You are on page 1of 4

WEEKLY REPORT : DRILLING DEPARTMENT

Cumulative meterage drilled since 01/04/2020 to 30/04/2020 mtrs


Total meterage drilled during the Week (24/04/2020 to 30/04/2020) mtrs
Total meterage drilled during the last Week (17/03/2020 to 23/04/2020) 689 mtrs

TARGET Vs. ACHIEVEMENT


No. Of
Annual
Pro-rata Wells Annual Pro-rata
Target
  Target (m) Achv (m) (ACHV Achv% Achv % Meterage /Rig Type
(BE) (m)
(BE) /Trgt Till (BE) (BE)
30thApr)
Exp
Dev
WDW
Total
RIG DEPLOYMENT
Waiting
Under Rig
Under Drilling Production for
Total Rigs Up/ Rig
Operations Testing Location
Down/ILM

In-house rigs 11 07 01 02 01
Charter hired rigs 07 06 00 01 00
DRILLING QUARTERLY COMPARISON BETWEEN
FY2019-2020 & FY2020-2021
2019-2020 2020-2021
Prorata Prorata Prorata Prorata
Achv.(m) Achv.(m)
Target Achv% Target Target
 
1st Quarter(Current) 5798 9,074 156.51% 10335 1,649 15.96%
2nd Quarter            

3rd Quarter            

4th Quarter            

TOTAL 5798 9074 156.51% 10335 1649 15.96%

WORKOVER REPORT
Rigs as Under Annual Target Prorata Annual Prorata
Detail Achv
per plan operations Target Achv% Achv %
Number of Jobs(B.E
24 19 200 13 3 1.50% 23.1%
Target)

CEMENTING REPORT
Jobs Done in FY20-21 07
Jobs Done in the same period during FY19-20 18
Jobs done during the week 06
COMPARISON OF NPT(DRILLING)

Cumulative
(16.04.2020 to 22.04.2020) Cumulative
Last FY
Category
Shut Down % NPT Shut Down % NPT
% NPT
Hours Hours
Surface 177.75 5.88% 218.75 1.69% 0.29%

Sub-Surface 0.00 0.00% 0.00 0.00% 0.00%

Absenteeism 0.00 0.00% 0.00 0.00% 0.03%

Waiting for Material 0.00 0.00% 20.30 0.16% 0.00%

Sub Total 0.00 0.00% 26.30 0.20% 0.32%

Environmental 103.00 3.41% 5120.95 39.51% 0.00%

Waiting for Services 0.00 0.00% 121.00 0.93% 6.79%

Waiting for Location 312.00 10.32% 1656.00 12.78% 4.73%

Total 592.75 19.60% 7137.00 55.07% 11.84%


COMPARISON OF NPT(WORK OVER)

Cumulative
(16.04.2020 to 22.04.2020) Cumulative
Last FY
Category
Shut Down % NPT Shut Down % NPT
% NPT
Hours Hours
Surface 0.00 0.00% 12.00 0.07% 1.04%

Sub-Surface 0.00 0.00% 0.00 0.00% 0.00%

Absenteeism 0.00 0.00% 0.00 0.00% 0.00%

Waiting for Material 0.00 0.00% 0.00 0.00% 0.00%

Sub Total 0.00 0.00% 0.00 0.00% 1.04%

Environmental 0.00 0.00% 2673.50 15.47% 1.92%

Waiting for Services 3.00 0.07% 246.00 1.42% 7.13%

Waiting for Location 0.00 0.00% 0.00 0.00% 0.00%

Total 3.00 0.07% 2934.50 16.98% 10.09%