SAUDI ARAMCO ID/PID - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER DATE

WEEKLY and CUMMULATIVE WELD STATUS REPORT SATR-W-2019 15-Dec-09 5/20/2021


PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR LOCATION

EXPAND UTMN GOSP-12 SWD SYSTEM DOWN STREAM 10-01433-7244 NESMA / TANMIA HWYH/ UTMN-FIELD /SHOP
SAUDI ARAMCO USE ONLY

SATIP NUMBER SATIP ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL MAIN CONTRACTOR (LSTK) INSP. LEVEL SAUDI ARAMCO INSPECTION LEVEL QTY. INSP. MHR's SPENT TRAVEL TIME

SATIP-W-012-01 MP 3.16 H H R

PROJECT WELD STATUS REPORT

WEEKLY WELD REJECTION STATUS FROM 26-Apr TO 2-May


A B C D E F G H I J K L M N O P Q R

Weld Length Reject Rate Reject Rate


Tracer Joints Reject Rate
Joints RT RT RT RT Joints Number Length Weld (%) (%) RT
Welds Re-Shoot RT Alarm
Categories Welded Requested Completed Accepted This Rejected Re-Shoot of RT'd Defects Joint Linear Backlog
Required Last Week Backlog (Green-<5%)
This Week This Week This Week Week This Week This Week RT Crews (Inches) (Inches) Method Method Alarm
This Week (Backlog) (Red>5%)
This Week This Week This Week This Week

1 100% 0 0 0 0 0 0 0 0 0 0.00 0 #DIV/0! #DIV/0! 0 0 #DIV/0!


Fab Shop Welds

2 10%+ 0 0 0 0 0 0 0 0 0 0.00 0 #DIV/0! #DIV/0! 0 0 #DIV/0!

3 Additional 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!


Welds 100%

4 Sub-Total 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!

5 100% 5 11 11 8 3 0 0 0 0 570.20 4.28 27.27% 0.75% 0 0 27%


Field Welds

6 10%+ 0 2 2 2 0 0 0 0 1 75.40 0 0.00% 0.00% 0 0 0%

Additional
7
Welds 100% 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!

8 Sub-Total 5 13 13 10 3 0 0 0 1 645.59729 4.278 23.08% 0.66% 0 0 23%

WEEKLY 645.59729 4.278 0


TOTALS
5 13 13 10 3 0 0 0 1 23.08% 0.66% 0 23%
0
SAUDI ARAMCO ID/PID - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER DATE

WEEKLY and CUMMULATIVE WELD STATUS REPORT SATR-W-2019 15-Dec-09 5/20/2021


PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR LOCATION

EXPAND UTMN GOSP-12 SWD SYSTEM DOWN STREAM 10-01433-7244 NESMA / TANMIA HWYH/ UTMN-FIELD /SHOP
SAUDI ARAMCO USE ONLY

SATIP NUMBER SATIP ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL MAIN CONTRACTOR (LSTK) INSP. LEVEL SAUDI ARAMCO INSPECTION LEVEL QTY. INSP. MHR's SPENT TRAVEL TIME

SATIP-W-012-01 MP 3.16 H H R

PROJECT WELD STATUS REPORT

CUMULATIVE WELD REJECTION STATUS FROM 5-Dec-17 TO 2-May


A B C D E F G H I J K L M N O P Q R

Weld Length of Reject Rate


Tracer Tracer Reject Rate Reject Rate
Joints RT RT RT RT Re-Shoot Re-Shoot Length Weld (%) RT
Welds Welds (%) RT Alarm
Categories Welded Requested Completed Accepted Rejected Required Completed RT'd Defects Joint Backlog
Required Completed Linear Method Backlog (Green-<5%)
To Date To Date To Date To Date To Date To Date To Date (Inches) (Inches) Method Alarm
To Date To Date To Date (Red>5%)
To Date To Date To Date

1 100% 5 5 5 5 0 0 0 0 0 163.28 0 0.00% 0.00% 0 0 0%


Fab Shop Welds

2 10%+ 131 34 34 34 0 0 0 1 1 1174.59 0 0.00% 0.00% 0 0 0%

3 Additional 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!


Welds 100%

4 Sub-Total 136 39 39 39 0 0 0 1 1 1337.87 0 0.00% 0.00% 0 0 0%

5 100% 95 95 95 83 12 0 0 2 2 4591.6349 19.134 12.63% 0.42% 0 0 13%


Field Welds

6 10%+ 553 164 164 152 12 24 24 4 4 7563.476 25.2 7.32% 0.33% 0 0 7%

Additional
7
Welds 100% 0 0 0 0 0 0 0 0 0 0 0 #DIV/0! #DIV/0! 0 0 #DIV/0!

8 Sub-Total 648 259 259 235 24 24 24 6 6 12155.111 44.334 9.27% 0.36% 0 0 9%

COMMULATIVE 13492.981 44.334


784 298 298 274 24 24 24 7 7 8.05% 0.33% 0 0 8%
TOTAL

PREPARED BY: QC VERIFIED BY: REVIEWED & VERIFIED BY: REVIEWED BY:
CONSTRUCTION REPRESENTITIVE QC INSPECTOR/SUPERVISOR MAIN CONTRACTOR or LSTK REPRESENTITIVE PID REPRESENTITIVE

NAME MR.SAMSAN / MR. RAED NAME MANIKANDAN/AKHIL SYAMKUMAR NAME MR. ROMMEL NAME MR. MOHSIN/ MR. M.ARSHAD

SIGN SIGN SIGN SIGN


DATE 5/20/2021 DATE 5/20/2021 DATE 5/20/2021 DATE 5/20/2021