Khurmala Field
FIELD DEPARTMENT
DRILLING DEVE. OIL WELLS PROJECT
TU Location
References RTKB
Well KDN-21(K-448)
Depth (mMD) 914
Lower fars formation
Current Formation
Totco
432m
643
842.5
Last Survey m MD
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
GEO
Interval m. MD
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Prog. MD (m Prog. TVD (m
PROVISIONAL FORMATION PICKS
RTKB) Depth RTKB) Depth
Formations
Upper Midle Fars in part
Lower Fars (URB) 750
Upper Red Bed 750
Operations 00:00–06:00
Overall Comments
ENTRY DATA
318 GL 309 Rig
Date 5/9/2018 day spud 10/8/2018
Depth (mTVD RT 914 Progress
wer fars formation
OC, Changed liner & pistons of MP2 to 6 1/4". Checked MP1, MP2 and MP3 seats and valves, Disconnect BOP h
eaning mud tanks.Hanged BOP stack to the rotary beams. Hanged 13 3/8" Csg to 21 1/4"" CHH. w/ 95 klbs, Cut 1
d 13 3/8" elevator, Untigtened bolts between 21 1/4" 2K Annular BOP, 21 1/4" 2K Double Ram BOP, 21 1/4" 2K D
" 2K Annular BOP.
Shows
Description
GAS DATA
Total C1 C2 C3
(%) ppm ppm ppm
735 -417
735 -417
06:00 UPDATE
Depth (mTVD RT) 914 Current Activity
N/D 21 1/4" 2K Double Ram BOP, 21 1/4" 2K Drilling Spool and 21 1/4" 2K Riser Spool.Final cut 13
the 13 3/8" hanger and tightened.Cont. N/U 21 1/4" 2M - 13 5/8" 5M Casing Spool.
N/D and N/U Wellhead.
Team Crew
Days on Akram Maqsud
Days on Dlnya Hoshyar
Days on Ahmed Adnan
nd MP3 seats and valves, Disconnect BOP hydraulic lines. R/D mouse hole.
3 3/8" Csg to 21 1/4"" CHH. w/ 95 klbs, Cut 13 3/8" Casing roughly. L/D slip spider
P, 21 1/4" 2K Double Ram BOP, 21 1/4" 2K Drilling Spool and 21 1/4" 2K, N/D 21
Basis of Pick