1)a1 Reinforcing Steel (Deformed - Grade 40) 6,429.04 kgs 100%
1.RSB (10mm dia.) kgs. Q-1 Q-1 None
(12mm dia.) kgs. Q-1 Q-1 None
(16mm dia.) kgs. Q-1 Q-1 None
903 FORMS AND FALSEWORKS
903(1) Forms and Falseworks 1.00 ls. P.E. Certification P.E. Certification 100%
PART C FINISHING
1000 TERMITE CONTROL WORKS
1000(3) Powder Termicide 5.00 kgs. P.E. Certification P.E. Certification 100%
1001 STORM DRAINAGE & SEWERAGE SYSTEM
1001(6)b Catch Basin (CHB) 5.00 ea. P.E. Certification P.E. Certification 100%
1. CHB 5" 41.00 pcs. Q-included in item 1046(2)b Q-included in item 1046(2)b None
2. Cement 6.00 bags Q-included in item 900(1)c1 Q-included in item 900(1)c1 None
3. Coarse Aggregates 2.00 cu.m G,Q-included in item 900(1)c1 G,Q-included in item 900(1)c1 None
4. Fine Aggregates 1.00 cu.m G,Q-included in item 900(1)c1 G,Q-included in item 900(1)c1 None
5. Water - P.E. Certification P.E. Certification None
6. RSB (10mm dia) kgs. Q-included in item 902(1)a1 Q-included in item 902(1)a1 None
1001(8) Sewer Line Works 1.00 ls. P.E. Certification P.E. Certification 100%
1001(9) Storm Drainage & Downspout 1.00 ls. P.E. Certification P.E. Certification 100%
1002 PLUMBING
1002(4) Plumbing Fixtures 1.00 ls. P.E. Certification P.E. Certification 100%
1002(24) Cold Water Lines 1.00 ls. P.E. Certification P.E. Certification 100%
1003 CARPENTRY AND JOINERY WORKS
1003(1)a1 Ceiling (Metal Frame - Fiber Cement Board) 90.82 sqm. P.E. Certification P.E. Certification 100%
1008 ALUMIN FRAMED GLASS DOOR
1008(1)a Aluminum Framed Glass Door (Swing Type) 3.36 sqm. P.E. Certification P.E. Certification 100%
1007 ALUMINUM FRAMED GLASS DOOR
1008(1)a Aluminum Glass Window (Sliding) 17.28 sqm. P.E. Certification P.E. Certification 100%
1008(1)c Aluminum Glass Window (Awning) 0.36 sqm. P.E. Certification P.E. Certification 100%
1010 WOODEN DOORS AND WINDOWS
1010(1) Frames(Jambs, Sills, Head, Transoms and Mullions) 8.00 sets P.E. Certification P.E. Certification 100%
1010(2)a Doors(Flush) 2.52 sqm. P.E. Certification P.E. Certification 100%
1010(2)b Doors (Wood Panel) 11.13 sqm. P.E. Certification P.E. Certification 100%
1014 PRE-PAINTED METAL SHEETS
1014(1)b1 Corrugated Type (Long Span) 114.14 sqm. Q-1 Q-1 100%
1018 CERAMIC/GRANITE TILES
1018(1) Glazed Tiles and Trims 108.00 sqm. P.E. Certification P.E. Certification 100%
1018(2) Unglazed Tiles 9.90 sqm. P.E. Certification P.E. Certification 100%
1021 CEMENT FLOOR FINISH
10217(1) Floor Topping (Plain) 9.00 sqm.
1. Cement 3.00 bags
2. Fine Aggregates 1.00 cu.m
1021 CEMENT PLASTER FINISH
1027(1) Cement Plaster Finish 470.00 sqm. 100%
1. Cement 136.00 bags Q-included in item 900(1) Q-included in item 900(1) None
2. Fine Aggregates 12.00 cu.m G-included in item 900(1) G-included in item 900(1) None
NOTE:
The number of tests indicated is based on the Minimum Testing Requirements for one source. If material is taken more than one(1) source, each
materials should be tested separately and the number of tests should be the same basis in Minimum Testing Requirements.
Contractor:
LIMITS:
DGSARM BUILDERS INC.
Total Number of test
Item Minimum Number of % of Work
Materials Estimated Accomplishe
No. Required Test On File Balance d
Quanitity
1027(3) Decorative Stone 6.93 sqm. P.E. Certification P.E. Certification 100%
1032 PAINTING VARNISHING & OTHER RELATED WORKS
1032(1)a1 Painting Works(Masonry Concrete) 470.00 sqm. 100%
Flat Latex 38.00 Q-1 Q-1 None
Semi Gloss Latex 38.00 Q-1 Q-1 None
1032(1)a2 Painting Works(Wood) 129.17 sqm. 100%
Flat Wall Enamel 4.00 Q-1 Q-1 None
1032(1)a3 Painting Works(Steel) 27.47 sqm. P.E. Certification P.E. Certification 100%
1035 NON STRUCTURAL METAL FRAMING
1035(1) Furring Channel 405.00 lm. P.E. Certification P.E. Certification 100%
1036 POLYCARBONATE SHEETS/PANELS
1036(1) Polycarbonate Sheets 4.46 lm. P.E. Certification P.E. Certification 100%
1046(2)a MASONRY WORKS
1046(2)a CHB Non-Load Bearing (INCLUDING REINFORCING STEEL - 100mm) 53.75 sqm. 100%
1. CHB "4" 287.00 pcs. Q-1 Q-1 None
2. Cement 23.24 bags Q-included in item 900(1) Q-included in item 900(1) None
3. Fine Aggregates 1.94 cu.m G, Q-included in item 900(1) G, Q-included in item 900(1) None
p kgs. Q-included in item 902(1)a1 Q-included in item 902(1)a1 None
5. Water - P.E. Certification P.E. Certification None
1046(2)b CHB Non-Load Bearing (INCLUDING REINFORCING STEEL - 150mm) 130.07 sqm. 100%
1. CHB "6" 3,763.00 pcs. Q-1 Q-1 None
2. Cement 305.00 bags Q-included in item 900(1) Q-included in item 900(1) None
3. Fine Aggregates 25.40 cu.m G, Q-included in item 900(1) G, Q-included in item 900(1) None
4. RSB (10 mm dia) kgs. Q-included in item 902(1)a1 Q-included in item 902(1)a1 None
5. Water - P.E. Certification P.E. Certification None
1047 METAL STRUCTURES
1047(1) Structural Steel (Roof Framing) 1.00 ls. 100%
Angle Bar - 50mm x 50mm x 6.0mm kgs. Q-1 Q-1 None
Purlins - 150mm x 50mm x 2.0mm kgs. Q-1 Q-1 None
1047(10) Metal Structure Accessories 1.00 ls. 100%
1051 RAILINGS
1051(1) G.I. Pipe Railings 9.30 lm. P.E. Certification P.E. Certification 100%
PART D ELECTRICAL
1100(19) Conduits, Boxes and Fittings 1.00 ls. P.E. Certification P.E. Certification 100%
1101(18) Wires & Wiring Devices 1.00 ls. P.E. Certification P.E. Certification 100%
1102(1)a1 Panelboard with Main & Branch Breakers 1.00 set P.E. Certification P.E. Certification 100%
1103 Lighting Fixtures 1.00 ls. P.E. Certification P.E. Certification 100%
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Subgrade Material Spec's Item No. 105(1)a
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m 3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Subgrade Material Spec's Item No. 105(1)a
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m 3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Subgrade Material Spec's Item No. 105(1)a
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m 3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Subgrade Material Spec's Item No. 105(1)a
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m 3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
CERTIFIED CORRECT: CHECKED BY:
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Subgrade Material Spec's Item No. 105(1)a
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m 3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Subgrade Material Spec's Item No. 105(1)a
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m 3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Subgrade Material Spec's Item No. 105(1)a
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m 3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Subgrade Material Spec's Item No. 105(1)a
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m 3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Subgrade Material Spec's Item No. 105(1)a
Lab No. 3
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 8.685 10.375 9.656
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m 3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Subgrade Material Spec's Item No. 105(1)a
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m 3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Subgrade Material Spec's Item No. 105(1)a
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m 3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Subgrade Material Spec's Item No. 105(1)a
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m 3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
CERTIFIED CORRECT: CHECKED BY:
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Aggregate Subbase Coarse Spec's Item No. 200(1)
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Aggregate Subbase Coarse Spec's Item No. 200(1)
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Aggregate Subbase Coarse Spec's Item No. 200(1)
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Aggregate Subbase Coarse Spec's Item No. 200(1)
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Aggregate Subbase Coarse Spec's Item No. 200(1)
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Aggregate Subbase Coarse Spec's Item No. 200(1)
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Aggregate Subbase Coarse Spec's Item No. 200(1)
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Aggregate Subbase Coarse Spec's Item No. 200(1)
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Aggregate Subbase Coarse Spec's Item No. 200(1)
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
CERTIFIED CORRECT: CHECKED BY:
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Aggregate Subbase Coarse Spec's Item No. 200(1)
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Aggregate Subbase Coarse Spec's Item No. 200(1)
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results
Project: Construction of Concreting of Roads, Brgy. Gomez, Sta. Rosa, Nueva Ecija
(Number) (Name) (City/Province)
Kind of Materials: Aggregate Subbase Coarse Spec's Item No. 200(1)
Field Density
18. Total material taken from hole ,kg. 4.697 4.395 5.213
19. Mass of Jar + Sand ,kg. 5.94 7.43 7.251
20. Mass of Jar + sand ,kg. (after pouring) 1.409 3.099 2.380
21. Sand to fill hole ,kg. (19) - (20) - (10) 3.1 2.9 3.44
22. Volume of hole ,m3 (21) / (7) 0.002180 0.002039 0.002419
23. Wet unit weight ,kg. /m3 (18) / (22) 2155 2155 2155
24. Dry unit weight ,kg. /m3 (23) / (17) /100) + 1 2001 2000 2000
25. Laboratory compaction test data:
(a) Maximum dry density ,kg. /m3 2092 2092 2092
(b) Optimum moisture content ,% 7.80 7.80 7.80
26. Degree of compaction (24) / (25a) x 100 95.65 95.6 95.62
REMARK/RECOMMENDATION
Satisfactory results