GAME PLAN KHRS-710

Aug 7, 2012

 RIH W/Smith Hook Assy & MWD to TOW @ 6508’.


 Orient Hook & Wash Out Slot, Retrieve W/Stock as per Smith Engineer’s
Instructions.
 F/C, Pump Slug & POH (As per smith engineer’s instructions). L/D MWD,
W/Stock & Hook.
 P/U & RIH W/ 6-1/8” Bit and 2 x 5-1/2” Junk baskets on 4” DP to 5500’, P/U 4-
3/4” Drilling Jar. (Note: Run all pipe w/ WWT Non-Rotating Protectors)
 Continue RIH to FD-BP @ 6535’.
 Mill FD-BP @ 6535’, if total losses are encountered , pump 20 bbls / ½ hr f/
trip tank. RIH W/ 6-1/8” Bit, push FD-BP debris to bottom @ 9025’.
 POH Bit, pump 20 bbls / ½ hr f/ trip tank. Note: Pull slowly into 7” EOL @
6573’ . Note: Remove all WWT Non-Rotating Protectors.

Please read above instruction carefully.


If unsure of any point, please ask and it can be clarified further.
If in doubt = STOP
Work safely – Work as Team – Plan ahead – PJSM & JSA as required.
Thanks for doing a good safe job

Thanks……Pat