You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

FOC BLOCK DIAGRAM

EXISTING JOINT PIT


B EXI. FO CABLE C1 ABANDONING CABLE C1 EXI. FO CABLE C1 TO BE ABANDONED B
E=488004.293
SCOPE OF WORKS: N=2764887.186
EXISTING RTU EXISTING RTU 1. LAYING OF NEW FIBER OPTIC CABLE THROUGH NEW HDPE DUCT. C
JOINT JOINT 2. JOINTING OF NEWLY LAID CABLE WITH EXISTING 24 F FIBER OPTIC CABLE BOTH JOINT
R590M R401M LOCATION.
E=486739.218 LOCATION-1 LOCATION-2 E=490183.503 3. PROPOSED MBV CHAMBER WORKS (INSTALLATION OF PT WITH PPR TUBING AND 6
N=2765378.006 N=2763970.331 INSTALLATION OF CABLE TRAYS) ER
CL PI
OC JOINT
4. TOTAL LENGTH OF FO CABLE= 850 MTRS (INCLUDING LOOP CABLES IN PROPOSED PULL PITS) PROPOSED F EXISTING
5. TOTAL LENGTH MAY VARY AS PER SITE REQUIREMENTS. AT
EXI. FO CABLE C2 ABANDONING CABLE C2 EXI. FO CABLE C2 LOCATION-2 J
P IT /E
JOINT PULL D 7
U C T
PE SCACDPAIER
C C

1x125mmØ HD L
END
E=487962.0E0J0
0
N=2764R908 3/ .00 00
IE 5+
7
CLP
PROP.DN1200 MBV
CHAMBER, MBV-01
PROPOSED 1x125mmØ J
/E
E=488152.1089 HDPE SCADA DUCT IER
9

PROP. FO CABLE C2 PROP. FO CABLE C1 N=2764830.547 PROP.MBV


CL P
(LENGTH=225m) JBL
D PROPOSED FOC PULL CONNECTION WITH
D
EJ
PIT (PULL PIT SUPPLIED 1 0/
SCADA UNDER M/s. IER
BY DEWA) DEWA SCOPE. CL P
E=488184.544
LOCATION OF RTU J 00
N=2764792.769
TO BE PROPOSEDR 11/E BY 5+6
E
CL PI
M/s. DEWA.
12
PROPOSED FOC PULL CL PIER
PIT (PULL PIT
START POINT
E
CH : 5+000 SUPPLIED BY DEWA) E
CL PIER 20 CL PIER 13 0
CL BEARING / E=488230.708 5+50
CL PIER 19 CL PIER 18 CL PIER 17 / EJ CL PIER 14 / EJ
ABUTMENT B N=2764772.870
CL PIER 16 / EJ CL PIER 15 / EJ

5+000 5+041 5+100 5+200 5+400


5+300 C
L

5+000
JBL
PROPOSED FOC PULL
PIT (PULL PIT SUPPLIED
BY DEWA
F E=488172.210 F
D
N=2764823.652 OA R
PROPOSED FOC PULL D
YE
PIT (PULL PIT SUPPLIED ZA
H
BY DEWA) EIK
E=488265.196 1 SH
E1
RE

DE SERV WIDE
N=2764786.581 TO

RE 0.0m
DE VATI
SE

WA AT )
(4
WA ON
R

WA ION
EH (15

PROPOSED 2x160mmØ +

TE
PROPOSED FOC PULL
V C 2.4

R
G PIT (PULL PIT 1x125mmØ HDPE SCADA G
OR 0m

PROPOSED FOC PULL SUPPLIED BY DEWA) DUCT (LENGTH=401m)


RID WID

PIT (PULL PIT SUPPLIED E=488312.192


OR E)

BY DEWA) N=2764766.321

FR URE
FU
E=488329.738

OZ ME
T
EN TR
PROPOSED Ø1200 GRE SELF N=2764722.183 FRL
FILENAME : D:\ETIHAD RAIL\SHOP DRAWING\DESCON\JBL1B SCADA\2022-11-16 REVISED SD\REV.01\WORKING\C0306-JBL-EUT-DS-00028-R1

FO O
RESTRAINED DEWA WD WATER

R
LINE PROTECTED BY Ø1727 STEEL
LEGEND: SLEEVE WITH GROUT

0.30
ETIHAD RAIL ALIGNMENT
H ETIHAD RAILRIGHT OF WAY WARING TAPE H
RTA RIGHT OF WAY
UTILITY CORRIDOR PROPOSED FOC JOINT
DUBAI METRO CORRIDOR LOCATION-1 AT PROPOSED E ET
ETIHAD RAIL FENCE STR
PULL PIT (PULL PIT SUPPLIED
RTA FENCE YIS

0.85
SAND MITIGATION BY DEWA) ALA
2x160mmØ + 1x125mmØ HDPE LY
ETIHAD RAIL EARTHWORK 7-A

0.50
LINESIDE ACCESS GATCH TRACK SCADA DUCT END D5
E=488481.069
PROPOSED AT GRADE ROAD N=2764656.947
MSE WALL
1. Approved
2. Subject to successfully handover the system to Authorities TILE MARKER
J PROPOSED BARRIER TRANSITION J

PROPOSED RAIL BRIDGE


CONCRETE BARRIER / WALL

0.20
125Ø 0.15
PILE
PROPOSED PILE / PILE CAP PILE CAP
NOTES:
LEGEND: 1. ALL DIMENSIONS ARE IN METER UNLESS OTHERWISE NOTED. SCADA DUCT
IN OPERATION SCADA DUCT 2. COORDINATE REFERENCE SYSTEM DLTM. (HDPE )MATERIAL
IN OPERATION SCADA DUCT TO 3. ALL EXISTING UTILITIES SHOWN WERE OBTAINED FROM THE DEWA GIS SYSTEM.
BE REMOVED 4. ALL UTILITY PROTECTION SHALL EXTEND FROM RAIL ROW TO ROW.

0.10
SAND BEDDING

160Ø
K PROPOSED SCADA DUCT 5. ALL EXISTING PIPES CROSSING THE RAIL ROW SHALL BE REPLACED WITH SELF-RESTRAINED K
IN OPERATION 1200mmØ PIPE GRE PIPES (10,000N/m2 STIFFNESS), LAMINATED JOINTS WITH STEEL SLEEVE.
IN OPERATION 1200mmØ PIPE 6. EXISTING FO CABLE (24F BIRLA CABLE) WILL BE JOINED WITH NEW 24F FO CABLE AT
TO BE REMOVED SCADA DUCT

0.15
PROPOSED JOINT LOCATIONS. (HDPE MATERIAL)
PROPOSED 1200mmØ PIPE
7. ALL FOC JOINT WORKS WILL BE DONE UNDER THE SUPERVISION AND PERMISSION OF DEWA
PROPOSED STEEL SLEEVE FOR
1200Ø WATER LINE
SND DEPARTMENT.
PROPOSED FOC PULL PIT
8. ALL THE PROPOSED PULL PITS WILL BE UNDER DEWA SCOPE. 0.15 160Ø 0.10 160Ø 0.15
9. PROPOSED MBV CONNECTION WITH SCADA UNDER DEWA SCOPE.
EXISTING FOC PULL PIT
10.PRIOR TO THE JOINT AND AFTER THE JOINT EXISTING FOC CABLES WILL BE TESTED AND TYPICAL SECTION FOR
PROPOSED MBV CHAMBER HEALTHNESS WILL BE VERIFIED. PROPOSED SCADA DUCT
L L

ETIHAD RAIL NETWORK


KEY PLAN SHARJAH REV DATE DESCRIPTION Drwn Chkd Appr CONTRACTOR'S JOINT VENTURE : SUB-CONSULTANT : SUB CONTRACTOR PROJECT DRAWING TITLE
USER NAME : Rejeesh Ratnapalan

ETIHAD RAIL STAGE 2 PROJECT C0306-PACKAGE 2C ZONE 5B


References C AA 19/09/2022 ISSUED FOR REVIEW SP NYM GP JEBEL ALI BRANCH LINE PACKAGE-5 JBL 1B (5+000 TO 8+000)
DEWA NOC no. 13928-2022 dated 25/5/2022 DM CLIENT
DEWA WATER SCADA FOC DIVERSION DETAILS
JB
DEWA approved network layout shop L AB 08/12/2022 AS PER SITE VISIT AND DEWA COMMENTS SP NYM GP
SHEET No SCALE ORIGINAL SIZE
Drawing no.C0306-JBL-EUT-DS-06203-AF P.O.Box. 7497 Dubai, U.A.E 01 OF 01 1:1000 A1
B THIS LOCATION

DM Tel: +971 4 350 5000 Fax: +971 4 350 5001


www.wsp.com PMC ENGINEER PROJECT STAGE DOCUMENT STATUS
DUBAI FOR CONSTRUCTION FOR REVIEW
M DRAWING No REVISION M
ABU DHABI
AL AIN C0306-JBL-EUT-DS-00030 AB
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16