Professional Documents
Culture Documents
Report by :
Surface Preparation Equipment
Surface preparation : Powertool Powertool Grinding : Makita size 6”
Surface Area : 1000.0 sqm Vacuum Cleaneer : 2 ea
Cleanliness : SSPC SP 10 Agitator : 1 ea
Spike Roll : 3 ea
Spike Shoes : 5 ea
Painting Application
1st Coat 2nd Coat Top Coat Remarks
Date of Application 20.04.21 21.04.20 02.05.20
Time of Application 8:00 17:00 14:30
Coating System Primer Bodycoat Finish Coat
Application Method Airless Airless Convesional
Name of Product Marathon XHB Marathon XHB Hardtop XP
Colour Grey Grey Grey / Yellow
Quantity 25 Liter 20 Liter &2 Liter
Batch No. Part A 2411458-1 2411458-1 2405148-1/2251382-1
Batch No. Part B 2400147-1 2400147-1 2408188-1/2464957-1
Pot Life 45 Minutes 45 Minutes 60 Minutes
Volume Solid 96% 96% 63%
Thinner No.17 No.17 No.10
Batch Number 240809-1 240809-1 2452734-1
Interval Coat 7 hours ( 30 ˚C) 7 hours ( 30 ˚C) 6 hours ( 30 ˚C)
WFT Requirement 120 microns 800 microns 480 microns
WFT Actual 120 microns 800 microns 480 microns
DFT Requirement 100 microns 780 microns 450 microns
DFT Actual (Average) 106.3 microns 800.2 microns 450.0 microns
Holiday Test N/A N/A N/A
Adhesion Test N/A N/A N/A
Manpower
No Posisi Nama
1 Supervisor Rifqi
2 Blaster/Painter Aditiya
3 Blaster/Painter Halimawan
4 Blaster/Painter
5 B/P/ Operator
(SECOND COAT)
Date 22.04.21
Spot 1 Spot 2 Spot 3 Spot 4 Spot 5
R R R Avr R R R Avr R R R Avr R R R Avr R R R Avr
780 785 783 783 780 785 783 783 785 783 780 783 780 785 783 783 785 783 780 783
788 876 789 818 788 876 789 818 876 789 788 818 788 876 789 818 876 789 788 818
Total Avg. 800 Total Avg. 800 Total Avg. 800 Total Avg. 800 Total Avg. 800
(TOP COAT)
Date 03.05.21
Spot 1 Spot 2 Spot 3 Spot 4 Spot 5
R R R Avr R R R Avr R R R Avr R R R Avr R R R Avr
450 456 457 454 450 456 457 454 457 450 456 454 450 456 457 454 457 450 456 454
453 456 455 455 453 456 455 455 455 453 456 455 453 456 455 455 455 453 456 455
Total Avg. 455 Total Avg. 455 Total Avg. 455 Total Avg. 455 Total Avg. 455
DOCUMENTATION 01/NB-WHPC/MMP015-CS2/IV/2021
Second/ Bodycoat Application Finish Coat Finish coat with line marking
Report by :
Surface Preparation Equipment
Surface preparation : Blasting Nozzle type and size : Graco 435 & 519
Surface Area : 28.0 sqm Nozzle Pressure : 7 Bar
Blasting time : 15:00 Blotter Test : No Oil & water contaminant
Abrasive Media : Garnet Chloride : 28 mg/m²
Rust Grade : Ri3 Conductivity : -
Cleanliness : SSPC SP 10 Compressor : Airman 390 CFM
Painting Application
1st Coat 2nd Coat Top Coat Remarks
Date of Application 24.04.21 25.04.21 02.05.20 Deck = 28.00 Sqm
Time of Application 17:00 17:00 16:00
Coating System CS 2 CS 2 CS 2
Application Method Airless Airless Convesional
Name of Product Marathon XHB Marathon XHB Hardtop XP
Colour Grey Grey Grey / Yellow
Quantity 20 Liter 20 Liter 5 & 2 Liter
Batch No. Part A 2411458-1 2411458-1 2405148-1/2251382-1
Batch No. Part B 2400147-1 2400147-1 2408188-1/2464957-1
Pot Life 45 Minutes 45 Minutes 60 Minutes
Volume Solid 96% 96% 63%
Thinner No.17 No.17 No.10
Batch Number 240809-1 240809-1 2452734-1
Interval Coat 7 hours ( 30 ˚C) 7 hours ( 30 ˚C) 6 hours ( 30 ˚C)
WFT Requirement 525 microns 525 microns 120- 125 microns
WFT Actual 600 microns 600 microns 125 - 150 microns
DFT Requirement 500 microns 500 microns 75 microns
DFT Actual (Average) 589.8 microns 1109.3 microns 1244.7 microns
Holiday Test N/A N/A N/A
Adhesion Test N/A N/A N/A
Manpower
No Posisi
1 Supervisor
2 Blaster/Painter
3 Blaster/Painter
4 Blaster/Painter
5 B/P/ Operator
(SECOND COAT)
Date 26.04.21
Spot 1 Spot 2 Spot 3 Spot 4 Spot 5
R R R Avr R R R Avr R R R Avr R R R Avr R R R Avr
1061 1114 1161 1112 1142 1161 1178 1160 1042 1061 1200 1101 1161 1169 1099 1143 1187 1092 1082 1120
1109 1067 1114 1097 1091 1104 1123 1106 1098 1103 1034 1078 1033 1103 1111 1082 1114 1123 1041 1093
Total Avg. 1104 Total Avg. 1133 Total Avg. 1090 Total Avg. 1113 Total Avg. 1107
(TOP COAT)
Date 03.05.21
Spot 1 Spot 2 Spot 3 Spot 4 Spot 5
R R R Avr R R R Avr R R R Avr R R R Avr R R R Avr
1286 1218 1168 1224 1168 1281 1299 1249 1286 1288 1297 1290 1199 1232 1241 1224 1218 1252 1286 1252
1361 1287 1288 1312 1218 1201 1198 1206 1218 1200 1211 1210 1290 1231 1366 1296 1209 1168 1177 1185
Total Avg. 1268 Total Avg. 1228 Total Avg. 1250 Total Avg. 1260 Total Avg. 1218
DOCUMENTATION 02/NB-WHPC/MMP015-CS2/IV/2021
Material Primer Coat and Second Coat Primer Coat Application WFT
DFT After Primer Coat Second Coat Application DFT After Second Coat
Material Top Coat Top Coat Application DFT After Top Coat
FABRIC MAINTENANCE
DAILY INSPECTION REPORT
Painting Application
1st Coat 2nd Coat Top Coat Remarks
Date of Application 30.04.21 01.05.21 02.05.20 T Beam = 11.12 Sqm
Time of Application 17:00 17:00 16:45 Deck = 34.38 Sqm
Coating System CS 2 CS 2 CS 2
Application Method Airless Airless Convesional Total = 45.50 Sqm
Name of Product Marathon XHB Marathon XHB Hardtop XP
Colour Grey Grey Grey / Yellow
Quantity 30 Liter 30 Liter &2 Liter
Batch No. Part A 2411458-1 2411458-1 2405148-1/2251382-1
Batch No. Part B 2400147-1 2400147-1 2408188-1/2464957-1
Pot Life 45 Minutes 45 Minutes 60 Minutes
Volume Solid 96% 96% 63%
Thinner No.17 No.17 No.10
Batch Number 240809-1 240809-1 2452734-1
Interval Coat 7 hours ( 30 ˚C) 7 hours ( 30 ˚C) 6 hours ( 30 ˚C)
WFT Requirement 525 microns 525 microns 120- 125 microns
WFT Actual 600 microns 600 microns 125 - 150 microns
DFT Requirement 500 microns 500 microns 75 microns
DFT Actual (Average) 598.2 microns 1142.0 microns 000.0 microns
Holiday Test N/A N/A N/A
Adhesion Test N/A N/A N/A
Manpower
No Posisi Nama
1 Supervisor
2 Blaster/Painter
3 Blaster/Painter
4 Blaster/Painter
5 B/P/ Operator
(SECOND COAT)
Date 02.05.21
Spot 1 Spot 2 Spot 3 Spot 4 Spot 5
R R R Avr R R R Avr R R R Avr R R R Avr R R R Avr
1284 1293 1152 1243 1152 1200 1197 1183 1284 1091 1089 1155 1091 1112 1102 1102 1284 1102 1105 1164
1152 1108 1098 1119 1293 1109 1101 1168 1152 1101 1209 1154 1032 1192 1099 1108 1009 1032 1034 1025
Total Avg. 1181 Total Avg. 1175 Total Avg. 1154 Total Avg. 1105 Total Avg. 1094
(TOP COAT)
Date 03.05.21
Spot 1 Spot 2 Spot 3 Spot 4 Spot 5
R R R Avr R R R Avr R R R Avr R R R Avr R R R Avr
1320 1380 1261 1320 1321 1298 1278 1299 1320 1299 1292 1304 1290 1380 1351 1340 1273 1261 1231 1255
1289 1261 1209 1253 1261 1278 1271 1270 1209 1261 1321 1264 1321 1263 1261 1282 1198 1186 1162 1182
Total Avg. 1287 Total Avg. 1285 Total Avg. 1284 Total Avg. 1311 Total Avg. 1219
DOCUMENTATION 03/NB-WHPC/MMP015-CS2/V/2021
Material Primer Coat and Second Coat Primer Coat Application WFT
DFT After Primer Coat Second Coat Application DFT After Second Coat
Material Top Coat Top Coat Application DFT After Top Coat