CENTER OF GRAVITY
A A
4129
EPOXY GROUT
B B
50
PROTECTIVE SLEEVE
C C
617
A
CONCRETE FOUNDATION
(800)
20
D D
1262
250
9000
2450
M30 STUD BAR
2,00
2,00
2,00
2,00
2,00
2,00
1080
1680
2180
3740
4240
5690
6190
7100
7600
8380
8880
8940
500
E E
60
0
NOTE:
F1 F2 F3 -Industry recommended best practice is to use a full bed epoxy grout between the bottom
F4 F5 F6 F7
of the skid and top of the concrete below compressor-engine skid.
L3 L6 - Epoxy grout thickness shall be in accordance with the grout supplier recommandations.
L1 L2 L4 L5
2390 - EGS specialist should be called to perform pre-grout inspection of the unit placement
F 2330 2,00 prior grouting being performed. F
- Keep foundation free of contamination by oil, dirt, water, and so forth until the time of
EGS specialist arrival to the site for pre-grout inspection.
- Proper grouting is an extremely important step in the unit installation for proper long
term operation of the compressor package.
-If it is done incorrectly it can/will lead to vibration problems and correcting improper
grouting is an expensive and time consuming endeavor. It is highly recommended to use
an experienced grouting company, to install the grout whom will work in accordance with
G the grout manufacturer's procedures and recommandations. G
0
60
L11 L10 L9 L8
L12 L7
500
2,00
1680
2,00
3740
2,00
5690
2,00
7100
2,00
8380
2,00
8940
1080
2180
4240
6190
7600
8880
J J
A(1:5)
K K
ESTIMATED WEIGHT: 17000 Kg
MIN 20 - MAX 90 mm
PRELIMINARY!
Designed by Checked by Approved by Scale Date
A1
T.H. A.P. A.P. 07.07.2020
Natural Gas Compression Unit: CI163
L
EGS
Euro Gas Systems
Project No.: 9002-0055
Name: Foundation bolt holes
Tag/Serial no.: Revision No.
PCS/Unit
1
Sheet
L