LAND KEY: N
ELEPHANT
SCHEDULE OF CONCRETE BEAM - HOLDING
G1 G2 G3 G4 G5' G5 G6 G7
M
50600
ELEPHANT HOLDING - ROOF LEVEL
SIZE CONCRETE
8645 9000 9000 8725 675 7125 7425 GRADE
MARK fcu/f'c
DEPTH REINF.
1 3 WIDTH (mm) (mm) (N/mm²) (Kg/m³)
This drawing is the copyright of AECOM and shall not be used, modified, repreduced, or relied upon by third parties, except as agreed by AECOM or as required by law. AECOM accepts no responsibility, and denies any liability whatsoever, to any party that uses or relies on this drawing without AECOM's express written consent. Do not scale from this drawing. All measurements must be obtained from the stated dimensions.
1 2 2 2 2
GRB1 600 700 45/36 210
04600 04600 03030 04600 04600 04600 03030
GRB1 GRB1
G
G
SC
SC
SC
SC
SC
GFSB2 GFSB2 GFSB2 GFSB2
1
1
GA 3
SCHEDULE OF SLABS -
Last Plotted: 9/30/2018 6:09:38 PM
GRB1
GRADE
GRB1
GRB1
SLOPE 7%
SLOPE 7%
5 5 MARK
R SB SB fcu/f'c REINF.
G G R (N/mm²)
THICKNESS (Kg/m³)
225 225
6870
100 GAP
G
GENERAL NOTES:
SC
SCHEDULE OF STEEL
2
2
SB SB SB SB
SC
5 5 5 5 3. DO NOT SCALE OFF THIS DRAWING. CHECK ALL DIMENSIONS ON SITE AND
G
5 5 MARK SIZE GRADE
SB SB
5 SB NOTIFY THE ENGINEER OF ANY DISCREPANCIES BEFORE PROCEEDING
GR GR GR GFSB1 150x150x8SHS S355
GFSB2 150x150x5SHS S355
WITH THE WORK.
RIDGE LINE 5 4. THESE DRAWINGS SHOULD BE READ IN CONJUNCTION WITH OTHER
TRUSS 1
GRB1
GRB1
GRB1
SSL +9.050 GRSB4 120x120x4SHS S355
GRSB5 150x150x5SHS S355
7115
TRUSS 2
TRUSS 2
TRUSS 1
5 5 5 5 GS2 GS2
1 5 5 5 5 1
SB SB SB SB
03030 GR GR GR GR 03030
29160
G
SC
SCHEDULE OF STEEL
2
GC 04600 HOLDING
2
SC
GR
G
GR SB GRB1 GRB1 MARK SIZE GRADE
SB 5
GSC1 533x210x82UB S355
5 GSC2 457x191x67UB S355
TOC +10.300
SLOPE 7%
SLOPE 7%
00 ISSUED FOR 100% SCHEMATIC DESIGN 26.09.2018
5 5 250THK
5465
GRB1
NOTE:
GRB1
GRB1
ALL MEP OPENING ARE STILL UNDER ASAAS
COORDINATION TO BE ADDRESSED IN Muscat National Development and
NEXT SUBMISSION Investment company. S.A.O.C.
G
SC
Al Harthy Complex, Muscat
GRSB5 GRSB5 GRSB5 GRSB5
1
Sultanate of Oman
GD 3
GFSB2 GFSB2 GFSB2 GFSB2
04600 LEAD CONSULTANT:
G
G
2015
SC
SC
SC
SC
1
1
GRB1 GRB1
GE
262 Z 25 SLEEVED PURLINS
AECOM MIDDLE EAST LIMITED
@ 1000mm c/c (TYP.)
P.O. Box 53, Abu Dhabi,
WITH ONE STRUT METSEC United Arab Emirates
OR EQUIVALENT APPROVED T +971 2 613 4000 F +971 2 613 4001
www.aecom.com
GRB1
GRB1
GRB1
6975
GS1 GS1
ZONE :
GRB1
GRB1
GRB1
TOC +10.300 PROJECT DESCRIPTION :
250THK
PARAPET WALL DESIGN OF THEME PARK
File Location: C:\Users\maduroa\Documents\REVIT LOCAL FILES\TPK_ACM_XX_ZZ_M3_S_056_ALBERT MADURO.rvt
GRB1 GRB1
DRAWING TITLE :
TPK-ACM-G-R1-DR-S-01095 00
26.09.2018 1:100
60582193 A1
LEGEND:
OFFICE USE ONLY :
COLUMNS /
WALLS
COLUMN /
WALL BELOW
Schematic Design
ALL COLUMNS AND WALLS ARE Not to be used for
CONCENTRIC TO THE GRID AND GRID Construction Purposes
INTERSECTION UNLESS NOTED
OTHERWISE