SAUDI ARAMCO ID/PIEU - 30-Nov-2017- REV. 2017.09.00 (Standards Cutoff - September 30, 2017) Rev. 2017.09.

00 30-Sep-17
SATR NUMBER DATE APPROVED QR NUMBER DATE
SAUDI ARAMCO TEST REPORT
WEEKLY and CUMMULATIVE WELD STATUS REPORT SATR-W-2019 30-Nov-17 9-Nov-19
PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR LOCATION

REPLACE EMERGENCY STEAM TURBINE GENERATORS 10-00163 SEG FABRICATION YARD


SAUDI ARAMCO USE ONLY
SATIP NUMBER SATIP ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL MAIN CONTRACTOR (LSTK) INSP. LEVEL SAUDI ARAMCO INSPECTION LEVEL QTY. INSP. MHR's SPENT TRAVEL TIME

SATIP-W-011-01 3.13 H R

PROJECT WELD STATUS REPORT


WEEKLY WELD REJECTION STATUS FROM 2-Nov-19 TO 8-Nov-19
A B C D E F G H I J K L M N O P Q R

Weld Length Reject Reject Reject Rate


Joints Tracer Joints
RT RT RT RT Joints Number Length Weld Rate (%) Rate (%) RT Alarm
Welded Welds Re-Shoot RT
Categories Requested Completed Accepted Rejected Re-Shoot of RT'd Defects Joint Linear Backlog (Green-
This Required Last Week Backlog
This Week This Week This Week This Week This Week RT Crews (Inches) (Inches) Method Method Alarm <5%)
Week This Week (Backlog)
This Week This Week This Week This Week (Red>5%)

1 100% 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!


Fab Shop Welds

2 10%+ 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!

3 Additional 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!


Welds 100%

4 Sub-Total 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!


5 100% 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!
Field Welds

6 10%+ 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!

Additional
7
Welds 100% 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!

8 Sub-Total 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!

WEEKLY
TOTALS
0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!

CUMULATIVE WELD REJECTION STATUS FROM TO


A B C D E F G H I J K L M N O P Q R
Weld Length of Reject Rate
Tracer Tracer Reject Rate
Joints RT RT RT RT Re-Shoot Re-Shoot Length Weld (%) RT Reject Rate
Welds Welds (%) RT
Categories Welded Requested Completed Accepted Rejected Required Completed RT'd Defects Joint Backlog Alarm (Green-
Required Completed Linear Method Backlog
To Date To Date To Date To Date To Date To Date To Date (Inches) (Inches) Method Alarm <5%) (Red>5%)
To Date To Date To Date
To Date To Date To Date

1 100% 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!


Fab Shop Welds

2 10%+ 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!

3 Additional 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!


Welds 100%

4 Sub-Total 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!


5 100% 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!
Field Welds

6 10%+ 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!

Additional
7
Welds 100% 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!

8 Sub-Total 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!

COMMULATIVE
0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!
TOTAL

Saudi Aramco: Company General Use


PREPARED BY: QC VERIFIED BY: REVIEWED & VERIFIED BY: REVIEWED BY:
CONSTRUCTION REPRESENTITIVE QC INSPECTOR/SUPERVISOR MAIN CONTRACTOR or LSTK REPRESENTITIVE PID REPRESENTITIVE

NAME NAME NAME NAME

SIGN SIGN SIGN SIGN

DATE DATE DATE DATE

Saudi Aramco: Company General Use


Rev. 2017.09.00 ###

###