Professional Documents
Culture Documents
JAZAN REFINERY AND TERMINAL PROJECT (EPC-14) 25-00024-0002 HANWHA / HIDADA JAZAN
SAUDI ARAMCO USE ONLY
SATIP NUMBER SATIP ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL MAIN CONTRACTOR (LSTK) INSP. LEVEL SAUDI ARAMCO INSPECTION LEVEL QTY. INSP. MHR's SPENT TRAVEL TIME
Joints Welded RT RT RT RT Tracer Welds Joints Joints Re-Shoot Number Weld Length Length Weld Reject Rate (%) Reject Rate (%) RT Reject Rate Alarm
RT
Categories This Week Requested This Completed This Accepted This Rejected Required Re-Shoot Last Week of RT'd (Meter) Defects (Meter) Joint Method Linear Method Backlog (Green-<5%)
Backlog
(Linear in Meter) Week Week Week This Week This Week This Week (Backlog) RT Crews This Week This Week This Week This Week Alarm (Red>5%)
WEEKLY
TOTAL
0.000 0 0 0 0 0 0 0 0 0.000 0.000 0.00% #DIV/0! 0 0 0%
3
Additional Welds 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!
4 Sub-Total 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!
5 100% 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!
Field Welds
COMMULATIVE
587.408 203 203 151 29 13 12 23 19 44.730 0.236 14.29% 0.53% 3 3 14%
TOTAL
PREPARED BY: QC VERIFIED BY: REVIEWED & VERIFIED BY: REVIEWED BY:
CONSTRUCTION REPRESENTITIVE QC INSPECTOR/SUPERVISOR MAIN CONTRACTOR or LSTK REPRESENTITIVE PID REPRESENTITIVE