1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

5000
A A
COORDINATE TABLE INTERFACE SCHEDULE PROPOSED LAND EASEMENT
AREA = 259.30m²

3
ID EASTING NORTHING 36504
1 E=484192.786 N=2766256.707 ITEM UTILITIES PROTECTION E- EXISTING
ALIGNMENT CHAINAGE DISCIPLINE AUTHORITY DESCRIPTION OF INTERFACE
2 E=484210.775 N=2766280.239 CODE TYPE OF WORK P-PROPOSED E=483815.983

ITY VILLAGE
N=2766389.351

E)
RESERVATION (152.40m WID
TL27 JBL 9+760 UTILITIES ETISALAT EXISTING 6 WAY DUCTS CONCRETE SURROUND E E=483821.858

DEWA EHV CORRIDOR


N=2766389.243

ROAD MCB8

134.71

TO GREEN COMMUN
TL-B1 JBL UTILITIES ETISALAT EXISTING 6 WAY DUCTS NO PROTECTION REQUIRED E
CH: 0+031
TING
69 EXIS
B 39/6/621 ROAD MCB9 EXTENSION OF EXISTING DUCTS. B
UC T TL-B2 JBL UTILITIES ETISALAT EXISTING 6 WAY DUCTS E
6-WAY D CH: 0+026 NO PROTECTION REQUIRED

180.33

0+300
TL27A JBL 10+000 UTILITIES ETISALAT EXISTING 9 WAY DUCTS (NOT EXIST AT SITE) NOT APPLICABLE E

ROAD MCB11 E=483891.706


TL-B7 JBL UTILITIES ETISALAT EXISTING 9 WAY DUCTS (NOT EXIST AT SITE) NOT APPLICABLE E N=2766387.958
CH: 0+150

116.12
ROAD MCB5
TL-B8 JBL UTILITIES ETISALAT EXISTING 9 WAY DUCTS (NOT NOT EXIST SITE) NOT APPLICABLE E
CH: 0+364
PROPOSED LAND EASEMENT
ROAD MCB6 AREA = 284.30m²
C LIMIT OF CONTRACT TL-B9 JBL UTILITIES ETISALAT EXISTING 9 WAY DUCTS (NOT EXIST AT SITE) NOT APPLICABLE E C
CH: 0+026

71.89
TIE IN WITH EXISTING 6/
83
/
L.O.C E=483929.833 63
06
5
N=2766387.257
TL-B7 E=483946.117

1:1
2
N=2766372.045

1:12
SLOPE
122.58

0+469

TL27 0+000 0+370


0+100
TL-B1 0+000
TL-B8
D D
150.02

53/6/63061 EXISTING 0+200

1:1 PE
SLO
2
0+400
6-WAY ETISALAT DUCT 0+100

EXISTING
TIE INTO
L.O.C
0+300 0+200
0+200
0+300
0+385
TRIAL PIT
0+363 10+200
10+100
0+300 JBL-TP245-TP246
C0306-JBL-EUT-ARD-059 10+000
0+40
0 EXISTING 6-WAY
9+900
ETISALAT DUCTS FOUND Duct not found at site.

EXISTING
0+200
E TL27A E
FILENAME :D:\BASHEER\2. DESIGN & CONSTRUCTION NOC\COMPREHENSSIVE PACKAGE\JBL-02 COMPREHENSIVE CONSTRUCTION NOC PACAKGE CH 8+000 TO 11+150\UTILITIES\CAD\TELECOM-ETISALAT\C0306-JBL-EUT-DG-36522-36526.DWG

1 Etisalat requested a
ES ROAD
90 9+800
0+100
A T °
11 EMIR new ductJBasL per the
TO E6 -0+000

CT
working drawing

6-WAY DU
16/6/58872
9+700

EXISTING
TIE INTO
L.O.C
9+600 0+000
CONCRETE

LIMIT OF CONTRACT
SURROUND 2
9+500 PROTECTION OF 0+362

LIMIT OF CONTRACT
0+300
EXISTING DUCT TL-B9
LENGTH = 29.75m 0+200
0+100
F 9+400 -0+000 L.O.C F

0+500
EXISTING ETISALAT DUCT NOT EXIST AT SITE TO E11 SHEIKH
AS PER SITE VERIFICATION DONE ON 09/02/2022 ZAYED ROAD
(BY ETISALAT Engi - Mr Naser Ahmed)
TRIAL PIT TL-B2 81/6/63064 EXISTING
JBL-TP247-TP248 6-WAY ETISALAT DUCT
C0306-JBL-EUT-ARD-059 71/6/63035 EXISTING EXISTING ETISALAT
EXISTING 6-WAY 6-WAY ETISALAT DUCT 254/4/63036 EXISTING MANHOLE
ETISALAT DUCTS FOUND 4-WAY ETISALAT DUCT JRC14\53197
270/4/63034 EXISTING
G 4-WAY ETISALAT DUCT G
EXISTING ETISALAT
MANHOLE
FOR CON -EUT-DG-36523
INE EE

DEWA W

JRC14\53196
RESERV
UATION S

40m WID

225/4/63037 EXISTING
ATER LIN

4-WAY ETISALAT DUCT


ATION
E
L
TIN

E
L
H
C0306-JB

C0306-JBL-EUT-DG-36525
E
C

FOR CONTINUATION SE
T

H H
M A

MATCH LINE
LEGEND:
ETIHAD RAIL ALIGNMENT
ETIHAD RAIL RIGHT OF WAY
RTA RIGHT OF WAY EXISTING ETISALAT
UTILITY CORRIDOR MANHOLE
DUBAI METRO CORRIDOR JRC14\53195
PROPOSED UTILITY CORRIDOR
ETIHAD RAIL FENCE
RTA FENCE
J SAND MITIGATION J
ETIHAD RAIL EARTHWORK
LINESIDE ACCESS GATCH TRACK
MSE WALL
PROPOSED CONCRETE BARRIER
PROPOSED BARRIER TRANSITION
METRO CORRIDOR
DEWA WATER CORRIDOR
DEWA EHV CORRIDOR
PROPOSED ROAD BRIDGE
PROPOSED AT GRADE ROAD
PROPOSED RAMP
PROPOSED INTERLOCK PAVEMENT
K K
EXISTING ROAD TO BE DEMOLISHED
TIMESTAMP : 2/27/2022 3:39:05 PM

FUTURE ROAD (BY OTHERS)


PROPOSED GUARDRAIL LEGEND:
EXISTING GUARDRAIL
EXISTING ETISALAT DUCT
EXISTING ROAD EXISTING ETISALAT MANHOLE ROADS LEGENDS:
PROPOSED EASEMENT AREA PROPOSED CONCRETE SURROUND PROPOSED GANTRY SIGN POST
PROTECTION
EXISTING ELECTRICAL HV TOWER PROPOSED CANTILEVER GANTRY
PROPOSED NON-DISRUPTIVE
(PYLON)
PROPOSED ELECTRICAL HV ROAD CROSSING (NDRC) EXISTING GANTRY TO BE JBL-2 COMPREHENSIVE PACKAGE 0 10 20 30 40 50 M
TOWER (PYLON) EXISTING ETISALAT DUCT TO BE
X X X
RETAINED / MODIFIED APPROVED DESIGN NOC-14102021-2222
REMOVED 1 : 1 000 SCALE BAR
EXISTING ELECTRICAL HV TOWER EXISTING GANTRY/CANTILEVER
L (PYLON) TO BE DEMOLISHED TRIAL TRENCH GANTRY TO BE REMOVED L

NOTES SHARJAH CONTRACTOR'S JOINT VENTURE : SUB-CONSULTANT : PROJECT DRAWING TITLE


1. ALL DIMENSIONS ARE IN METER UNLESS
OTHERWISE NOTED.
5. ALL UTILITY PROTECTION SHALL BE EXTENDED 1m
BEYOND ETIHAD RAIL FENCE LINE AND PROPOSED
REV DATE DESCRIPTION Drwn Chkd Appr
ETIHAD RAIL NETWORK ETIHAD RAIL STAGE 2 PROJECT C0306-PACKAGE 2C ZONE 6
JEBEL ALI BRANCH LINE PACKAGE-6 JBL 2 (8+000 TO 11+150)
2. COORDINATE REFERENCE SYSTEM IN DLTM. ROAD WORKS. C AA 16/02/202 ISSUED FOR APPROVAL AB GK WL
DM CLIENT TELECOM ETISALAT PROTECTION AND DIVERSION PLAN
3. BASED ON VIBRATION STUDY, DOCUMENT 6. CONTRACTOR TO CHECK AND VERIFY THE LEVELS OF JB
USER NAME : Abdul Basheer

NO.C0306-S02-ECB-RP-00005, NO ADDITIONAL ALL UTILITY CROSSINGS UNDER THE RAIL PRIOR TO L


AB 24/02/2022 REVISED AS PER ENGINEER COMMENTS AB GK WL
PROTECTION MEASURES ARE REQUIRED DURING CONSTRUCTION AND ENSURE MINIMUM COVER IS SHEET No SCALE ORIGINAL SIZE
THE RAILWAY OPERATIONAL PHASE OTHER THAN PROVIDED AS PER ER REQUIREMENTS (CLAUSE 7.8.9 03 OF 05 1:1000 A1
THE APPLICABLE ER OR LOCAL AUTHORITY FROM DESIGN CRITERIA CIVIL AND INFRASTRUCTURE B THIS SHEET
STANDARDS. WORKS) AND LATEST EARTHWORK DESIGN & CROSS DM PMC ENGINEER PROJECT STAGE DOCUMENT STATUS
4. UTILITIES UNDER RAIL BRIDGES SHALL BE PROVIDED SECTION DURING CONSTRUCTION STAGE. DUBAI P.O.Box. 7497 Dubai, U.A.E CONSTRUCTION APPROVAL
M WITH PROTECTION AS AND WHERE REQUIRED Tel: +971 4 350 5000 Fax: +971 4 350 5001 DRAWING No REVISION M
ABU DHABI www.wsp.com
DURING EXCAVATION AND CONSTRUCTION.
AL AIN C0306-JBL-EUT-DG-36524 AB