DOCUMENT TYPE: AC SINGLE LINE DIAGRAM

ITEM: =STATCOM

PROJECT NAME: PROYECTO MLP_INCO

STATION NAME: EL CHACAY SUBSTATION - 220 kV

C C
CUSTOMER: MINERA LOS PELAMBRES

ABB PROJECT NO: F10321

D D

BECHTEL
SUPPLIER/CONTRACTOR DOCUMENT
REVIEW STATUS CODE

1 – WORK MAY PROCEED


2 – REVISE AND RESUBMIT – WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES
E 3 – REVISE & RESUBMIT – WORK MAY NOT PROCEED
4 – REVIEW NOT REQUIRED – WORK MAY PROCEED
E
5 – CANCELLED / SUPERSEDED

Permission to proceed does not constitute acceptance or approval of


design detail, calculations, analysis, test methods, or materials
developed or selected by Supplier/Contractor, and does not relieve the
Supplier/Contractor from full compliance with cont
RESPONSIBLE ENGINEER: DATE:
PUEBLA, ALDO

DISCIPLINE: DDR NO:


ELECTRICAL 141

PO / CONTRACT NO:

26148-220-POB-EVC0-00001 / GCP-1001-01-ODC-0012B

BECHTEL DOCUMENT NUMBER: SUBMITTAL NO:

26148-220-V1B-EVC0-00157 003
F PROJECT DOCUMENT NUMBER:
F
GCP-1001-01-ODC-0012B-0000-E-VE-00157

STATION NAME:
EL CHACAY SUBSTATION - 220 kV
LOS PELAMBRES
ANTOFAGASTA MINERALS

SCALE: DATE
G APPROVAL
DESIGNED DREW
MLP_INCO PROJECT G
PROJECT DATE MINERA LOS PELAMBRES DATE
BY: BY: DETAILED ENGINEERING
CLIENT

REVIEWED SUPERVISED
PROYECTO MLP_INCO 2019-08-06 BY: BY.: AC SINGLE LINE DIAGRAM
0 2019-10-31 APPROVED AND REVISED AS PER FINAL LOADS GK AB RD ENGR. MNGR.:
GCP-1001-01-ODC-0012B DRAWING DESIGN REVISED APPROVED
ENGR. MNGR.: TITLE SHEET
C 2019-05-15 REVISED AS PER CUSTOMER COMMENTS DATED 2019-03-14 GK AB RD AUXILIARY POWER LOAD CALCULATION -0000-E-VE-00177 1JNS10321D1E066 MLP_INCO MNGR.:
GOKUL K. VINAYAGAM ABHAY B ROBERT D MNGR.:
GCP-1001-01-ODC-0012B
B 2019-02-18 FIRST ISSUE GK AB RD SINGLE LINE DIAGRAM -0000-E-VE-00156 1JNS10321D1SB REV. SHEET NEXT SHT. PLAN N°: DDR: MLP_INCO PLAN N°: REV.
PLAN N°
Rev. DATE DESCRIPTION DWG. REV. SUPV. E.M. MLP_INCO REFERENCE DOCUMENTS MLP_INCO NUMBER NUMBER NOTES 1JNS10321D1ECC C 01 02
Job No. 26148 26148-220-V1B-EVC0-00157 141 GCP-1001-01-ODC-0012B-0000-E-VE-00157 0
No.

1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
LIST OF SYMBOLS

SYMBOL DESCRIPTION
INCOMING SUPPLY-1
FROM 26kV STATCOM
POWER TRANSFORMER AUX. WINDING INCOMING SUPPLY-2
300kVA, 400V ±10%, 50Hz FROM CUSTOMER 23kV OHL
A REF. SLD : 1JNS10321D1SB REF. SLD : 1JNS10321D1SB TRANSFORMER A

-0741-XF-5011(-TA1)

CIRCUIT BREAKER

300kVA
23/0.4-0.23 kV

CURRENT TRANSFORMER

27 UNDERVOLTAGE SUPERVISION
B B
49 OVERLOAD PROTECTION PROTECTION
50 INSTANTANEOUS OVERCURRENT PROTECTION
=NE1 51 TIME DELAYED OVERCURRENT PROTECTION
-0741-DP-5030(-UC1)
PROTECTION FUNCTIONS:
400/230V AC DISTRIBUTION
A A LSI L=LONG TIME, S=SHORT TIME & I=INSTANTUOUS
LS/I L=LONG TIME, S=SHORT TIME OR I=INSTANTUOUS
V V
V VOLTAGE MEASUREMENT
27
27
A CURRENT MEASUREMENT
-QA1 -QA2
49 49 CIRCUIT BREAKER (MCB/MCCB)
C C

I>
50 50 (X = NUMBER OF POLES)
4P,630A AUTO TRANSFER SWITCH 4P, 630A xPxA
51 LOGIC CONTROLLER 51
SIGNAL INTERFACE TO CONTROL SYSTEM
LSI LSI
NUMBER OF CONTACT FOR EACH SIGNAL: 02
BUS-1 400V, 50HZ, Ics=10kA/1s 3Ph + N + PE -QA3 3Ph + N + PE BUS-2 400V, 50HZ, Ics=10kA/1s -QA1 OPEN/CLOSE/TRIP
-QA2 OPEN/CLOSE/TRIP
4P, 630A -QA3 OPEN/CLOSE/TRIP
-OUTGOING FEEDER MCB TRIP
-F1 -F2 -F51 -F52 -INCOMER SUPPLY-1 U<
COOLING SYSTEM VALVE ROOM MAINTENANCE CRANE GIS BUILDING SERVICES -INCOMER SUPPLY-2 U<
I>

I>
I>

I>
MAIN SUPPLY AIR CONDITIONER 1 -AUTO TRANSFER SWITCH FAIL
3P, 250A 3P, 16A 3P, 100A 3P, 63A -AUTO TRANSFER SWITCH MANUAL
-F3 -F4 -F53 -F54
GIS CUBICLE BAY - (1 - 11) SPARE CODES FOR STRUCTURING, SUB-CLASSES FOR LETTER N
I>

I>
I>

I>
VALVE ROOM VALVE ROOM
D AIR CONDITIONER 2 3P, 16A 3P, 16A AIR CONDITIONER 3 3P, 10A 3P, 10A
D
CODE AC DISTRIBUTION
-F5 -F6 -F55 -F56
SPARE SPARE
I>

I>
I>

I>
CONTROL ROOM CONTROL ROOM AIR =NBn 501 - 750 VAC
AIR CONDITIONER 1 3P, 10A 3P, 10A CONDITIONER 2 3P, 10A 3P, 10A
-F7 -F8 -F57 -F58 =NCn 401 - 500 VAC
SPARE SPARE
I>

I>
I>

I>
BATTERY ROOM PUMP ROOM
AIR CONDITIONER 3P, 10A 3P, 16A AIR CONDITIONER 3P, 100A 3P, 63A =NEn 301 - 400 VAC
-F9 -F10
=NFn 201 - 300 VAC
I>

I>

SPARE BATTERY CHARGER-1


3P, 16A 3P, 40A
=NGn 101 - 200 VAC
-F11 -F12
I>

I>

BATTERY CHARGER-2 STATCOM BUILDING SERVICES


E TRANSFER SWITCH LOGIC E
3P, 40A 3P, 25A
-F13 -F14 IN NORMAL OPERATING MODE BOTH -QA1 AND -QA2 ARE CLOSED
I>

I>

=T1-TA1 TRANSFORMER CONTROL SUPPLY STATCOM CONTROL CUBICLES AND -QA3 IS OPEN.

3P, 40A 1P, 10A HEATING & LIGHTING


IF OPERATING VOLTAGE IS BELOW 0.9 x Un (ADJUSTABLE) IN THE INCOMING FEEDER-1
-QA1 WILL OPEN AND -QA3 WILL CLOSE AFTER A SHORT DELAY OF
-F15 -F16
1 SEC (ADJUSTABLE).
PROTECTION CUBICLES
I>

I>

PROTECTION CUBICLES
HEATING & LIGHTING HEATING & LIGHTING IF OPERATING VOLTAGE IS BELOW 0.9 x Un (ADJUSTABLE) IN THE INCOMING FEEDER-2
1P, 10A 1P, 10A
-QA2 WILL OPEN AND -QA3 WILL CLOSE AFTER A SHORT DELAY OF
-F17 -F18 1 SEC (ADJUSTABLE).
PROTECTION CUBICLES HEATER =WA1-BA1,-QC1,
I>

I>

PARRALLELING OF INCOMERS IS NOT PERMITTED EITHER CONDITION


HEATING & LIGHTING =VSC11-BC1 WHEN THE TIE CB CLOSED.
1P, 10A 1P, 10A
JUNCTION BOXES
UPON RESTORATION OF THE FAULTY FEEDER-1 THERE WILL BE A
DELAY OF ABOUT 120 SEC (ADJUSTABLE) BEFORE CLOSING BACK IN.
F AFTER THE 120 SEC DELAY IS COMPLETE -QA3 WILL OPEN. FOLLOWING F
THIS -QA1 WILL CLOSE AFTER A TIME DELAY OF 1 SEC (ADJUSTABLE) AND
SAME IS APPLICABLE FOR RESTORATION OF FEEDER-2 OPERATION

IF DURING THE 120 SEC DELAY THE OPERATING VOLTAGE IN THE INCOMING FEEDER-2
SHT.03/ A3

IS BELOW 0.9 x Un SWITCHING TO THE RESTORED FEEDER


WILL INITIATE INSTANTLY. IF NOT RESTORED -QA2,-QA3 WILL REMAIN IN
CLOSE POSITION EVEN BELOW 0.9 x Un.

IF OPERATING VOLTAGE IN INCOMING FEEDER-1 IS BELOW 0.9 x Un AND


INCOMING FEEDER-2 IS NOT HEALTHY -QA1,-QA3 REMAIN IN CLOSE POSITION EVEN
BELOW 0.9 x Un.

=STATCOM.X1 STATION NAME:


EL CHACAY SUBSTATION - 220 kV
LOS PELAMBRES
ANTOFAGASTA MINERALS

SCALE: DATE
G APPROVAL
DESIGNED DREW
MLP_INCO PROJECT G
PROJECT DATE MINERA LOS PELAMBRES DATE
BY: BY: DETAILED ENGINEERING
CLIENT

REVIEWED SUPERVISED
PROYECTO MLP_INCO 2019-08-06 BY: BY.: AC SINGLE LINE DIAGRAM
0 2019-10-31 APPROVED AND REVISED AS PER FINAL LOADS GK AB RD ENGR. MNGR.:
GCP-1001-01-ODC-0012B DRAWING DESIGN REVISED APPROVED
ENGR. MNGR.: DOUBLE SOURCE
C 2019-05-15 REVISED AS PER CUSTOMER COMMENTS DATED 2019-03-14 GK AB RD AUXILIARY POWER LOAD CALCULATION -0000-E-VE-00177 1JNS10321D1E066 MLP_INCO MNGR.:
GOKUL K. VINAYAGAM ABHAY B ROBERT D MNGR.:
GCP-1001-01-ODC-0012B
B 2019-02-18 FIRST ISSUE GK AB RD SINGLE LINE DIAGRAM -0000-E-VE-00156 1JNS10321D1SB REV. SHEET NEXT SHT. PLAN N°: DDR: MLP_INCO PLAN N°: REV.
PLAN N°
Rev. DATE DESCRIPTION DWG. REV. SUPV. E.M. MLP_INCO REFERENCE DOCUMENTS MLP_INCO NUMBER NUMBER NOTES 1JNS10321D1ECC C 02 03
Job No. 26148 26148-220-V1B-EVC0-00157 141 GCP-1001-01-ODC-0012B-0000-E-VE-00157 0
No.

1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10

=NE1
BREAKER OPERATION LOGIC
-0741-DP-5030(-UC1)

SHT.02/ F3
400/230V AC DISTRIBUTION -QA1 -QA2 -QA3 COMMENTS

A A
O O O

X X O

CRANE FEEDER -F51


-F19 -F20 X O X SHOULD BE OPEN
HEATER =VSC11-QS1 DC DISTRIBUTION PANEL

I>

I>
JUNCTION BOXES
1P, 10A 1P, 10A
O X X
-F21 -F22
SPARE

I>

I>
HEATER =VSC11-QS2
JUNCTION BOXES O - OPEN
1P, 10A 3P, 25A
X - CLOSE
-F23 -F24
B SPARE B

I>

I>
SPARE
3P, 250A 3P, 40A
-F25 -F26

I>

I>
SPARE SPARE
3P, 16A 3P, 16A
-F27 -F28
SPARE

I>

I>
SPARE
3P, 10A 3P, 10A
-F29 -F30
SPARE

I>

I>
SPARE
1P, 10A 1P, 10A

C C

D D

E E

F F

=STATCOM.X1 STATION NAME:


EL CHACAY SUBSTATION - 220 kV
LOS PELAMBRES
ANTOFAGASTA MINERALS

SCALE: DATE
G APPROVAL
DESIGNED DREW
MLP_INCO PROJECT G
PROJECT DATE MINERA LOS PELAMBRES DATE
BY: BY: DETAILED ENGINEERING
CLIENT

REVIEWED SUPERVISED
PROYECTO MLP_INCO 2019-08-06 BY: BY.: AC SINGLE LINE DIAGRAM
0 2019-10-31 APPROVED AND REVISED AS PER FINAL LOADS GK AB RD ENGR. MNGR.:
GCP-1001-01-ODC-0012B DRAWING DESIGN REVISED APPROVED
ENGR. MNGR.: DOUBLE SOURCE
C 2019-05-15 REVISED AS PER CUSTOMER COMMENTS DATED 2019-03-14 GK AB RD AUXILIARY POWER LOAD CALCULATION -0000-E-VE-00177 1JNS10321D1E066 MLP_INCO MNGR.:
GOKUL K. VINAYAGAM ABHAY B ROBERT D MNGR.:
GCP-1001-01-ODC-0012B
B 2019-02-18 FIRST ISSUE GK AB RD SINGLE LINE DIAGRAM -0000-E-VE-00156 1JNS10321D1SB REV. SHEET NEXT SHT. PLAN N°: DDR: MLP_INCO PLAN N°: REV.
PLAN N°
Rev. DATE DESCRIPTION DWG. REV. SUPV. E.M. MLP_INCO REFERENCE DOCUMENTS MLP_INCO NUMBER NUMBER NOTES 1JNS10321D1ECC C 03 04
Job No. 26148 26148-220-V1B-EVC0-00157 141 GCP-1001-01-ODC-0012B-0000-E-VE-00157 0
No.

1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10

CONTROL SYSTEM A INTERFACE CONTROL SYSTEM B INTERFACE

-0741-DP-5030(-UC1) -0741-DP-5030(-UC1)

-QA1 -QA1

A CB OPEN CB OPEN A

TO CONTROL CB CLOSE TO CONTROL CB CLOSE


SYSTEM A SYSTEM B

CB TRIP CB TRIP

-QA2 -QA2

B CB OPEN CB OPEN B

TO CONTROL CB CLOSE TO CONTROL CB CLOSE


SYSTEM A SYSTEM B

CB TRIP CB TRIP

-QA3 -QA3

C CB OPEN CB OPEN C

TO CONTROL CB CLOSE TO CONTROL CB CLOSE


SYSTEM A SYSTEM B

CB TRIP CB TRIP

27 27
D D
INCOMER SUPPLY-1 UNDERVOLTAGE INCOMER SUPPLY-1 UNDERVOLTAGE

27 27

INCOMER SUPPLY-2 UNDERVOLTAGE INCOMER SUPPLY-2 UNDERVOLTAGE

ATS FAIL ATS FAIL

TO CONTROL TO CONTROL
E SYSTEM A SYSTEM B E

ATS MANUAL ATS MANUAL

**)
**)
ALARM SIGNALS ALARM SIGNALS
OUTGOING FEEDER MCB OUTGOING FEEDER MCB
-F1 -Fxx TRIP (GROUP ALARM) -F1 -Fxx TRIP (GROUP ALARM)
BUS 1 BUS 1

F **)
F
**)
ALARM SIGNALS ALARM SIGNALS
OUTGOING FEEDER MCB OUTGOING FEEDER MCB
-F51 -Fxx TRIP (GROUP ALARM) -F51 -Fxx TRIP (GROUP ALARM)
BUS 2 BUS 2

NOTE:
**) GROUP ALRAM SIGNALS TO BE ADVISED DURING DETAIL DESIGN.

=STATCOM.X1.NE1 STATION NAME:


EL CHACAY SUBSTATION - 220 kV
LOS PELAMBRES
ANTOFAGASTA MINERALS

SCALE: DATE
G APPROVAL
DESIGNED DREW
MLP_INCO PROJECT G
PROJECT DATE MINERA LOS PELAMBRES DATE
BY: BY: DETAILED ENGINEERING
CLIENT

REVIEWED SUPERVISED
PROYECTO MLP_INCO 2019-08-06 BY: BY.: AC SINGLE LINE DIAGRAM
0 2019-10-31 APPROVED AND REVISED AS PER FINAL LOADS GK AB RD ENGR. MNGR.:
GCP-1001-01-ODC-0012B DRAWING DESIGN REVISED APPROVED
ENGR. MNGR.: CONTROL SYSTEM INTERFACE
C 2019-05-15 REVISED AS PER CUSTOMER COMMENTS DATED 2019-03-14 GK AB RD AUXILIARY POWER LOAD CALCULATION -0000-E-VE-00177 1JNS10321D1E066 MLP_INCO MNGR.:
GOKUL K. VINAYAGAM ABHAY B ROBERT D MNGR.:
GCP-1001-01-ODC-0012B
B 2019-02-18 FIRST ISSUE GK AB RD SINGLE LINE DIAGRAM -0000-E-VE-00156 1JNS10321D1SB REV. SHEET NEXT SHT. PLAN N°: DDR: MLP_INCO PLAN N°: REV.
PLAN N°
Rev. DATE DESCRIPTION DWG. REV. SUPV. E.M. MLP_INCO REFERENCE DOCUMENTS MLP_INCO NUMBER NUMBER NOTES 1JNS10321D1ECC C 04
Job No. 26148 26148-220-V1B-EVC0-00157 141 GCP-1001-01-ODC-0012B-0000-E-VE-00157 0