You are on page 1of 9

Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide

ANNEX 2
SURVEY SHEET #2 FOR ROAD SLOPE PROJECT INVENTORY (PROPOSED FOR FUNDING)
Location With Slope Without Slope
Project Inventory (if any)
(KM-Stationing) Gradient Protection Protection Disaster
Target Target
Height (in Type of Failure in the Type of Protection Project
Region DEO Road Name Section ID Road Integrity Length Area Estimated
(m) degrees) 2 Disaster Past Countermeasure (s) Status Implement
(m) (m ) Stable/Not Stable/Not Cost of Slope Priority
Start LRP End LRP (Y/N) ation
Stable Stable Protection Ranking
Schedule
(in Million P)
Grouted Riprap w/ Concrete New
Region VIII Samar 1st Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) S00062SM Primary K0695+410 R K0695+505 R 95 19 60 1805 RS/SC Not Stable N 2021 1
Facing and Parapet Blocks Proposal
Grouted Riprap w/ Concrete New
Region VIII Samar 1st Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) S00062SM Primary K0696+701 L K0696+738 L 37 1.5 65 55.5 RS/SC Not Stable Y 41.70 2021 1
Facing and Parapet Blocks Proposal
Grouted Riprap w/ Concrete New
Region VIII Samar 1st Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) S00062SM Primary K0696+738 L K0696+804 L 66 12 60 792 RS/SC Not Stable Y 2021 1
Facing and Parapet Blocks Proposal

EXAMPLE #3
Continuation
CAR Benguet 1st Kennon Rd S00393LZ Primary K0216+000 K0216+020 20 20 80 400 RC Not Stable N Shotcrete 10.00 2016 1
of On-going
Crib Wall w/ Paving of Repair/Resto
CAR Benguet 1st Kennon Rd S00393LZ Primary K0216+040 K0216+060 20 50 50 1000 LS Not Stable N 10.00 2017 2
shoulder ration
EXAMPLE #4

Coco-net & vetiver grass New


VII Negros Oriental 2nd Dumaguete North Rd S00353NR Primary K0040+250 K0040-280 30 25 68 750 SC Not Stable Y 2.00 2016 1
installation Proposal

LEGEND PREPARED/SUBMITTED BY:


Location : Km-Stationing corresponding to the disaster site RS : Road Slip (see Annex 4 for your reference)
SC : Soil Slope Collapse DF : Debris Flow Length: Distance between the start and end point of the survey section Name: JOHN REY R. BERNATE
RC : Rock Slope Collapse RE : River Erosion Height: Height of the proposed countermeasure in the mountain/valley side slope Position: ENGINEER II
LS : Landslide CE : Coastal Erosion Gradient: Degree of inclination or rate of ascent or descent Office: DPWH-SFDEO
note: Contact Number(s): (0927) 316 0868
-no sta. limit is allowed with exceptions (w/e)
-no Duplication on Priority Ranking

Page 1 of 1
ANNEX 5
ROAD SLOPE PROTECTION PROJECT
(PROPOSED FOR FUNDING)

REGION : Region VIII


DISTRICT ENG'G OFFICE : Samar 1st
ROAD NAME : Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br)
STATION LIMIT : K0695+410 to K0695+505 Right
TYPE OF DISASTER : Road Slip and Soil Collapse
SCOPE OF WORK : Construction of Grouted Riprap with Concrete
Facing and Parapet Blocks
(e.g. Construction of Gabions/Retaining Wall/High Tensile Wire/etc.)

PARTICULARS Type "1" or


check the box
A. IMPORTANCE OF THE PROJECT
I. Current Project Status
a. Continuation of on-going/phase implemented DPWH Project
If YES, please attach Background/Information of the Project

b. New Proposal with RDC Endorsement


If YES, please attach Photocopy of the RDC Endorsement

c. New Proposal without RDC Endorsement 1


II. Road Integrity
a. National Primary Road 1
b. National Secondary Road (Without Alternate Road)
c. National Tertiary Road (Without Alternate Road)
d. National Secondary Road (With Alternate Road)
e. National Tertiary Road (With Alternate Road)
III. Volume of Traffic (AADT) : Please indicate actual AADT
a. = 5,001 and up 1 14575
b. = 1,001 - 5,000
c. = 501 - 1,000
d. = 1 - 500

IV. Status of the Project Yes No

a. With Technical/Feasibility Study 1


If YES, please attach documents (i.e. Summary of the Study and Year conducted)
V. Condition(s) of the Road
a. Whole/Partial width of the road is currently closed due to slope failure
b. Fully passable road but prone to slope failure in the near future 1

c. Minor Cracking
d. No evidence of deformation at present
VI. Project is
a. Rehabilitation/Major Repair (with existing slope protection)
b. Upgrading/Improvement (with existing slope protection)
c. New Construction 1

B. ROW AND INVESTMENT REQUIREMENTS Yes No

a. ROW Problem (Having ROW Acquisition?) 1

C. PHOTOGRAPHS (MANDATORY)
Please attach two or more photos which justify the condition(s) of the road indicated in the above V.

General View
Station limit: K0695+410 to K0695+505 Right

PREPARED/SUBMITTED BY :
Name : John Rey R. Bernate
Position : Engineer II
Office : DPWH-Samar 1st
Contact Number (s) : (0997) 583 8753
Please sign above your name Please copy this sheet for other proposed project
ANNEX 5
ROAD SLOPE PROTECTION PROJECT
(PROPOSED FOR FUNDING)

REGION : Region VIII


DISTRICT ENG'G OFFICE : Samar 1st
ROAD NAME : Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br)
STATION LIMIT : K0696+701 to K0696+738 Left
TYPE OF DISASTER : Road Slip and Soil Collapse
SCOPE OF WORK : Construction of Grouted Riprap with Concrete
Facing and Parapet Blocks
(e.g. Construction of Gabions/Retaining Wall/High Tensile Wire/etc.)

PARTICULARS Type "1" or


check the box
A. IMPORTANCE OF THE PROJECT
I. Current Project Status
a. Continuation of on-going/phase implemented DPWH Project
If YES, please attach Background/Information of the Project

b. New Proposal with RDC Endorsement


If YES, please attach Photocopy of the RDC Endorsement

c. New Proposal without RDC Endorsement 1


II. Road Integrity
a. National Primary Road 1
b. National Secondary Road (Without Alternate Road)
c. National Tertiary Road (Without Alternate Road)
d. National Secondary Road (With Alternate Road)
e. National Tertiary Road (With Alternate Road)
III. Volume of Traffic (AADT) : Please indicate actual AADT
a. = 5,001 and up 1 14575
b. = 1,001 - 5,000
c. = 501 - 1,000
d. = 1 - 500

IV. Status of the Project Yes No

a. With Technical/Feasibility Study 1


If YES, please attach documents (i.e. Summary of the Study and Year conducted)
V. Condition(s) of the Road
a. Whole/Partial width of the road is currently closed due to slope failure
b. Fully passable road but prone to slope failure in the near future 1

c. Minor Cracking
d. No evidence of deformation at present
VI. Project is
a. Rehabilitation/Major Repair (with existing slope protection)
b. Upgrading/Improvement (with existing slope protection)
c. New Construction 1

B. ROW AND INVESTMENT REQUIREMENTS Yes No

a. ROW Problem (Having ROW Acquisition?) 1

C. PHOTOGRAPHS (MANDATORY)
Please attach two or more photos which justify the condition(s) of the road indicated in the above V.

General View

Station limit: K0696+701 to K0696+738 Left

PREPARED/SUBMITTED BY :
Name : John Rey R. Bernate
Position : Engineer II
Office : DPWH-Samar 1st
Contact Number (s) : (0997) 583 8753
Please sign above your name Please copy this sheet for other proposed project
ANNEX 5
ROAD SLOPE PROTECTION PROJECT
(PROPOSED FOR FUNDING)

REGION : Region VIII


DISTRICT ENG'G OFFICE : Samar 1st
ROAD NAME : Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br)
STATION LIMIT : K0696+738 to K0696+804 Left
TYPE OF DISASTER : Road Slip and Soil Collapse
SCOPE OF WORK : Construction of Grouted Riprap with Concrete
Facing and Parapet Blocks
(e.g. Construction of Gabions/Retaining Wall/High Tensile Wire/etc.)

PARTICULARS Type "1" or


check the box
A. IMPORTANCE OF THE PROJECT
I. Current Project Status
a. Continuation of on-going/phase implemented DPWH Project
If YES, please attach Background/Information of the Project

b. New Proposal with RDC Endorsement


If YES, please attach Photocopy of the RDC Endorsement

c. New Proposal without RDC Endorsement 1


II. Road Integrity
a. National Primary Road 1
b. National Secondary Road (Without Alternate Road)
c. National Tertiary Road (Without Alternate Road)
d. National Secondary Road (With Alternate Road)
e. National Tertiary Road (With Alternate Road)
III. Volume of Traffic (AADT) : Please indicate actual AADT
a. = 5,001 and up 1 14575
b. = 1,001 - 5,000
c. = 501 - 1,000
d. = 1 - 500

IV. Status of the Project Yes No

a. With Technical/Feasibility Study 1


If YES, please attach documents (i.e. Summary of the Study and Year conducted)
V. Condition(s) of the Road
a. Whole/Partial width of the road is currently closed due to slope failure
b. Fully passable road but prone to slope failure in the near future 1

c. Minor Cracking
d. No evidence of deformation at present
VI. Project is
a. Rehabilitation/Major Repair (with existing slope protection)
b. Upgrading/Improvement (with existing slope protection)
c. New Construction 1

B. ROW AND INVESTMENT REQUIREMENTS Yes No

a. ROW Problem (Having ROW Acquisition?) 1

C. PHOTOGRAPHS (MANDATORY)
Please attach two or more photos which justify the condition(s) of the road indicated in the above V.

General View
Station limit: K0696+738 to K0696+804 Left

PREPARED/SUBMITTED BY :
Name : John Rey R. Bernate
Position : Engineer II
Office : DPWH-Samar 1st
Contact Number (s) : (0997) 583 8753
Please sign above your name Please copy this sheet for other proposed project

You might also like