The game plan outlines steps for running and retrieving a Smith Hook assembly and MWD tool to total depth at 6508 feet, cleaning out a slot, and then running drill pipe and bits while picking up junk baskets and a drilling jar to deepen the well to 9025 feet, cleaning the hole as needed and pulling out of the existing casing at 6573 feet. Safety is emphasized with instructions to ask questions if unsure of any steps and to stop if in doubt.
The game plan outlines steps for running and retrieving a Smith Hook assembly and MWD tool to total depth at 6508 feet, cleaning out a slot, and then running drill pipe and bits while picking up junk baskets and a drilling jar to deepen the well to 9025 feet, cleaning the hole as needed and pulling out of the existing casing at 6573 feet. Safety is emphasized with instructions to ask questions if unsure of any steps and to stop if in doubt.
The game plan outlines steps for running and retrieving a Smith Hook assembly and MWD tool to total depth at 6508 feet, cleaning out a slot, and then running drill pipe and bits while picking up junk baskets and a drilling jar to deepen the well to 9025 feet, cleaning the hole as needed and pulling out of the existing casing at 6573 feet. Safety is emphasized with instructions to ask questions if unsure of any steps and to stop if in doubt.
Orient Hook & Wash Out Slot, Retrieve W/Stock as per Smith Engineer’s Instructions. F/C, Pump Slug & POH (As per smith engineer’s instructions). L/D MWD, W/Stock & Hook. P/U & RIH W/ 6-1/8” Bit and 2 x 5-1/2” Junk baskets on 4” DP to 5500’, P/U 4- 3/4” Drilling Jar. (Note: Run all pipe w/ WWT Non-Rotating Protectors) Continue RIH to FD-BP @ 6535’. Mill FD-BP @ 6535’, if total losses are encountered , pump 20 bbls / ½ hr f/ trip tank. RIH W/ 6-1/8” Bit, push FD-BP debris to bottom @ 9025’. POH Bit, pump 20 bbls / ½ hr f/ trip tank. Note: Pull slowly into 7” EOL @ 6573’ . Note: Remove all WWT Non-Rotating Protectors.
Please read above instruction carefully.
If unsure of any point, please ask and it can be clarified further. If in doubt = STOP Work safely – Work as Team – Plan ahead – PJSM & JSA as required. Thanks for doing a good safe job