You are on page 1of 1

General Parties / References Timing Main objective:

Well Name: He-E10 Client: IOOC Est. Skid Duration:0.5 day Drill a new directional well from surface to produce Oil
Well Type: Oil Well Development Contractor: ABAN Consultant: MPE Est. Spud Date: Will be Specified from Ilam & sarvak reservoirs via 8 ½” open
Type of Operation: Drilling Rig: DD4 Est. Well Duration: 132.5 days holereservoirs.
Field: Hengam RKB-MSL: 34.15m Est. Water Depth: 69.7m Est. Rig Release At: Will be Specified
Country: Iran Proposed T.D: ±4523.5m, MD/ ±4164.03m, TVD
Year To Be Drilled: 1391

Formation Tops
Formation Well Sketch Time Vs. Depth Chart Bit Size/Type Drilling Fluid BOP'S Status Drilling Problems / Remarks
Depth Depth
m, TVD TVDss (m)

RKB 34.15

1000

1200

1400
0

200

400

600

800
Sea level 34.15 0

0
Sea bed 103.85 -69.7 0
Vertical Section (m) Drilling Problems:

30" C.P Pre-Installed


KOP- 1 @ 200m, MD 500 - Sever Flow then Loss Has been observed
Sea water/Water Base Mud/ Hi Vis Pill from 885 to 902 MD(RTE=30 m) in Well
26 in. He-E2 (MW=65 pcf).
1000 MW: 64-66.5 PCF
Vis.: >100 Sec. 30" Divertor -Tight Hole, stuck pipe, a common wash
500 1-1-4 and ream to bottom was the main
Note1: Adjust mud weight with respect to the
1500 1-1-5 problem encountered while drilling and
hole condition.
tripping into this hole section.
-Stuck casing @ He-E4
2000
20" Casing @ 940m, MD

Vertical Depth (m)


935.15m, TVD
2500
L.Fars(Anhydrite) 928.06 -893.91

1000m 3000 1000

20" Casing @ 940m, MD


935.15m, TVD 3500

L.Fars(Saltiferous) 1334.78 -1300.63 4000


DepthTVD (m)

Drilling Problems:
- H2S Hasn't Been Observed on Near By
4500 1500 Salt Saturate KCL Polymer Mud Wells,
Pabdeh 1567.43 -1533.28 MW: 75-81 PCF Vis.: 40-50 PV: ALAP - Heavy Mud Losses.

Depth in m (MD RKB)


YP: 20-25, PH: 9.5–10 - Tight Hole observed on He-E1, He-E2,
17-1/2 in. Note-1: Adjust mud weight with respect to the He-E3 between 1500-1780 m MD, Have

-1400

-1200

-1000
hole condition. acid in field for contingency.

-800

-600

-400

-200
1-1-4 18-3/4"-
Note-2: Final mud program will be issued by
15K BOP -A common wash and ream to bottom.

0
180 4-3-5 service Co. in due time -Stuck pipe at 1650m, Mud losses in
PDC Note-3: Enough mud materials should be He-E4
160 present on board in case of needed -Tight Hole, stuck pipe, a common wash
2000m 2000 13-3/8" x 13-5/8" Casing @ ±2250m, MD and ream to bottom was the main
140 2245.15m, TVD problem encountered while drilling and
tripping into this hole section at He-E6.
120
Northing

KOP- 2 @ 2300m, MD
100
80
13-3/8" x 13-5/8" Casing @ ±2250m, MD

60 2500

40

20
2245.15m, TVD

Easting 0
Drilling Problems:
Salt Polymer KCL Mud / Oil Base Mud - H2S Hasn't Been Observed on Near By
3000 MW: 81-91 PCF, Vis.: 50-60 PV: ALAP Wells mud system
3000m 12-1/4 in
Gurpi 3022.37 -2988.22 YP: 25-30, PH: 9.5 -10.5, - Tight Spot at ±2500 m as report of near
Drilling mud should be Salt polymer KCL Mud by well He-E2.
1-2-4(D/O) to top of shale zone (Gurpi Shale) and then - There is Risk of Kick at ±2644 m as
2-1-4 change mud system to OBM. 18-3/4"- report of near by well West Bukha-1.
5-3-7 15K BOP -The Risk of kick at the base of Pabdeh as
PDC Note-1: Adjust mud weight with respect to the it happen in HE-E3.
hole condition. - There is Risk of Loss from ±3170m to
3500 Note-2: Enough mud materials should be ±3450m (Vertical Depth) as report of near
present on board in case of needed. by wells West Bukha-1 and He-E1, So Pass
Gurpi-Shale 3563.22 -3529.07 Note-3: Final mud program will be issued by this section with Minimum GPM.
service Co. in due time - Complete losses @ 2676m (Section TD)
in He-E3. -Mud losses in He-E4

Ilam 3933.65 -3899.5


Lafan 3961.55 -3927.4 4000
Mishrif(Sarvak) 3962.96 -3928.81 9-5/8" Casing @ ±4264m, MD
4000m 4053.31 -4019.16 3935.54m, TVD
Khatiyah TD @ ±4523.5m, MD
Mauddud 4082.74 -4048.59 (±2m, TVD inside Ilam Formation) ±4164.03m, TVD

Salt Polymer KCL Mud


9-5/8" Casing @ ±4264m, MD MW: 78-85 PCF, Vis.: 45-50, PV: ALAP Drilling Problems:
3935.54m, TVD YP: 25-30, - All Necessary Precautions related to H2S
4500 8-1/2in Note-1: 78 pcf MW impose 276.7 psi over monitoring and detection should be
pressure to the Ilam reservoir @ 9-5/8" taken.
2-1-4(D/O) Casing Shoe (3935.54m TVD) - Risk of Complete Loss and stuck as
TD @ ±4523.5m, MD 4-3-5
18-3/4"-
±4164.03m, TVD Note-2: Adjust mud weight with respect to 15K BOP report of near by well He-E1.
5-1-7 the hole condition. - Well kicking, Tight Spot & heavy losses
PDC Note-3: Enough mud materials should be were reported in He-E2 near by well.
present on board in case of needed. -Stuck Pipes (He-E3 & He-E1).
Note-4: Final mud program will be issued by -A common wash and ream.
5000 service Co. in due time -Complete Loss @ He-E4
5000m
0 20 40 60 80 100 120 140

Days

Logging:
MWD(GR/ROP) from KOP-1 (200m, MD) to end of nudge @ 750m, MD & from KOP-2 (2300m, MD) to TD @ 4523.5m, MD.
DSI Log in 26", 17 ½” , 12 ¼” & 8 ½” hole section.
Total Depth TD @ ±4523.5m, MD/ ±4164.03m, TVD Full Suit Log in 8 ½” hole section.
FMI Log in 8 ½” hole section.
XPT Log in 8 ½” hole section.

You might also like