KAR OIL & GAS CO.

Khurmala Field
FIELD DEPARTMENT
DRILLING DEVE. OIL WELLS PROJECT
TU Location

References RTKB
Well KDN-21(K-448)
Depth (mMD) 914
Lower fars formation
Current Formation

Current Operation at 24:00: N/D 21 1/4" 2K Annular BOP.

WOC, Changed liner & pistons of MP


Cleaning mud tanks.Hanged BOP sta
and 13 3/8" elevator, Untigtened bolts
Operations last 24 hours(00:00 to 24:00) 1/4" 2K Annular BOP.

Totco
432m
643
842.5

Last Survey m MD

MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
GEO

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Interval m. MD

Interval m. MD

Gas Type Interval


(m)
Background Gas

Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Prog. MD (m Prog. TVD (m
PROVISIONAL FORMATION PICKS
RTKB) Depth RTKB) Depth

Formations
Upper Midle Fars in part
Lower Fars (URB) 750
Upper Red Bed 750

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Ao 750
R6 N/A
R7 N/A
R8 N/A
R9 N/A
Seepage Beds 802
B1
B2
B3
B4
Saliferous Beds 836
S1
Transition Beds 913
T1
T2
T3
T4
T5
BFC
Avana Dense 943
Avana Porous 1012
Khurmala A 1059
Total Depth
0
Depth (mMD) 914

Operations 00:00–06:00

Plan next 24 hrs

Overall Comments

Supervisor Geologist Ranjdar Ahmed


Wellsite Geologist Kovan waleed
Wellsite Geologist Twana alyas
Signature

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


DAILY GEOLOGY REPORT (DGR)

ENTRY DATA
318 GL 309 Rig
Date 5/9/2018 day spud 10/8/2018
Depth (mTVD RT 914 Progress
wer fars formation

D 21 1/4" 2K Annular BOP.

OC, Changed liner & pistons of MP2 to 6 1/4". Checked MP1, MP2 and MP3 seats and valves, Disconnect BOP h
eaning mud tanks.Hanged BOP stack to the rotary beams. Hanged 13 3/8" Csg to 21 1/4"" CHH. w/ 95 klbs, Cut 1
d 13 3/8" elevator, Untigtened bolts between 21 1/4" 2K Annular BOP, 21 1/4" 2K Double Ram BOP, 21 1/4" 2K D
" 2K Annular BOP.

Inc 0.5 Azi


Inc 0.75 Azi
Inc 0.5 Azi
Inc 0.75 Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Csg Size (inch) 20" Csg Depth (m)
Csg Size (inch) 17 1/2" Csg Depth (m)
Csg Size (inch) 13 3/8" Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)
GEOLOGICAL SUMMARY

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Lithology Descriptions

Shows
Description

GAS DATA
Total C1 C2 C3
(%) ppm ppm ppm

Well site Top MD Actual Depth


Difference
Depth TVDss Actual
Thickness
M m +/-

735 -417
735 -417

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


735 -417
740 -422
755 -437
764 -446
778 -460
792 -474
792 -474
808 -490
816 -498
822 -504
829 -511
901 -583
911 -593
911 -593

06:00 UPDATE
Depth (mTVD RT) 914 Current Activity
N/D 21 1/4" 2K Double Ram BOP, 21 1/4" 2K Drilling Spool and 21 1/4" 2K Riser Spool.Final cut 13
the 13 3/8" hanger and tightened.Cont. N/U 21 1/4" 2M - 13 5/8" 5M Casing Spool.
N/D and N/U Wellhead.

Plan next 48 hrs / BOP tests. Preparation for RIH.

Team Crew
Days on Akram Maqsud
Days on Dlnya Hoshyar
Days on Ahmed Adnan

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


GYP.8
Rpt No 27
ROP m/h

nd MP3 seats and valves, Disconnect BOP hydraulic lines. R/D mouse hole.
3 3/8" Csg to 21 1/4"" CHH. w/ 95 klbs, Cut 13 3/8" Casing roughly. L/D slip spider
P, 21 1/4" 2K Double Ram BOP, 21 1/4" 2K Drilling Spool and 21 1/4" 2K, N/D 21

Csg Depth (m) 4m


Csg Depth (m) 406m
Csg Depth (m) 913m
Csg Depth (m)
Csg Depth (m)

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


ion

iC4 nC4 iC5 nC5


ppm ppm ppm ppm

Basis of Pick

BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells


BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells

Cont. N/U 21 1/4" 2M - 13 5/8" 5M Casing Spool.


Spool and 21 1/4" 2K Riser Spool.Final cut 13 3/8" Casing. Placed packing unit on
M - 13 5/8" 5M Casing Spool.

Akram Maqsud Days Off


Dlnya Hoshyar Days Off
Ahmed Adnan Days Off