SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER REPORT DATE

WEEKLY WELDER REPAIR RATE REPORT SATR-W-2013


PROJECT TITLE WBS/BI/JO NUMBER CONT./SUB-CONT.

P-102 P-102
SAUDI ARAMCO USE ONLY
SATIP ACTIVITY NUMBER CONTRACTOR INSP LEVEL SUB-CONTRACTOR INSP LEVEL ARAMCO INSPECTION LEVEL QTY INSP MH's SPENT TRAVEL TIME
SATIP NUMBER

From Jan-01-2021 To Jun-10-2022


WEEKLY WELDER REPAIR RATE REPORT
LINEAR/JOINT BASIS

THIS WEEK -JOINT BASIS CUMULATIVE-JOINT BASIS THIS WEEK -LINEAR BASIS CUMULATIVE- LINEAR BASIS
ITEM

WELDERS
SYMBOL Remarks
NAME
REJECT NUMBER NUMBER OF REJECT NUMBER REJECT NUMBER NUMBER NUMBER REJECT
NUMBER JOINTS NUMBER JOINTS NUMBER JOINTS NUMBER JOINTS NUMBER INCHES NUMBER INCHES
% JOINTS JOINTS % INCHES % INCHES INCHES INCHES %
WELDED RT REJECTED RT WELDED RT
JOINT WELDED REJECTED JOINT REJECTED INCHES WELDED RT REJECTED INCHES

100% 10% 100% 10% 100% 10% 100% 10% 100% 10% 100% 10% 100% 10% 100% 10% 100% 10% 100% 10% 100% 10% 100% 10%

1 WEL DERR WD1 28 0 2 0 1 0 3.57 - 0 44 0 6 0 2 0 4.55 - 0 11265 0 365 0 0 00-0 11376 0 365 0 0 00-0

PREPARED BY: VERIFIED BY: REVIEWED AND APPROVED BY: REVIEWED BY:
CONSTRUCTION REPRESENTATIVE QC INSPECTOR or SUPERVISOR SAPMT REPRESENTATIVE-REVIEWED BY PID REPRESENTITIVE
NAME: NAME: NAME: NAME:
SIGN: SIGN: SIGN: SIGN:
DATE: DATE: DATE: DATE:

Saudi Aramco: Company General Use

You might also like