You are on page 1of 1

AE102P1 B01 2648

SHEET NO. FACILITY NO. PROJECT NO.

MATCH LINE LINE

REFER TO DWG. NO.


FOR CONTINUATION
MATCH
1 / AE102P2
A B C D E F G

98500
355 5950 6150 8400 8400 8400 8400 8400

285
1
ENTRANCE ROOM

3000
B1 112
6105 19900 3000 15950 6050

3650
R6
25

5135
0

250
MAIN TELECOM ROOM

8235
CONTROL AND SECURITY ROOM

R6
B1 113 B1 114

10900

3415
1500
R26 00 250
LIMIT OF CHANGE 00 R26
OF SLAB ABOVE 12855 1600 1495 1600 4200
2600 1600
DOWN TO B2

3515

3515
HVAC SHAFT EL 94 450

2650
FPL
2

23685

5000
STORAGE
B1 101

13000
027 028 029 030 031 032 033 034 035 036
8400

FUTURE GENERATOR
EL 94 200 B1 103
TOC
8450 4550 750 2400 1200 7200 1200 7200 1200 7200

HVAC OPENING ABOVE

6000
3
DRIVE WAY

PARKING
LIMIT OF SLAB BELOW SLOPE 1:12 SLOPE 1:12
B1 117
SLOPE 1:10

1100

500
8400

1400

R26
HVAC 3100

2500
0
1550 1200 HVAC SHAFT
MAIN GARBAGE ROOM

2400
SHAFT HVAC

1000

4000
200 B1 110 SHAFT

200 1600
5150

2965
IT ROOM
B1 108
4

4900

900 200 200 900


STORAGE EL 94 450
B1 104 VESTIBULE 600 FPL
B1 106
GSM ELEC.ROOM PLUMING OPENING ABOVE

2035
600

5100
B1 109 B1 111
STAIR 02

1300 1000
B1 115
14400

STORAGE
STAIR 01 200
B1 102

1500
B1 105 3250 1000
8400

R30
2950 1800 2850

00
EL 94 200

00
R5
TOC

200
1000
SLOPE 1:7 VESTIBULE
HVAC
SHAFT B1 116
HVAC OPENING ABOVE
6105 5400 8750 68400
IT. SLAB OPENING ELEC. SLAB OPENING

5
EL 94 200
4505 1500 TOC
GENERATOR EL 94 300
B1 107 FFL

077 076 075 R5


080 079 078

R500
4200 1700 00 00
RAMP 01 R5
8400

B1 118

PUMP ROOM
B1 119
14000

6
4550 5000 6000 5000 700 5000 6000
5000
SLOPE 1:14
070 071 072

111 112 113


93370

8400

SLAB OPENING ABOVE


MATCH LINE
FOR CONTINUATION

109 110
093 092

REFER TO DWG. NO.


1 / AE102P4 EL 94 300
EL 94 450
FFL SLAB OPENING ABOVE LIMIT OF SLAB ABOVE
FPL
4800

1000 2700

2500

TRUE NORTH.
NORTH OF DWG.

FIRST BASEMENT PARTIAL PLAN - PART 1 OF 4


1 1:100