INSPECTION AND TEST REPORT REPORT NO.

:
FOR HOIST & O/H CRANE PAGE : OF

PROJECT: JOB NO. :

AREA : EQUIPMENT NAME :

LOCATION : EQUIPMENT NO. :

REF. DWG. : Rev No. : TAG NO. :

1. Tolerance : Refer to CMAA (Crane Manufacturers Association of America, inc)


Max. Rate of
Item Figure Overall Tolerance
Change

min L=L-A
L < 50' A=3 / 16"
SPAN max Nominal Span L > 50' <100' A=1 /4" 1 / 4" IN 20' - 0"
L=L+A L> 100' A=3 / 8"

+B
STRAIGHTNESS I B = 3 / 8" 1 / 4" IN 20' - 0"
-B

ELEVATION C = 3 / 8" 1 / 4" IN 20' - 0"

+c
-C

SPAN
D L < 50' D ± 3 / 16"
RAIL-TO-RAIL L > 50', 100' D=±1 /4" 1 / 4" IN 20' - 0"
L >100' D=± 3 /8"

2. Inspection

Span Point Result

Straight- Right
ness Left

Right
Elevation
Left
Rail- to- Rail

Remarks

Inspection Result : □ Accept □ Conditionally Accept □ Reject

Inspection by Contractor Client

Name
Signature

Date
Form No. : ITR-MCR-001
INSPECTION AND TEST REPORT REPORT NO. :
FOR HOIST & O/H CRANE PAGE : OF

PROJECT: JOB NO. :

AREA : EQUIPMENT NAME :

LOCATION : EQUIPMENT NO. :

REF. DWG. : Rev No. : TAG NO. :

Inspection Result
No. Item to be Checked Remarks
Accept Reject

### Cable routing as per vendor's recommendation

### Power cable insulation as per vendor's recommendation

### Control cable insulation as per vendor's recommendation

### Cable termination checked & accepted

### Panel inspection acceptable

### Limit switches in operation

Tolerance :

Inspection Result : □ Accept □ Conditionally Accept □ Reject

Inspection by Contractor Client

Name
Signature

Date
Form No. : ITR-MCR-002
INSPECTION AND TEST REPORT REPORT NO. :
FOR HOIST & O/H CRANE PAGE : OF

PROJECT: JOB NO. :

AREA : EQUIPMENT NAME :

LOCATION : EQUIPMENT NO. :

REF. DWG. : Rev No. : TAG NO. :

Inspection Result
No. Item to be Checked Remarks
Accept Reject

### The name plate is properly attached

### Foundation level & location for cranes travelling on rails.

### All safety stopper and bumper are installed correctly

### All the wire ropes are undamaged

### Rails are correctly installed

### All restraining devices and braces used for shipment are removed

Bolt and clamps at span, track and rails are correctly torque
7
as requested by the specification

Safe working loads are painted and displayed on


8
equipment

### Hydraulic systems is filled with oil correctly

Tolerance :

Inspection Result : □ Accept □ Conditionally Accept □ Reject

Inspection by Contractor Client

Name