Professional Documents
Culture Documents
NOTE:
A A
B B
CEILING BOTTOM LEVEL
3000-FROM FINISH FLOOR LEVEL
50
C C
125
ENGINEERED TIMBER
ARCHITRAVE
70
TEAK LIPPING
D D
CONCEALED DOOR CLOSER
(REFER MASTER SCHEDULE OF
DOOR HARDWARE FITTING & ACCESSORIES)
BLOCK 5C
BLOCK 5B
BLOCK 5A
ZONE 1B ZONE 1C
ZONE 1A
1 DETAIL- C9
- Scale 1:4 PULL HANDLE KEY PLAN
F F
FIRE RATED CORE MATERIAL AS PER REBATED TEAK LIPPING Rev. Date Desd. Description Drwn. Chk'd App'd
MANUFACTURER'S RECOMMENDATION This drawing was prepared by CECB based on Architectural design drawings prepared by M/s Muditha Jayakody Associates Pvt.
Ltd, who was the Main Consultant/Architectural Consultant for Defence Headquarters Complex Project, Akuregoda till 30.09.2016.
MINISTRY OF DEFENCE
Project
DEFENCE HEADQUARTERS COMPLEX - AKUREGODA
5
Project Management & Procurement
PROJECT MANAGEMENT UNIT OF THE ARMED FORCES
13 18
3.6
Construction by
CONSTRUCTION MANAGEMENT UNIT OF THE ARMED FORCES
Drawing Title
MAIN BUILDING
75
BLOCK 02
TYPICAL DOOR DETAILS IN
SPECIALIST AREAS SHEET 05 OF 06
Designed Recommended
YGAD ...............................................
CONSULTANT ARCHITECT / SENIOR ARCHITECT
H 2 DETAIL - C10 Drawn WMN Approved
........................................
H
Checked TOT
- Scale 1:2 DGM (Architectural)
Submitted Scale Date Status
TGRS AS SHOWN 23.12.2020
CAD File P:\02_Bldgs\01_MB\MB_AR\ARPrint\TI\DETAILS\TIMBER DOORS\Block 2 TEN
Sheet Size Drawing No. Rev. No.
This drawing is sole property of CECB. Data contained on this drawing shall not to be used, reproduced, duplicated in whole or part without the A3 DHQC-CECB-MB-TI-AR-DW-ML-02-80541
prior permission of CECB. CECB shall not be held responsible for the unauthorized use of this drawing on Projects other than for which it was used.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 23 December 2020