You are on page 1of 55

CENTRAL ENGINEERING CONSULTANCY BUREAU

D H Q C - BUILDING PROJECT
Fire B3 METHOD STATEMENT LOG Run Date 6/4/2021 10:15

CECB Responded
MS S/No. Rev. Description (Concise Content of RFI) Discipline Block Originator Submittal Date Remarks (concise response)
Date
MVAC
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 Shop Drawing Submittal Log Run Date 6/4/2021 10:15

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

SH/MVAC/DHQC/01

Page 2 of 55
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 Shop Drawing Submittal Log Run Date 6/4/2021 10:15

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 3 of 55
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 Shop Drawing Submittal Log Run Date 6/4/2021 10:15

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 4 of 55
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 Shop Drawing Submittal Log Run Date 6/4/2021 10:15

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 5 of 55
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 Shop Drawing Submittal Log Run Date 6/4/2021 10:15

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 6 of 55
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 Shop Drawing Submittal Log Run Date 6/4/2021 10:15

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 7 of 55
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 Shop Drawing Submittal Log Run Date 6/4/2021 10:15

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 8 of 55
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 Shop Drawing Submittal Log Run Date 6/4/2021 10:15

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 9 of 55
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 Shop Drawing Submittal Log Run Date 6/4/2021 10:15

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 10 of 55
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 Shop Drawing Submittal Log Run Date 6/4/2021 10:15

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 11 of 55
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 MATERIAL APPROVAL LOG Run Date 6/4/2021 10:15

Supplier Sub-con Actual Submission Date Consultant


MAR # Rev.# Material Description Manufacturer/ Make Status Remarks File Number
Name Ref. No. Date Commented

Schedule Fire Detection System

Fire Alarm Control Panel

Repeater Panel

Fire Fighter Smoke Control Panel

Manual Call Points (Addressable)

Fire Resistance Cable

Smoke Detector (Addressable)

Duct Smoke Detector (Addressable)

Heat Detector (Addressable)

Alarm Sounder

Alarm Sounder with Strobe

Intelligent Monitor Module (Addressable)

Intelligent Control Module (Addressable)

Exit Sign

Video Display Terminal

Printer

Technical Schedule Fire Protection System


Stop, Test, Drain, Flushing Valves, Alarm Valves,
Supervisory switches and flow switches
Valves

Alarm Valves

Alarm and motor gong

Automatic Air Release Valve

Supervisory switch

Flow Switches

Fire Mains

Landing Valve

Fire Hose

Fire Hose Reel

Fire Pipes
Pressure Gauges
Sprinklers

Sprinkler (pendent - concealed type)

Sprinkler (upright)

Portable Fire Extinguishers

Water/CO2 Portable Fire Extinguisher - 9 litres

CO2 Portable Fire Extinguisher - 5 kg

Inert Gas Suppression System

Inert Gas C ylinders


Cylinders Valves, Manifold, Orifice and Pipes of
Inert Gas S ystem
Cylinder Valves

Inert Gas Agent Manifold

Inert Gas Agent Main Orifice

Pipes of Inert Gas S ystem

Discharge Nozzle

Inert Gas Agent Fire Detection & Actuation System

Fire Detection Panel

Remote Panel

Status Panel

Manual Call Points

Smoke/Heat Detector

Alarm Sounder

Alarm Sounder with Strobe

Interface/ Control unit

Fire Cable

Flexible Connection for Sprinklers & Pipe Supports

Flexible Connection for Sprinklers

Supports

Hangers

Grooved Fittings
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 Technical submittal log Run Date 6/4/2021 10:15

Prepared Date of CECB Responded


MS # Rev.# Description Status Remarks File No.
By submission Date
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 REQUEST FOR INFORMATION LOG Run Date 6/4/2021 10:15

CECB Responded
RFI S/No. Rev. Description (Concise Content of RFI) Discipline Block Originator Submittal Date Remarks (concise response)
Date
RFI/MVAC/DHQC/001
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 REQUEST FOR INFORMATION LOG Run Date
CECB Responded
RFI S/No. Rev. Description (Concise Content of RFI) Discipline Block Originator Submittal Date
Date
RFI/MVAC/DHQC/B12/PM001
6/4/2021 10:15

Remarks (concise response)


CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 REQUEST FOR INFORMATION LOG Run Date 6/4/2021 10:15

CECB Responded
RFI S/No. Rev. Description (Concise Content of RFI) Discipline Block Originator Submittal Date Remarks (concise response)
Date
RFI/MVAC/DHQC/001
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 REQUEST FOR INFORMATION LOG Run Date
CECB Responded
RFI S/No. Rev. Description (Concise Content of RFI) Discipline Block Originator Submittal Date
Date
RFI/MVAC/DHQC/IR-001
6/4/2021 10:15

Remarks (concise response)


CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 CONTRACTOR'S LETTER LOG Run Date 6/4/2021 10:15

CECB Responded
Ref No. Description Originator Submittal Date Remarks (concise response) Ref File
Date
DHQC/AC-12/GEN 001
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 CONTRACTOR'S LETTER LOG Run Date 6/4/2021 10:15

CECB Responded
Ref No. Description Originator Responded to Remarks (concise response)
Date
CB/DHQC/MEPI/MVAC/B8 (001)
6/4/2021 10:15

Ref File
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 CONTRACTOR'S RESOURCES PLAN Run Date 6/4/2021 10:15

CECB Responded
Ref No. Description Originator Responded to Remarks (concise response)
Date
RP/MVAC/DHQC/001
6/4/2021 10:15

Ref File
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 INTERNAL MEMOS LOG Run Date 6/4/2021 10:15

CECB Responded
Ref No. Description Originator Responded to Remarks (concise response)
Date
CECB/DHQC/STR/GEN/556
6/4/2021 10:15

Ref File
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
Fire B3 INTERNAL MEMOS LOG Run Date 6/4/2021 10:15

CECB Responded
Ref No. Description Originator Responded to Remarks (concise response)
Date
CECB/DHQC/STR/GEN/556
6/4/2021 10:15

Ref File

You might also like