Professional Documents
Culture Documents
:
FOR EARTH SYSTEM PAGE : OF
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-001A
INSPECTION AND TEST REPORT REPORT NO.:
FOR EARTH SYSTEM PAGE: OF
Supply Earth
(ESE)
Instrument
Clean Earth bar
2 (CE)
Equipment External Earth
(EE) C
5
3 C
4Ω
C
Ligthning & Static Earth 4
(LPE) 1
4Ω
M
C Substation
C
Earth bar
10Ω
C
7 8
6
9 C
11
C
10
Switchgear
10
TANK C Plant Earth Ring
10Ω
Notes : 1 - Test Number
- Test Electrode
9 - Disconnection for Measurement
1Ω - Maximum Acceptable value
C
- Continuity
Where electrodes are installed in a group values are for the group
1. Electrode Test
2. Cable/connection Test :
3. Others
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-002
INSPECTION AND TEST REPORT REPORT NO.:
FOR CABLE TO PIPE
CONNECTION (CP) PAGE: OF
Inspection Result
No Check/Test Remark
Accept Reject
1 Connection areas cleaned to bright metal.
4 Correct size stud and cable lug uesd(both proprietary Pin Braze item)
13 Test Instrument :
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-003
INSPECTION AND TEST REPORT REPORT NO.:
FOR TEST STATION (CP) PAGE: OF
Inspection Result
No Check/Test Remark
Accept Reject
Cables are correctly terminated inside the test station and correctly
4
identified with permanent tag.
Cable glands are securely fitted around cables and blanking plugs
5
fitted where necessary.
Test station and mounting frame are firmly secured in the concrete
6
footing
Tolerance :
Note
Name
Signature
Date
Form No. : ITR-ELF-004
INSPECTION AND TEST REPORT REPORT NO.:
FOR PDB (CP) PAGE: OF
Inspection Result
No Check/Test Remark
Accept Reject
Cable are corrcetly terminated inside the junction box and correctly
4
identified with permanent tag.
Cable glands are securely fitted around cables and blanking plugs
5
fitted where necessary
Junstion box and mounting frame are firmly secured in the concrete
6
footing
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-005
INSPECTION AND TEST REPORT REPORT NO.:
FOR TRANSFORMER
RECTIFIER (CP) PAGE: OF
Inspection Result
No Check/Test Remark
Accept Reject
Cables are properly terminated inside the T/R unit and correctly
3
identified with cable lugs(without AC power)
Cable glands are securely fitted around cables and blacking plugs
5
fitted where necessary
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-006
INSPECTION AND TEST REPORT REPORT NO.:
FOR ANODE INSTALLATION (CP) PAGE: OF
Inspection Result
No Check/Test Remark
Accept Reject
Anode cable tail routed properly to the test facility without any
5
damage and correctly identified
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-007
INSPECTION AND TEST REPORT REPORT NO.:
FOR PERMANENT REFERENCE
ELECTRODE (CP) PAGE: OF
Inspection Result
No Check/Test Remark
Accept Reject
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-008
INSPECTION AND TEST REPORT REPORT NO.:
FOR MMO WIRE ANODE (CP) PAGE: OF
Inspection Result
No Check/Test Remark
Accept Reject
1 Shallow groundbed location as per project drawings
Vertical position of MMO wire anodes wrt the buried pipe structure
3 (top, mid-point, bottom)
· Anode Reel # 1/Reel # 2/Reel # 3
Note :
Name
Signature
Date
Form No. : ITR-ELF-009
INSPECTION AND TEST REPORT REPORT NO.:
FOR COUPONS (CP) PAGE: OF
Inspection Result
No Check/Test Remark
Accept Reject
Coupon installed :
· At correct level wrt pipe/hydrant
2 · 100mm perpendicular distance from pipe
· 100mm from and with bare face of coupon facing the permanent
reference electrode
Coupon cable tail routed properly to the test facility without any
5
damage and correctly identified
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-010
INSPECTION AND TEST REPORT REPORT NO.:
FOR MONITORING OF TEMP.
CATHODIC PROTECTION PAGE: OF
Check/Test Result
wrt wrt
portable permanent DC current
ASTP/FHTP(delete as appropriate)
Cu/CuSO4 Cu/CuSO4 mAmps
ref cell(V) ref elec(V)
wrt wrt
portable permanent DC current
STP(delete as appropriate)
Cu/CuSO4 Cu/CuSO4 mAmps
ref cell(V) ref elec(V)
Tolerance :
Note :
Signature
Date
Form No. : ITR-ELF-011
INSPECTION AND TEST REPORT REPORT NO.:
FOR CABLE TRAY PAGE: OF
Inspection Result
No Check/Test Remark
Accept Reject
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-012
INSPECTION AND TEST REPORT REPORT NO.:
FOR CABLE TRENCH PAGE: OF
Inspection Result
No Check/Test Remark
Accept Reject
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-013
INSPECTION AND TEST REPORT REPORT NO.:
FOR CONDUIT(PVC PIPE) PAGE: OF
Inspection Result
No Check/Test Remark
Accept Reject
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-014
INSPECTION AND TEST REPORT REPORT NO.:
FOR CABLE NO. AND SIZE PAGE: OF
Tolerance :
Note
Name
Signature
Date
Form No. : ITR-ELF-015
INSPECTION AND TEST REPORT REPORT NO.:
FOR CABLE PULLING &
TERMINATION PAGE: OF
Inspection Result
No Check/Test Remark
Accept Reject
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-016
INSPECTION AND TEST REPORT REPORT NO.:
FOR HV CABLE PAGE: OF
Test Instrument :
L1 - L2/L3/E ㏁ ㎃ s
L2 - L1/L3/E ㏁ ㎃ s
L3 - L1/L2/E ㏁ ㎃ s
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-017
INSPECTION AND TEST REPORT REPORT NO.:
FOR LV AND CONTROL CABLE PAGE: OF
Cable Test(Multicore cable : After cable IR test, the lowest IR(3 ea) is recorded in this report.)
Insulation Resistance(㏁)
Cable No. Continuity
Applied
voltage(d.c.) L1 to L2 L2 to L3 L3 to L1 L1/L2/L3 to E
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-018
INSPECTION AND TEST REPORT REPORT NO.:
FOR LIGHTING FIXTURES &
CONVENIENCE OUTLETS PAGE: OF
Inspection Result
No Check/Test Remark
Accept Reject
1 No physical damages
2 Equipment/devices identification
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-019
INSPECTION AND TEST REPORT REPORT NO.:
FOR LIGHTING TEST PAGE: OF
1. Check the installation of normal and emergency lighting system by the trial switching operations
1. 2. 3 4.
1. 2. 3 4.
Tolerance :
Note
Name
Signature
Date
Form No. : ITR-ELF-020
INSPECTION AND TEST REPORT REPORT NO.:
FOR TELECOMUNICATION
SYSTEM EQUIPMENT & DEVICES PAGE: OF
Inspection Result
No Check/Test Remark
Accept Reject
1 No physical damages
2 Equipment/devices identification
Tolerance :
Note :
Name
Signature
Date
Form No. : ITR-ELF-021