Khurmala Field
FIELD DEPARTMENT
DRILLING DEVE. OIL WELLS PROJECT
TU Location
References RTKB
Well KDN-21(K-448)
Depth (mMD) 406.5
Upper Fars Formation
Current Formation
Totco
Totco
Last Survey m MD
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
(m)
Interval m. MD
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Prog. MD (m Prog. TVD (m
PROVISIONAL FORMATION PICKS
RTKB) Depth RTKB) Depth
Formations
Upper Midle Fars in part
Lower Fars (URB) 750
Upper Red Bed 750
Ao 750
R6
R7
R8
R9
Operations 00:00–06:00
Overall Comments
ENTRY DATA
318 GL 309 Rig
Date 22/8/2018 day spud 10/8/2018
Depth (mTVD RT 406.5 Progress
per Fars Formation
tighten all the bolts and nuts in between flanges , Remove the bolts .N/D BOP stack.Remove annular bag
one.Preparetion to cut out the CHH from 3-4 cm below the welding point and cut the CHH and remove
pick up and sent to the machine shop
Shows
Description
GAS DATA
Total C1 C2 C3
(%) ppm ppm ppm
Cut out CHH and machining and weld on 20" casing again and N/ O BOP STACK and test
Team Crew
Days on Ranjdar Ahmed
Days on Ahmed Adnan
Days on Hemn salih
bolts .N/D BOP stack.Remove annular bag, ram type BOP and riser spool one
elding point and cut the CHH and remove from wellhead.Load the CHH on
Basis of Pick