1.1 GENERAL
This calculation report covers the design of steel structure for Stagging for hammer head shuttering.
Structure mainly consists of inner formwork, external formwork, stagging and working platform.
This document set out the design philosophy and all appropriate design criteria. Only the relevant
calculation is reported. The report is set with the minimum requirement of the section, however
higher configuration is accepted.
The structure is composed by two different parts, main formwork, supporting column framing.
Main structural supporting framings are provided with Crib L 50x50x6 etc.
Page 2 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 VENTURE
REV
DESIGN OF CRIB SECTION
FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.
R0
Page 3 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 VENTURE
REV
DESIGN OF CRIB SECTION
FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.
R0
Page 4 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 VENTURE
REV
DESIGN OF CRIB
SECTION FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.
R0
Page 5 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 VENTURE
REV
DESIGN OF CRIB SECTION
FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.
R0
Page 6 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
08.06.2021 DC-02
REV
DESIGN OF CRIB SECTION VENTURE
2.0 MATERIALS
STEEL –
Structural Steel, Es = 2 x105 N/ mm2
Density – 7850kg/m3
IS 2062 Grade A (Fy 250) for Rolled section and plates upto 20mm
thk., IS 2062 Grade B for plates higher than 20mm thk.
Page 7 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 VENTURE
REV
DESIGN OF CRIB SECTION
FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.
R0
Page 8 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 VENTURE
REV
DESIGN OF CRIB SECTION
FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.
R0
4 DEAD LOAD ( DL )
5
FIRE PROOFING LOAD (FP) – NOT APPLIED
6 LIVE LOAD ( LL )
8 WIND LOAD
Page 9 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 VENTURE
REV
DESIGN OF CRIB
R0
SECTION FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.
Page 10 of 10