Schedule-1, Page 1 of 5

SILK POWER PVT.LTD.


132kV Single and Double Circuit Transmission Line Project
Tower Steel, Insulator, Fitting Hardware, OPGW & Fittings, Vibration Damper & Acceories
Master List of Equipment (to be consumed in Nepal)
BILL OF QUANTITY
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and
Total Amount (Excluding
Estimated transportaion to site (Excluding Taxes and Duties applicable
Country of Taxes and Duties)
Item No. Item description in Nepal)
origin
FC FC
Unit Quantity
Currency# Unit Rate Amount
1 2 3 4 5.00 6 7.00 8 = (7) x (5) 9=8
1.1 Supply of following types of towers & tower extension parts complete with stubs, step bolts, hangers, D-shackles,
bolts & nuts etc but excluding tower accessories such as danger plates, number plates, phase plates, anti-climbing
devices
1.1.1 Tension Tower SB - -
a.1) Basic tower Nos. - - -
a.2.1) Normal Stub Nos. - - -
a.2.2) +1.5m RC Nos. - - -
a.2.3) +3.0m RC Nos. - - -
a.2.4) +4.5m RC Nos. - - -
a.2.5) +6.0m RC Nos. - - -
b) -4.5 m Leg Extension Nos. - - -
c) -3 m Leg Extension Nos. - - -
d) -1.5 m Leg Extension Nos. - - -
e) +/- 0 m Leg Extension Nos. - - -
f) +1.5 m Leg Extension Nos. - - -
g) +3 m Leg Extension Nos. - - -
h) +4.5 m Leg Extension Nos. - - -
i) +6 m Leg Extension Nos. - - -
j) +7.5 m Leg Extension Nos. - - -
k) +9 m Leg Extension Nos. - - -

1.1.2 Tension Tower SC - -


a.1) Basic tower Nos. 4.00 - -
a.2.1) Normal Stub Nos. 16.00 - -
a.2.2) +1.5m RC Nos. 2.00 - -
a.2.3) +3.0m RC Nos. 1.00 - -
a.2.4) +4.5m RC Nos. - - -
a.2.5) +6.0m RC Nos. - - -
b) -4.5 m Leg Extension Nos. 2.00 - -
c) -3 m Leg Extension Nos. - - -
d) -1.5 m Leg Extension Nos. 2.00 - -
e) +/- 0 m Leg Extension Nos. 11.00 - -
f) +1.5 m Leg Extension Nos. - - -
g) +3 m Leg Extension Nos. 2.00 - -
h) +4.5 m Leg Extension Nos. - - -
i) +6 m Leg Extension Nos. 2.00 - -
j) +7.5 m Leg Extension Nos. 3.00 - -
k) +9 m Leg Extension Nos. 4.00 - -
- -
1.1.2 Tension Tower SD - -
a.1) Basic tower Nos. 10.00 - -

SILK POWER PVT. LTD. 132 KV TRANSMISSION LINE WORKS FROM LUJA POWERHOUSE TO TINGLA SUBSTATION N.TECH POWER PVT. LTD.
Schedule-1, Page 2 of 5

SILK POWER PVT.LTD.


132kV Single and Double Circuit Transmission Line Project
Tower Steel, Insulator, Fitting Hardware, OPGW & Fittings, Vibration Damper & Acceories
Master List of Equipment (to be consumed in Nepal)
BILL OF QUANTITY
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and
Total Amount (Excluding
Estimated transportaion to site (Excluding Taxes and Duties applicable
Country of Taxes and Duties)
Item No. Item description in Nepal)
origin
FC FC
Unit Quantity
Currency# Unit Rate Amount
1 2 3 4 5.00 6 7.00 8 = (7) x (5) 9=8
a.2.1) Normal Stub Nos. 40.00 - -
a.2.2) +1.5m RC Nos. 4.00 - -
a.2.3) +3.0m RC Nos. - - -
a.2.4) +4.5m RC Nos. 2.00 - -
a.2.5) +6.0m RC Nos. - - -
b) -4.5 m Leg Extension Nos. - - -
c) -3 m Leg Extension Nos. 2.00 - -
d) -1.5 m Leg Extension Nos. 3.00 - -
e) +/- 0 m Leg Extension Nos. 33.00 - -
f) +1.5 m Leg Extension Nos. 2.00 - -
g) +3 m Leg Extension Nos. 10.00 - -
h) +4.5 m Leg Extension Nos. 3.00 - -
i) +6 m Leg Extension Nos. 3.00 - -
j) +7.5 m Leg Extension Nos. 2.00 - -
k) +9 m Leg Extension Nos. 14.00 - -

1.1.2 Tension Tower SPC


a.1) Basic tower Nos. 2.00 - -
a.2.1) Normal Stub Nos. 8.00 - -
a.2.2) +1.5m RC Nos. - - -
a.2.3) +3.0m RC Nos. - - -
a.2.4) +4.5m RC Nos. - - -
a.2.5) +6.0m RC Nos. - - -
b) -4.5 m Leg Extension Nos. - - -
c) -3 m Leg Extension Nos. - - -
d) -1.5 m Leg Extension Nos. - - -
e) +/- 0 m Leg Extension Nos. 8.00 - -
f) +1.5 m Leg Extension Nos. - - -
g) +3 m Leg Extension Nos. 2.00 - -
h) +4.5 m Leg Extension Nos. 2.00 - -
i) +6 m Leg Extension Nos. 3.00 - -
j) +7.5 m Leg Extension Nos. 1.00 - -
k) +9 m Leg Extension Nos. - - -

1.1.2 Tension Tower DB


a.1) Basic tower Nos. 15.00 - -
a.2.1) Normal Stub Nos. 60.00 - -
a.2.2) +1.5m RC Nos. 4.00 - -
a.2.3) +3.0m RC Nos. - - -
a.2.4) +4.5m RC Nos. - - -
a.2.5) +6.0m RC Nos. - - -

SILK POWER PVT. LTD. 132 KV TRANSMISSION LINE WORKS FROM LUJA POWERHOUSE TO TINGLA SUBSTATION N.TECH POWER PVT. LTD.
Schedule-1, Page 3 of 5

SILK POWER PVT.LTD.


132kV Single and Double Circuit Transmission Line Project
Tower Steel, Insulator, Fitting Hardware, OPGW & Fittings, Vibration Damper & Acceories
Master List of Equipment (to be consumed in Nepal)
BILL OF QUANTITY
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and
Total Amount (Excluding
Estimated transportaion to site (Excluding Taxes and Duties applicable
Country of Taxes and Duties)
Item No. Item description in Nepal)
origin
FC FC
Unit Quantity
Currency# Unit Rate Amount
1 2 3 4 5.00 6 7.00 8 = (7) x (5) 9=8
b) -4.5 m Leg Extension Nos. - - -
c) -3 m Leg Extension Nos. 4.00 - -
d) -1.5 m Leg Extension Nos. 3.00 - -
e) +/- 0 m Leg Extension Nos. 48.00 - -
f) +1.5 m Leg Extension Nos. 5.00 - -
g) +3 m Leg Extension Nos. 7.00 - -
h) +4.5 m Leg Extension Nos. 11.00 - -
i) +6 m Leg Extension Nos. 6.00 - -
j) +7.5 m Leg Extension Nos. 4.00 - -
k) +9 m Leg Extension Nos. 12.00 - -

1.1.2 Tension Tower DC - -


a.1) Basic tower Nos. 34.00 - -
a.2.1) Normal Stub Nos. 136.00 - -
a.2.2) +1.5m RC Nos. 9.00 - -
a.2.3) +3.0m RC Nos. 2.00 - -
a.2.4) +4.5m RC Nos. - - -
a.2.5) +6.0m RC Nos. - - -
b) -4.5 m Leg Extension Nos. 1.00 - -
c) -3 m Leg Extension Nos. 3.00 - -
d) -1.5 m Leg Extension Nos. 11.00 - -
e) +/- 0 m Leg Extension Nos. 112.00 - -
f) +1.5 m Leg Extension Nos. 9.00 - -
g) +3 m Leg Extension Nos. 17.00 - -
h) +4.5 m Leg Extension Nos. 12.00 - -
i) +6 m Leg Extension Nos. 22.00 - -
j) +7.5 m Leg Extension Nos. 20.00 - -
k) +9 m Leg Extension Nos. 29.00 - -

1.1.2 Tension Tower DD - -


a.1) Basic tower Nos. 20.00 - -
a.2.1) Normal Stub Nos. 80.00 - -
a.2.2) +1.5m RC Nos. 7.00 - -
a.2.3) +3.0m RC Nos. 4.00 - -
a.2.4) +4.5m RC Nos. 6.00 - -
a.2.5) +6.0m RC Nos. - -
b) -4.5 m Leg Extension Nos. 1.00 - -
c) -3 m Leg Extension Nos. 5.00 - -
d) -1.5 m Leg Extension Nos. 8.00 - -
e) +/- 0 m Leg Extension Nos. 61.00 - -
f) +1.5 m Leg Extension Nos. 5.00 - -

SILK POWER PVT. LTD. 132 KV TRANSMISSION LINE WORKS FROM LUJA POWERHOUSE TO TINGLA SUBSTATION N.TECH POWER PVT. LTD.
Schedule-1, Page 4 of 5

SILK POWER PVT.LTD.


132kV Single and Double Circuit Transmission Line Project
Tower Steel, Insulator, Fitting Hardware, OPGW & Fittings, Vibration Damper & Acceories
Master List of Equipment (to be consumed in Nepal)
BILL OF QUANTITY
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and
Total Amount (Excluding
Estimated transportaion to site (Excluding Taxes and Duties applicable
Country of Taxes and Duties)
Item No. Item description in Nepal)
origin
FC FC
Unit Quantity
Currency# Unit Rate Amount
1 2 3 4 5.00 6 7.00 8 = (7) x (5) 9=8
g) +3 m Leg Extension Nos. 2.00 - -
h) +4.5 m Leg Extension Nos. 3.00 - -
i) +6 m Leg Extension Nos. 6.00 - -
j) +7.5 m Leg Extension Nos. 5.00 - -
k) +9 m Leg Extension Nos. 36.00 - -

2 Supply of Earthing of towers


i. Pipe Type Nos. 84.00 - -
ii. Counterpoise Type - -
ii.a Counterpoise Type-25m m 262.50
ii.b Counterpoise Type-50m m 252.50
ii.c Counterpoise Type-100m m 525.00
- -
3 Supply of tower accessories - -
i. Danger Plate Nos. 84.00 - -
ii. Number Plate Nos. 84.00 - -
iii. Phase Plate ( Set of three) Sets 84.00 - -
iv. Circuit Plate(Set of two) Sets 84.00 - -
v. Anti climbimg device Nos. 84.00 - -
vi. Bird Guard(set of three) Sets 168.00 - -
- -
4 Conductor - -
i) ACSR Bear Conductor KM 181.00 - -
- -
4.1 Insulators for 132kV ckts with ACSR Bear -
A. Composite Insulators -
(i) 90kN Composite Long Rod Insulator Nos 22.00 - -
(ii 120kN Composite Long Rod Insulator Nos 1,526.00 - -
- -
4.2 Hardware Fittings suitable for Bear conductor - -
i) Single Tension Insulator String with necessary clamps Sets 162.00 - -
ii) Double Tension Insulator String with necessary clamps Sets 302.00 - -
iii) Single 'I' Suspension PILOT String with necessary clamps Sets 20.00 - -
-
4.3 Conductor Accessories -
i) Mid span compression joint for ACSR Bear conductor Nos 30.00 - -
ii) Repair Sleeve for ACSR Bear conductor Nos 30.00 - -
iii) Vibration Damper for ACSR Bear conductor Nos 780.00 - -
- -
5 Supply of Fibre Cable & Accessories - -
- -

SILK POWER PVT. LTD. 132 KV TRANSMISSION LINE WORKS FROM LUJA POWERHOUSE TO TINGLA SUBSTATION N.TECH POWER PVT. LTD.
Schedule-1, Page 5 of 5

SILK POWER PVT.LTD.


132kV Single and Double Circuit Transmission Line Project
Tower Steel, Insulator, Fitting Hardware, OPGW & Fittings, Vibration Damper & Acceories
Master List of Equipment (to be consumed in Nepal)
BILL OF QUANTITY
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and
Total Amount (Excluding
Estimated transportaion to site (Excluding Taxes and Duties applicable
Country of Taxes and Duties)
Item No. Item description in Nepal)
origin
FC FC
Unit Quantity
Currency# Unit Rate Amount
1 2 3 4 5.00 6 7.00 8 = (7) x (5) 9=8
5.1 OPGW cable & Accessories - -
i) 24 Fibre (DWSM) OPGW fibre optic cable km 33.69 - -
ii) Installation Hardware set for above 24 Fibre OPGW Fibre Optic cabling including all cable fittings & accessories
except joint box - -
a) Dead End Assembly Sets 2.00 - -
b) Tension Assembly (For joint Box Location) Sets 86.00 - -
c) Pass through Assembly Sets 2.00 - -
d) Vibration Damper Sets 154.00 - -
e) Down Lead Clamp assemblies No. 12.00 - -
f) Joint Box (24 fibre) No. 10.00 - -
- -
5.2 FODP - -
i) FODP 24F : Indoor Type, rack mounted with FCPC coupling and pig tails (5 mtrs each). No. - -
- -
5.3 Fibre Optic approach cable - -
i) 24 Fibre (DWSM) Km. 0.25 - -
ii) Installation hardware set for above 24 Fibre, Fibre Optic Approach Cable Set 4.00 - -
- -
6 Supply of following items for aviation requirements - -
i) Span markers Nos. - -
ii) Obstruction lights (to be provided as per IS 5613) - -
a) 1 Medium + 2low intensity Sets. 2.00 - -
b) 1 Medium + 4low intensity Sets. 2.00 - -
c) Aviation Sphere Ball Sets. 6.00 - -