Do Not Scale the Drawing

A 500 / 350 TPH 3 STAGE SKID MOUNTING CRUSHING AND SCREENING PLANT WITH WASHING A

FROM E B NOTE :
1) ACB & APFC Panel not in
VCB SWITCH CUSTOMER SCOPE PROPEL SCOPE
2) Panel Incoming Cable
B
TRANSFORMER
P
Customer Scope B

1600 KVA
3) Equipments Panel Will be
S
Supplied By PROPEL
4) Equipment Panel to Equipment
Motor Cable Will be Supplied
3200 A
C
ACB I>
CUSTOMER SCOPE
By PROPEL C
A

3200A BUS BAR


** AS PER WORK ORDER
630 A 630 A 800 A 630 A 630 A 630 A 630 A
MCCB I> MCCB I> MCCB I> MCCB I> MCCB I> MCCB I> MCCB I>
ARMOURED CABLE ( 2 RUNS )

ARMOURED CABLE ( 2 RUNS )

ARMOURED CABLE ( 2 RUNS )

ARMOURED CABLE ( 2 RUNS )

ARMOURED CABLE ( 2 RUNS )

ARMOURED CABLE ( 2 RUNS )


ARMOURED CABLE ( 2 RUNS)
31 2 CORE 240 SQ MM ALUMINUM

31 2 CORE 240 SQ MM ALUMINUM

31 2 CORE 400 SQ MM ALUMINUM

31 2 CORE 240 SQ MM ALUMINUM

31 2 CORE 240 SQ MM ALUMINUM

31 2 CORE 185 SQ MM ALUMINUM

31 2 CORE 185 SQ MM ALUMINUM


D D

E E

JAW 220 KW CONE 220 KW S/D VSI 2 X 187 KW S/D CONVEYOR PANEL PROWASH 350 KVAR APFC 350 KVAR APFC
SOFTSTARTER (QM-350) (AVVI-300) 243 KW CONVEYOR PANEL PANEL - 01 PANEL - 02
(AVJ-1214) 239 KW

PROPEL INDUSTRIES PVT LTD


COIMBATORE, INDIA
SCALE : NTS Drawn by-date Checked by-date Approved by-Date
F F
D.S 29/04/2022 R.S 29/04/2022 R.S

TITLE: DRAWING NO: REV. NO SHEET. NO


M/S TRIWAY GROUPS AVSP0765-000-00-00-R09 R01
This document is the property of PROPEL INDUSTRIES (P) LTD., All rights reserved.
** ALL CABLE RATINGS ARE CALCULATED FOR POLY CAB MAKE ONLY 8