DOCUMENT TYPE: AC SINGLE LINE DIAGRAM
ITEM: =STATCOM
C C
CUSTOMER: MINERA LOS PELAMBRES
D D
BECHTEL
SUPPLIER/CONTRACTOR DOCUMENT
REVIEW STATUS CODE
PO / CONTRACT NO:
26148-220-POB-EVC0-00001 / GCP-1001-01-ODC-0012B
26148-220-V1B-EVC0-00157 003
F PROJECT DOCUMENT NUMBER:
F
GCP-1001-01-ODC-0012B-0000-E-VE-00157
STATION NAME:
EL CHACAY SUBSTATION - 220 kV
LOS PELAMBRES
ANTOFAGASTA MINERALS
SCALE: DATE
G APPROVAL
DESIGNED DREW
MLP_INCO PROJECT G
PROJECT DATE MINERA LOS PELAMBRES DATE
BY: BY: DETAILED ENGINEERING
CLIENT
REVIEWED SUPERVISED
PROYECTO MLP_INCO 2019-08-06 BY: BY.: AC SINGLE LINE DIAGRAM
0 2019-10-31 APPROVED AND REVISED AS PER FINAL LOADS GK AB RD ENGR. MNGR.:
GCP-1001-01-ODC-0012B DRAWING DESIGN REVISED APPROVED
ENGR. MNGR.: TITLE SHEET
C 2019-05-15 REVISED AS PER CUSTOMER COMMENTS DATED 2019-03-14 GK AB RD AUXILIARY POWER LOAD CALCULATION -0000-E-VE-00177 1JNS10321D1E066 MLP_INCO MNGR.:
GOKUL K. VINAYAGAM ABHAY B ROBERT D MNGR.:
GCP-1001-01-ODC-0012B
B 2019-02-18 FIRST ISSUE GK AB RD SINGLE LINE DIAGRAM -0000-E-VE-00156 1JNS10321D1SB REV. SHEET NEXT SHT. PLAN N°: DDR: MLP_INCO PLAN N°: REV.
PLAN N°
Rev. DATE DESCRIPTION DWG. REV. SUPV. E.M. MLP_INCO REFERENCE DOCUMENTS MLP_INCO NUMBER NUMBER NOTES 1JNS10321D1ECC C 01 02
Job No. 26148 26148-220-V1B-EVC0-00157 141 GCP-1001-01-ODC-0012B-0000-E-VE-00157 0
No.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
LIST OF SYMBOLS
SYMBOL DESCRIPTION
INCOMING SUPPLY-1
FROM 26kV STATCOM
POWER TRANSFORMER AUX. WINDING INCOMING SUPPLY-2
300kVA, 400V ±10%, 50Hz FROM CUSTOMER 23kV OHL
A REF. SLD : 1JNS10321D1SB REF. SLD : 1JNS10321D1SB TRANSFORMER A
-0741-XF-5011(-TA1)
CIRCUIT BREAKER
300kVA
23/0.4-0.23 kV
CURRENT TRANSFORMER
27 UNDERVOLTAGE SUPERVISION
B B
49 OVERLOAD PROTECTION PROTECTION
50 INSTANTANEOUS OVERCURRENT PROTECTION
=NE1 51 TIME DELAYED OVERCURRENT PROTECTION
-0741-DP-5030(-UC1)
PROTECTION FUNCTIONS:
400/230V AC DISTRIBUTION
A A LSI L=LONG TIME, S=SHORT TIME & I=INSTANTUOUS
LS/I L=LONG TIME, S=SHORT TIME OR I=INSTANTUOUS
V V
V VOLTAGE MEASUREMENT
27
27
A CURRENT MEASUREMENT
-QA1 -QA2
49 49 CIRCUIT BREAKER (MCB/MCCB)
C C
I>
50 50 (X = NUMBER OF POLES)
4P,630A AUTO TRANSFER SWITCH 4P, 630A xPxA
51 LOGIC CONTROLLER 51
SIGNAL INTERFACE TO CONTROL SYSTEM
LSI LSI
NUMBER OF CONTACT FOR EACH SIGNAL: 02
BUS-1 400V, 50HZ, Ics=10kA/1s 3Ph + N + PE -QA3 3Ph + N + PE BUS-2 400V, 50HZ, Ics=10kA/1s -QA1 OPEN/CLOSE/TRIP
-QA2 OPEN/CLOSE/TRIP
4P, 630A -QA3 OPEN/CLOSE/TRIP
-OUTGOING FEEDER MCB TRIP
-F1 -F2 -F51 -F52 -INCOMER SUPPLY-1 U<
COOLING SYSTEM VALVE ROOM MAINTENANCE CRANE GIS BUILDING SERVICES -INCOMER SUPPLY-2 U<
I>
I>
I>
I>
MAIN SUPPLY AIR CONDITIONER 1 -AUTO TRANSFER SWITCH FAIL
3P, 250A 3P, 16A 3P, 100A 3P, 63A -AUTO TRANSFER SWITCH MANUAL
-F3 -F4 -F53 -F54
GIS CUBICLE BAY - (1 - 11) SPARE CODES FOR STRUCTURING, SUB-CLASSES FOR LETTER N
I>
I>
I>
I>
VALVE ROOM VALVE ROOM
D AIR CONDITIONER 2 3P, 16A 3P, 16A AIR CONDITIONER 3 3P, 10A 3P, 10A
D
CODE AC DISTRIBUTION
-F5 -F6 -F55 -F56
SPARE SPARE
I>
I>
I>
I>
CONTROL ROOM CONTROL ROOM AIR =NBn 501 - 750 VAC
AIR CONDITIONER 1 3P, 10A 3P, 10A CONDITIONER 2 3P, 10A 3P, 10A
-F7 -F8 -F57 -F58 =NCn 401 - 500 VAC
SPARE SPARE
I>
I>
I>
I>
BATTERY ROOM PUMP ROOM
AIR CONDITIONER 3P, 10A 3P, 16A AIR CONDITIONER 3P, 100A 3P, 63A =NEn 301 - 400 VAC
-F9 -F10
=NFn 201 - 300 VAC
I>
I>
I>
I>
=T1-TA1 TRANSFORMER CONTROL SUPPLY STATCOM CONTROL CUBICLES AND -QA3 IS OPEN.
I>
PROTECTION CUBICLES
HEATING & LIGHTING HEATING & LIGHTING IF OPERATING VOLTAGE IS BELOW 0.9 x Un (ADJUSTABLE) IN THE INCOMING FEEDER-2
1P, 10A 1P, 10A
-QA2 WILL OPEN AND -QA3 WILL CLOSE AFTER A SHORT DELAY OF
-F17 -F18 1 SEC (ADJUSTABLE).
PROTECTION CUBICLES HEATER =WA1-BA1,-QC1,
I>
I>
IF DURING THE 120 SEC DELAY THE OPERATING VOLTAGE IN THE INCOMING FEEDER-2
SHT.03/ A3
SCALE: DATE
G APPROVAL
DESIGNED DREW
MLP_INCO PROJECT G
PROJECT DATE MINERA LOS PELAMBRES DATE
BY: BY: DETAILED ENGINEERING
CLIENT
REVIEWED SUPERVISED
PROYECTO MLP_INCO 2019-08-06 BY: BY.: AC SINGLE LINE DIAGRAM
0 2019-10-31 APPROVED AND REVISED AS PER FINAL LOADS GK AB RD ENGR. MNGR.:
GCP-1001-01-ODC-0012B DRAWING DESIGN REVISED APPROVED
ENGR. MNGR.: DOUBLE SOURCE
C 2019-05-15 REVISED AS PER CUSTOMER COMMENTS DATED 2019-03-14 GK AB RD AUXILIARY POWER LOAD CALCULATION -0000-E-VE-00177 1JNS10321D1E066 MLP_INCO MNGR.:
GOKUL K. VINAYAGAM ABHAY B ROBERT D MNGR.:
GCP-1001-01-ODC-0012B
B 2019-02-18 FIRST ISSUE GK AB RD SINGLE LINE DIAGRAM -0000-E-VE-00156 1JNS10321D1SB REV. SHEET NEXT SHT. PLAN N°: DDR: MLP_INCO PLAN N°: REV.
PLAN N°
Rev. DATE DESCRIPTION DWG. REV. SUPV. E.M. MLP_INCO REFERENCE DOCUMENTS MLP_INCO NUMBER NUMBER NOTES 1JNS10321D1ECC C 02 03
Job No. 26148 26148-220-V1B-EVC0-00157 141 GCP-1001-01-ODC-0012B-0000-E-VE-00157 0
No.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
=NE1
BREAKER OPERATION LOGIC
-0741-DP-5030(-UC1)
SHT.02/ F3
400/230V AC DISTRIBUTION -QA1 -QA2 -QA3 COMMENTS
A A
O O O
X X O
I>
I>
JUNCTION BOXES
1P, 10A 1P, 10A
O X X
-F21 -F22
SPARE
I>
I>
HEATER =VSC11-QS2
JUNCTION BOXES O - OPEN
1P, 10A 3P, 25A
X - CLOSE
-F23 -F24
B SPARE B
I>
I>
SPARE
3P, 250A 3P, 40A
-F25 -F26
I>
I>
SPARE SPARE
3P, 16A 3P, 16A
-F27 -F28
SPARE
I>
I>
SPARE
3P, 10A 3P, 10A
-F29 -F30
SPARE
I>
I>
SPARE
1P, 10A 1P, 10A
C C
D D
E E
F F
SCALE: DATE
G APPROVAL
DESIGNED DREW
MLP_INCO PROJECT G
PROJECT DATE MINERA LOS PELAMBRES DATE
BY: BY: DETAILED ENGINEERING
CLIENT
REVIEWED SUPERVISED
PROYECTO MLP_INCO 2019-08-06 BY: BY.: AC SINGLE LINE DIAGRAM
0 2019-10-31 APPROVED AND REVISED AS PER FINAL LOADS GK AB RD ENGR. MNGR.:
GCP-1001-01-ODC-0012B DRAWING DESIGN REVISED APPROVED
ENGR. MNGR.: DOUBLE SOURCE
C 2019-05-15 REVISED AS PER CUSTOMER COMMENTS DATED 2019-03-14 GK AB RD AUXILIARY POWER LOAD CALCULATION -0000-E-VE-00177 1JNS10321D1E066 MLP_INCO MNGR.:
GOKUL K. VINAYAGAM ABHAY B ROBERT D MNGR.:
GCP-1001-01-ODC-0012B
B 2019-02-18 FIRST ISSUE GK AB RD SINGLE LINE DIAGRAM -0000-E-VE-00156 1JNS10321D1SB REV. SHEET NEXT SHT. PLAN N°: DDR: MLP_INCO PLAN N°: REV.
PLAN N°
Rev. DATE DESCRIPTION DWG. REV. SUPV. E.M. MLP_INCO REFERENCE DOCUMENTS MLP_INCO NUMBER NUMBER NOTES 1JNS10321D1ECC C 03 04
Job No. 26148 26148-220-V1B-EVC0-00157 141 GCP-1001-01-ODC-0012B-0000-E-VE-00157 0
No.
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
-0741-DP-5030(-UC1) -0741-DP-5030(-UC1)
-QA1 -QA1
A CB OPEN CB OPEN A
CB TRIP CB TRIP
-QA2 -QA2
B CB OPEN CB OPEN B
CB TRIP CB TRIP
-QA3 -QA3
C CB OPEN CB OPEN C
CB TRIP CB TRIP
27 27
D D
INCOMER SUPPLY-1 UNDERVOLTAGE INCOMER SUPPLY-1 UNDERVOLTAGE
27 27
TO CONTROL TO CONTROL
E SYSTEM A SYSTEM B E
**)
**)
ALARM SIGNALS ALARM SIGNALS
OUTGOING FEEDER MCB OUTGOING FEEDER MCB
-F1 -Fxx TRIP (GROUP ALARM) -F1 -Fxx TRIP (GROUP ALARM)
BUS 1 BUS 1
F **)
F
**)
ALARM SIGNALS ALARM SIGNALS
OUTGOING FEEDER MCB OUTGOING FEEDER MCB
-F51 -Fxx TRIP (GROUP ALARM) -F51 -Fxx TRIP (GROUP ALARM)
BUS 2 BUS 2
NOTE:
**) GROUP ALRAM SIGNALS TO BE ADVISED DURING DETAIL DESIGN.
SCALE: DATE
G APPROVAL
DESIGNED DREW
MLP_INCO PROJECT G
PROJECT DATE MINERA LOS PELAMBRES DATE
BY: BY: DETAILED ENGINEERING
CLIENT
REVIEWED SUPERVISED
PROYECTO MLP_INCO 2019-08-06 BY: BY.: AC SINGLE LINE DIAGRAM
0 2019-10-31 APPROVED AND REVISED AS PER FINAL LOADS GK AB RD ENGR. MNGR.:
GCP-1001-01-ODC-0012B DRAWING DESIGN REVISED APPROVED
ENGR. MNGR.: CONTROL SYSTEM INTERFACE
C 2019-05-15 REVISED AS PER CUSTOMER COMMENTS DATED 2019-03-14 GK AB RD AUXILIARY POWER LOAD CALCULATION -0000-E-VE-00177 1JNS10321D1E066 MLP_INCO MNGR.:
GOKUL K. VINAYAGAM ABHAY B ROBERT D MNGR.:
GCP-1001-01-ODC-0012B
B 2019-02-18 FIRST ISSUE GK AB RD SINGLE LINE DIAGRAM -0000-E-VE-00156 1JNS10321D1SB REV. SHEET NEXT SHT. PLAN N°: DDR: MLP_INCO PLAN N°: REV.
PLAN N°
Rev. DATE DESCRIPTION DWG. REV. SUPV. E.M. MLP_INCO REFERENCE DOCUMENTS MLP_INCO NUMBER NUMBER NOTES 1JNS10321D1ECC C 04
Job No. 26148 26148-220-V1B-EVC0-00157 141 GCP-1001-01-ODC-0012B-0000-E-VE-00157 0
No.
1 2 3 4 5 6 7 8 9 10