00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

C
IEC 104 IEC 101

TELECOMMUNICATION PANEL

ETH RS-232
D

IEC 104 IEC 101

RTU PANEL
E

CM Ready to IEC61850v2
(RJ45 Cooper / LAN)
Modbus
RS-232 BCU
BPU
MPU F

CM
RTU SICAM AK3

BUSBAR 1 BUSBAR 2 TRAFO 1 TRAFO 2 MAJENE 1 MAJENE 2 SPARE SPARE SPARE SPARE SPARE

Approved by : ZZ Date : Title :

Checked by : Date :
RTU & Power Meter Hardware Overview
PT PLN (Persero) PT PLN (Persero) DKW

Wilayah SulselRaBar Pusenlis Design by : HH Date : 28.04.2016


150kV GI Mamuju K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-001 1/1
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

E
2000

Approved by : ZZ Date : Title :


AK3 RTU PANEL LAYOUT
Checked by : Date :
PT PLN (Persero) PT PLN (Persero) DKW
150kV GI Mamuju
Wilayah SulselRaBar Pusenlis Design by : HH Date : 26.02.2016 K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-002 1/2
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

DOOR

SIE MENS
AK3

DISABLE

ENABLE

E
2000

2000

800
F

800
G

TOP VIEW

H
800 800

SIDE VIEW
FRONT VIEW FRONT VIEW BACK VIEW

Approved by : ZZ Date : Title :


AK3 RTU PANEL LAYOUT
Checked by : Date :
PT PLN (Persero) PT PLN (Persero) DKW
150kV GI Mamuju
Wilayah SulselRaBar Pusenlis Design by : HH Date : 26.02.2016 K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-003 2/2
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

Approved by : ZZ Date : Title :

Checked by : Date :
RTU Panel Power Distribution
PT PLN (Persero) PT PLN (Persero) DKW

Wilayah SulselRaBar Pusenlis Design by : HH Date : 28.04.2016


150kV GI Mamuju K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-004 1/1
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

Approved by : ZZ Date : Title :

Checked by : Date :
RTU Panel DC Distribution to Power Meter
PT PLN (Persero) PT PLN (Persero) DKW

Wilayah SulselRaBar Pusenlis Design by : HH Date : 28.04.2016


150kV GI Mamuju K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-005 1/1
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

Approved by : ZZ Date : Title :

Checked by : Date :
Voltage Transformer Circuit
PT PLN (Persero) PT PLN (Persero) DKW

Wilayah SulselRaBar Pusenlis Design by : HH Date : 28.04.2016


150kV GI Mamuju K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-006 1/2
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

Approved by : ZZ Date : Title :

Checked by : Date :
Voltage Transformer Circuit
PT PLN (Persero) PT PLN (Persero) DKW

Wilayah SulselRaBar Pusenlis Design by : HH Date : 28.04.2016


150kV GI Mamuju K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-007 2/2
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

Approved by : ZZ Date : Title :

Checked by : Date :
Current Transformer Circuit
PT PLN (Persero) PT PLN (Persero) DKW

Wilayah SulselRaBar Pusenlis Design by : HH Date : 28.04.2016


150kV GI Mamuju K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-008 1/2
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

Bay Fault Check Syncronizing Over Current Bay Fault Temperature Transformator Tap Changer Tap Changer Differential Relay Ground Fault CB Trip Tap position Tap position Tap position Tap position Tap position
In Progress Relay Operate Alarm Alarm Trip High Operate Relay Operate 2 4 6 8 10

Breaker Fault Ground Fault CB Trip Breaker Fault Temperature Transformator Tap position Tap Changer Restricted Earth Over Current Tap position Tap position Tap position Tap position Tap position Tap position
Relay Operate Trip Trip Indication Failure Low Fault Relay Operate 1 3 5 7 9 11

+ 48vdc B

-X112 1 -X112 2 -X112 3 -X112 4

C
Panel Interface

TRAFO 1
KOPEL
1 1
D
2 3 4 5 6 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

DI-001 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

H
PM PM PM PM
D00 D01 D02 D03 D04 D05 D06 D07 D08 D09 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D24 D25 D26 D27 D28 D29 D30 D31
Sicam AK3

Com Com Com Com


DI-001

-X111 1 2 -X111 3 4 -X111 5 6 -X111 7 8


I
- 48vdc

Approved by : ZZ Date : Title :

Checked by : Date :
Schematic drawing Sicam AK3 card DI-001
PT PLN (Persero) PT PLN (Persero) DKW

Wilayah SulselRaBar Pusenlis Design by : HH Date : 26.02.2016


150kV GI Mamuju K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
1/2
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-009
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

Tap position Tap position Tap position Bay Fault Temperature Transformator Tap Changer Tap Changer Differential Relay Ground Fault CB Trip Tap position Tap position Tap position Tap position Tap position
12 14 16 Alarm Alarm Trip High Operate Relay Operate 2 4 6 8 10

Tap position Tap position Tap position Breaker Fault Temperature Transformator Tap position Tap Changer Restricted Earth Over Current Tap position Tap position Tap position Tap position Tap position Tap position
13 15 17 Trip Trip Indication Failure Low Fault Relay Operate 1 3 5 7 9 11

+ 48vdc B

-X112 5 -X112 6 -X112 7 -X112 8

C
Panel Interface

TRAFO 1 TRAFO 2 D
27 28 29 30 31 32 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

DI-001 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64

H
PM PM PM PM
D32 D33 D34 D35 D36 D37 D38 D39 D40 D41 D42 D43 D44 D45 D46 D47 D48 D49 D50 D51 D52 D53 D54 D55 D56 D57 D58 D59 D60 D61 D62 D63
Sicam AK3

Com Com Com Com


DI-001

-X111 9 10 -X111 11 12 -X111 13 14 -X111 15 16


I
- 48vdc

Approved by : ZZ Date : Title :

Checked by : Date :
Schematic drawing Sicam AK3 card DI-001
PT PLN (Persero) PT PLN (Persero) DKW

Wilayah SulselRaBar Pusenlis Design by : HH Date : 26.02.2016


150kV GI Mamuju K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
2/2
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-010
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

Tap position Tap position Tap position Auto Reclose Bay Fault Check Syncronizing Teleprotection Directional Distance Protection Ground Fault Direct Transfer Auto Reclose Bay Fault Check Syncronizing Teleprotection Directional
12 14 16 Succes In Progress Trip Transmit Earth Fault Zone 2 Relay Operate Trip Succes In Progress Trip Transmit Earth Fault

Tap position Tap position Tap position Auto Reclose Breaker Fault Teleprotection Current Distance Protection Distance Protection Over Current CB Trip Auto Reclose Breaker Fault Teleprotection Current Distance Protection
13 15 17 On progress Trip Receive Differential Zone 1 Zone 3 Relay Operate On progress Trip Receive Differential Zone 1

+ 48vdc B

-X112 9 -X112 10 -X112 11 -X112 12

C
Panel Interface

TRAFO 2 MAJENE 1 MAJENE 2 D


27 28 29 30 31 32 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10

DI-002 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

H
PM PM PM PM
D00 D01 D02 D03 D04 D05 D06 D07 D08 D09 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D24 D25 D26 D27 D28 D29 D30 D31
Sicam AK3

Com Com Com Com


DI-002

-X111 17 18 -X111 19 20 -X111 21 22 -X111 23 24


I
- 48vdc

Approved by : ZZ Date : Title :

Checked by : Date :
Schematic drawing Sicam AK3 card DI-002
PT PLN (Persero) PT PLN (Persero) DKW

Wilayah SulselRaBar Pusenlis Design by : HH Date : 26.02.2016


150kV GI Mamuju K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-011 1/2
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

Ground Fault Direct Transfer CB Open BI1 Open BI2 Open Local CSO Open CB Open BI1 Open BI2 Open Local CSO Open CB Open BI1 Open BI2 Open
Distance Protection
Zone 2 Relay Operate Trip

CB Close BI1 Close BI2 Close Remote CSO Close CB Close BI1 Close BI2 Close Remote CSO Close CB Close BI1 Close BI2 Close
Distance Protection Over Current CB Trip
Zone 3 Relay Operate

+ 48vdc B

-X112 13 -X112 14 -X112 15 -X112 16

C
Panel Interface

KOPEL TRAFO 1 TRAFO 2 D


11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 33 34 35 36 37 38 39 40 41 42 33 34 35 36 37 38

DI-002 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64

H
PM PM PM PM
D32 D33 D34 D35 D36 D37 D38 D39 D40 D41 D42 D43 D44 D45 D46 D47 D48 D49 D50 D51 D52 D53 D54 D55 D56 D57 D58 D59 D60 D61 D62 D63
Sicam AK3

Com Com Com Com


DI-002

-X111 25 26 -X111 27 28 -X111 29 30 -X111 31 32


I
- 48vdc

Approved by : ZZ Date : Title :

Checked by : Date :
Schematic drawing Sicam AK3 card DI-002
PT PLN (Persero) PT PLN (Persero) DKW

Wilayah SulselRaBar Pusenlis Design by : HH Date : 26.02.2016


150kV GI Mamuju K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-012 2/2
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

Local CSO Open CB Open BI1 Open BI2 Open LI Open Local CSO Open CB Open BI1 Open BI2 Open LI Open Local CSO Open RTUA VDCF

Remote CSO Close CB Close BI1 Close BI2 Close LI Close Remote CSO Close CB Close BI1 Close BI2 Close LI Close Remote CSO Close VACF PHA

+ 48vdc B

-X112 17 -X112 18 -X112 19 -X112 20

C
Panel Interface

MAJENE 1 MAJENE 2 COMMON D


39 40 41 42 17 18 19 20 21 22 23 24 25 26 27 28 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4

DI-003 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

H
PM PM PM PM
D00 D01 D02 D03 D04 D05 D06 D07 D08 D09 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D24 D25 D26 D27 D28 D29 D30 D31
Sicam AK3

Com Com Com Com


DI-003

-X111 33 34 -X111 35 36 -X111 37 38 -X111 39 40


I
- 48vdc

Approved by : ZZ Date : Title :

Checked by : Date :
Schematic drawing Sicam AK3 card DI-003
PT PLN (Persero) PT PLN (Persero) DKW

Wilayah SulselRaBar Pusenlis Design by : HH Date : 26.02.2016


150kV GI Mamuju K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-013 1/2
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

COM MTO SIB SOTF VS OVR BF UVR P1BP Spare Spare Spare Spare Spare Spare Spare

SYNF PTF IEDF BF UVR P1BP VS OVR Spare Spare Spare Spare Spare Spare Spare Spare

+ 48vdc B

-X112 21 -X112 22 -X112 23 -X112 24

C
Panel Interface

BUSBAR 1 BUSBAR 2 D
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

DI-003 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64

H
PM PM PM PM
D32 D33 D34 D35 D36 D37 D38 D39 D40 D41 D42 D43 D44 D45 D46 D47 D48 D49 D50 D51 D52 D53 D54 D55 D56 D57 D58 D59 D60 D61 D62 D63
Sicam AK3

Com Com Com Com


DI-003

-X111 41 42 -X111 43 44 -X111 45 46 -X111 47 48


I
- 48vdc

Approved by : ZZ Date : Title :

Checked by : Date :
Schematic drawing Sicam AK3 card DI-003
PT PLN (Persero) PT PLN (Persero) DKW

Wilayah SulselRaBar Pusenlis Design by : HH Date : 26.02.2016


150kV GI Mamuju K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-014 2/2
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

+ 48vdc

CB Open BI1 Open BI2 Open CB Open BI1 Open BI2 Open CB Open BI1 Open BI2 Open CB Open BI1 Open BI2 Open CB Open BI1 Open BI2 Open DCBC Open
C

CB Close BI1 Close BI2 Close CB Close BI1 Close BI2 Close CB Close BI1 Close BI2 Close CB Close BI1 Close BI2 Close CB Close BI1 Close BI2 Close DCBC Close

D
Panel Interface

KOPEL TRAFO 1 TRAFO 2 MAJENE 1 MAJENE 2 COMMON


29 30 31 32 33 34 29 30 31 32 33 34 29 30 31 32 33 34 29 30 31 32 33 34 43 44 45 46 47 48 14 15

DO-001 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

CA00 CB00 CA01 CB01 CA02 CB02 CA03 CB03 CA04 CB04 CA05 CB05 CA06 CB06 CA07 CB07 CA08 CB08 CA09 CB09 CA10 CB10 CA11 CB11 CA12 CB12 CA13 CB13 CA14 CB14 CA15 CB15

Sicam AK3 To
DO-2210 CA16

- 48vdc

Approved by : ZZ Date : Title :

Checked by : Date :
Schematic drawing Sicam AK3 card DO-001
PT PLN (Persero) PT PLN (Persero) DKW

Wilayah SulselRaBar Pusenlis Design by : HH Date : 26.02.2016


150kV GI Mamuju K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-015 1/2
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

+ 48vdc

X112 25

Spare Spare Spare Spare Spare Spare Spare Spare CB Open BI1 Open BI2 Open LI Open Spare Spare Spare Spare
C

Spare Spare Spare Spare Spare Spare Spare Spare CB Close BI1 Close BI2 Close LI Close Spare Spare Spare Spare

D
Panel Interface

DO-001 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64

G
Sicam AK3
DO-2210
VR
CA16 CB16 CA17 CB17 CA18 CB18 CA19 CB19 CA20 CB20 CA21 CB21 CA22 CB22 CA23 CB23 CA24 CB24 CA25 CB25 CA26 CB26 CA27 CB27 CA28 CB28 CA29 CB29 CA30 CB30 CA31 CB31
OA
From -48VDC
CB15

X111 65
I

- 48vdc

Approved by : ZZ Date : Title :

Checked by : Date :
Schematic drawing Sicam AK3 card DO-001
PT PLN (Persero) PT PLN (Persero) DKW

Wilayah SulselRaBar Pusenlis Design by : HH Date : 26.02.2016


150kV GI Mamuju K
Project No : Drawing No : Sheet No : Project :
PT. SIEMENS INDONESIA
Upgrade Sistem SCADA/EMS RCC Sulselrabar
0163.PJ/DAN.02.06/WSSTB/2015 GI MAMJU-016 2/2
00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

You might also like