Foundation Works
April 2020
1
1. Agenda
Items Content
2. Team Introduction
i. Hoarding
2
2. Team Introduction
MTRC
(RP&LS)
Project Co-ordinator
AECOM – Associate
Director
Jeremy Lam (94338628)
For
Ap
AECOM ALKF (AP) WSP (Safety pro
(RSE) & Risk) val
Sunley
(contractor)
4
4. Site Works Overview
5
1. Major Scope and Programme of Works
UN ND
L
E T OU
NE
SITE A2
Chung Hau Street
KT GR
R
DE
UN
EPIW
EPIW(Sub
ZONE 1
(Subwa
ZONE 2
way)
y)
3m
MT MTR
Ho R P Pro
Ma rot tec
ecti tio
nT on n Z
in S Zon one
tati e
on
(Ho
M)
7 Site
Boundary
1. Major Scope of Works
(Con’t)
UN ND
L
E T OU
NE
SITE A2
KT GR
R
DE
Erection of Hoarding
UN
Chung Hau Street
ZONE 1 ZONE 2
EPIW
EPIW(Sub
(Subwa
way)
y)
3m
MT MTR
Ho R P Pro
Ma rot tec
ecti tio
nT on n Z
in S Zon one
tati e
Open Up Existing Stub Column on
(Ho
M)
8 Site
ELS Works Boundary
2. General Arrangement
and Site Layout of Facilities
9
2. General Arrangement and Site Layout of
Facilities
Vehicular Dangerous Goods, Tools
Vehicular Pedestrian Dangerous Goods, Tools
Entrance Guard and Equipment Storage
Entrance Guard House
House and
and Staff
Staff Pedestrian
Entrance
Entrance
and Equipment Storage
Registration Point
Registration Point
Hoarding Covered
Hoarding Covered
UN ND
Walkway
SITE A2 Container Muster Walkway
L
E T OU
NE
Container
Office Area Point
KT GR
Office Area
R
DE
UN
Major
Haul
Route to
30
ZONE 1 Pro m MT
Site A
tec R
EPIW (Su
Entrance
Zon tion
e ZONE 2 /Exit
Once Possession of Site
EPIW
bwa(Su
A2, Chain Link Fence will
y) bway)
be erected
Ho
Ma 3m
nT
in S MT MTR
tati R P Pro
on rot tec
ecti tio
(Ho on n Z
M) Zon one
e
EVACUATION Site
ROUTE Boundary
Plastic
Plastic
10 Barrier
Barrier
3. Major Site Activities in
Coming
Three months
11
3. Major Site Activities in Coming 3
months
Site Activities Location
General Site Clearance - Within 3-10m RP Zone
(Eradicate Shrubs and - Within 10m-30m RP Zone
Unplanned Vegetation) - Outside 30m
Erection of Site Offices and Site - Within 10m-30m RP Zone
Accommodation - Outside 30m
UN ND
SITE A2
L
E T OU
NE
KT GR
Chung Hau Street
R
DE
UN
ZONE 1 30
Pro m MT
tec R
EPIW (Su
Zon tion
e
EPIW
bwa(Su
y) bway)
ZONE 2
Ho 3m
Ma
nT MT MTR
in S R P Pro
tati rot tec
on ecti tio
(Ho on n Z
Zon one
M) e
Site
Boundary
13
3. Major Site Activities in Coming 3 months
(Con’t)
Erection of Hoarding
Erection of Hoarding
UN ND
SITE A2
L
E T OU
NE
KT GR
R
DE
UN
Chung Hau Street
ZONE 1 30
Pro m MT
tec R
EPIW (Su
Zon tion ZONE 2
e
EPIW
bwa(Su
y) bway)
HHoo 3m
MMaa
nnTT MT MTR
iinnS R P Pro
Sttaati rot tec
ecti tio
tioon on n Z
n((H Zon one
HooM
M)) e
Site
Boundary
14
3. Major Site Activities in Coming 3 months
(Con’t)
Site Activity - Construct Temporary Surface Water Drainage System with Provision of
Desilting Facilities
ZONE 1
ZONE 2
15
3. Major Site Activities in Coming 3 months (Con’t)
Site Activity - Installation of Monitoring Check Points
TE
GS1
DK
UN
SITE A2
EL RO
IN1
TM1 GS2
NN G
TU DER
BS1
VCP1 Chung Hau Street
UN
USM1
SP1
GS3 GS5 GS6 USM2
GS4
IN3
IN2 SP3
VCP4
IN6
EPIW
tec R
EPIW(Sub
TM3
BS5 Zon tion
TM5 e M
(Subwa
BS3 S2
way)
VCP6 GS9
y)
BS4 BS6
ZONE 2
TM4 TM6
VCP9 MS
1
IN
BS7 TM7 3m
MT MTR
Ho VCP11 R P Pro
Ma rot tec
ecti tio
nT on n Z VCP13
in S BS8
TM8 Zon one
GS1 Ground Settlement Marker tati e
on VCP12
TM1 Tilting Marker ( Ho
M) BS9
TM9
BS4
Building Settlement Marker
USM2
Utility Settlement Marker
Vibration Checkpoint
VCP1
SP1
Piezometer/Standpipe
16 IN1 Inclinometer
Magnetic Probe Extensometer Site
MS1
Boundary
3. Major Site Activities in Coming 3 months
(Con’t)
Site Activity - Predrilling Works
UN ND
SITE A2
L
E T OU
NE
KT GR
R
DE
UN
Chung Hau Street
30
Pro m MT
ZONE 1 tec R
EPIW (Su
Zon tion
e
EPIW
bwa(Su
y) bway)
ZONE 2
3m
MT MTR
R P Pro
Ho rot tec
Ma ecti tio
nT on n Z
in S Zon one
tati e
on
( Ho
M)
Site
Boundary
17
4. High Risk Activities and
Associated Precautionary
Measures
18
4. High Risk Activities and Associated Precautionary
Measures (Con’t)
Risks Control Measures
General 1. All method statements shall
be submitted to RP and seek
their comment/approval
20
4. High Risk Activities and Associated Precautionary
Measures (Con’t)
Risks Control Measures
Flooding 1. Routine surface channel
maintenance will be
conducted regularly and
report will be submitted to
MTRC
24
Upcoming Site Activities
- Erection of Hoarding
Sprinkler Inlets
B2 Entrance of
HoM Station Typical Section
of Hoarding
Works Extent
`
Chung Hau Street
Works Extent
HoM Station
25
Upcoming Site Activities
- Erection of Hoarding
Sprinkler Inlets
Pre-fabricate major components off site
Erection to be Portion by Portion
Erection by using Crane Lorry TTM
Arrangement of TTM Works Extent
` to Lift” and
Lifting supervisor to issue the “Permit
Crane
checked with SO and RSS before any lifting Chung Hau Street
operation Lorry
Assign at least 2 personnel to fence off both ends
of Works Extent to ensure no pedestrian get in
during the lifting operation
Lifting supervisor shall supervise the entire lifting
operation to ensure all the operation are in order Portion by
-During the welding operation, Shelter to be Ho
provided to protect the pedestrian MS Portion
tati
- Repeat the above procedures to complete the on
remaining portions
Proposed Steel
Hoarding
26
Upcoming Site Activities – Installation of Fir Log
Platform
TE
A
DK
UN
SITE A2
EL RO
Chung Hau Street
NN G
TU DER
UN
B
A IN6
ZONE 1 ZONE 2
EPIW
EPIW(Sub
Ramp
(Subwa
way)
y)
B Ram p
IN
3m
MT MTR
Ho R P Pro
Ma rot tec
ecti tio
nT on n Z
in S Zon one
tati e
on
( Ho
M)
27
Site
Boundary
Upcoming Site Activities – Erection of Fir Log Platform
28
Upcoming Site Activities – Erection of Fir Log Platform
29
Upcoming Site Activities – Erection of Fir Log Platform
• Form 5 will be signed by Competent Person before use for first time and at
regular intervals not exceeding 14 days
• Supporting calculation for the stability and integrity of the platform shall be
provided and be certified by ICE
30
Upcoming Site Activities – Predrilling Works
Precaution Measures for drilling works for monitoring check points are also
applied for predrilling works
TE
DK
A
UN
EL RO
SITE A2
NN G
TU DER
UN
Chung Hau Street
B
A IN6
ZONE 1 ZONE 2
EPIW
EPIW(Sub
Ramp
(Subwa
way)
y)
B Ram p
IN
3m
MTR Nos. of Ho
MT MTR
R P Pro
Ma rot tec
Protection Prdrilled nT
in S
ecti tio
on n Z
Zon one
Zone Hole tati
on
(
e
Ho
M)
0-3m None
3m – 10m 9 nos.
10m – 30m 15 nos.
31 Outside 30m 4 nos. Site
Boundary
Upcoming Site Activities – Installation of Monitoring
Checkpoint
TE
GS1
DK
UN
SITE A2
EL RO
IN1
TM1 GS2
NN G
TU DER
BS1
VCP1 Chung Hau Street
UN
USM1
SP1
GS3 GS5 GS6 USM2
GS4
IN3
IN2 SP3
VCP4
IN6
EPIW
tec R
EPIW(Sub
TM3
BS5 Zon tion
TM5 e M
(Subwa
BS3 S2
way)
VCP6 GS9
y)
BS4 BS6
TM4 TM6
VCP9 MS
1
IN
BS7 TM7 3m
MT MTR
Ho VCP11 R P Pro
Ma rot tec
MTR Monitorin nT
in S BS8
ecti tio
on n Z VCP13
Zon one
Protection
Involved Drilling Works:
g Point. tati
on
TM8
e
VCP12
( Ho
Zone
(A) 3 nos. of Inclinometer M) BS9
TM9
0-3m
IN1, IN2 and IN3 None
(B) 3 nos. of Magnetic Extensometer
3m
MS1,–MS2
10m and MS3IN2, MS1
32 10m – 30m MS2,IN1
Site
Outside 30m IN3, MS3 Boundary
Upcoming Site Activities – Installation of Monitoring
Checkpoints
For drilling works within 3-10m RP Zone (i.e. IN2 and MS1)
• Arrange joint survey with MTR survey team for setting out of drillholes with
the presentation of RSS representative
• Implementation of “Permit to Drill” System
- checked by RSS Representative
• Forming a Whatapps Group for communication and reporting the status of
critical activities with the participation of Sunley, RPE, RPI, RSS and PPD
representatives
• Verticality check by using inclinometer to be conducted at interval of depth
<5m.
“AAA” Criteria to be 13mm (Alert), 20mm (Alarm) & 25mm (Action)
For remaining drilling works within 10-30m RP Zone (i.e. MS2 and IN1) and
outside 30m RP Zone (i.e. IN3 and MS3)
• Checking and inspection of setting out to be conducted by RSS representative
• Implementation of “Permit to Drill” System
- checked by RSS Representative in order prior to drilling
Checkpoint
Remaining Monitoring Checkpoints
TE
GS1
DK
UN
SITE A2
EL RO
IN1 GS2
TM1
NN G
TU DER
BS1
VCP1
Chung Hau Street
UN
USM1
VCP3 VCP5
GS7
ZONE 1 30
Pro m MT ZONE 2
EPIW
tec R
EPIW(Sub
TM3
BS5 Zon tion
TM5 e
(Subwa
BS3
way)
VCP6 GS9
y)
BS4 BS6
TM4 TM6
VCP9
6mIN
M
TM7 3m TR
BS7
MT MTR Prote
Ho VCP11 R P Pro cti
Ma rot tec on
nT ecti tio Zon VCP13
in S BS8 on n Z e
tati TM8 Zon one
e
on VCP12
( Ho
GS1
M) BS9
TM9
Ground Settlement Marker
TM1
Tilting Marker
BS4
Building Settlement Marker
USM2
Utility Settlement Marker
VCP1
Vibration Checkpoint
34 IN1 Inclinometer
Site
Boundary
Upcoming Site Activities – Installation of Monitoring
Checkpoints
For installation of Settlement Marker and Utility Settlement Marker within 3-10m
RP Zone
• Arrange joint inspection with MTR survey team for setting out of pit location
before excavation with the presentation of RSS representative
• Implementation of “Permit to Dig” System
- checked by RSS Representative
• Forming a Whatapps Group for communication and reporting the status of
critical activities of installation with the participation of Sunley, RPE, RPI, RSS and
PPD representatives
Upcoming Site Activities – Installation of Monitoring
Checkpoints
Tiltmeter Marker Tiltmeter Marker
• Tilt Plates with 150mm diameter to be employed
• Tilt Plates shall be installed on sound concrete of
HoM Station
• Tilt Plates fixed to the sound concrete surface of
HoM Station by epoxy resin and further bolted into
the sound concrete
Manitowoc 11000-
1
38
Proposed Major Lifting Plants situated on existing
slope crest
- Manitowoc
11000-1 - Sunward SWTD80
行架
Piling Rig
度長
27.
4
m
39
Proposed Measures for Major
Lifting Plants situated on existing
slope crest
40
Proposed Major Lifting Plants situated on existing
slope crest
- Manitowoc 11000-1 Crawler Crane
- Sunward SWTD80 Piling RigProposed Grade
30/20 Concrete
350
2 Layers of A252
Wire Mesh
Proposed 350tk Concrete Slab for Operation of
Machineries on Existing Slope Crest
Outside Inside
42
THE END