Professional Documents
Culture Documents
A A
B B
50
EPOXY GROUT
PROTECTIVE SLEEVE
975
C C
(1000)
A
CONCRETE FOUNDATION
4200
12500
20
D D
250
2,00
2,00
2,00
2,00
2,00
2,00
M30 STUD BAR
10340
11380
12380
12440
1440
2540
3140
5190
5690
7740
8240
9840
940
E E
60
0
F3 NOTE:
F1 F2 F4 F5 F6 F7
-Industry recommended best practice is to use a full bed epoxy grout between the bottom
L2
of the skid and top of the concrete below compressor-engine skid.
L1 L3 L4 L5 L6
4140 - Epoxy grout thickness shall be in accordance with the grout supplier recommandations.
4080 2,00 - EGS specialist should be called to perform pre-grout inspection of the unit placement
F prior grouting being performed. F
- Keep foundation free of contamination by oil, dirt, water, and so forth until the time of
EGS specialist arrival to the site for pre-grout inspection.
- Proper grouting is an extremely important step in the unit installation for proper long
term operation of the compressor package.
-If it is done incorrectly it can/will lead to vibration problems and correcting improper
grouting is an expensive and time consuming endeavor. It is highly recommended to use
an experienced grouting company, to install the grout whom will work in accordance with
G the grout manufacturer's procedures and recommandations. G
0
60
L12 L11 L10 L9 L8 L7
I F14 F13 F12 F11 F10 F9 F8 I
60
0
940
2,00
2540
2,00
5190
2,00
7740
2,00
9840
2,00
11440
2,00
12440
1440
3140
5690
8240
10340
12380
J J
A(1:5)
K K
ESTIMATED WEIGHT: 50000 Kg
MIN 20 - MAX 90 mm
PRELIMINARY!
Designed by Checked by Approved by Scale Date
A1
T.H. A.P. A.P. 07.07.2020
Natural Gas Compression Unit: CI164
L
EGS
Euro Gas Systems
Project No.: 9002-0056
Name: Foundation bolt holes - 23-PK-021-A/B
Tag/Serial no.: Revision No.
PCS/Unit
1
Sheet
L