You are on page 1of 11

DESIGN CALCULATION REPORT

FOR

DESIGN OF CRIB SECTION FOR STAGGING

PROJECT

DELHI METRO PHASE-IV CONTRACT NO DC-02

CLIENT

DELHI METRO RAIL CORPORATION LIMITED

CONTRACTOR

LONGJIAN-KEC JOINT VENTURE

PREPARED BY

ATYCONSULT ENGINEERS AND PLANNERS LLP.


Rev Remark Date Prepared By Approved by
R0 FOR INFO. 08/06/2021 MAYANK RAWAT ASHWANI TYAGI
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 DESIGN OF CRIB SECTION VENTURE
REV
FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.
R0

TABLE OF CONTENTS

1.0 INDRODUCTION 2

1.1 GENERAL 2
1.2 DESCRIPTION OF THE STEEL STRUCTURE 2
1.3 REFERENCE DOCCUMENTS 7

2.0 MATERIALS 7

2.1 STRUCTURAL STEEL 7

3.0 ANALYSIS AND DESIGN METHODOLOGY 7

5.0 PRILIMINARY LOAD CASES AND COMBINATIONS 9

5.1 PRILIMINARY LOAD CASES 9

6.0 SAP DESIGN ANALYSIS 10

Page 1 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 VENTURE
REV
DESIGN OF CRIB SECTION
FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.
R0

1.0 INDRODUCTION

1.1 GENERAL

This calculation report covers the design of steel structure for Stagging for hammer head shuttering.

Structure mainly consists of inner formwork, external formwork, stagging and working platform.

This document set out the design philosophy and all appropriate design criteria. Only the relevant
calculation is reported. The report is set with the minimum requirement of the section, however
higher configuration is accepted.

1.2 DESCRIPTION OF THE STEEL STRUCTURE

The structure is composed by two different parts, main formwork, supporting column framing.

Formwork is provided with horizontal stiffeners and columns of built-up section.

Main structural supporting framings are provided with Crib L 50x50x6 etc.

Support conditions are considered as pin support.

Page 2 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 VENTURE
REV
DESIGN OF CRIB SECTION
FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.
R0

ISOMETRIC VIEW STAGE 1

Page 3 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 VENTURE
REV
DESIGN OF CRIB SECTION
FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.
R0

Page 4 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 VENTURE
REV
DESIGN OF CRIB
SECTION FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.
R0

Page 5 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 VENTURE
REV
DESIGN OF CRIB SECTION
FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.
R0

Page 6 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
08.06.2021 DC-02
REV
DESIGN OF CRIB SECTION VENTURE

FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.


R0

1.3 REFERENCE DOCCUMENTS

Drawing – ATY 202016 D209, D210, D211

Design Standard – IS800:2007 & CIRIA Report

2.0 MATERIALS

2.1 STRUCTURAL STEEL

STEEL –
Structural Steel, Es = 2 x105 N/ mm2
Density – 7850kg/m3
IS 2062 Grade A (Fy 250) for Rolled section and plates upto 20mm
thk., IS 2062 Grade B for plates higher than 20mm thk.

3.0 ANALYSIS AND DESIGN METHODOLOGY

For analysis whole structure/frame is modeled in SAP2000 with pinned support.


Structural steel designed in SAP2000, however formwork plate is not modeled which is designed
separately.
The structural framing member design check has been done in limit state method in SAP2000 and a
plate, stiffeners has been checked for working stress method.

Page 7 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 VENTURE
REV
DESIGN OF CRIB SECTION
FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.
R0

Page 8 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 VENTURE
REV
DESIGN OF CRIB SECTION
FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.
R0

5.0 PRILIMINARY LOAD CASES AND COMBINATIONS

5.1 PRILIMINARY LOAD CASES

Sr. No. Description

1 SEISMIC LOAD IN +X DIRECTION. ( SLX ) NOT


APPLIED

2 SEISMIC LOAD IN +Z DIRECTION. ( SLZ ) NOT


APPLIED

3 SEISMIC LOAD IN +Y DIRECTION. ( SLY )


NOT APPLIED

4 DEAD LOAD ( DL )

5
FIRE PROOFING LOAD (FP) – NOT APPLIED

6 LIVE LOAD ( LL )

7 FILLED DEAD LOAD ( FL )

8 WIND LOAD

Page 9 of 10
Calculation Report for Contractor
Project DELHI METRO PHASE IV
DATE LONGJIAN-KEC JOINT
DC-02
08.06.2021 VENTURE
REV
DESIGN OF CRIB
R0
SECTION FOR STAGGING ATYCONSULT ENGINEERS AND PLANNERS LLP.

6.0 SAP DESIGN ANALYSIS

STAGGING IS SAFE UNDER GIVEN CRIB SECTION