You are on page 1of 21

ISGEC HEAVY ENGINEERING LIMITED

PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI & KHAPERKHEDA TPS
DOCUMENT NO.
ES0154-75990800-CAL-5001 REV

DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

Grid Mark Top reinforcement Bottom reinforcement Deflection Check


Beam Length (mm)
Beam. Size
S.No Memb No. Location
Mark (B x D)
(STAAD) Stirrups Stirrups
Dia Dia Dia Dia Prov. Dia Dia Dia Dia Prov. Stirrups Reqd.Stirr Prov.
Ast req Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY spacing Stirrups spacing
From To % Ptreq (mm) (mm) (mm) (mm) CHECK Ast req (mm2) % Ptreq (mm) (mm) (mm) (mm) CHECK leg ups Dia Stirrups
(mm2) (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO reqd. leg (Prov.) prov.
(T.O) (T.O) (EX) (EX) (T.O) (T.O) (EX) (EX) (Reqd.) (mm) Dia (mm)
(mm) (mm)
4.0 PLINTH BEAM(-0.65M TOC) Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 2405.13 1.78 3 20 3 25 2415 1.79 1.00 SAFE 1448.30 1.073 3 25 1473 1.09 0.98 SAFE 2 8d 160 2 8 150 450.00 307.692 0.93 270 1
5250

1 PB1 279 x mid 1014.37 0.75 3 20 3 25 2415 1.79 0.42 SAFE 863.29 0.639 3 25 1473 1.09 0.59 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.99 290 1
are satisifed
450 end 15.50 0.01 3 20 942 0.70 0.02 SAFE 1158.81 0.858 3 25 1473 1.09 0.79 SAFE 2 8d 160 2 8 150
300 Start 0.00 0.00 3 20 942 0.70 0.00 SAFE 999.33 0.740 3 25 1473 1.09 0.68 SAFE 2 8d 160 2 8 150
2750

2 PB1 1252 x mid 1770.30 1.31 3 20 4 25 2906 2.15 0.61 SAFE 745.61 0.552 3 25 1473 1.09 0.51 SAFE 2 8d 160 2 8 150
450 end 2701.90 2.00 3 20 4 25 2906 2.15 0.93 SAFE 1673.78 1.240 3 25 2 12 1699 1.26 0.99 SAFE 2 8d 160 2 8 150
300 Start 2193.24 1.62 3 20 4 25 2906 2.15 0.75 SAFE 1138.89 0.844 3 25 2 12 1699 1.26 0.67 SAFE 2 8d 160 2 8 150
8000

3 PB1 281 x mid 407.90 0.30 3 20 942 0.70 0.43 SAFE 609.17 0.451 3 25 1473 1.09 0.41 SAFE 2 8d 160 2 8 150
450 end 2195.71 1.63 3 20 3 25 2415 1.79 0.91 SAFE 1141.52 0.846 3 25 1473 1.09 0.78 SAFE 2 8d 160 2 8 150
300 Start 2267.01 1.68 3 20 3 25 2415 1.79 0.94 SAFE 1210.94 0.897 3 25 1473 1.09 0.82 SAFE 2 8d 160 2 8 150
8000

4 PB1 282 x mid 448.83 0.33 3 20 942 0.70 0.48 SAFE 736.75 0.546 3 25 1473 1.09 0.50 SAFE 2 8d 160 2 8 150
450 end 2244.15 1.66 3 20 3 25 2415 1.79 0.93 SAFE 1186.70 0.879 3 25 1473 1.09 0.81 SAFE 2 8d 160 2 8 150
300 Start 1898.33 1.41 3 20 2 25 1924 1.43 0.99 SAFE 1247.60 0.924 3 20 2 16 1345 1.00 0.93 SAFE 2 8d 160 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
5000

5 PB2 1284 x mid 671.24 0.50 3 20 942 0.70 0.71 SAFE 791.00 0.586 3 20 2 16 1345 1.00 0.59 SAFE 2 8d 160 2 8 150 450.00 341.880 0.99 290 0.9
450 end 1772.25 1.31 3 20 2 25 1924 1.43 0.92 SAFE 1219.68 0.903 3 20 2 16 1345 1.00 0.91 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.93 270 1
are satisifed
300 Start 1115.14 0.83 3 20 2 25 1924 1.43 0.58 SAFE 713.75 0.529 3 20 942 0.70 0.76 SAFE 2 8d 160 2 8 150
8000

6 PB2 287 x mid 393.58 0.29 3 20 942 0.70 0.42 SAFE 408.38 0.303 3 20 942 0.70 0.43 SAFE 2 8d 160 2 8 150
450 end 1113.09 0.82 3 20 2 16 1345 1.00 0.83 SAFE 740.84 0.549 3 20 942 0.70 0.79 SAFE 2 8d 160 2 8 150
300 Start 1070.19 0.79 3 20 2 16 1345 1.00 0.80 SAFE 776.99 0.576 3 20 942 0.70 0.82 SAFE 2 8d 160 2 8 150
8000

7 PB2 288 x mid 397.98 0.29 3 20 942 0.70 0.42 SAFE 431.63 0.320 3 20 942 0.70 0.46 SAFE 2 8d 160 2 8 150
450 end 1120.80 0.83 3 20 2 16 1345 1.00 0.83 SAFE 775.20 0.574 3 20 942 0.70 0.82 SAFE 2 8d 160 2 8 150
300 Start 1160.11 0.86 3 20 2 16 1345 1.00 0.86 SAFE 851.63 0.631 3 20 942 0.70 0.90 SAFE 2 8d 160 2 8 150
8000

8 PB2 289 x mid 465.02 0.34 3 20 942 0.70 0.49 SAFE 448.85 0.332 3 20 942 0.70 0.48 SAFE 2 8d 160 2 8 150
450 end 1248.92 0.93 3 20 2 16 1345 1.00 0.93 SAFE 840.66 0.623 3 20 942 0.70 0.89 SAFE 2 8d 160 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 1769.06 1.31 3 20 2 25 1924 1.43 0.92 SAFE 660.28 0.489 3 16 2 12 829 0.61 0.80 SAFE 2 8d 160 2 8 150 450.00 226.244 0.92 270 0.9
5000

9 PB9 1294 x mid 807.21 0.60 3 20 942 0.70 0.86 SAFE 548.71 0.406 3 16 603 0.45 0.91 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.8 240 0.85
are satisifed
450 end 211.14 0.16 3 20 942 0.70 0.22 SAFE 211.14 0.156 3 16 603 0.45 0.35 SAFE 2 8d 160 2 8 150
300 Start 1789.53 0.99 3 20 3 25 2415 1.34 0.74 SAFE 1255.38 0.697 3 20 2 16 1345 0.75 0.93 SAFE 2 8d 195 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
5000

10 PB3 1286 x mid 639.61 0.36 3 20 942 0.52 0.68 SAFE 728.12 0.405 3 20 2 16 1345 0.75 0.54 SAFE 2 8d 195 2 8 150 600.00 361.991 0.9 270 0.85
600 end 1762.35 0.98 3 20 3 25 2415 1.34 0.73 SAFE 1092.65 0.607 3 20 2 16 1345 0.75 0.81 SAFE 2 8d 195 2 8 150 Vertical defelction limits 0.93 270 0.85
are satisifed
300 Start 1724.17 0.96 3 20 3 25 2415 1.34 0.71 SAFE 333.17 0.185 3 20 942 0.52 0.35 SAFE 2 8d 195 2 8 150
8000

11 PB3 273 x mid 366.14 0.20 3 20 942 0.52 0.39 SAFE 495.78 0.275 3 20 942 0.52 0.53 SAFE 2 8d 195 2 8 150
600 end 1833.56 1.02 3 20 3 25 2415 1.34 0.76 SAFE 326.24 0.181 3 20 942 0.52 0.35 SAFE 2 8d 195 2 8 150
300 Start 1813.32 1.01 3 20 3 25 2415 1.34 0.75 SAFE 375.91 0.209 3 20 942 0.52 0.40 SAFE 2 8d 195 2 8 150
8000

12 PB3 101 x mid 354.08 0.20 3 20 942 0.52 0.38 SAFE 517.49 0.287 3 20 942 0.52 0.55 SAFE 2 8d 195 2 8 150
600 end 1810.45 1.01 3 20 3 25 2415 1.34 0.75 SAFE 360.74 0.200 3 20 942 0.52 0.38 SAFE 2 8d 195 2 8 150
300 Start 2163.50 1.20 3 20 3 25 2415 1.34 0.90 SAFE 628.44 0.349 3 20 942 0.52 0.67 SAFE 2 8d 195 2 8 150
5250

13 PB3 276 x mid 889.07 0.49 3 20 942 0.52 0.94 SAFE 605.06 0.336 3 20 942 0.52 0.64 SAFE 2 8d 195 2 8 150
600 end 286.62 0.16 3 20 942 0.52 0.30 SAFE 941.52 0.523 3 20 942 0.52 1.00 SAFE 2 8d 195 2 8 150
300 Start 285.60 0.16 3 20 942 0.52 0.30 SAFE 941.33 0.523 3 20 942 0.52 1.00 SAFE 2 8d 195 2 8 150
2750

14 PB3 1342 x mid 1480.54 0.82 3 20 3 25 2415 1.34 0.61 SAFE 831.06 0.462 3 20 942 0.52 0.88 SAFE 2 8d 195 2 8 150
600 end 2183.38 1.21 3 20 3 25 2415 1.34 0.90 SAFE 650.46 0.361 3 20 942 0.52 0.69 SAFE 2 8d 195 2 8 150
300 Start 288.15 0.16 3 25 2 25 2454 1.36 0.12 SAFE 284.33 0.158 3 20 942 0.52 0.30 SAFE 2 8d 195 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
5250

15 PB10 280 x mid 301.84 0.17 3 25 1473 0.82 0.20 SAFE 1872.29 1.040 3 20 2 25 1924 1.07 0.97 SAFE 2 8d 195 2 8 150 600.00 237.557 0.85 250 0.85
600 end 364.32 0.20 3 25 1473 0.82 0.25 SAFE 1923.21 1.068 3 20 2 25 1924 1.07 1.00 SAFE 2 8d 195 2 8 150 Vertical defelction limits 1 290 0.9
are satisifed
300 Start 390.62 0.22 3 25 1473 0.82 0.27 SAFE 1918.85 1.066 3 20 2 25 1924 1.07 1.00 SAFE 2 8d 195 2 8 150
2750

16 PB10 1251 x mid 48.34 0.03 3 25 2 25 2454 1.36 0.02 SAFE 1625.14 0.903 3 20 2 25 1924 1.07 0.84 SAFE 2 8d 195 2 8 150
600 end 288.15 0.16 3 25 2 25 2454 1.36 0.12 SAFE 284.33 0.158 3 20 942 0.52 0.30 SAFE 2 8d 195 2 8 150
300 Start 2011.27 1.12 3 25 2 25 2454 1.36 0.82 SAFE 468.83 0.260 3 20 942 0.52 0.50 SAFE 2 8d 195 2 8 150
5250

17 PB10 1334 x mid 767.46 0.43 3 25 1473 0.82 0.52 SAFE 654.56 0.364 3 20 942 0.52 0.69 SAFE 2 8d 195 2 8 150
600 end 0.00 0.00 3 25 1473 0.82 0.00 SAFE 892.01 0.496 3 20 942 0.52 0.95 SAFE 2 8d 195 2 8 150
300 Start 0.00 0.00 3 25 1473 0.82 0.00 SAFE 896.48 0.498 3 20 942 0.52 0.95 SAFE 2 8d 195 2 8 150
2750

18 PB10 1341 x mid 1353.99 0.75 3 25 1473 0.82 0.92 SAFE 756.09 0.420 3 20 942 0.52 0.80 SAFE 2 8d 195 2 8 150
600 end 2085.27 1.16 3 25 2 25 2454 1.36 0.85 SAFE 546.63 0.304 3 20 942 0.52 0.58 SAFE 2 8d 195 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 1236.65 0.92 3 20 2 20 1571 1.16 0.79 SAFE 96.39 0.071 3 16 603 0.45 0.16 SAFE 2 8d 160 2 8 150 450.00 256.410 0.79 230 1.1
7000

19 PB4 1285 x mid 211.65 0.16 3 20 942 0.70 0.22 SAFE 448.77 0.332 3 16 603 0.45 0.74 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.74 220 1.05
are satisifed
450 end 1218.59 0.90 3 20 2 20 1571 1.16 0.78 SAFE 77.60 0.057 3 16 603 0.45 0.13 SAFE 2 8d 160 2 8 150
300 Start 837.02 0.62 3 20 2 20 1571 1.16 0.53 SAFE 415.84 0.308 3 16 603 0.45 0.69 SAFE 2 8d 160 2 8 150
3655

20 PB4 1300 x mid 262.05 0.19 3 20 942 0.70 0.28 SAFE 307.87 0.228 3 16 603 0.45 0.51 SAFE 2 8d 160 2 8 150
450 end 808.17 0.60 3 20 2 20 1571 1.16 0.51 SAFE 386.18 0.286 3 16 603 0.45 0.64 SAFE 2 8d 160 2 8 150
300 Start 339.15 0.16 3 20 2 20 1571 0.75 0.22 SAFE 338.64 0.161 3 20 2 12 1169 0.56 0.29 SAFE 2 8d 295 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
600

21 PB5 290 x mid 339.15 0.16 3 20 942 0.45 0.36 SAFE 0.00 0.000 3 20 942 0.45 0.00 SAFE 2 8d 285 2 8 150 700.00 316.742 0.78 230 0.95
700 end 354.16 0.17 3 20 3 25 2415 1.15 0.15 SAFE 0.00 0.000 3 20 2 12 1169 0.56 0.00 SAFE 2 8d 265 2 8 150 Vertical defelction limits 0.99 290 0.85
are satisifed
300 Start 1772.68 1.31 3 20 3 25 2415 1.79 0.73 SAFE 666.26 0.494 3 20 2 12 1169 0.87 0.57 SAFE 2 8d 160 2 8 150
4345

22 PB5 1200
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI & KHAPERKHEDA TPS
DOCUMENT NO.
ES0154-75990800-CAL-5001 REV

DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

Grid Mark Top reinforcement Bottom reinforcement Deflection Check


Beam.
Beam Length (mm) Size
S.No Memb No. Location
Mark (B x D)
(STAAD) Stirrups Stirrups
Dia Dia Dia Dia Prov. Dia Dia Dia Dia Prov. Stirrups Reqd.Stirr Prov.
Ast req Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY spacing Stirrups spacing
From To % Ptreq (mm) (mm) (mm) (mm) CHECK Ast req (mm2) % Ptreq (mm) (mm) (mm) (mm) CHECK leg ups Dia Stirrups
(mm2) (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO reqd. leg (Prov.) prov.
(T.O) (T.O) (EX) (EX) (T.O) (T.O) (EX) (EX) (Reqd.) (mm) Dia (mm)
(mm) (mm)
4345

22 PB5 1200 x mid 668.63 0.50 3 20 942 0.70 0.71 SAFE 788.34 0.584 3 20 942 0.70 0.84 SAFE 2 8d 160 2 8 150
450 end 0.00 0.00 3 20 942 0.70 0.00 SAFE 1128.00 0.836 3 20 2 12 1169 0.87 0.97 SAFE 2 8d 160 2 8 150
300 Start 0.00 0.00 3 20 942 0.70 0.00 SAFE 1152.39 0.854 3 20 2 12 1169 0.87 0.99 SAFE 2 8d 160 2 8 150
3655

23 PB5 1293 x mid 914.36 0.68 3 20 3 25 2415 1.79 0.38 SAFE 682.22 0.505 3 20 942 0.70 0.72 SAFE 2 8d 160 2 8 150
450 end 1873.67 1.39 3 20 3 25 2415 1.79 0.78 SAFE 765.78 0.567 3 20 2 12 1169 0.87 0.66 SAFE 2 8d 160 2 8 150
300 Start 1479.46 1.10 3 20 3 25 2415 1.79 0.61 SAFE 357.03 0.264 3 20 2 12 1169 0.87 0.31 SAFE 2 8d 160 2 8 150
7000

24 PB5 272 x mid 211.65 0.16 3 20 942 0.70 0.22 SAFE 438.20 0.325 3 20 942 0.70 0.46 SAFE 2 8d 160 2 8 150
450 end 1382.60 1.02 3 20 2 25 1924 1.43 0.72 SAFE 256.18 0.190 3 20 942 0.70 0.27 SAFE 2 8d 160 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 338.64 0.16 3 20 2 20 1571 0.75 0.22 SAFE 338.64 0.161 3 20 3 16 1546 0.74 0.22 SAFE 2 8d 225 2 8 150 700.00 28.846 0.28 90 0.8
600

25 PB12 291 x mid 338.64 0.16 3 20 942 0.45 0.36 SAFE 0.00 0.000 3 20 3 16 1546 0.74 0.00 SAFE 2 8d 210 2 8 150 Vertical defelction limits 0.22 70 0.95
are satisifed
700 end 436.03 0.21 3 20 2 20 1571 0.75 0.28 SAFE 0.00 0.000 3 20 3 16 1546 0.74 0.00 SAFE 2 8d 205 2 8 150
300 Start 609.59 0.45 3 20 2 20 1571 1.16 0.39 SAFE 306.88 0.227 3 20 942 0.70 0.33 SAFE 2 8d 160 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
8000

26 PB6 283 x mid 236.59 0.18 3 20 942 0.70 0.25 SAFE 278.18 0.206 3 20 942 0.70 0.30 SAFE 2 8d 160 2 8 150 450.00 307.692 0.57 170 1.35
450 end 659.74 0.49 3 20 2 16 1345 1.00 0.49 SAFE 378.05 0.280 3 20 942 0.70 0.40 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.64 190 1
are satisifed
300 Start 805.08 0.60 3 20 2 16 1345 1.00 0.60 SAFE 599.68 0.444 3 20 942 0.70 0.64 SAFE 2 8d 160 2 8 150
7000

27 PB6 284 x mid 338.90 0.25 3 20 942 0.70 0.36 SAFE 338.21 0.251 3 20 942 0.70 0.36 SAFE 2 8d 160 2 8 150
450 end 897.38 0.66 3 20 2 16 1345 1.00 0.67 SAFE 598.25 0.443 3 20 942 0.70 0.63 SAFE 2 8d 160 2 8 150
300 Start 939.05 0.70 3 16 2 20 1232 0.91 0.76 SAFE 579.43 0.429 3 20 942 0.70 0.61 SAFE 2 8d 160 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
8000

28 PB7 285 x mid 331.43 0.25 3 16 603 0.45 0.55 SAFE 350.05 0.259 3 20 942 0.70 0.37 SAFE 2 8d 160 2 8 150 450.00 384.615 0.94 280 0.8
450 end 861.89 0.64 3 16 2 20 1232 0.91 0.70 SAFE 579.96 0.430 3 20 942 0.70 0.62 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.92 270 0.85
are satisifed
300 Start 887.52 0.66 3 16 2 20 1232 0.91 0.72 SAFE 634.07 0.470 3 20 942 0.70 0.67 SAFE 2 8d 160 2 8 150
7000

29 PB7 286 x mid 336.57 0.25 3 16 603 0.45 0.56 SAFE 361.31 0.268 3 20 942 0.70 0.38 SAFE 2 8d 160 2 8 150
450 end 893.29 0.66 3 16 2 25 1585 1.17 0.56 SAFE 624.62 0.463 3 20 942 0.70 0.66 SAFE 2 8d 160 2 8 150
300 Start 1486.21 1.10 3 16 2 25 1585 1.17 0.94 SAFE 1450.10 1.074 3 20 2 20 1571 1.16 0.92 SAFE 2 8d 160 2 8 150
3000

30 PB7 1332 x mid 696.43 0.52 3 16 2 25 1585 1.17 0.44 SAFE 817.53 0.606 3 20 942 0.70 0.87 SAFE 2 8d 160 2 8 150
450 end 1419.83 1.05 3 16 2 25 1585 1.17 0.90 SAFE 1177.40 0.872 3 20 2 20 1571 1.16 0.75 SAFE 2 8d 160 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 1023.46 0.76 3 20 2 12 1169 0.87 0.88 SAFE 752.88 0.558 3 20 942 0.70 0.80 SAFE 2 8d 160 2 8 150 450.00 341.880 0.91 270 0.9
3000

31 PB8 1333 x mid 553.75 0.41 3 20 942 0.70 0.59 SAFE 583.95 0.433 3 20 942 0.70 0.62 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.84 250 0.95
are satisifed
450 end 1348.96 1.00 3 20 2 25 1924 1.43 0.70 SAFE 983.01 0.728 3 20 2 12 1169 0.87 0.84 SAFE 2 8d 160 2 8 150
300 Start 1724.29 1.28 3 20 2 25 1924 1.43 0.90 SAFE 615.75 0.456 3 20 942 0.70 0.65 SAFE 2 8d 160 2 8 150
8000

32 PB8 277 x mid 211.65 0.16 3 20 942 0.70 0.22 SAFE 562.63 0.417 3 20 942 0.70 0.60 SAFE 2 8d 160 2 8 150
450 end 1751.54 1.30 3 20 2 25 1924 1.43 0.91 SAFE 644.27 0.477 3 20 942 0.70 0.68 SAFE 2 8d 160 2 8 150
300 Start 1519.97 1.13 3 20 2 25 1924 1.43 0.79 SAFE 373.83 0.277 3 20 942 0.70 0.40 SAFE 2 8d 160 2 8 150
7000

33 PB8 278 x mid 245.28 0.18 3 20 942 0.70 0.26 SAFE 440.44 0.326 3 20 942 0.70 0.47 SAFE 2 8d 160 2 8 150
Depth Prov. Depth req.
450 end 1485.28 1.10 3 20 2 25 1924 1.43 0.77 SAFE 337.75 0.250 3 20 942 0.70 0.36 SAFE 2 8d 160 2 8 150 Ratio fs Mod.fact.
300 Start 211.65 0.16 3 16 603 0.45 0.35 SAFE 211.65 0.157 3 16 603 0.45 0.35 SAFE 2 8d 160 2 8 150 450.00 104.895 0.35 110 2
3000

34 PB11 1255 x mid 0.00 0.00 3 16 603 0.45 0.00 SAFE 455.39 0.337 3 16 603 0.45 0.75 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.75 220 1.1
are satisifed
450 end 211.65 0.16 3 16 603 0.45 0.35 SAFE 211.65 0.157 3 16 603 0.45 0.35 SAFE 2 8d 160 2 8 150
300 Start 211.65 0.16 3 16 603 0.45 0.35 SAFE 211.14 0.156 3 16 603 0.45 0.35 SAFE 2 8d 160 2 8 150
3000

35 PB11 1343 x mid 0.00 0.00 3 16 603 0.45 0.00 SAFE 402.27 0.298 3 16 603 0.45 0.67 SAFE 2 8d 160 2 8 150
450 end 211.65 0.16 3 16 603 0.45 0.35 SAFE 211.14 0.156 3 16 603 0.45 0.35 SAFE 2 8d 160 2 8 150

5.0 FLOOR BEAM @ 3.5M (TOC) Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 2592.75 1.15 3 25 3 25 2945 1.31 0.88 SAFE 1132.74 0.503 3 20 2 12 1169 0.52 0.97 SAFE 2 8d 235 2 10 150 750.00 341.880 0.88 260 0.9
5250

1 FB1 14 x mid 1193.26 0.53 3 25 1473 0.65 0.81 SAFE 1097.72 0.488 3 20 2 12 1169 0.52 0.94 SAFE 2 8d 235 2 10 150 Vertical defelction limits 0.98 290 0.9
are satisifed
750 end 0.00 0.00 3 25 1473 0.65 0.00 SAFE 914.91 0.407 3 20 2 12 1169 0.52 0.78 SAFE 2 8d 235 2 10 150
300 Start 0.00 0.00 3 25 1473 0.65 0.00 SAFE 829.25 0.369 3 20 942 0.42 0.88 SAFE 2 8d 235 2 10 150
2750

2 FB1 317 x mid 1713.79 0.76 3 25 2 25 2454 1.09 0.70 SAFE 732.26 0.325 3 20 942 0.42 0.78 SAFE 2 8d 180 2 10 150
750 end 2560.26 1.14 3 25 3 25 2945 1.31 0.87 SAFE 615.42 0.274 3 20 942 0.42 0.65 SAFE 2 8d 235 2 10 150
300 Start 2015.45 0.90 3 25 2 25 2454 1.09 0.82 SAFE 414.71 0.184 3 20 942 0.42 0.44 SAFE 2 8d 235 2 10 150
8000

3 FB1 4 x mid 427.10 0.19 3 25 1473 0.65 0.29 SAFE 551.76 0.245 3 20 942 0.42 0.59 SAFE 2 8d 235 2 10 150
750 end 1987.43 0.88 3 25 2 25 2454 1.09 0.81 SAFE 489.46 0.218 3 20 942 0.42 0.52 SAFE 2 8d 235 2 10 150
300 Start 2445.12 1.09 3 25 2 25 2454 1.09 1.00 SAFE 637.78 0.283 3 20 942 0.42 0.68 SAFE 2 8d 210 2 10 150
1720

4 FB1 5 x mid 2039.64 0.91 3 25 2 25 2454 1.09 0.83 SAFE 651.71 0.290 3 20 942 0.42 0.69 SAFE 2 8d 235 2 10 150
750 end 678.36 0.30 3 25 1473 0.65 0.46 SAFE 604.92 0.269 3 20 942 0.42 0.64 SAFE 2 8d 235 2 10 150
300 Start 609.55 0.27 3 25 1473 0.65 0.41 SAFE 712.91 0.317 3 20 942 0.42 0.76 SAFE 2 8d 235 2 10 150
6280

5 FB1 1379 x mid 908.29 0.40 3 25 1473 0.65 0.62 SAFE 1106.16 0.492 3 20 2 12 1169 0.52 0.95 SAFE 2 8d 235 2 10 150
750 end 2432.44 1.08 3 25 2 25 2454 1.09 0.99 SAFE 1150.19 0.511 3 20 2 12 1169 0.52 0.98 SAFE 2 8d 235 2 10 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 288.15 0.16 3 20 942 0.52 0.31 SAFE 287.64 0.160 3 20 942 0.52 0.31 SAFE 2 8d 195 2 8 150 600.00 361.991 0.85 250 1
3670

6 FB2 28 x mid 0.00 0.00 3 20 942 0.52 0.00 SAFE 1269.84 0.705 3 20 2 16 1345 0.75 0.94 SAFE 2 8d 195 2 8 150 Vertical defelction limits 0.96 280 0.85
are satisifed
600 end 0.00 0.00 3 20 942 0.52 0.00 SAFE 1287.75 0.715 3 20 2 16 1345 0.75 0.96 SAFE 2 8d 195 2 8 150
300 Start 0.00 0.00 3 20 942 0.52 0.00 SAFE 1289.29 0.716 3 20 2 16 1345 0.75 0.96 SAFE 2 8d 195 2 8 150
4330

7 FB2 301 x mid 660.52 0.37 3 20 942 0.52 0.70 SAFE 845.09 0.469 3 20 942 0.52 0.90 SAFE 2 8d 195 2 8 150
600 end 1955.06 1.09 3 20 3 25 2415 1.34 0.81 SAFE 386.87 0.215 3 20 942 0.52 0.41 SAFE 2 8d 195 2 8 150
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI & KHAPERKHEDA TPS
DOCUMENT NO.
ES0154-75990800-CAL-5001 REV

DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

Grid Mark Top reinforcement Bottom reinforcement Deflection Check


Beam Length (mm)
Beam. Size
S.No Memb No. Location
Mark (B x D)
(STAAD) Stirrups Stirrups
Dia Dia Dia Dia Prov. Dia Dia Dia Dia Prov. Stirrups Reqd.Stirr Prov.
Ast req Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY spacing Stirrups spacing
From To % Ptreq (mm) (mm) (mm) (mm) CHECK Ast req (mm2) % Ptreq (mm) (mm) (mm) (mm) CHECK leg ups Dia Stirrups
(mm2) (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO reqd. leg (Prov.) prov.
(T.O) (T.O) (EX) (EX) (T.O) (T.O) (EX) (EX) (Reqd.) (mm) Dia (mm)
(mm) (mm)
300 Start 2053.17 1.14 3 20 3 25 2415 1.34 0.85 SAFE 514.92 0.286 3 20 942 0.52 0.55 SAFE 2 8d 195 2 8 150
8000

8 FB2 27 x mid 286.62 0.16 3 20 942 0.52 0.30 SAFE 888.57 0.494 3 20 942 0.52 0.94 SAFE 2 8d 195 2 8 150
600 end 286.62 0.16 3 20 942 0.52 0.30 SAFE 286.62 0.159 3 20 942 0.52 0.30 SAFE 2 8d 195 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 0.00 0.00 3 16 603 0.34 0.00 SAFE 1025.83 0.570 3 20 2 25 1924 1.07 0.53 SAFE 2 8d 195 2 8 150 600.00 127.126 0.48 140 1.9
6280

9 FB11 1380 x mid 222.52 0.12 3 16 603 0.34 0.37 SAFE 1777.48 0.987 3 20 2 25 1924 1.07 0.92 SAFE 2 8d 195 2 8 150 Vertical defelction limits 0.92 270 2
are satisifed
600 end 288.15 0.16 3 16 603 0.34 0.48 SAFE 286.62 0.159 3 20 942 0.52 0.30 SAFE 2 8d 195 2 8 150
300 Start 288.15 0.16 3 20 942 0.52 0.31 SAFE 287.64 0.160 3 20 942 0.52 0.31 SAFE 2 8d 195 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
3670

10 FB3 33 x mid 0.00 0.00 3 20 942 0.52 0.00 SAFE 1448.72 0.805 3 20 2 20 1571 0.87 0.92 SAFE 2 8d 195 2 8 150 600.00 341.880 0.87 260 0.9
600 end 0.00 0.00 3 20 942 0.52 0.00 SAFE 1471.87 0.818 3 20 2 20 1571 0.87 0.94 SAFE 2 8d 195 2 8 150 Vertical defelction limits 0.98 290 0.9
are satisifed
300 Start 0.00 0.00 3 20 942 0.52 0.00 SAFE 1470.22 0.817 3 20 2 20 1571 0.87 0.94 SAFE 2 8d 195 2 8 150
4330

11 FB3 302 x mid 666.07 0.37 3 20 942 0.52 0.71 SAFE 970.42 0.539 3 20 2 20 1571 0.87 0.62 SAFE 2 8d 195 2 8 150
600 mid 2099.98 1.17 3 20 3 25 2415 1.34 0.87 SAFE 561.74 0.312 3 20 942 0.52 0.60 SAFE 2 8d 195 2 8 150
300 Start 1865.42 1.04 3 20 3 25 2415 1.34 0.77 SAFE 306.92 0.171 3 20 942 0.52 0.33 SAFE 2 8d 195 2 8 150
8000

12 FB3 32 x mid 288.15 0.16 3 20 942 0.52 0.31 SAFE 724.93 0.403 3 20 942 0.52 0.77 SAFE 2 8d 195 2 8 150
600 end 866.47 0.48 3 20 3 25 2415 1.34 0.36 SAFE 288.15 0.160 3 20 942 0.52 0.31 SAFE 2 8d 195 2 8 150
300 Start 288.15 0.16 3 20 3 25 2415 1.34 0.12 SAFE 286.62 0.159 3 20 942 0.52 0.30 SAFE 2 8d 195 2 8 150
2085

13 FB3 161 x mid 310.74 0.17 3 20 3 25 2415 1.34 0.13 SAFE 1857.42 1.032 3 20 3 25 2415 1.34 0.77 SAFE 2 8d 195 2 8 150
600 end 855.57 0.48 3 20 942 0.52 0.91 SAFE 2372.28 1.318 3 20 3 25 2415 1.34 0.98 SAFE 2 8d 195 2 8 150
300 Start 782.56 0.43 3 20 942 0.52 0.83 SAFE 2303.51 1.280 3 20 3 25 2415 1.34 0.95 SAFE 2 8d 195 2 8 150
5915

14 FB3 1382 x mid 769.12 0.43 3 20 942 0.52 0.82 SAFE 2290.49 1.272 3 20 3 25 2415 1.34 0.95 SAFE 2 8d 195 2 8 150
600 end 288.15 0.16 3 20 942 0.52 0.31 SAFE 286.62 0.159 3 20 942 0.52 0.30 SAFE 2 8d 195 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 287.64 0.16 3 20 942 0.52 0.31 SAFE 287.64 0.160 3 20 942 0.52 0.31 SAFE 2 8d 195 2 8 150 600.00 341.880 0.9 270 0.9
8000

15 FB9 45 x mid 287.64 0.16 3 20 942 0.52 0.31 SAFE 822.67 0.457 3 20 2 12 1169 0.65 0.70 SAFE 2 8d 195 2 8 150 Vertical defelction limits 0.7 210 1
are satisifed
600 end 1379.27 0.77 3 20 2 25 1924 1.07 0.72 SAFE 0.00 0.000 3 20 942 0.52 0.00 SAFE 2 8d 195 2 8 150
300 Start 1724.61 0.96 3 20 2 25 1924 1.07 0.90 SAFE 168.36 0.094 3 20 942 0.52 0.18 SAFE 2 8d 195 2 8 150
8000

16 FB9 46 x mid 287.64 0.16 3 20 942 0.52 0.31 SAFE 700.10 0.389 3 20 942 0.52 0.74 SAFE 2 8d 195 2 8 150
600 end 287.64 0.16 3 20 942 0.52 0.31 SAFE 287.64 0.160 3 20 942 0.52 0.31 SAFE 2 8d 195 2 8 150
300 Start 288.15 0.16 3 20 942 0.52 0.31 SAFE 288.15 0.160 3 20 942 0.52 0.31 SAFE 2 8d 195 2 8 150 600.00 279.720 0.88 260 1.4
8000

17 FB6 38 x mid 288.15 0.16 3 20 942 0.52 0.31 SAFE 797.76 0.443 3 20 2 12 1169 0.65 0.68 SAFE 2 8d 195 2 8 150 Vertical defelction limits 0.68 200 1.1
are satisifed
600 end 1189.40 0.66 3 20 2 16 1345 0.75 0.88 SAFE 0.00 0.000 3 20 942 0.52 0.00 SAFE 2 8d 195 2 8 150
300 Start 1302.28 0.72 3 20 2 16 1345 0.75 0.97 SAFE 0.00 0.000 3 20 942 0.52 0.00 SAFE 2 8d 195 2 8 150 600.00 341.880 0.97 290 1.15
8000

18 FB7 39 x mid 287.64 0.16 3 20 942 0.52 0.31 SAFE 437.42 0.243 3 20 942 0.52 0.46 SAFE 2 8d 195 2 8 150 Vertical defelction limits 0.46 140 0.9
are satisifed
600 end 691.33 0.38 3 20 942 0.52 0.73 SAFE 287.64 0.160 3 20 942 0.52 0.31 SAFE 2 8d 195 2 8 150
300 Start 2420.23 1.34 3 25 3 25 2945 1.64 0.82 SAFE 1075.75 0.598 3 25 1473 0.82 0.73 SAFE 2 8d 195 2 10 125 600.00 375.235 0.94 280 0.82
5000

19 FB4 1269 x mid 816.88 0.45 3 25 1473 0.82 0.55 SAFE 1041.42 0.579 3 25 1473 0.82 0.71 SAFE 2 8d 195 2 10 125 Vertical defelction limits 0.59 180 1.1
are satisifed
600 end 2294.16 1.27 3 25 3 25 2945 1.64 0.78 SAFE 1553.66 0.863 3 25 2 12 1699 0.94 0.91 SAFE 2 8d 195 2 10 125
300 Start 2723.44 1.51 3 25 3 25 2945 1.64 0.92 SAFE 1232.86 0.685 3 25 1473 0.82 0.84 SAFE 2 10d 195 2 10 125
2245

20 FB4 15 x mid 1785.83 0.99 3 25 3 25 2945 1.64 0.61 SAFE 493.53 0.274 3 25 1473 0.82 0.34 SAFE 2 10d 100 2 10 125
600 end 285.60 0.16 3 25 1473 0.82 0.19 SAFE 1008.87 0.560 3 25 1473 0.82 0.69 SAFE 2 10d 195 2 10 125
300 Start 288.15 0.16 3 25 1473 0.82 0.20 SAFE 956.95 0.532 3 25 1473 0.82 0.65 SAFE 2 8d 195 2 10 125
2245

21 FB4 1250 x mid 74.40 0.04 3 25 1473 0.82 0.05 SAFE 1633.08 0.907 3 25 3 16 2076 1.15 0.79 SAFE 2 8d 195 2 10 125
600 end 184.17 0.10 3 25 1473 0.82 0.13 SAFE 1740.09 0.967 3 25 3 16 2076 1.15 0.84 SAFE 2 8d 195 2 10 125
300 Start 192.62 0.11 3 25 1473 0.82 0.13 SAFE 1747.80 0.971 3 25 3 16 2076 1.15 0.84 SAFE 2 8d 195 2 10 125
3510

22 FB4 162 x mid 1083.99 0.60 3 25 1473 0.82 0.74 SAFE 999.99 0.556 3 25 1473 0.82 0.68 SAFE 2 8d 145 2 10 125
600 end 2376.52 1.32 3 25 3 25 2945 1.64 0.81 SAFE 855.29 0.475 3 25 1473 0.82 0.58 SAFE 2 8d 195 2 10 125
300 Start 1999.79 1.11 3 25 3 25 2945 1.64 0.68 SAFE 457.04 0.254 3 25 1473 0.82 0.31 SAFE 2 8d 195 2 10 125
8000

23 FB4 16 x mid 287.64 0.16 3 25 1473 0.82 0.20 SAFE 669.71 0.372 3 25 1473 0.82 0.45 SAFE 2 8d 195 2 10 125
600 end 1910.50 1.06 3 25 3 25 2945 1.64 0.65 SAFE 365.39 0.203 3 25 1473 0.82 0.25 SAFE 2 8d 195 2 10 125
300 Start 2780.40 1.54 3 25 3 25 2945 1.64 0.94 SAFE 1282.36 0.712 3 25 1473 0.82 0.87 SAFE 2 10d 195 2 10 125
2085

24 FB4 17 x mid 1879.10 1.04 3 25 3 25 2945 1.64 0.64 SAFE 404.10 0.225 3 25 3 25 2945 1.64 0.14 SAFE 2 10d 165 2 10 125
600 end 286.62 0.16 3 25 1473 0.82 0.19 SAFE 631.84 0.351 3 25 3 25 2945 1.64 0.21 SAFE 2 10d 195 2 10 125
300 Start 1862.89 1.03 3 25 2 25 2454 1.36 0.76 SAFE 304.32 0.169 3 16 603 0.34 0.50 SAFE 2 8d 195 2 10 125 600.00 341.880 0.91 270 0.9
3510

25 FB5 187 x mid 1185.48 0.66 3 25 1473 0.82 0.81 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 150 2 10 125 Vertical defelction limits 0.8 240 1.1
are satisifed
600 end 288.15 0.16 3 25 1473 0.82 0.20 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 10 125
300 Start 1326.67 0.74 3 25 1473 0.82 0.90 SAFE 0.00 0.000 3 16 603 0.34 0.00 SAFE 2 8d 195 2 10 125
8000

26 FB5 182 x mid 288.15 0.16 3 25 1473 0.82 0.20 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 10 125
600 end 1183.00 0.66 3 25 1473 0.82 0.80 SAFE 0.00 0.000 3 16 603 0.34 0.00 SAFE 2 8d 195 2 10 125
300 Start 944.26 0.52 3 25 2 25 2454 1.36 0.38 SAFE 0.00 0.000 3 16 603 0.34 0.00 SAFE 2 8d 195 2 10 125
8000

27 FB5 97 x mid 0.00 0.00 3 25 1473 0.82 0.00 SAFE 884.88 0.492 3 16 2 16 1005 0.56 0.88 SAFE 2 8d 195 2 10 125
600 end 286.62 0.16 3 25 1473 0.82 0.19 SAFE 285.60 0.159 3 16 603 0.34 0.47 SAFE 2 8d 195 2 10 125
300 Start 1819.74 1.01 3 25 2 25 2454 1.36 0.74 SAFE 260.06 0.144 3 16 603 0.34 0.43 SAFE 2 8d 195 2 10 125
3510

28 FB5 188 x mid 1057.42 0.59 3 25 1473 0.82 0.72 SAFE 0.00 0.000 3 16 603 0.34 0.00 SAFE 2 8d 195 2 10 125
600 end 288.15 0.16 3 25 1473 0.82 0.20 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 10 125
300 Start 1423.26 0.79 3 25 2 25 2454 1.36 0.58 SAFE 0.00 0.000 3 16 603 0.34 0.00 SAFE 2 8d 195 2 10 125
8000

29 FB5 179 x mid 288.15 0.16 3 25 1473 0.82 0.20 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 10 125
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI & KHAPERKHEDA TPS
DOCUMENT NO.
ES0154-75990800-CAL-5001 REV

DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

Grid Mark Top reinforcement Bottom reinforcement Deflection Check


Beam Length (mm)
Beam. Size
S.No Memb No. Location
Mark (B x D)
(STAAD) Stirrups Stirrups
Dia Dia Dia Dia Prov. Dia Dia Dia Dia Prov. Stirrups Reqd.Stirr Prov.
Ast req Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY spacing Stirrups spacing
From To % Ptreq (mm) (mm) (mm) (mm) CHECK Ast req (mm2) % Ptreq (mm) (mm) (mm) (mm) CHECK leg ups Dia Stirrups
(mm2) (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO reqd. leg (Prov.) prov.
(T.O) (T.O) (EX) (EX) (T.O) (T.O) (EX) (EX) (Reqd.) (mm) Dia (mm)
8000

29 FB5 179 (mm) (mm)


600 end 1684.14 0.94 3 25 2 25 2454 1.36 0.69 SAFE 126.78 0.070 3 16 603 0.34 0.21 SAFE 2 8d 195 2 10 125
300 Start 3139.15 1.74 3 25 4 25 3436 1.91 0.91 SAFE 1662.54 0.924 3 16 3 25 2076 1.15 0.80 SAFE 2 12d 195 2 10 125
4885

30 FB5 192 x mid 2024.55 1.12 3 25 2 25 2454 1.36 0.82 SAFE 486.63 0.270 3 16 603 0.34 0.81 SAFE 2 12d 95 2 10 125
600 end 325.63 0.18 3 25 1473 0.82 0.22 SAFE 325.63 0.181 3 16 603 0.34 0.54 SAFE 2 12d 195 2 10 125
300 Start 1818.77 1.01 3 25 2 25 2454 1.36 0.74 SAFE 264.88 0.147 3 16 603 0.34 0.44 SAFE 2 8d 195 2 10 125
3510

31 FB5 189 x mid 1088.07 0.60 3 25 1473 0.82 0.74 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 170 2 10 125
600 end 288.15 0.16 3 25 1473 0.82 0.20 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 10 125
300 Start 1393.06 0.77 3 25 2 25 2454 1.36 0.57 SAFE 0.00 0.000 3 16 603 0.34 0.00 SAFE 2 8d 195 2 10 125
8000

32 FB5 173 x mid 288.15 0.16 3 25 1473 0.82 0.20 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 10 125
600 end 1642.25 0.91 3 25 2 25 2454 1.36 0.67 SAFE 83.81 0.047 3 16 2 16 1005 0.56 0.08 SAFE 2 8d 195 2 10 125
300 Start 2418.73 1.34 3 25 2 25 2454 1.36 0.99 SAFE 865.83 0.481 3 16 2 16 1005 0.56 0.86 SAFE 2 12d 195 2 10 125
4885

33 FB5 198 x mid 1531.64 0.85 3 25 2 25 2454 1.36 0.62 SAFE 519.59 0.289 3 16 603 0.34 0.86 SAFE 2 12d 180 2 10 125
600 end 409.35 0.23 3 25 1473 0.82 0.28 SAFE 404.13 0.225 3 16 603 0.34 0.67 SAFE 2 12d 195 2 10 125
300 Start 1546.73 0.86 3 25 2 25 2454 1.36 0.63 SAFE 0.00 0.000 3 16 603 0.34 0.00 SAFE 2 10d 195 2 10 125
3510

34 FB5 1050 x mid 961.30 0.53 3 25 1473 0.82 0.65 SAFE 334.75 0.186 3 16 603 0.34 0.55 SAFE 2 10d 180 2 10 125
600 end 287.64 0.16 3 25 1473 0.82 0.20 SAFE 287.64 0.160 3 16 2 12 829 0.46 0.35 SAFE 2 10d 195 2 10 125
300 Start 1101.34 0.61 3 25 2 25 2454 1.36 0.45 SAFE 0.00 0.000 3 16 2 12 829 0.46 0.00 SAFE 2 8d 195 2 10 125
8000

35 FB5 176 x mid 288.15 0.16 3 25 1473 0.82 0.20 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 10 125
600 end 1221.93 0.68 3 25 2 25 2454 1.36 0.50 SAFE 0.00 0.000 3 16 603 0.34 0.00 SAFE 2 8d 195 2 10 125
300 Start 1939.59 1.08 3 25 2 25 2454 1.36 0.79 SAFE 371.00 0.206 3 16 603 0.34 0.62 SAFE 2 12d 195 2 10 125
4885

36 FB5 102 x mid 1199.15 0.67 3 25 1473 0.82 0.81 SAFE 591.68 0.329 3 16 603 0.34 0.98 SAFE 2 12d 65 2 10 125
600 end 545.60 0.30 3 25 1473 0.82 0.37 SAFE 538.38 0.299 3 16 603 0.34 0.89 SAFE 2 12d 195 2 10 125 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 525.95 0.39 3 25 1473 1.09 0.36 SAFE 823.42 0.610 3 20 942 0.70 0.87 SAFE 2 8d 160 2 8 150 450.00 341.880 0.69 210 1.1
1185

37 FB8 1390 x mid 1476.75 1.09 3 25 2 16 1875 1.39 0.79 SAFE 810.43 0.600 3 20 942 0.70 0.86 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.9 270 0.9
are satisifed
450 end 1838.39 1.36 3 25 2 16 1875 1.39 0.98 SAFE 804.92 0.596 3 20 942 0.70 0.85 SAFE 2 8d 160 2 8 150
300 Start 460.51 0.34 3 25 1473 1.09 0.31 SAFE 429.11 0.318 3 20 942 0.70 0.46 SAFE 2 8d 160 2 8 150
2665

38 FB8 1392 x mid 211.65 0.16 3 25 1473 1.09 0.14 SAFE 653.87 0.484 3 20 942 0.70 0.69 SAFE 2 8d 160 2 8 150
450 end 488.08 0.36 3 25 1473 1.09 0.33 SAFE 867.81 0.643 3 20 2 12 1169 0.87 0.74 SAFE 2 8d 160 2 8 150
300 Start 2025.68 1.50 3 25 3 25 2945 2.18 0.69 SAFE 939.81 0.696 3 20 2 12 1169 0.87 0.80 SAFE 2 8d 160 2 8 150
1150

39 FB8 1270 x mid 1640.70 1.22 3 25 3 25 2945 2.18 0.56 SAFE 526.40 0.390 3 20 942 0.70 0.56 SAFE 2 8d 160 2 8 150
450 end 500.85 0.37 3 25 1473 1.09 0.34 SAFE 383.20 0.284 3 20 942 0.70 0.41 SAFE 2 8d 160 2 8 150
300 Start 2690.82 1.20 3 25 3 25 2945 1.31 0.91 SAFE 749.10 0.333 3 20 942 0.42 0.79 SAFE 2 10d 235 2 10 125
2245

40 FB8 18 x mid 2000.75 0.89 3 25 3 25 2945 1.31 0.68 SAFE 839.44 0.373 3 20 942 0.42 0.89 SAFE 2 10d 125 2 10 125
750 end 363.12 0.16 3 25 1473 0.65 0.25 SAFE 1134.74 0.504 3 20 2 25 1924 0.86 0.59 SAFE 2 10d 235 2 10 125
300 Start 364.65 0.16 3 25 1473 0.65 0.25 SAFE 1145.24 0.509 3 20 2 25 1924 0.86 0.60 SAFE 2 8d 235 2 10 125
2245

41 FB8 166 x mid 0.00 0.00 3 25 1473 0.65 0.00 SAFE 1568.47 0.697 3 20 2 25 1924 0.86 0.82 SAFE 2 8d 235 2 10 125
750 end 0.00 0.00 3 25 1473 0.65 0.00 SAFE 1644.75 0.731 3 20 2 25 1924 0.86 0.85 SAFE 2 8d 235 2 10 125
300 Start 0.00 0.00 3 25 1473 0.65 0.00 SAFE 1637.64 0.728 3 20 2 25 1924 0.86 0.85 SAFE 2 8d 235 2 10 125
3510

42 FB8 163 x mid 1111.02 0.49 3 25 1473 0.65 0.75 SAFE 927.61 0.412 3 20 942 0.42 0.98 SAFE 2 8d 165 2 10 125
750 end 2233.67 0.99 3 25 3 25 2945 1.31 0.76 SAFE 363.12 0.161 3 20 942 0.42 0.39 SAFE 2 8d 235 2 10 125
300 Start 1850.72 0.82 3 25 3 25 2945 1.31 0.63 SAFE 364.65 0.162 3 20 942 0.42 0.39 SAFE 2 8d 235 2 10 125
8000

43 FB8 19 x mid 422.48 0.19 3 25 1473 0.65 0.29 SAFE 364.65 0.162 3 20 942 0.42 0.39 SAFE 2 8d 235 2 10 125
750 end 1837.97 0.82 3 25 3 25 2945 1.31 0.62 SAFE 364.65 0.162 3 20 942 0.42 0.39 SAFE 2 8d 235 2 10 125
300 Start 2546.30 1.13 3 25 3 25 2945 1.31 0.86 SAFE 593.36 0.264 3 20 942 0.42 0.63 SAFE 2 10d 235 2 10 125
4885

44 FB8 20 x mid 934.72 0.42 3 25 1473 0.65 0.63 SAFE 1877.46 0.834 3 20 4 25 2906 1.29 0.65 SAFE 2 10d 180 2 10 125
750 end 671.07 0.30 3 25 1473 0.65 0.46 SAFE 2614.26 1.162 3 20 4 25 2906 1.29 0.90 SAFE 2 10d 235 2 10 125
300 Start 224.53 0.10 3 25 1473 0.65 0.15 SAFE 2196.76 0.976 3 20 4 25 2906 1.29 0.76 SAFE 2 8d 235 2 10 125
365

45 FB8 169 x mid 189.41 0.08 3 25 1473 0.65 0.13 SAFE 2162.44 0.961 3 20 4 25 2906 1.29 0.74 SAFE 2 8d 235 2 10 125
750 end 73.20 0.03 3 25 1473 0.65 0.05 SAFE 2048.85 0.911 3 20 4 25 2906 1.29 0.71 SAFE 2 8d 235 2 10 125
300 Start 95.62 0.04 3 25 1473 0.65 0.06 SAFE 2070.64 0.920 3 20 4 25 2906 1.29 0.71 SAFE 2 10d 235 2 10 125
2750

46 FB8 1339 x mid 1639.02 0.73 3 25 3 25 2945 1.31 0.56 SAFE 1403.80 0.624 3 20 4 25 2906 1.29 0.48 SAFE 2 10d 180 2 10 125
750 end 2659.36 1.18 3 25 3 25 2945 1.31 0.90 SAFE 717.29 0.319 3 20 4 25 2906 1.29 0.25 SAFE 2 10d 235 2 10 125 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 288.15 0.16 3 25 2 25 2454 1.36 0.12 SAFE 286.62 0.159 3 20 942 0.52 0.30 SAFE 2 8d 195 2 8 150 600.00 252.404 0.97 290 0.8
5250

47 FB13 1 x mid 646.68 0.36 3 25 1473 0.82 0.44 SAFE 2177.91 1.210 3 20 3 25 2415 1.34 0.90 SAFE 2 8d 195 2 8 150 Vertical defelction limits 0.99 290 0.95
are satisifed
600 end 784.70 0.44 3 25 1473 0.82 0.53 SAFE 2305.58 1.281 3 20 3 25 2415 1.34 0.95 SAFE 2 8d 195 2 8 150
300 Start 910.44 0.51 3 25 1473 0.82 0.62 SAFE 2393.61 1.330 3 20 3 25 2415 1.34 0.99 SAFE 2 8d 195 2 8 150
2750

48 FB13 313 x mid 416.23 0.23 3 25 2 25 2454 1.36 0.17 SAFE 1960.25 1.089 3 20 3 25 2415 1.34 0.81 SAFE 2 8d 195 2 8 150
600 end 288.15 0.16 3 25 2 25 2454 1.36 0.12 SAFE 286.62 0.159 3 20 942 0.52 0.30 SAFE 2 8d 195 2 8 150
300 Start 2321.71 1.29 3 25 2 25 2454 1.36 0.95 SAFE 798.88 0.444 3 20 942 0.52 0.85 SAFE 2 8d 195 2 8 150
5250

49 FB13 1318 x mid 927.46 0.52 3 25 1473 0.82 0.63 SAFE 851.79 0.473 3 20 942 0.52 0.90 SAFE 2 8d 195 2 8 150
600 end 0.00 0.00 3 25 1473 0.82 0.00 SAFE 1171.37 0.651 3 20 2 16 1345 0.75 0.87 SAFE 2 8d 195 2 8 150
300 Start 0.00 0.00 3 25 1473 0.82 0.00 SAFE 1140.57 0.634 3 20 2 16 1345 0.75 0.85 SAFE 2 8d 195 2 8 150
2750

50 FB13 1338 x mid 1623.22 0.90 3 25 2 25 2454 1.36 0.66 SAFE 964.55 0.536 3 20 2 16 1345 0.75 0.72 SAFE 2 8d 195 2 8 150
600 end 2385.39 1.33 3 25 2 25 2454 1.36 0.97 SAFE 864.43 0.480 3 20 942 0.52 0.92 SAFE 2 8d 195 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 869.63 0.39 3 25 1473 0.65 0.59 SAFE 550.25 0.245 3 20 942 0.42 0.58 SAFE 2 8d 235 2 8 150 750.00 156.197 0.89 260 0.9
3655

51 FB21 1298
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI & KHAPERKHEDA TPS
DOCUMENT NO.
ES0154-75990800-CAL-5001 REV

DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

Grid Mark Top reinforcement Bottom reinforcement Deflection Check


Beam Length (mm)
Beam. Size
S.No Memb No. Location
Mark (B x D)
(STAAD) Stirrups Stirrups
Dia Dia Dia Dia Prov. Dia Dia Dia Dia Prov. Stirrups Reqd.Stirr Prov.
Ast req Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY spacing Stirrups spacing
From To % Ptreq (mm) (mm) (mm) (mm) CHECK Ast req (mm2) % Ptreq (mm) (mm) (mm) (mm) CHECK leg ups Dia Stirrups
(mm2) (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO reqd. leg (Prov.) prov.
(T.O) (T.O) (EX) (EX) (T.O) (T.O) (EX) (EX) (Reqd.) (mm) Dia (mm)
(mm) (mm)
3655

51 FB21 1298 x mid 399.70 0.18 3 25 1473 0.65 0.27 SAFE 364.14 0.162 3 20 942 0.42 0.39 SAFE 2 8d 235 2 8 150 Vertical defelction limits 0.81 240 1.1
are satisifed
750 end 792.37 0.35 3 25 1473 0.65 0.54 SAFE 411.92 0.183 3 20 942 0.42 0.44 SAFE 2 8d 235 2 8 150
300 Start 1317.41 0.59 3 25 1473 0.65 0.89 SAFE 0.00 0.000 3 20 942 0.42 0.00 SAFE 2 8d 235 2 8 150
2625

52 FB21 1271 x mid 702.16 0.31 3 25 1473 0.65 0.48 SAFE 467.14 0.208 3 20 942 0.42 0.50 SAFE 2 8d 195 2 8 150
750 end 0.00 0.00 3 25 1473 0.65 0.00 SAFE 943.19 0.419 3 20 2 12 1169 0.52 0.81 SAFE 2 8d 235 2 8 150
300 Start 0.00 0.00 3 25 1473 0.65 0.00 SAFE 941.19 0.418 3 20 2 12 1169 0.52 0.81 SAFE 2 8d 235 2 8 150
3500

53 FB21 1314 x mid 363.12 0.16 3 25 1473 0.65 0.25 SAFE 843.45 0.375 3 20 942 0.42 0.89 SAFE 2 8d 235 2 8 150
750 end 580.25 0.26 3 25 1473 0.65 0.39 SAFE 362.10 0.161 3 20 942 0.42 0.38 SAFE 2 8d 235 2 8 150
300 Start 578.42 0.26 3 25 1473 0.65 0.39 SAFE 364.65 0.162 3 20 942 0.42 0.39 SAFE 2 8d 235 2 8 150
875

54 FB21 1312 x mid 1040.06 0.46 3 25 1473 0.65 0.71 SAFE 364.65 0.162 3 20 942 0.42 0.39 SAFE 2 8d 235 2 8 150
750 end 1223.11 0.54 3 25 1473 0.65 0.83 SAFE 364.65 0.162 3 20 942 0.42 0.39 SAFE 2 8d 235 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 1938.27 0.72 3 20 3 25 2415 0.89 0.80 SAFE 440.64 0.163 3 20 942 0.35 0.47 SAFE 2 10d 175 2 12 150 900.00 149.573 0.82 240 0.9
1050

55 FB14 6 x mid 1600.54 0.59 3 20 3 25 2415 0.89 0.66 SAFE 440.64 0.163 3 20 942 0.35 0.47 SAFE 2 10d 175 2 12 150 Vertical defelction limits 0.61 180 1.3
are satisifed
900 end 754.03 0.28 3 20 942 0.35 0.80 SAFE 440.64 0.163 3 20 942 0.35 0.47 SAFE 2 10d 190 2 12 150
300 Start 755.16 0.28 3 20 942 0.35 0.80 SAFE 440.64 0.163 3 20 942 0.35 0.47 SAFE 2 8d 245 2 12 150
2700

56 FB14 24 x mid 441.15 0.16 3 20 942 0.35 0.47 SAFE 1070.36 0.396 3 20 3 25 2415 0.89 0.44 SAFE 2 8d 245 2 12 150
900 end 0.00 0.00 3 20 942 0.35 0.00 SAFE 1483.15 0.549 3 20 3 25 2415 0.89 0.61 SAFE 2 8d 245 2 12 150
300 Start 0.00 0.00 3 20 942 0.35 0.00 SAFE 1481.56 0.549 3 20 3 25 2415 0.89 0.61 SAFE 2 8d 245 2 12 150
595

57 FB14 29 x mid 0.00 0.00 3 20 942 0.35 0.00 SAFE 1473.04 0.546 3 20 3 25 2415 0.89 0.61 SAFE 2 8d 245 2 12 150
900 end 0.00 0.00 3 20 942 0.35 0.00 SAFE 1429.92 0.530 3 20 3 25 2415 0.89 0.59 SAFE 2 8d 245 2 12 150
300 Start 0.00 0.00 3 20 942 0.35 0.00 SAFE 1436.06 0.532 3 20 3 25 2415 0.89 0.59 SAFE 2 8d 245 2 12 150
955

58 FB14 1344 x mid 0.00 0.00 3 20 942 0.35 0.00 SAFE 1332.40 0.493 3 20 3 25 2415 0.89 0.55 SAFE 2 8d 245 2 12 150
900 end 0.00 0.00 3 20 942 0.35 0.00 SAFE 991.76 0.367 3 20 3 25 2415 0.89 0.41 SAFE 2 8d 245 2 12 150
300 Start 0.00 0.00 3 20 942 0.35 0.00 SAFE 985.11 0.365 3 20 3 25 2415 0.89 0.41 SAFE 2 10d 220 2 12 150
1400

59 FB14 41 x mid 441.15 0.16 3 20 942 0.35 0.47 SAFE 683.24 0.253 3 20 942 0.35 0.72 SAFE 2 10d 170 2 12 150
900 end 505.11 0.19 3 20 942 0.35 0.54 SAFE 439.62 0.163 3 20 942 0.35 0.47 SAFE 2 10d 235 2 12 150
300 Start 510.55 0.19 3 20 942 0.35 0.54 SAFE 440.64 0.163 3 20 942 0.35 0.47 SAFE 2 12d 160 2 12 150
1300

60 FB14 34 x mid 1720.83 0.64 3 20 4 25 2906 1.08 0.59 SAFE 440.64 0.163 3 20 942 0.35 0.47 SAFE 2 12d 165 2 12 150
900 end 2382.34 0.88 3 20 4 25 2906 1.08 0.82 SAFE 0.00 0.000 3 20 942 0.35 0.00 SAFE 2 12d 240 2 12 150
300 Start 1998.31 0.74 3 20 4 25 2906 1.08 0.69 SAFE 441.15 0.163 3 20 942 0.35 0.47 SAFE 2 8d 245 2 12 150
2625

61 FB14 10 x mid 1128.82 0.42 3 20 4 25 2906 1.08 0.39 SAFE 441.15 0.163 3 20 942 0.35 0.47 SAFE 2 8d 165 2 12 150
900 end 0.00 0.00 3 20 942 0.35 0.00 SAFE 733.64 0.272 3 20 942 0.35 0.78 SAFE 2 8d 245 2 12 150
300 Start 0.00 0.00 3 20 942 0.35 0.00 SAFE 731.45 0.271 3 20 942 0.35 0.78 SAFE 2 8d 245 2 12 150
3500

62 FB14 1313 x mid 441.15 0.16 3 20 942 0.35 0.47 SAFE 782.81 0.290 3 20 942 0.35 0.83 SAFE 2 8d 245 2 12 150
900 end 759.55 0.28 3 20 942 0.35 0.81 SAFE 581.07 0.215 3 20 942 0.35 0.62 SAFE 2 8d 245 2 12 150
300 Start 753.08 0.28 3 20 942 0.35 0.80 SAFE 582.55 0.216 3 20 942 0.35 0.62 SAFE 2 8d 245 2 12 150
875

63 FB14 53 x mid 1238.08 0.46 3 20 3 20 1885 0.70 0.66 SAFE 574.99 0.213 3 20 942 0.35 0.61 SAFE 2 8d 240 2 12 150
900 end 1429.04 0.53 3 20 3 20 1885 0.70 0.76 SAFE 526.94 0.195 3 20 942 0.35 0.56 SAFE 2 8d 210 2 12 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 288.15 0.16 3 16 603 0.34 0.48 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 8 150 600.00 57.692 0.48 140 1.8
2700

64 FB22 303 x mid 0.00 0.00 3 16 603 0.34 0.00 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 8 150 Vertical defelction limits 0.48 140 1.8
are satisifed
600 end 288.15 0.16 3 16 603 0.34 0.48 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 8 150
300 Start 286.62 0.16 3 20 942 0.52 0.30 SAFE 285.60 0.159 3 20 942 0.52 0.30 SAFE 2 8d 195 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
7000

65 FB18 167 x mid 659.69 0.37 3 20 942 0.52 0.70 SAFE 2193.87 1.219 3 20 3 25 2415 1.34 0.91 SAFE 2 8d 195 2 8 150 600.00 299.145 0.7 210 1.2
600 end 286.62 0.16 3 20 942 0.52 0.30 SAFE 285.60 0.159 3 20 942 0.52 0.30 SAFE 2 8d 195 2 8 150 Vertical defelction limits 0.91 270 0.9
are satisifed
300 Start 288.15 0.16 3 16 603 0.34 0.48 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 8 150
1370

66 FB19 164 x mid 0.00 0.00 3 16 603 0.34 0.00 SAFE 594.30 0.330 3 16 3 20 1546 0.86 0.38 SAFE 2 8d 195 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
600 end 0.00 0.00 3 16 603 0.34 0.00 SAFE 747.72 0.415 3 16 3 20 1546 0.86 0.48 SAFE 2 8d 195 2 8 150 600.00 60.897 0.48 140 1.8
300 Start 0.00 0.00 3 16 603 0.34 0.00 SAFE 618.23 0.343 3 16 3 20 1546 0.86 0.40 SAFE 2 8d 195 2 8 150 Vertical defelction limits 0.75 220 1.2
1300

67 FB19 183 are satisifed


x mid 0.00 0.00 3 16 603 0.34 0.00 SAFE 1016.47 0.565 3 16 3 20 1546 0.86 0.66 SAFE 2 8d 195 2 8 150
600 end 0.00 0.00 3 16 603 0.34 0.00 SAFE 1087.27 0.604 3 16 3 20 1546 0.86 0.70 SAFE 2 8d 195 2 8 150
300 Start 0.00 0.00 3 16 603 0.34 0.00 SAFE 1032.95 0.574 3 16 3 20 1546 0.86 0.67 SAFE 2 8d 195 2 8 150
1900

73 FB19 184 x mid 0.00 0.00 3 16 603 0.34 0.00 SAFE 1165.33 0.647 3 16 3 20 1546 0.86 0.75 SAFE 2 8d 195 2 8 150
600 end 0.00 0.00 3 16 603 0.34 0.00 SAFE 999.10 0.555 3 16 3 20 1546 0.86 0.65 SAFE 2 8d 195 2 8 150
300 Start 0.00 0.00 3 16 603 0.34 0.00 SAFE 1135.53 0.631 3 16 3 20 1546 0.86 0.73 SAFE 2 8d 195 2 8 150
1300

74 FB19 96 x mid 0.00 0.00 3 16 603 0.34 0.00 SAFE 1039.24 0.577 3 16 3 20 1546 0.86 0.67 SAFE 2 8d 195 2 8 150
600 end 0.00 0.00 3 16 603 0.34 0.00 SAFE 569.75 0.317 3 16 3 20 1546 0.86 0.37 SAFE 2 8d 195 2 8 150
300 Start 0.00 0.00 3 16 603 0.34 0.00 SAFE 762.45 0.424 3 16 3 20 1546 0.86 0.49 SAFE 2 8d 195 2 8 150
1130

75 FB19 186 x mid 0.00 0.00 3 16 603 0.34 0.00 SAFE 589.01 0.327 3 16 3 20 1546 0.86 0.38 SAFE 2 8d 195 2 8 150
600 end 288.15 0.16 3 16 603 0.34 0.48 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 180 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 338.64 0.16 3 25 1473 0.70 0.23 SAFE 338.64 0.161 3 20 942 0.45 0.36 SAFE 2 10d 275 2 8 150 700.00 25.641 0.38 120 0.9
600

76 FB23 3 x mid 399.65 0.19 3 25 1473 0.70 0.27 SAFE 0.00 0.000 3 20 942 0.45 0.00 SAFE 2 10d 235 2 8 150 Vertical defelction limits 0.36 110 1.4
are satisifed
700 end 557.16 0.27 3 25 1473 0.70 0.38 SAFE 0.00 0.000 3 20 942 0.45 0.00 SAFE 2 10d 220 2 8 150
300 Start 246.33 0.18 3 16 603 0.45 0.41 SAFE 246.97 0.183 3 20 942 0.70 0.26 SAFE 2 8d 160 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
3000

77 FB24 318 x mid 0.00 0.00 3 16 603 0.45 0.00 SAFE 864.54 0.640 3 20 942 0.70 0.92 SAFE 2 8d 130 2 8 150 450.00 88.757 0.41 120 2
450 end 246.33 0.18 3 16 603 0.45 0.41 SAFE 246.97 0.183 3 20 942 0.70 0.26 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.92 270 1.3
are satisifed
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI & KHAPERKHEDA TPS
DOCUMENT NO.
ES0154-75990800-CAL-5001 REV

DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

Grid Mark Top reinforcement Bottom reinforcement Deflection Check


Beam Length (mm)
Beam. Size
S.No Memb No. Location
Mark (B x D)
(STAAD) Stirrups Stirrups
Dia Dia Dia Dia Prov. Dia Dia Dia Dia Prov. Stirrups Reqd.Stirr Prov.
Ast req Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY spacing Stirrups spacing
From To % Ptreq (mm) (mm) (mm) (mm) CHECK Ast req (mm2) % Ptreq (mm) (mm) (mm) (mm) CHECK leg ups Dia Stirrups
(mm2) (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO reqd. leg (Prov.) prov.
(T.O) (T.O) (EX) (EX) (T.O) (T.O) (EX) (EX) (Reqd.) (mm) Dia (mm)
(mm) (mm) Vertical defelction limits
are satisifed
450 Start 2495.18 0.55 4 20 4 25 3220 0.72 0.77 SAFE 735.93 0.164 4 20 1257 0.28 0.59 SAFE 2 12d 125 4 12 125
1050

78 FB15 7 x mid 1957.06 0.43 4 20 4 25 3220 0.72 0.61 SAFE 810.02 0.180 4 20 1257 0.28 0.64 SAFE 2 12d 85 4 12 125 Depth Prov. Depth req. Ratio fs Mod.fact.
1000 end 841.21 0.19 4 20 1257 0.28 0.67 SAFE 967.67 0.215 4 20 4 25 3220 0.72 0.30 SAFE 2 12d 120 4 12 125 1000.00 122.172 0.87 260 0.9
450 Start 840.06 0.19 4 20 1257 0.28 0.67 SAFE 940.80 0.209 4 20 4 25 3220 0.72 0.29 SAFE 2 10d 240 4 12 125 Vertical defelction limits 0.95 280 0.85
2700

79 FB15 25 are satisifed


x mid 738.23 0.16 4 20 1257 0.28 0.59 SAFE 2329.09 0.518 4 20 4 25 3220 0.72 0.72 SAFE 2 10d 285 4 12 125
1000 end 0.00 0.00 4 20 1257 0.28 0.00 SAFE 3071.48 0.683 4 20 4 25 3220 0.72 0.95 SAFE 2 10d 240 4 12 125
450 Start 0.00 0.00 4 20 1257 0.28 0.00 SAFE 3056.47 0.679 4 20 4 25 3220 0.72 0.95 SAFE 2 8d 240 4 12 125
1550

80 FB15 30 x mid 0.00 0.00 4 20 1257 0.28 0.00 SAFE 2789.04 0.620 4 20 4 25 3220 0.72 0.87 SAFE 2 8d 240 4 12 125
1000 end 0.00 0.00 4 20 1257 0.28 0.00 SAFE 2038.10 0.453 4 20 4 25 3220 0.72 0.63 SAFE 2 8d 240 4 12 125
450 Start 0.00 0.00 4 20 1257 0.28 0.00 SAFE 2108.43 0.469 4 20 4 25 3220 0.72 0.65 SAFE 2 12d 175 4 12 125
1400

81 FB15 42 x mid 737.46 0.16 4 20 1257 0.28 0.59 SAFE 1478.01 0.328 4 20 4 25 3220 0.72 0.46 SAFE 2 12d 70 4 12 125
1000 end 780.51 0.17 4 20 1257 0.28 0.62 SAFE 737.46 0.164 4 20 1257 0.28 0.59 SAFE 2 12d 105 4 12 125
450 Start 984.45 0.22 4 20 1257 0.28 0.78 SAFE 738.23 0.164 4 20 1257 0.28 0.59 SAFE 2 12d 95 4 12 125
1300

82 FB15 35 x mid 3450.54 0.77 4 20 8 25 5184 1.15 0.67 SAFE 738.23 0.164 4 20 1257 0.28 0.59 SAFE 2 12d 45 4 12 125
1000 end 4485.68 1.00 4 20 8 25 5184 1.15 0.87 SAFE 487.49 0.108 4 20 1257 0.28 0.39 SAFE 2 12d 105 4 12 125
450 Start 4489.56 1.00 4 20 8 25 5184 1.15 0.87 SAFE 491.54 0.109 4 20 1257 0.28 0.39 SAFE 2 12d 65 4 12 125
1370

83 FB15 11 x mid 3649.01 0.81 4 20 8 25 5184 1.15 0.70 SAFE 737.46 0.164 4 20 1257 0.28 0.59 SAFE 2 12d 90 4 12 125
1000 end 1385.14 0.31 4 20 8 25 5184 1.15 0.27 SAFE 1421.16 0.316 4 20 4 25 3220 0.72 0.44 SAFE 2 12d 60 4 12 125
450 Start 820.76 0.18 4 20 1257 0.28 0.65 SAFE 735.93 0.164 4 20 4 25 3220 0.72 0.23 SAFE 2 12d 175 4 12 125
1300

84 FB15 1100 x mid 738.23 0.16 4 20 1257 0.28 0.59 SAFE 957.88 0.213 4 20 4 25 3220 0.72 0.30 SAFE 2 12d 180 4 12 125
1000 end 0.00 0.00 4 20 1257 0.28 0.00 SAFE 1355.22 0.301 4 20 4 25 3220 0.72 0.42 SAFE 2 12d 195 4 12 125
450 Start 0.00 0.00 4 20 1257 0.28 0.00 SAFE 1176.49 0.261 4 20 4 25 3220 0.72 0.37 SAFE 2 8d 240 4 12 125
1900

85 FB15 177 x mid 0.00 0.00 4 20 1257 0.28 0.00 SAFE 1582.78 0.352 4 20 4 25 3220 0.72 0.49 SAFE 2 8d 240 4 12 125
1000 end 738.23 0.16 4 20 1257 0.28 0.59 SAFE 1700.70 0.378 4 20 4 25 3220 0.72 0.53 SAFE 2 8d 240 4 12 125
450 Start 738.23 0.16 4 20 1257 0.28 0.59 SAFE 1862.88 0.414 4 20 4 25 3220 0.72 0.58 SAFE 2 12d 230 4 12 125
1300

86 FB15 171 x mid 738.23 0.16 4 20 1257 0.28 0.59 SAFE 1627.21 0.362 4 20 4 25 3220 0.72 0.51 SAFE 2 12d 135 4 12 125
1000 end 834.61 0.19 4 20 1257 0.28 0.66 SAFE 1432.79 0.318 4 20 4 25 3220 0.72 0.44 SAFE 2 12d 205 4 12 125
450 Start 1004.04 0.22 4 20 1257 0.28 0.80 SAFE 1482.61 0.329 4 20 4 25 3220 0.72 0.46 SAFE 2 12d 120 4 12 125
1130

87 FB15 174 x mid 1998.34 0.44 4 20 4 25 3220 0.72 0.62 SAFE 1350.16 0.300 4 20 4 25 3220 0.72 0.42 SAFE 2 12d 120 4 12 125
1000 end 2367.29 0.53 4 20 4 25 3220 0.72 0.74 SAFE 1057.77 0.235 4 20 1257 0.28 0.84 SAFE 2 12d 85 4 12 125 Depth Prov. Depth req. Ratio fs Mod.fact.
450 Start 2345.63 0.52 4 20 4 25 3220 0.72 0.73 SAFE 874.05 0.194 4 20 1257 0.28 0.70 SAFE 2 10d 80 4 12 125 1000.00 81.197 0.85 250 0.9
1050

88 FB16 8 x mid 2022.06 0.45 4 20 4 25 3220 0.72 0.63 SAFE 1034.36 0.230 4 20 1257 0.28 0.82 SAFE 2 10d 80 4 12 125 Vertical defelction limits 0.84 250 1.2
are satisifed
1000 end 1148.13 0.26 4 20 1257 0.28 0.91 SAFE 1158.98 0.258 4 20 4 25 3220 0.72 0.36 SAFE 2 10d 80 4 12 125
450 Start 1151.75 0.26 4 20 1257 0.28 0.92 SAFE 1151.16 0.256 4 20 4 25 3220 0.72 0.36 SAFE 2 12d 145 4 12 125
1200

89 FB16 26 x mid 898.54 0.20 4 20 1257 0.28 0.72 SAFE 1737.06 0.386 4 20 4 25 3220 0.72 0.54 SAFE 2 12d 105 4 12 125
1000 end 738.23 0.16 4 20 1257 0.28 0.59 SAFE 2085.12 0.463 4 20 4 25 3220 0.72 0.65 SAFE 2 12d 115 4 12 125
450 Start 0.00 0.00 4 20 1257 0.28 0.00 SAFE 1348.37 0.300 4 20 4 25 3220 0.72 0.42 SAFE 2 12d 165 4 12 125
1400

90 FB16 43 x mid 743.69 0.17 4 20 1257 0.28 0.59 SAFE 925.84 0.206 4 20 4 25 3220 0.72 0.29 SAFE 2 12d 65 4 12 125
1000 end 1180.88 0.26 4 20 1257 0.28 0.94 SAFE 737.46 0.164 4 20 4 25 3220 0.72 0.23 SAFE 2 12d 65 4 12 125
450 Start 1211.64 0.27 4 20 1257 0.28 0.96 SAFE 1183.63 0.263 4 20 3 25 2729 0.61 0.43 SAFE 2 12d 60 4 12 125
1300

91 FB16 1386 x mid 884.57 0.20 4 20 1257 0.28 0.70 SAFE 2296.76 0.510 4 20 3 25 2729 0.61 0.84 SAFE 2 12d 60 4 12 125
1000 end 0.00 0.00 4 20 1257 0.28 0.00 SAFE 2713.24 0.603 4 20 3 25 2729 0.61 0.99 SAFE 2 12d 90 4 12 125
450 Start 0.00 0.00 4 20 1257 0.28 0.00 SAFE 1576.60 0.350 4 20 4 20 2513 0.56 0.63 SAFE 2 8d 240 4 12 125
1900

92 FB16 178 x mid 0.00 0.00 4 20 1257 0.28 0.00 SAFE 1892.60 0.421 4 20 4 20 2513 0.56 0.75 SAFE 2 8d 240 4 12 125
1000 end 0.00 0.00 4 20 1257 0.28 0.00 SAFE 1978.13 0.440 4 20 4 20 2513 0.56 0.79 SAFE 2 8d 240 4 12 125
450 Start 737.46 0.16 4 20 1257 0.28 0.59 SAFE 2330.88 0.518 4 20 4 20 2513 0.56 0.93 SAFE 2 12d 195 4 12 125
1300

93 FB16 196 x mid 779.23 0.17 4 20 1257 0.28 0.62 SAFE 2020.83 0.449 4 20 4 20 2513 0.56 0.80 SAFE 2 12d 185 4 12 125
1000 end 998.42 0.22 4 20 1257 0.28 0.79 SAFE 1585.70 0.352 4 20 4 20 2513 0.56 0.63 SAFE 2 12d 180 4 12 125
450 Start 1234.64 0.27 4 20 1257 0.28 0.98 SAFE 1570.54 0.349 4 20 4 20 2513 0.56 0.62 SAFE 2 10d 45 4 12 125
1130

94 FB16 94 x mid 2327.59 0.52 4 20 4 25 3220 0.72 0.72 SAFE 1428.74 0.317 4 20 4 20 2513 0.56 0.57 SAFE 2 10d 45 4 12 125
1000 end 2745.40 0.61 4 20 4 25 3220 0.72 0.85 SAFE 1122.19 0.249 4 20 1257 0.28 0.89 SAFE 2 10d 45 4 12 125 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 1168.03 0.87 3 25 1473 1.09 0.79 SAFE 446.67 0.331 3 20 942 0.70 0.47 SAFE 2 8d 160 2 8 150 450.00 104.895 0.79 230 1.1
3000

95 FB23 1317 x mid 403.23 0.30 3 25 1473 1.09 0.27 SAFE 433.22 0.321 3 20 942 0.70 0.46 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.61 180 1.4
are satisifed
450 end 908.12 0.67 3 25 1473 1.09 0.62 SAFE 573.51 0.425 3 20 942 0.70 0.61 SAFE 2 8d 160 2 8 150
300 Start 211.65 0.16 3 16 603 0.45 0.35 SAFE 211.14 0.156 3 20 942 0.70 0.22 SAFE 2 8d 160 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
3000

96 FB24 1340 x mid 0.00 0.00 3 16 603 0.45 0.00 SAFE 647.08 0.479 3 20 942 0.70 0.69 SAFE 2 8d 160 2 8 150 450.00 96.154 0.35 110 2
Vertical defelction limits
450 end 211.65 0.16 3 16 603 0.45 0.35 SAFE 211.14 0.156 3 20 942 0.70 0.22 SAFE 2 8d 160 2 8 150 are satisifed 0.69 210 1.2
300 Start 2101.87 0.78 3 20 4 20 2199 0.81 0.96 SAFE 504.21 0.187 3 20 942 0.35 0.53 SAFE 2 12d 165 2 12 150 900.00 108.173 0.9 270 0.8
2250

97 FB17 9 x mid 1393.79 0.52 3 20 4 20 2199 0.81 0.63 SAFE 946.35 0.351 3 20 2 25 1924 0.71 0.49 SAFE 2 12d 240 2 12 150 Vertical defelction limits 0.95 280 0.8
are satisifed
900 end 438.60 0.16 3 20 942 0.35 0.47 SAFE 1249.41 0.463 3 20 2 25 1924 0.71 0.65 SAFE 2 12d 200 2 12 150
300 Start 440.64 0.16 3 20 942 0.35 0.47 SAFE 1248.70 0.462 3 20 2 25 1924 0.71 0.65 SAFE 2 8d 245 2 12 150
1500

98 FB17 158 x mid 440.64 0.16 3 20 942 0.35 0.47 SAFE 1707.01 0.632 3 20 2 25 1924 0.71 0.89 SAFE 2 8d 245 2 12 150
900 end 0.00 0.00 3 20 942 0.35 0.00 SAFE 1825.19 0.676 3 20 2 25 1924 0.71 0.95 SAFE 2 8d 245 2 12 150
300 Start 0.00 0.00 3 20 942 0.35 0.00 SAFE 1826.75 0.677 3 20 2 25 1924 0.71 0.95 SAFE 2 8d 245 2 12 150
970

99 FB17 93 x mid 0.00 0.00 3 20 942 0.35 0.00 SAFE 1728.71 0.640 3 20 2 25 1924 0.71 0.90 SAFE 2 8d 245 2 12 150
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI & KHAPERKHEDA TPS
DOCUMENT NO.
ES0154-75990800-CAL-5001 REV

DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

Grid Mark Top reinforcement Bottom reinforcement Deflection Check


Beam Length (mm)
Beam. Size
S.No Memb No. Location
Mark (B x D)
(STAAD) Stirrups Stirrups
Dia Dia Dia Dia Prov. Dia Dia Dia Dia Prov. Stirrups Reqd.Stirr Prov.
Ast req Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY spacing Stirrups spacing
From To % Ptreq (mm) (mm) (mm) (mm) CHECK Ast req (mm2) % Ptreq (mm) (mm) (mm) (mm) CHECK leg ups Dia Stirrups
(mm2) (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO reqd. leg (Prov.) prov.
(T.O) (T.O) (EX) (EX) (T.O) (T.O) (EX) (EX) (Reqd.) (mm) Dia (mm)
970

99 FB17 93 (mm) (mm)


900 end 0.00 0.00 3 20 942 0.35 0.00 SAFE 1386.86 0.514 3 20 2 25 1924 0.71 0.72 SAFE 2 8d 245 2 12 150
300 Start 0.00 0.00 3 20 942 0.35 0.00 SAFE 1391.19 0.515 3 20 2 25 1924 0.71 0.72 SAFE 2 12d 230 2 12 150
2130

100 FB17 44 x mid 592.45 0.22 3 20 942 0.35 0.63 SAFE 855.28 0.317 3 20 942 0.35 0.91 SAFE 2 12d 175 2 12 150
900 end 1083.92 0.40 3 20 2 20 1571 0.58 0.69 SAFE 439.62 0.163 3 20 942 0.35 0.47 SAFE 2 12d 240 2 12 150
300 Start 1072.56 0.40 3 20 2 20 1571 0.58 0.68 SAFE 440.64 0.163 3 20 942 0.35 0.47 SAFE 2 12d 110 2 12 150
1150

101 FB17 37 x mid 2207.78 0.82 3 20 4 25 2906 1.08 0.76 SAFE 440.64 0.163 3 20 942 0.35 0.47 SAFE 2 12d 245 2 12 150
900 end 2624.09 0.97 3 20 4 25 2906 1.08 0.90 SAFE 245.37 0.091 3 20 942 0.35 0.26 SAFE 2 12d 240 2 12 150
300 Start 1462.26 1.08 3 20 2 20 1571 1.16 0.93 SAFE 472.04 0.350 3 16 603 0.45 0.78 SAFE 2 8d 160 2 8 150 450.00 213.675 0.93 270 0.9
5000

102 FB12 1345 x mid 734.29 0.54 3 20 942 0.70 0.78 SAFE 515.32 0.382 3 16 603 0.45 0.85 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.85 250 1.1
are satisifed
450 end 211.65 0.16 3 20 942 0.70 0.22 SAFE 211.65 0.157 3 16 603 0.45 0.35 SAFE 2 8d 160 2 8 150
300 Start 571.75 0.32 3 16 603 0.34 0.95 SAFE 569.40 0.316 3 16 603 0.34 0.94 SAFE 2 12d 195 2 8 150
2250

103 FB25 1381 x mid 513.66 0.29 3 16 603 0.34 0.85 SAFE 647.95 0.360 3 16 2 12 829 0.46 0.78 SAFE 2 12d 160 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
600 end 571.75 0.32 3 16 603 0.34 0.95 SAFE 569.40 0.316 3 16 603 0.34 0.94 SAFE 2 12d 195 2 8 150 600.00 45.547 0.95 280 1.9
300 Start 252.81 0.19 3 16 603 0.45 0.42 SAFE 1396.24 1.034 3 20 2 20 1571 1.16 0.89 SAFE 2 8d 160 2 8 150 450.00 102.500 0.57 170 1.5
1185

104 FB26 1310 x mid 0.00 0.00 3 16 603 0.45 0.00 SAFE 1073.99 0.796 3 20 2 20 1571 1.16 0.68 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.93 270 1
are satisifed
450 end 211.65 0.16 3 16 603 0.45 0.35 SAFE 210.12 0.156 3 20 2 20 1571 1.16 0.13 SAFE 2 8d 160 2 8 150
300 Start 112.17 0.08 3 16 603 0.45 0.19 SAFE 1251.81 0.927 3 20 2 20 1571 1.16 0.80 SAFE 2 8d 160 2 8 150
2665

105 FB26 1307 x mid 344.44 0.26 3 16 603 0.45 0.57 SAFE 1467.37 1.087 3 20 2 20 1571 1.16 0.93 SAFE 2 8d 160 2 8 150
450 end 155.13 0.11 3 16 603 0.45 0.26 SAFE 1289.01 0.955 3 20 2 20 1571 1.16 0.82 SAFE 2 8d 160 2 8 150
300 Start 211.65 0.16 3 16 603 0.45 0.35 SAFE 210.12 0.156 3 20 2 20 1571 1.16 0.13 SAFE 2 8d 160 2 8 150
1150

106 FB26 1305 x mid 0.00 0.00 3 16 603 0.45 0.00 SAFE 1051.51 0.779 3 20 2 20 1571 1.16 0.67 SAFE 2 8d 160 2 8 150
450 end 232.71 0.17 3 16 603 0.45 0.39 SAFE 1376.92 1.020 3 20 2 20 1571 1.16 0.88 SAFE 2 8d 160 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 211.65 0.16 3 12 339 0.25 0.62 SAFE 210.12 0.156 3 16 603 0.45 0.35 SAFE 2 8d 160 2 10 150 450.00 168.269 0.62 180 1.5
3500

107 FB28 1311 x mid 0.00 0.00 3 12 339 0.25 0.00 SAFE 942.91 0.698 3 16 2 16 1005 0.74 0.94 SAFE 2 8d 160 2 10 150 Vertical defelction limits 0.98 290 0.8
are satisifed
450 end 0.00 0.00 3 12 339 0.25 0.00 SAFE 672.28 0.498 3 16 2 16 1005 0.74 0.67 SAFE 2 8d 160 2 10 150
300 Start 0.00 0.00 3 12 339 0.25 0.00 SAFE 680.41 0.504 3 16 2 16 1005 0.74 0.68 SAFE 2 8d 140 2 10 150
875

108 FB28 1394 x mid 211.65 0.16 3 12 339 0.25 0.62 SAFE 547.34 0.405 3 16 603 0.45 0.91 SAFE 2 8d 125 2 10 150
450 end 211.65 0.16 3 12 339 0.25 0.62 SAFE 211.65 0.157 3 16 603 0.45 0.35 SAFE 2 8d 110 2 10 150
300 Start 211.65 0.16 3 12 339 0.25 0.62 SAFE 211.14 0.156 3 16 603 0.45 0.35 SAFE 2 8d 160 2 10 150
3500

109 FB28 1308 x mid 0.00 0.00 3 12 339 0.25 0.00 SAFE 983.64 0.729 3 16 2 16 1005 0.74 0.98 SAFE 2 8d 155 2 10 150
450 end 0.00 0.00 3 12 339 0.25 0.00 SAFE 694.43 0.514 3 16 2 16 1005 0.74 0.69 SAFE 2 8d 160 2 10 150
300 Start 0.00 0.00 3 12 339 0.25 0.00 SAFE 700.94 0.519 3 16 2 16 1005 0.74 0.70 SAFE 2 10d 125 4 10 200
875

110 FB28 1393 x mid 211.65 0.16 3 12 339 0.25 0.62 SAFE 567.79 0.421 3 16 603 0.45 0.94 SAFE 2 10d 115 4 10 200
450 end 211.65 0.16 3 12 339 0.25 0.62 SAFE 211.65 0.157 3 16 603 0.45 0.35 SAFE 2 10d 160 4 10 200 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 211.65 0.16 3 12 339 0.25 0.62 SAFE 211.65 0.157 3 12 339 0.25 0.62 SAFE 2 8d 160 2 8 150 450.00 68.333 0.62 180 1.5
2665

111 FB27 1306 x mid 211.65 0.16 3 12 339 0.25 0.62 SAFE 211.65 0.157 3 12 339 0.25 0.62 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.62 180 1.5
are satisifed
450 end 211.65 0.16 3 12 339 0.25 0.62 SAFE 211.65 0.157 3 12 339 0.25 0.62 SAFE 2 8d 160 2 8 150
300 Start 338.64 0.16 3 25 1473 0.70 0.23 SAFE 338.64 0.161 3 20 942 0.45 0.36 SAFE 2 8d 245 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
600

112 FB23 1388 x mid 338.64 0.16 3 25 1473 0.70 0.23 SAFE 0.00 0.000 3 20 942 0.45 0.00 SAFE 2 8d 230 2 8 150 700.00 82.418 0.53 160 1.4
700 end 405.69 0.19 3 25 1473 0.70 0.28 SAFE 0.00 0.000 3 20 942 0.45 0.00 SAFE 2 8d 230 2 8 150 Vertical defelction limits 0.59 180 1.4
are satisifed
300 Start 746.69 0.55 3 25 1473 1.09 0.51 SAFE 384.63 0.285 3 20 942 0.70 0.41 SAFE 2 8d 160 2 8 150
3000

113 FB23 1389 x mid 363.85 0.27 3 25 1473 1.09 0.25 SAFE 316.84 0.235 3 20 942 0.70 0.34 SAFE 2 8d 160 2 8 150
450 end 782.10 0.58 3 25 1473 1.09 0.53 SAFE 552.87 0.410 3 20 942 0.70 0.59 SAFE 2 8d 160 2 8 150
300 Start 211.14 0.16 2 20 628 0.47 0.34 SAFE 209.10 0.155 3 20 942 0.70 0.22 SAFE 2 8d 160 2 8 150 450.00 151.667 0.66 200 1.5
5915

114 FB27 1413 x mid 414.20 0.31 2 20 628 0.47 0.66 SAFE 1558.15 1.154 3 20 2 20 1571 1.16 0.99 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.99 290 1.5
are satisifed
450 end 211.14 0.16 2 20 628 0.47 0.34 SAFE 209.10 0.155 3 20 942 0.70 0.22 SAFE 2 8d 160 2 8 150
300 Start 211.65 0.16 2 20 628 0.47 0.34 SAFE 211.14 0.156 3 20 942 0.70 0.22 SAFE 2 10d 130 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
970

115 FB23 1412 x mid 0.00 0.00 2 20 628 0.47 0.00 SAFE 985.10 0.730 3 20 2 20 1571 1.16 0.63 SAFE 2 10d 150 2 8 150 450.00 90.110 0.34 100 1.4
450 end 147.58 0.11 2 20 628 0.47 0.23 SAFE 1281.75 0.949 3 20 2 20 1571 1.16 0.82 SAFE 2 10d 110 2 8 150 Vertical defelction limits 0.82 240 1.4
are satisifed
300 Start 140.70 0.10 2 20 628 0.47 0.22 SAFE 1275.14 0.945 3 20 2 20 1571 1.16 0.81 SAFE 2 8d 160 2 8 150
3280

116 FB23 1414 x mid 57.47 0.04 2 20 628 0.47 0.09 SAFE 1199.26 0.888 3 20 2 20 1571 1.16 0.76 SAFE 2 8d 160 2 8 150
450 end 211.65 0.16 2 20 628 0.47 0.34 SAFE 211.14 0.156 3 20 942 0.70 0.22 SAFE 2 8d 160 2 8 150
300 Start 571.75 0.32 3 16 603 0.34 0.95 SAFE 569.40 0.316 3 20 942 0.52 0.60 SAFE 2 12d 195 2 8 150 600.00 57.692 0.95 280 1.5
2250

117 FB27 1381 x mid 513.66 0.29 3 16 603 0.34 0.85 SAFE 647.95 0.360 3 20 942 0.52 0.69 SAFE 2 12d 160 2 8 150 Vertical defelction limits 0.69 210 1.5
are satisifed
600 end 571.75 0.32 3 16 603 0.34 0.95 SAFE 569.40 0.316 3 20 942 0.52 0.60 SAFE 2 12d 195 2 8 150
300 Start 0.00 0.00 2 16 402 0.22 0.00 SAFE 1025.83 0.570 3 20 2 25 1924 1.07 0.53 SAFE 2 8d 195 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
6280

118 FB23 1380 x mid 222.52 0.12 2 16 402 0.22 0.55 SAFE 1777.48 0.987 3 20 2 25 1924 1.07 0.92 SAFE 2 8d 195 2 8 150 600.00 172.527 0.53 160 1.4
600 end 288.15 0.16 2 16 402 0.22 0.72 SAFE 286.62 0.159 3 20 942 0.52 0.30 SAFE 2 8d 195 2 8 150 Vertical defelction limits 0.92 270 1.4
are satisifed
300 Start 746.69 0.55 3 25 1473 1.09 0.51 SAFE 384.63 0.285 3 20 942 0.70 0.41 SAFE 2 8d 160 2 8 150
3000

119 FB23 1389 x mid 363.85 0.27 3 25 1473 1.09 0.25 SAFE 316.84 0.235 3 20 942 0.70 0.34 SAFE 2 8d 160 2 8 150
450 end 782.10 0.58 3 25 1473 1.09 0.53 SAFE 552.87 0.410 3 20 942 0.70 0.59 SAFE 2 8d 160 2 8 150
6.0 ROOF BEAM @ 8.0M (TOC) Depth Prov. Depth req. Ratio fs Mod.fact.
450 Start 520.06 0.19 4 16 2 16 1206 0.45 0.43 SAFE 431.46 0.160 4 16 804 0.30 0.54 SAFE 2 8d 235 2 8 150 600.00 127.797 0.68 200 1.2
3655

1 RB10 1299 x mid 432.23 0.16 4 16 804 0.30 0.54 SAFE 431.46 0.160 4 16 804 0.30 0.54 SAFE 2 8d 235 2 8 150 Vertical defelction limits 0.74 220 1.1
are satisifed
600 end 572.56 0.21 4 16 804 0.30 0.71 SAFE 431.46 0.160 4 16 804 0.30 0.54 SAFE 2 8d 235 2 8 150
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI & KHAPERKHEDA TPS
DOCUMENT NO.
ES0154-75990800-CAL-5001 REV

DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

Grid Mark Top reinforcement Bottom reinforcement Deflection Check


Beam.
Beam Length (mm) Size
S.No Memb No. Location
Mark (B x D)
(STAAD) Stirrups Stirrups
Dia Dia Dia Dia Prov. Dia Dia Dia Dia Prov. Stirrups Reqd.Stirr Prov.
Ast req Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY spacing Stirrups spacing
From To % Ptreq (mm) (mm) (mm) (mm) CHECK Ast req (mm2) % Ptreq (mm) (mm) (mm) (mm) CHECK leg ups Dia Stirrups
(mm2) (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO reqd. leg (Prov.) prov.
(T.O) (T.O) (EX) (EX) (T.O) (T.O) (EX) (EX) (Reqd.) (mm) Dia (mm)
(mm) (mm)
450 Start 823.08 0.30 4 16 2 16 1206 0.45 0.68 SAFE 0.00 0.000 4 16 804 0.30 0.00 SAFE 2 8d 235 2 8 150
3500

2 RB10 1280 x mid 432.23 0.16 4 16 804 0.30 0.54 SAFE 446.74 0.165 4 16 804 0.30 0.56 SAFE 2 8d 235 2 8 150
600 end 0.00 0.00 4 16 804 0.30 0.00 SAFE 593.18 0.220 4 16 804 0.30 0.74 SAFE 2 8d 235 2 8 150
450 Start 0.00 0.00 4 16 804 0.30 0.00 SAFE 593.97 0.220 4 16 804 0.30 0.74 SAFE 2 8d 235 2 8 150
3500

3 RB10 1281 x mid 432.23 0.16 4 16 804 0.30 0.54 SAFE 470.39 0.174 4 16 804 0.30 0.58 SAFE 2 8d 235 2 8 150
600 end 721.19 0.27 4 16 2 16 1206 0.45 0.60 SAFE 0.00 0.000 4 16 804 0.30 0.00 SAFE 2 8d 235 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 338.64 0.16 3 20 942 0.45 0.36 SAFE 338.64 0.161 3 16 603 0.29 0.56 SAFE 2 8d 300 2 8 150 700.00 15.385 0.29 90 1.5
600

4 RB8 111 x mid 339.15 0.16 3 20 942 0.45 0.36 SAFE 0.00 0.000 3 16 603 0.29 0.00 SAFE 2 8d 300 2 8 150 Vertical defelction limits 0.56 170 1.5
are satisifed
700 end 339.15 0.16 3 20 2 12 1169 0.56 0.29 SAFE 0.00 0.000 3 16 603 0.29 0.00 SAFE 2 8d 300 2 8 150
450 Start 1652.64 0.61 4 20 2 25 2238 0.83 0.74 SAFE 0.00 0.000 4 16 804 0.30 0.00 SAFE 2 8d 235 4 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
1750

5 RB11 115 x mid 1236.51 0.46 4 20 1257 0.47 0.98 SAFE 431.46 0.160 4 16 804 0.30 0.54 SAFE 2 8d 230 4 8 150 600.00 156.197 0.96 280 0.9
600 end 432.23 0.16 4 20 1257 0.47 0.34 SAFE 431.46 0.160 4 16 2 25 1786 0.66 0.24 SAFE 2 8d 235 4 8 150 Vertical defelction limits 0.98 290 0.9
are satisifed
450 Start 432.23 0.16 4 20 1257 0.47 0.34 SAFE 432.23 0.160 4 16 2 25 1786 0.66 0.24 SAFE 2 8d 235 4 8 150
2250

5 RB11 1395 x mid 432.23 0.16 4 20 1257 0.47 0.34 SAFE 892.68 0.331 4 16 2 25 1786 0.66 0.50 SAFE 2 8d 235 4 8 150
600 end 0.00 0.00 4 20 1257 0.47 0.00 SAFE 1175.54 0.435 4 16 2 25 1786 0.66 0.66 SAFE 2 8d 235 4 8 150
450 Start 0.00 0.00 4 20 1257 0.47 0.00 SAFE 1174.47 0.435 4 16 2 25 1786 0.66 0.66 SAFE 2 8d 235 4 8 150
345

6 RB11 202 x mid 0.00 0.00 4 20 1257 0.47 0.00 SAFE 1144.87 0.424 4 16 2 25 1786 0.66 0.64 SAFE 2 8d 235 4 8 150
600 end 0.00 0.00 4 20 1257 0.47 0.00 SAFE 1074.68 0.398 4 16 2 25 1786 0.66 0.60 SAFE 2 8d 235 4 8 150
450 Start 0.00 0.00 4 20 1257 0.47 0.00 SAFE 1082.05 0.401 4 16 2 25 1786 0.66 0.61 SAFE 2 8d 235 4 8 150
3655

7 RB11 1291 x mid 951.19 0.35 4 20 1257 0.47 0.76 SAFE 595.32 0.220 4 16 804 0.30 0.74 SAFE 2 8d 210 4 8 150
600 end 1861.85 0.69 4 20 2 25 2238 0.83 0.83 SAFE 0.00 0.000 4 16 804 0.30 0.00 SAFE 2 8d 235 4 8 150
450 Start 2150.47 0.80 4 20 2 25 2238 0.83 0.96 SAFE 0.00 0.000 4 16 804 0.30 0.00 SAFE 2 10d 235 4 8 150
3500

8 RB11 119 x mid 1059.56 0.39 4 20 1257 0.47 0.84 SAFE 973.16 0.360 4 16 2 25 1786 0.66 0.54 SAFE 2 10d 165 4 8 150
600 end 0.00 0.00 4 20 1257 0.47 0.00 SAFE 1753.21 0.649 4 16 2 25 1786 0.66 0.98 SAFE 2 10d 235 4 8 150
450 Start 0.00 0.00 4 20 1257 0.47 0.00 SAFE 1753.54 0.649 4 16 2 25 1786 0.66 0.98 SAFE 2 10d 235 4 8 150
3500

9 RB11 1277 x mid 742.23 0.27 4 20 1257 0.47 0.59 SAFE 1138.82 0.422 4 16 2 25 1786 0.66 0.64 SAFE 2 10d 125 4 8 150
600 end 1569.24 0.58 4 20 2 25 2238 0.83 0.70 SAFE 431.46 0.160 4 16 804 0.30 0.54 SAFE 2 10d 235 4 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 338.64 0.16 3 20 942 0.45 0.36 SAFE 338.64 0.161 3 16 603 0.29 0.56 SAFE 2 8d 240 2 8 150 700.00 23.077 0.37 110 1
600

10 RB9 112 x mid 338.64 0.16 3 20 942 0.45 0.36 SAFE 0.00 0.000 3 16 603 0.29 0.00 SAFE 2 8d 210 2 8 150 Vertical defelction limits 0.56 170 1.5
are satisifed
700 end 434.08 0.21 3 20 2 12 1169 0.56 0.37 SAFE 0.00 0.000 3 16 603 0.29 0.00 SAFE 2 8d 200 2 8 150
450 Start 2652.12 0.98 4 20 4 25 3220 1.19 0.82 SAFE 313.54 0.116 4 20 1257 0.47 0.25 SAFE 2 12d 235 4 10 200 Depth Prov. Depth req. Ratio fs Mod.fact.
4000

11 RB12 116 x mid 1265.92 0.47 4 20 4 25 3220 1.19 0.39 SAFE 1493.17 0.553 4 20 4 25 3220 1.19 0.46 SAFE 2 12d 180 4 10 200 600.00 161.943 0.9 270 0.95
600 end 358.44 0.13 4 20 1257 0.47 0.29 SAFE 2695.78 0.998 4 20 4 25 3220 1.19 0.84 SAFE 2 12d 235 4 10 200 Vertical defelction limits 0.89 260 0.95
are satisifed
450 Start 500.53 0.19 4 20 1257 0.47 0.40 SAFE 2851.24 1.056 4 20 4 25 3220 1.19 0.89 SAFE 2 12d 235 4 10 200
4000

12 RB12 203 x mid 1475.97 0.55 4 20 4 25 3220 1.19 0.46 SAFE 1557.14 0.577 4 20 4 25 3220 1.19 0.48 SAFE 2 12d 140 4 10 200
600 end 2896.36 1.07 4 20 4 25 3220 1.19 0.90 SAFE 547.17 0.203 4 20 1257 0.47 0.44 SAFE 2 12d 235 4 10 200
450 Start 2582.21 0.96 4 20 4 25 3220 1.19 0.80 SAFE 233.92 0.087 4 20 1257 0.47 0.19 SAFE 2 10d 235 4 10 200
3500

13 RB12 89 x mid 1341.61 0.50 4 20 4 25 3220 1.19 0.42 SAFE 1139.90 0.422 4 20 1257 0.47 0.91 SAFE 2 10d 165 4 10 200
600 end 55.37 0.02 4 20 1257 0.47 0.04 SAFE 2417.32 0.895 4 20 4 25 3220 1.19 0.75 SAFE 2 10d 235 4 10 200
450 Start 45.56 0.02 4 20 1257 0.47 0.04 SAFE 2383.60 0.883 4 20 4 25 3220 1.19 0.74 SAFE 2 10d 235 4 10 200
3500

14 RB12 212 x mid 798.95 0.30 4 20 1257 0.47 0.64 SAFE 1311.52 0.486 4 20 4 25 3220 1.19 0.41 SAFE 2 10d 205 4 10 200
600 end 1724.00 0.64 4 20 4 25 3220 1.19 0.54 SAFE 431.46 0.160 4 20 1257 0.47 0.34 SAFE 2 10d 235 4 10 200
450 Start 2409.37 0.89 4 20 4 25 3220 1.19 0.75 SAFE 47.45 0.018 4 25 1963 0.73 0.02 SAFE 2 12d 235 4 10 200 Depth Prov. Depth req. Ratio fs Mod.fact.
4000

15 RB13 117 x mid 1067.30 0.40 4 20 1257 0.47 0.85 SAFE 1723.44 0.638 4 25 1963 0.73 0.88 SAFE 2 12d 225 4 10 200 600.00 192.308 0.94 280 0.85
600 end 486.41 0.18 4 20 1257 0.47 0.39 SAFE 2840.09 1.052 4 25 2 25 2945 1.09 0.96 SAFE 2 12d 235 4 10 200 Vertical defelction limits 0.98 290 0.8
are satisifed
450 Start 535.81 0.20 4 20 1257 0.47 0.43 SAFE 2888.13 1.070 4 25 2 25 2945 1.09 0.98 SAFE 2 12d 235 4 10 200
4000

16 RB13 204 x mid 1566.74 0.58 4 20 4 25 3220 1.19 0.49 SAFE 1549.27 0.574 4 25 1963 0.73 0.79 SAFE 2 12d 205 4 10 200
600 end 3034.21 1.12 4 20 4 25 3220 1.19 0.94 SAFE 717.13 0.266 4 25 1963 0.73 0.37 SAFE 2 12d 235 4 10 200
450 Start 2806.92 1.04 4 20 4 25 3220 1.19 0.87 SAFE 475.29 0.176 4 25 1963 0.73 0.24 SAFE 2 12d 235 4 10 200
3500

17 RB13 121 x mid 1538.99 0.57 4 20 4 25 3220 1.19 0.48 SAFE 1109.72 0.411 4 25 1963 0.73 0.57 SAFE 2 12d 95 4 10 200
600 end 65.61 0.02 4 20 1257 0.47 0.05 SAFE 2430.82 0.900 4 25 2 20 2592 0.96 0.94 SAFE 2 12d 235 4 10 200
450 Start 57.73 0.02 4 20 1257 0.47 0.05 SAFE 2423.03 0.897 4 25 2 20 2592 0.96 0.93 SAFE 2 10d 235 4 10 200
3500

18 RB13 213 x mid 1095.70 0.41 4 20 1257 0.47 0.87 SAFE 1282.11 0.475 4 25 1963 0.73 0.65 SAFE 2 10d 110 4 10 200
600 end 2165.40 0.80 4 20 4 25 3220 1.19 0.67 SAFE 0.00 0.000 4 25 1963 0.73 0.00 SAFE 2 10d 235 4 10 200
450 Start 1287.70 0.48 3 20 2 16 1345 0.50 0.96 SAFE 432.23 0.160 3 20 942 0.35 0.46 SAFE 2 8d 235 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
4000

19 RB14 118 x mid 577.45 0.21 3 20 942 0.35 0.61 SAFE 761.62 0.282 3 20 942 0.35 0.81 SAFE 2 8d 235 2 8 150 600.00 180.995 0.87 260 0.85
600 end 0.00 0.00 3 20 942 0.35 0.00 SAFE 1068.87 0.396 3 20 2 16 1345 0.50 0.79 SAFE 2 8d 235 2 8 150 Vertical defelction limits 0.79 230 1.1
are satisifed
450 Start 0.00 0.00 3 20 942 0.35 0.00 SAFE 1068.39 0.396 3 20 2 16 1345 0.50 0.79 SAFE 2 8d 235 2 8 150
4000

20 RB14 99 x mid 814.79 0.30 3 20 942 0.35 0.86 SAFE 599.71 0.222 3 20 942 0.35 0.64 SAFE 2 8d 235 2 8 150
600 end 1677.63 0.62 3 20 2 25 1924 0.71 0.87 SAFE 0.00 0.000 3 20 942 0.35 0.00 SAFE 2 8d 235 2 8 150
450 Start 1444.83 0.54 3 20 2 25 1924 0.71 0.75 SAFE 0.00 0.000 3 20 942 0.35 0.00 SAFE 2 8d 235 2 8 150
3500

21 RB14 122 x mid 780.03 0.29 3 20 942 0.35 0.83 SAFE 469.01 0.174 3 20 942 0.35 0.50 SAFE 2 8d 235 2 8 150
600 end 0.00 0.00 3 20 942 0.35 0.00 SAFE 725.89 0.269 3 20 942 0.35 0.77 SAFE 2 8d 235 2 8 150
450 Start 0.00 0.00 3 20 942 0.35 0.00 SAFE 726.54 0.269 3 20 942 0.35 0.77 SAFE 2 8d 235 2 8 150
3500

22 RB14 214 x mid 615.25 0.23 3 20 942 0.35 0.65 SAFE 572.69 0.212 3 20 942 0.35 0.61 SAFE 2 8d 235 2 8 150
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI & KHAPERKHEDA TPS
DOCUMENT NO.
ES0154-75990800-CAL-5001 REV

DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

Grid Mark Top reinforcement Bottom reinforcement Deflection Check


Beam Length (mm)
Beam. Size
S.No Memb No. Location
Mark (B x D)
(STAAD) Stirrups Stirrups
Dia Dia Dia Dia Prov. Dia Dia Dia Dia Prov. Stirrups Reqd.Stirr Prov.
Ast req Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY spacing Stirrups spacing
From To % Ptreq (mm) (mm) (mm) (mm) CHECK Ast req (mm2) % Ptreq (mm) (mm) (mm) (mm) CHECK leg ups Dia Stirrups
(mm2) (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO reqd. leg (Prov.) prov.
(T.O) (T.O) (EX) (EX) (T.O) (T.O) (EX) (EX) (Reqd.) (mm) Dia (mm)
3500

22 RB14 214 (mm) (mm)


600 end 1178.85 0.44 3 20 2 16 1345 0.50 0.88 SAFE 432.23 0.160 3 20 942 0.35 0.46 SAFE 2 8d 235 2 8 150
300 Start 725.54 0.54 3 20 942 0.70 0.77 SAFE 254.70 0.189 3 16 603 0.45 0.42 SAFE 2 8d 160 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
3000

23 RB15 1322 x mid 306.16 0.23 3 20 942 0.70 0.32 SAFE 223.59 0.166 3 16 603 0.45 0.37 SAFE 2 8d 160 2 8 150 450.00 104.895 0.77 230 1.1
450 end 466.26 0.35 3 20 942 0.70 0.49 SAFE 383.36 0.284 3 16 603 0.45 0.64 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.64 190 1.2
are satisifed
300 Start 649.75 0.48 3 20 942 0.70 0.69 SAFE 228.40 0.169 3 16 603 0.45 0.38 SAFE 2 8d 160 2 8 150
3000

24 RB16 1319 x mid 220.43 0.16 3 20 942 0.70 0.23 SAFE 219.83 0.163 3 16 603 0.45 0.36 SAFE 2 8d 160 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
450 end 445.60 0.33 3 20 942 0.70 0.47 SAFE 269.99 0.200 3 16 603 0.45 0.45 SAFE 2 8d 160 2 8 150 450.00 96.154 0.69 210 1.2
300 Start 2326.61 1.55 3 25 2 25 2454 1.64 0.95 SAFE 1113.24 0.742 3 20 2 20 1571 1.05 0.71 SAFE 2 8d 170 2 8 150 Vertical defelction limits 0.45 140 1.8
5250

25 RB2 123 are satisifed


x mid 758.81 0.51 3 25 1473 0.98 0.52 SAFE 1238.76 0.826 3 20 2 20 1571 1.05 0.79 SAFE 2 8d 170 2 8 150
500 end 84.14 0.06 3 25 1473 0.98 0.06 SAFE 1362.50 0.908 3 20 2 20 1571 1.05 0.87 SAFE 2 8d 170 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 49.20 0.03 3 25 1473 0.98 0.03 SAFE 1328.73 0.886 3 20 2 20 1571 1.05 0.85 SAFE 2 8d 170 2 8 150 500.00 384.615 0.91 270 0.8
2750

26 RB2 315 x mid 1652.70 1.10 3 25 2 25 2454 1.64 0.67 SAFE 684.95 0.457 3 20 2 20 1571 1.05 0.44 SAFE 2 8d 130 2 8 150 Vertical defelction limits 0.96 280 0.9
are satisifed
500 end 2673.85 1.78 3 25 3 25 2945 1.96 0.91 SAFE 1501.70 1.001 3 20 2 20 1571 1.05 0.96 SAFE 2 8d 170 2 8 150
300 Start 1764.72 1.18 3 25 2 25 2454 1.64 0.72 SAFE 504.06 0.336 3 20 942 0.63 0.53 SAFE 2 8d 170 2 8 150
8000

27 RB2 113 x mid 279.12 0.19 3 25 1473 0.98 0.19 SAFE 496.59 0.331 3 20 942 0.63 0.53 SAFE 2 8d 170 2 8 150
500 end 1742.55 1.16 3 25 2 25 2454 1.64 0.71 SAFE 481.12 0.321 3 20 942 0.63 0.51 SAFE 2 8d 170 2 8 150
300 Start 1785.73 1.19 3 25 2 25 2454 1.64 0.73 SAFE 525.80 0.351 3 20 942 0.63 0.56 SAFE 2 8d 170 2 8 150
8000

28 RB2 114 x mid 237.15 0.16 3 25 1473 0.98 0.16 SAFE 657.59 0.438 3 20 942 0.63 0.70 SAFE 2 8d 170 2 8 150
500 end 1624.55 1.08 3 25 2 20 2101 1.40 0.77 SAFE 359.04 0.239 3 20 942 0.63 0.38 SAFE 2 8d 170 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 237.15 0.16 3 25 1473 0.98 0.16 SAFE 237.15 0.158 3 20 942 0.63 0.25 SAFE 2 8d 170 2 8 150 500.00 160.256 0.75 220 1.2
5000

29 RB19 1292 x mid 403.37 0.27 3 25 1473 0.98 0.27 SAFE 455.89 0.304 3 20 942 0.63 0.48 SAFE 2 8d 170 2 8 150 Vertical defelction limits 0.48 140 1.9
are satisifed
500 end 1103.97 0.74 3 25 1473 0.98 0.75 SAFE 237.15 0.158 3 20 942 0.63 0.25 SAFE 2 8d 170 2 8 150
300 Start 234.60 0.16 3 25 1473 0.98 0.16 SAFE 234.60 0.156 3 20 942 0.63 0.25 SAFE 2 8d 170 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
8000

30 RB3 207 x mid 129.11 0.09 3 25 1473 0.98 0.09 SAFE 1426.05 0.951 3 20 3 16 1546 1.03 0.92 SAFE 2 8d 170 2 8 150 500.00 361.991 0.88 260 0.9
500 end 2164.99 1.44 3 25 2 25 2454 1.64 0.88 SAFE 933.44 0.622 3 20 942 0.63 0.99 SAFE 2 8d 170 2 8 150 Vertical defelction limits 0.92 270 0.85
are satisifed
300 Start 1826.49 1.22 3 25 2 25 2454 1.64 0.74 SAFE 562.80 0.375 3 20 942 0.63 0.60 SAFE 2 8d 170 2 8 150
8000

31 RB3 208 x mid 236.64 0.16 3 25 1473 0.98 0.16 SAFE 632.30 0.422 3 20 942 0.63 0.67 SAFE 2 8d 170 2 8 150
500 end 1774.25 1.18 3 25 2 25 2454 1.64 0.72 SAFE 508.69 0.339 3 20 942 0.63 0.54 SAFE 2 8d 170 2 8 150
300 Start 2165.66 1.44 3 25 2 25 2454 1.64 0.88 SAFE 934.13 0.623 3 20 3 16 1546 1.03 0.60 SAFE 2 8d 170 2 8 150
8000

32 RB3 209 x mid 129.95 0.09 3 25 1473 0.98 0.09 SAFE 1426.86 0.951 3 20 3 16 1546 1.03 0.92 SAFE 2 8d 170 2 8 150
500 end 234.60 0.16 3 25 1473 0.98 0.16 SAFE 234.60 0.156 3 20 942 0.63 0.25 SAFE 2 8d 170 2 8 150
300 Start 1372.42 0.91 3 20 2 25 1924 1.28 0.71 SAFE 292.40 0.195 3 20 942 0.63 0.31 SAFE 2 8d 170 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
5000

33 RB4 1276 x mid 367.69 0.25 3 20 942 0.63 0.39 SAFE 880.78 0.587 3 20 942 0.63 0.93 SAFE 2 8d 170 2 8 150 500.00 307.692 0.78 230 1
500 end 1033.72 0.69 3 20 2 25 1924 1.28 0.54 SAFE 572.67 0.382 3 20 942 0.63 0.61 SAFE 2 8d 170 2 8 150 Vertical defelction limits 0.8 240 1
are satisifed
300 Start 1650.84 1.10 3 20 2 25 1924 1.28 0.86 SAFE 380.30 0.254 3 20 942 0.63 0.40 SAFE 2 8d 170 2 8 150
8000

34 RB4 124 x mid 237.15 0.16 3 20 942 0.63 0.25 SAFE 773.66 0.516 3 20 942 0.63 0.82 SAFE 2 8d 170 2 8 150
500 end 1822.31 1.21 3 20 3 25 2415 1.61 0.75 SAFE 557.66 0.372 3 20 942 0.63 0.59 SAFE 2 8d 170 2 8 150
300 Start 1820.81 1.21 3 20 3 25 2415 1.61 0.75 SAFE 560.19 0.373 3 20 942 0.63 0.59 SAFE 2 8d 170 2 8 150
8000

35 RB4 103 x mid 234.60 0.16 3 20 942 0.63 0.25 SAFE 935.93 0.624 3 20 2 12 1169 0.78 0.80 SAFE 2 8d 170 2 8 150
500 end 1852.77 1.24 3 20 3 25 2415 1.61 0.77 SAFE 593.49 0.396 3 20 942 0.63 0.63 SAFE 2 8d 170 2 8 150
300 Start 1881.91 1.25 3 20 3 25 2415 1.61 0.78 SAFE 622.03 0.415 3 20 942 0.63 0.66 SAFE 2 8d 170 2 8 150
8000

36 RB4 126 x mid 235.62 0.16 3 20 942 0.63 0.25 SAFE 788.66 0.526 3 20 942 0.63 0.84 SAFE 2 8d 170 2 8 150
500 end 1713.45 1.14 3 20 2 25 1924 1.28 0.89 SAFE 447.02 0.298 3 20 942 0.63 0.47 SAFE 2 8d 170 2 8 150
300 Start 829.91 0.55 3 20 942 0.63 0.88 SAFE 0.00 0.000 3 25 1473 0.98 0.00 SAFE 2 8d 170 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
5000

37 RB5 1278 x mid 237.15 0.16 3 20 942 0.63 0.25 SAFE 277.64 0.185 3 25 1473 0.98 0.19 SAFE 2 8d 170 2 8 150 500.00 361.991 0.88 260 0.85
500 end 237.15 0.16 3 20 2 16 1345 0.90 0.18 SAFE 236.64 0.158 3 25 1473 0.98 0.16 SAFE 2 8d 170 2 8 150 Vertical defelction limits 0.79 230 1
are satisifed
300 Start 1170.02 0.78 3 20 2 16 1345 0.90 0.87 SAFE 0.00 0.000 3 25 1473 0.98 0.00 SAFE 2 8d 170 2 8 150
8000

38 RB5 108 x mid 0.00 0.00 3 20 942 0.63 0.00 SAFE 712.85 0.475 3 25 1473 0.98 0.48 SAFE 2 8d 170 2 8 150
500 end 1752.96 1.17 3 20 3 25 2415 1.61 0.73 SAFE 491.89 0.328 3 25 1473 0.98 0.33 SAFE 2 8d 170 2 8 150
300 Start 1894.93 1.26 3 20 3 25 2415 1.61 0.78 SAFE 635.67 0.424 3 25 1473 0.98 0.43 SAFE 2 8d 170 2 8 150
8000

39 RB5 216 x mid 237.15 0.16 3 20 942 0.63 0.25 SAFE 1113.98 0.743 3 25 1473 0.98 0.76 SAFE 2 8d 170 2 8 150
500 end 2113.08 1.41 3 20 3 25 2415 1.61 0.87 SAFE 884.69 0.590 3 25 1473 0.98 0.60 SAFE 2 8d 170 2 8 150
300 Start 2131.01 1.42 3 20 3 25 2415 1.61 0.88 SAFE 897.17 0.598 3 25 1473 0.98 0.61 SAFE 2 8d 170 2 8 150
8000

40 RB5 217 x mid 0.00 0.00 3 20 942 0.63 0.00 SAFE 1160.09 0.773 3 25 1473 0.98 0.79 SAFE 2 8d 170 2 8 150
500 end 236.64 0.16 3 20 942 0.63 0.25 SAFE 236.64 0.158 3 25 1473 0.98 0.16 SAFE 2 8d 170 2 8 150
300 Start 1095.68 0.73 3 20 2 20 1571 1.05 0.70 SAFE 327.94 0.219 3 20 942 0.63 0.35 SAFE 2 8d 170 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
5000

41 RB6 1279 x mid 312.92 0.21 3 20 942 0.63 0.33 SAFE 403.75 0.269 3 20 942 0.63 0.43 SAFE 2 8d 170 2 8 150 500.00 361.991 0.92 270 0.85
500 end 947.58 0.63 3 20 2 20 1571 1.05 0.60 SAFE 500.41 0.334 3 20 942 0.63 0.53 SAFE 2 8d 170 2 8 150 Vertical defelction limits 0.87 260 0.85
are satisifed
300 Start 1296.92 0.86 3 20 2 20 1571 1.05 0.83 SAFE 15.96 0.011 3 20 942 0.63 0.02 SAFE 2 8d 170 2 8 150
8000

42 RB6 127 x mid 237.15 0.16 3 20 942 0.63 0.25 SAFE 457.59 0.305 3 20 942 0.63 0.49 SAFE 2 8d 170 2 8 150
500 end 1477.78 0.99 3 20 3 25 2415 1.61 0.61 SAFE 206.59 0.138 3 20 942 0.63 0.22 SAFE 2 8d 170 2 8 150
300 Start 1462.97 0.98 3 20 3 25 2415 1.61 0.61 SAFE 166.34 0.111 3 20 942 0.63 0.18 SAFE 2 8d 170 2 8 150
8000

43 RB6 128 x mid 237.15 0.16 3 20 942 0.63 0.25 SAFE 689.87 0.460 3 20 942 0.63 0.73 SAFE 2 8d 170 2 8 150
500 end 1431.13 0.95 3 20 3 25 2415 1.61 0.59 SAFE 133.43 0.089 3 20 942 0.63 0.14 SAFE 2 8d 170 2 8 150
300 Start 2139.36 1.43 3 20 3 25 2415 1.61 0.89 SAFE 905.86 0.604 3 20 2 20 1571 1.05 0.58 SAFE 2 8d 170 2 8 150
5250

44 RB6 129
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI & KHAPERKHEDA TPS
DOCUMENT NO.
ES0154-75990800-CAL-5001 REV

DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

Grid Mark Top reinforcement Bottom reinforcement Deflection Check


Beam Length (mm)
Beam. Size
S.No Memb No. Location
Mark (B x D)
(STAAD) Stirrups Stirrups
Dia Dia Dia Dia Prov. Dia Dia Dia Dia Prov. Stirrups Reqd.Stirr Prov.
Ast req Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY spacing Stirrups spacing
From To % Ptreq (mm) (mm) (mm) (mm) CHECK Ast req (mm2) % Ptreq (mm) (mm) (mm) (mm) CHECK leg ups Dia Stirrups
(mm2) (T.O) (T.O) (EX) (EX) (mm2) RATIO (T.O) (T.O) (EX) (EX) (mm2) RATIO reqd. leg (Prov.) prov.
(T.O) (T.O) (EX) (EX) Ptprov (T.O) (T.O) (EX) (EX) Ptprov (Reqd.) (mm) Dia (mm)
(mm) (mm)
5250

44 RB6 129 x mid 681.51 0.45 3 20 942 0.63 0.72 SAFE 1095.75 0.731 3 20 2 20 1571 1.05 0.70 SAFE 2 8d 170 2 8 150
500 end 13.52 0.01 3 20 942 0.63 0.01 SAFE 1294.32 0.863 3 20 2 20 1571 1.05 0.82 SAFE 2 8d 170 2 8 150
300 Start 81.03 0.05 3 20 942 0.63 0.09 SAFE 1359.27 0.906 3 20 2 20 1571 1.05 0.87 SAFE 2 8d 170 2 8 150
2750

45 RB6 1336 x mid 1339.86 0.89 3 20 3 25 2415 1.61 0.55 SAFE 705.53 0.470 3 20 2 20 1571 1.05 0.45 SAFE 2 8d 130 2 8 150
500 end 2221.46 1.48 3 20 3 25 2415 1.61 0.92 SAFE 995.26 0.664 3 20 2 20 1571 1.05 0.63 SAFE 2 8d 170 2 8 150
300 Start 1678.40 0.93 3 20 2 25 1924 1.07 0.87 SAFE 288.15 0.160 3 20 942 0.52 0.31 SAFE 2 8d 195 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
5250

46 RB7 1323 x mid 628.00 0.35 3 20 942 0.52 0.67 SAFE 642.86 0.357 3 20 942 0.52 0.68 SAFE 2 8d 195 2 8 150 600.00 237.557 0.89 260 0.85
600 end 0.00 0.00 3 20 942 0.52 0.00 SAFE 864.43 0.480 3 20 942 0.52 0.92 SAFE 2 8d 195 2 8 150 Vertical defelction limits 0.74 220 1.2
are satisifed
300 Start 0.00 0.00 3 20 942 0.52 0.00 SAFE 791.31 0.440 3 20 2 12 1169 0.65 0.68 SAFE 2 8d 195 2 8 150
2750

47 RB7 1335 x mid 997.53 0.55 3 20 2 25 1924 1.07 0.52 SAFE 592.14 0.329 3 20 942 0.52 0.63 SAFE 2 8d 195 2 8 150
600 end 1704.38 0.95 3 20 2 25 1924 1.07 0.89 SAFE 286.62 0.159 3 20 942 0.52 0.30 SAFE 2 8d 195 2 8 150
300 Start 287.64 0.16 3 20 2 25 1924 1.07 0.15 SAFE 285.60 0.159 3 20 942 0.52 0.30 SAFE 2 8d 195 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
5250

48 RB1 54 x mid 290.72 0.16 3 20 942 0.52 0.31 SAFE 1849.52 1.028 3 20 3 25 2415 1.34 0.77 SAFE 2 8d 195 2 8 150 600.00 237.557 0.27 80 0.85
600 end 509.85 0.28 3 20 942 0.52 0.54 SAFE 2049.44 1.139 3 20 3 25 2415 1.34 0.85 SAFE 2 8d 195 2 8 150 Vertical defelction limits 0.86 250 1.2
are satisifed
300 Start 527.22 0.29 3 20 942 0.52 0.56 SAFE 2066.66 1.148 3 20 3 25 2415 1.34 0.86 SAFE 2 8d 195 2 8 150
2750

49 RB1 314 x mid 104.43 0.06 3 20 2 25 1924 1.07 0.05 SAFE 1668.02 0.927 3 20 3 25 2415 1.34 0.69 SAFE 2 8d 195 2 8 150
600 end 288.15 0.16 3 20 2 25 1924 1.07 0.15 SAFE 285.60 0.159 3 20 942 0.52 0.30 SAFE 2 8d 195 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
300 Start 211.65 0.16 3 16 603 0.45 0.35 SAFE 211.65 0.157 3 16 603 0.45 0.35 SAFE 2 8d 160 2 8 150 450.00 135.747 0.35 110 0.85
3000

50 RB17 316 x mid 0.00 0.00 3 16 603 0.45 0.00 SAFE 695.49 0.515 3 16 2 12 829 0.61 0.84 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.84 250 1.2
are satisifed
450 end 211.65 0.16 3 16 603 0.45 0.35 SAFE 211.65 0.157 3 16 603 0.45 0.35 SAFE 2 8d 160 2 8 150
300 Start 211.65 0.16 3 16 603 0.45 0.35 SAFE 211.65 0.157 3 16 603 0.45 0.35 SAFE 2 8d 160 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
3000

51 RB18 1337 x mid 0.00 0.00 3 16 603 0.45 0.00 SAFE 764.25 0.566 3 16 2 12 829 0.61 0.92 SAFE 2 8d 160 2 8 150 450.00 135.747 0.35 110 2
450 end 211.65 0.16 3 16 603 0.45 0.35 SAFE 211.65 0.157 3 16 603 0.45 0.35 SAFE 2 8d 160 2 8 150 Vertical defelction limits 0.92 270 0.85
are satisifed

STAIRCASE LANDING BEAM


300 Start 0.00 0.00 3 25 1473 1.09 0.00 SAFE 0.00 0.000 3 25 1473 1.09 0.00 SAFE 2 8d 300 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
600

1 LB 227 x mid 211.65 0.16 3 25 1473 1.09 0.14 SAFE 0.00 0.000 3 25 1473 1.09 0.00 SAFE 2 8d 300 2 8 150 450.00 28.846 0.14 50 0.8
450 end 211.65 0.16 3 25 1473 1.09 0.14 SAFE 0.00 0.000 3 25 1473 1.09 0.00 SAFE 2 8d 300 2 8 150 Vertical defelction limits 0 0 1
are satisifed
300 Start 0.00 0.00 3 25 1473 1.09 0.00 SAFE 0.00 0.000 3 25 1473 1.09 0.00 SAFE 2 8d 300 2 8 150
600

2 LB 2 x mid 211.65 0.16 3 25 1473 1.09 0.14 SAFE 0.00 0.000 3 25 1473 1.09 0.00 SAFE 2 8d 300 2 8 150
450 end 211.65 0.16 3 25 1473 1.09 0.14 SAFE 0.00 0.000 3 25 1473 1.09 0.00 SAFE 2 8d 300 2 8 150

HEAD ROOM BEAM @ 11.0M (TOC)


300 Start 0.00 0.00 3 16 603 0.29 0.00 SAFE 338.64 0.161 3 12 339 0.16 1.00 SAFE 2 8d 300 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
600

1 HB2 1359 x mid 338.64 0.16 3 16 603 0.29 0.56 SAFE 0.00 0.000 3 12 339 0.16 0.00 SAFE 2 8d 300 2 8 150 700.00 96.154 0.61 180 1.3
700 end 339.15 0.16 3 16 603 0.29 0.56 SAFE 0.00 0.000 3 12 339 0.16 0.00 SAFE 2 8d 300 2 8 150 Vertical defelction limits 0.7 210 1.2
are satisifed
300 Start 338.64 0.16 3 16 603 0.29 0.56 SAFE 0.00 0.000 3 12 339 0.16 0.00 SAFE 2 8d 300 2 8 150
600

2 HB2 1360 x mid 338.64 0.16 3 16 603 0.29 0.56 SAFE 0.00 0.000 3 12 339 0.16 0.00 SAFE 2 8d 300 2 8 150
700 end 338.64 0.16 3 16 603 0.29 0.56 SAFE 0.00 0.000 3 12 339 0.16 0.00 SAFE 2 8d 300 2 8 150
300 Start 281.74 0.21 3 16 603 0.45 0.47 SAFE 211.65 0.157 3 12 339 0.25 0.62 SAFE 2 8d 160 2 8 150
3000

3 HB2 1365 x mid 211.65 0.16 3 16 603 0.45 0.35 SAFE 211.65 0.157 3 12 339 0.25 0.62 SAFE 2 8d 160 2 8 150
450 end 211.65 0.16 3 16 603 0.45 0.35 SAFE 211.65 0.157 3 12 339 0.25 0.62 SAFE 2 8d 160 2 8 150
300 Start 368.10 0.27 3 16 603 0.45 0.61 SAFE 229.71 0.170 3 12 339 0.25 0.68 SAFE 2 8d 160 2 8 150
3000

4 HB2 1366 x mid 211.65 0.16 3 16 603 0.45 0.35 SAFE 211.65 0.157 3 12 339 0.25 0.62 SAFE 2 8d 160 2 8 150
450 end 211.65 0.16 3 16 603 0.45 0.35 SAFE 238.19 0.176 3 12 339 0.25 0.70 SAFE 2 8d 160 2 8 150
300 Start 288.15 0.16 3 20 942 0.52 0.31 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 8 150 Depth Prov. Depth req. Ratio fs Mod.fact.
8000

1 HB1 1358 x mid 0.00 0.00 3 20 942 0.52 0.00 SAFE 778.71 0.433 3 16 2 12 829 0.46 0.94 SAFE 2 8d 195 2 8 150 600.00 307.692 0.91 270 1
600 end 288.15 0.16 3 20 942 0.52 0.31 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 8 150 Vertical defelction limits 0.94 280 1.6
are satisifed
300 Start 976.74 0.54 3 20 2 12 1169 0.65 0.84 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 8 150
8000

2 HB1 1361 x mid 288.15 0.16 3 20 942 0.52 0.31 SAFE 365.96 0.203 3 16 603 0.34 0.61 SAFE 2 8d 195 2 8 150
600 end 1058.10 0.59 3 20 2 12 1169 0.65 0.91 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 8 150
300 Start 774.41 0.43 3 20 942 0.52 0.82 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 8 150
8000

3 HB1 1362 x mid 288.15 0.16 3 20 942 0.52 0.31 SAFE 304.97 0.169 3 16 603 0.34 0.51 SAFE 2 8d 195 2 8 150
600 end 664.19 0.37 3 20 942 0.52 0.70 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 8 150
300 Start 773.48 0.43 3 20 942 0.52 0.82 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 8 150
8000

4 HB1 1367 x mid 288.15 0.16 3 20 942 0.52 0.31 SAFE 301.91 0.168 3 16 603 0.34 0.50 SAFE 2 8d 195 2 8 150
600 end 697.42 0.39 3 20 942 0.52 0.74 SAFE 288.15 0.160 3 16 603 0.34 0.48 SAFE 2 8d 195 2 8 150
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI & KHAPERKHEDA TPS
DOCUMENT NO.
ES0154-75990800-CAL-5001 REV

DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

Grid Mark Top reinforcement Bottom reinforcement Deflection Check


Length (mm)

Beam
Beam. Size
S.No Memb No. Location
Mark (B x D)
(STAAD) Stirrups Stirrups
Dia Dia Dia Dia Prov. Dia Dia Dia Dia Prov. Stirrups Reqd.Stirr Prov.
Ast req Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY Req Steel Nos Nos Nos Nos Ast Prov. Steel % UTILITY spacing Stirrups spacing
From To % Ptreq (mm) (mm) (mm) (mm) CHECK Ast req (mm2) % Ptreq (mm) (mm) (mm) (mm) CHECK leg ups Dia Stirrups
(mm2) (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO (T.O) (T.O) (EX) (EX) (mm2) Ptprov RATIO reqd. leg (Prov.) prov.
(T.O) (T.O) (EX) (EX) (T.O) (T.O) (EX) (EX) (Reqd.) (mm) Dia (mm)
(mm) (mm)
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI & KHAPERKHEDA TPS
DOCUMENT NO.
REV
ES0154-75990800-CAL-5001
DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

7.0 COLUMN DESIGN

Column CORNER Prov. STIRRUPS STIRRUPS


Req MIDDLE REIN.
S. Grid Col. Member DEPTH WIDTH Ast req Steel % REIN. Ast Prov. Steel REQUIRED PROVIDED
% CHECK CHECK
No Mark Mark No. (D) (B) (mm2) Ptreq (mm2) No.
(STAAD) Dia Dia Dia Ptprov
Nos Nos Nos DIA. SPACING DIA. of SPACING
(mm) (mm) (mm)
1 C2 leg
251 450 600 5353.95 1.98 4 25 12 25 7854 2.91 SAFE 8 255 8 2 175 SAFE
2 C2 59 450 600 7563.36 2.80 4 25 12 25 7854 2.91 SAFE 8 300 8 2 175 SAFE
3 C2 77 450 600 6506.69 2.41 4 25 12 25 7854 2.91 SAFE 8 300 8 2 175 SAFE
4 C2 1374 450 600 2413.55 0.89 4 25 12 25 7854 2.91 SAFE 8 300 8 2 175 SAFE
5 C2 255 450 600 4081.76 1.51 4 25 12 25 7854 2.91 SAFE 8 255 8 2 175 SAFE
6 C2 63 450 600 5910.67 2.19 4 25 12 25 7854 2.91 SAFE 8 300 8 2 175 SAFE
7 C2 81 450 600 3683.01 1.36 4 25 12 25 7854 2.91 SAFE 8 300 8 2 175 SAFE
8 C2 259 450 600 2259.66 0.84 4 25 12 25 7854 2.91 SAFE 8 190 8 2 175 SAFE
9 C2 67 450 600 6268.42 2.32 4 25 12 25 7854 2.91 SAFE 8 300 8 2 175 SAFE
10 C2 85 450 600 5723.51 2.12 4 25 12 25 7854 2.91 SAFE 8 300 8 2 175 SAFE
11 C2 252 450 600 4351.92 1.61 4 25 12 25 7854 2.91 SAFE 8 255 8 2 175 SAFE
12 C2 60 450 600 6893.75 2.55 4 25 12 25 7854 2.91 SAFE 8 300 8 2 175 SAFE
13 C2 78 450 600 7428.43 2.75 4 25 12 25 7854 2.91 SAFE 8 300 8 2 175 SAFE
14 C2 256 450 600 4414.47 1.63 4 25 12 25 7854 2.91 SAFE 8 255 8 2 175 SAFE
15 C2 64 450 600 6201.45 2.30 4 25 12 25 7854 2.91 SAFE 8 300 8 2 175 SAFE
16 C2 82 450 600 3809.84 1.41 4 25 12 25 7854 2.91 SAFE 8 300 8 2 175 SAFE
17 C2 260 450 600 4134.18 1.53 4 25 12 25 7854 2.91 SAFE 8 255 8 2 175 SAFE
18 C2 1315 450 600 4690.03 1.74 4 25 12 25 7854 2.91 SAFE 8 255 8 2 175 SAFE
19 C2 68 450 600 6841.35 2.53 4 25 12 25 7854 2.91 SAFE 8 300 8 2 175 SAFE
20 C2 86 450 600 5609.05 2.08 4 25 12 25 7854 2.91 SAFE 8 255 8 2 175 SAFE
21 C2 1328 450 600 4258.53 1.58 4 25 12 25 7854 2.91 SAFE 8 255 8 2 175 SAFE
22 C2 1370 450 600 2124.00 0.79 4 25 12 25 7854 2.91 SAFE 8 190 8 2 175 SAFE
23 C1 1297 450 600 3439.83 1.27 4 25 8 25 5890 2.18 SAFE 8 190 8 2 175 SAFE
24 C1 1295 450 600 2719.46 1.01 4 25 8 25 5890 2.18 SAFE 8 190 8 2 175 SAFE
25 C1 1296 450 600 2314.50 0.86 4 25 8 25 5890 2.18 SAFE 8 255 8 2 175 SAFE
26 C1 1282 450 600 3622.08 1.34 4 25 8 25 5890 2.18 SAFE 8 300 8 2 175 SAFE
27 C1 1272 450 600 3630.73 1.34 4 25 8 25 5890 2.18 SAFE 8 300 8 2 175 SAFE
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI & KHAPERKHEDA TPS
DOCUMENT NO.
REV
ES0154-75990800-CAL-5001
DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

7.0 COLUMN DESIGN

Column CORNER Prov. STIRRUPS STIRRUPS


Req MIDDLE REIN.
S. Grid Col. Member DEPTH WIDTH Ast req Steel % REIN. Ast Prov. Steel REQUIRED PROVIDED
% CHECK CHECK
No Mark Mark No. (D) (B) (mm2) Ptreq (mm2) No.
(STAAD) Dia Dia Dia Ptprov
Nos Nos Nos DIA. SPACING DIA. of SPACING
(mm) (mm) (mm)
28 C1 1274 450 600 2706.60 1.00 4 25 8 25 5890 2.18 SAFE 8 190 8 leg2 175 SAFE
29 C1 1283 450 600 2674.98 0.99 4 25 8 25 5890 2.18 SAFE 8 190 8 2 175 SAFE
30 C1 1273 450 600 3683.56 1.36 4 25 8 25 5890 2.18 SAFE 8 300 8 2 175 SAFE
31 C1 1275 450 600 2869.60 1.06 4 25 8 25 5890 2.18 SAFE 8 190 8 2 175 SAFE
32 C1 254 450 600 4695.08 1.74 4 25 8 25 5890 2.18 SAFE 8 255 8 2 175 SAFE
33 C1 62 450 600 5292.16 1.96 4 25 8 25 5890 2.18 SAFE 8 255 8 2 175 SAFE
34 C1 80 450 600 4056.44 1.50 4 25 8 25 5890 2.18 SAFE 8 190 8 2 175 SAFE
35 C1 257 450 600 3054.20 1.13 4 25 8 25 5890 2.18 SAFE 8 190 8 2 175 SAFE
36 C1 65 450 600 4756.75 1.76 4 25 8 25 5890 2.18 SAFE 8 255 8 2 175 SAFE
37 C1 83 450 600 5147.54 1.91 4 25 8 25 5890 2.18 SAFE 8 255 8 2 175 SAFE
38 C4 261 450 600 2689.13 1.00 4 32 12 25 9107 3.37 SAFE 8 190 8 2 175 SAFE
39 C4 69 450 600 8004.93 2.96 4 32 12 25 9107 3.37 SAFE 8 300 8 2 175 SAFE
40 C4 87 450 600 5732.07 2.12 4 32 12 25 9107 3.37 SAFE 8 300 8 2 175 SAFE
41 C4 1371 450 600 1737.79 0.64 4 32 12 25 9107 3.37 SAFE 8 190 8 2 175 SAFE
42 C4 258 450 600 2887.53 1.07 4 32 12 25 9107 3.37 SAFE 8 190 8 2 175 SAFE
43 C4 66 450 600 7037.39 2.61 4 32 12 25 9107 3.37 SAFE 8 300 8 2 175 SAFE
44 C4 84 450 600 5923.58 2.19 4 32 12 25 9107 3.37 SAFE 8 300 8 2 175 SAFE
45 C2 253 450 600 4359.16 1.61 4 25 12 25 7854 2.91 SAFE 8 255 8 2 175 SAFE
46 C2 61 450 600 6853.94 2.54 4 25 12 25 7854 2.91 SAFE 8 300 8 2 175 SAFE
47 C2 79 450 600 5268.77 1.95 4 25 12 25 7854 2.91 SAFE 8 255 8 2 175 SAFE
48 C2 250 450 600 4835.10 1.79 4 25 12 25 7854 2.91 SAFE 8 300 8 2 175 SAFE
49 C2 223 450 600 4418.39 1.64 4 25 12 25 7854 2.91 SAFE 8 255 8 2 175 SAFE
50 C2 58 450 600 6400.99 2.37 4 25 12 25 7854 2.91 SAFE 8 255 8 2 175 SAFE
51 C2 76 450 600 4415.71 1.64 4 25 12 25 7854 2.91 SAFE 8 255 8 2 175 SAFE
52 C2 226 450 600 514.00 0.19 4 25 12 25 7854 2.91 SAFE 8 190 8 2 175 SAFE
53 C2 1288 450 600 4766.52 1.77 4 25 12 25 7854 2.91 SAFE 8 255 8 2 175 SAFE
54 C2 1373 450 600 2438.24 0.90 4 25 12 25 7854 2.91 SAFE 8 300 8 2 175 SAFE
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI & KHAPERKHEDA TPS
DOCUMENT NO.
REV
ES0154-75990800-CAL-5001
DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

7.0 COLUMN DESIGN

Column CORNER Prov. STIRRUPS STIRRUPS


Req MIDDLE REIN.
S. Grid Col. Member DEPTH WIDTH Ast req Steel % REIN. Ast Prov. Steel REQUIRED PROVIDED
% CHECK CHECK
No Mark Mark No. (D) (B) (mm2) Ptreq (mm2) No.
(STAAD) Dia Dia Dia Ptprov
Nos Nos Nos DIA. SPACING DIA. of SPACING
(mm) (mm) (mm)
55 C3 1330 300 600 2277.50 1.27 4 20 8 25 5184 2.88 SAFE 8 255 8 leg2 175 SAFE
56 C3 1326 300 600 4436.62 2.46 4 20 8 25 5184 2.88 SAFE 8 300 8 2 175 SAFE
57 C3 1324 300 600 2071.01 1.15 4 20 8 25 5184 2.88 SAFE 8 190 8 2 175 SAFE
58 C3 1320 300 600 1981.35 1.10 4 20 8 25 5184 2.88 SAFE 8 190 8 2 175 SAFE
59 C3 1327 300 600 2372.08 1.32 4 20 8 25 5184 2.88 SAFE 8 255 8 2 175 SAFE
60 C3 1369 300 600 1713.10 0.95 4 20 8 25 5184 2.88 SAFE 8 190 8 2 175 SAFE
61 C3 1331 300 600 1932.57 1.07 4 20 8 25 5184 2.88 SAFE 8 190 8 2 175 SAFE
62 C3 1325 300 600 4124.60 2.29 4 20 8 25 5184 2.88 SAFE 8 300 8 2 175 SAFE
63 C3 1321 300 600 2722.41 1.51 4 20 8 25 5184 2.88 SAFE 8 255 8 2 175 SAFE
64 C3 1368 300 600 1266.78 0.70 4 20 8 25 5184 2.88 SAFE 8 190 8 2 175 SAFE
65 C3 248 300 600 2304.00 1.28 4 20 8 25 5184 2.88 SAFE 8 255 8 2 175 SAFE
66 C3 224 300 600 2160.00 1.20 4 20 8 25 5184 2.88 SAFE 8 190 8 2 175 SAFE
67 C3 56 300 600 1536.41 0.85 4 20 8 25 5184 2.88 SAFE 8 255 8 2 175 SAFE
68 C3 74 300 600 619.39 0.34 4 20 8 25 5184 2.88 SAFE 8 190 8 2 175 SAFE
69 C3 225 300 600 646.43 0.36 4 20 8 25 5184 2.88 SAFE 8 190 8 2 175 SAFE
70 C3 1372 300 600 498.37 0.28 4 20 8 25 5184 2.88 SAFE 8 190 8 2 175 SAFE
71 C3 249 300 600 3050.54 1.69 4 20 8 25 5184 2.88 SAFE 8 255 8 2 175 SAFE
72 C3 57 300 600 2768.60 1.54 4 20 8 25 5184 2.88 SAFE 8 255 8 2 175 SAFE
73 C3 75 300 600 971.57 0.54 4 20 8 25 5184 2.88 SAFE 8 190 8 2 175 SAFE
74 C3 1375 300 600 644.32 0.36 4 20 8 25 5184 2.88 SAFE 8 190 8 2 175 SAFE
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI & KHAPERKHEDA TPS
DOCUMENT NO.
REV
ES0154-75990800-CAL-5001
DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

7.0 COLUMN DESIGN

Column CORNER Prov. STIRRUPS STIRRUPS


Req MIDDLE REIN.
S. Grid Col. Member DEPTH WIDTH Ast req Steel % REIN. Ast Prov. Steel REQUIRED PROVIDED
% CHECK CHECK
No Mark Mark No. (D) (B) (mm2) Ptreq (mm2) No.
(STAAD) Dia Dia Dia Ptprov
Nos Nos Nos DIA. SPACING DIA. of SPACING
(mm) (mm) (mm)
leg
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI &
KHAPERKHEDA TPS
DOCUMENT NO.
ES0154-75990800-CAL-5001 REV

DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0

7.1 CHECK FOR DEFLECTION

General Inputs:

Total height of the Structure = 13.900 m

Deflection (Sway) check for Columns: (Load combinations 401 to 552)

Permissible horizontal sway along X-direction = H / 325

At RL 13.900 m Lvl (13.9 x 1000 / 325) = 42.769 mm


SAFE
X-DIR -Actual Sway (From STAAD) Node: 471 LC: 420 = 38.589 mm

Permissible horizontal sway along Z-direction = H / 325

At RL 13.900 m Lvl (13.9 x 1000 / 325) = 42.769 mm


SAFE
Z-DIR -Actual Sway (From STAAD) Node: 466 LC: 423 = 17.923 mm
ISGEC HEAVY ENGINEERING LIMITED
PROJECT TITLE
PIPE CONVEYOR SYSTEM TO TRANSPORT COAL FROM WCL COAL MINES TO KORADI &
KHAPERKHEDA TPS
DOCUMENT NO.
ES0154-75990800-CAL-5001 REV

DESIGN CALCULATIONS FOR MCC PANEL AND CONTROL ROOM AT GONDEGAON TPS 0
Design Calculations For ESR

Coimbatore City Municipal Corporation


24x7 Water Supply Project

Concessionaire: Suez Projects Pvt. Ltd.

DESIGN OF COLUMN FOOTING-F3

fck = 25 N/mm2
fy = 500 N/mm2
Cover = 50 mm
Depth of excavation = 3.00 m from FGL
gsoil = 18 kN/m3
gcon = 25 kN/m3
Net SBC = 100 kN/m2
Width assumed = 1.00 m

d/2 d

d/2

Two Way Shear One Way Shear

Column moment, My

Column moment, Mz

Bc Lc

Z L

Support Moment, Mz X
Support Moment, Mx
Design Calculations For ESR

Coimbatore City Municipal Corporation


24x7 Water Supply Project

Concessionaire: Suez Projects Pvt. Ltd.

Axis shown are STAAD Global Axis.


Design Calculations For ESR

Coimbatore City Municipal Corporation


24x7 Water Supply Project

Concessionaire: Suez Projects Pvt. Ltd.

FOOTING DESIGN-F3
One way shear check One way shear check
Input Sizing Reinforcement Along Length Reinforcement Along Width Punching Shear
along Length along breadth Overturning Mx Overturning Mz
Node

L/C Fy Mx Mz Lc Bc L B Fy/A Mx/Z Mz/Z qmax,g qmin,g qgross,m qnet,m qmax,n qmin,n Wf Ws Sur q1 q2 q3 q4 h y Mu,x Mux,lim dx ptx,cal pt,pro f1 s1 x Mu,z Muz,lim dy pty,cal pt,pro f2 s2 V b t c,1 tc,max tv,1 V b tc,1 tc,max tv,1 bc ks tc,2 tv,2 qb,net kN/m2

kN kNm kNm mm mm m m kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN kN kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 mm m kNm kNm mm % % mm mm m kNm kNm mm % % mm mm kN N/mm2 N/mm2 N/mm2 kN N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 FOS > 1.5 FOS > 1.5 100
Footing ID (F3) - Node no: 61 Mox Mrx FOS Moz Mrz FOS
61 201 539 0 0 600 600 4.60 4.60 84 0.00 0.00 84 84 141 100 25 25 370 861 0 84 84 84 84 700 2.00 76 1385 644 0.04 0.14 12 125 2.00 76 1334 632 0.04 0.14 12 125 52 21 0.28 3.15 0.08 52 20 0.28 3.15 0.08 1.00 1.50 1.25 0.06 0.00 3664.77 NA 0.00 3664.77 NA SAFE
202 1309 0 0 600 600 4.60 4.60 120 0.00 0.00 120 120 141 100 62 62 370 861 0 120 120 120 120 700 2.00 186 1385 644 0.11 0.14 12 125 2.00 186 1334 632 0.11 0.14 12 125 126 21 0.28 3.15 0.20 127 20 0.28 3.15 0.20 1.00 1.50 1.25 0.15 0.00 5258.67 NA 0.00 5258.67 NA SAFE
203 969 0 0 600 600 4.60 4.60 104 0.00 0.00 104 104 141 100 46 46 370 861 0 104 104 104 104 700 2.00 137 1385 644 0.08 0.14 12 125 2.00 137 1334 632 0.08 0.14 12 125 93 21 0.28 3.15 0.14 94 20 0.28 3.15 0.15 1.00 1.50 1.25 0.11 0.00 4554.87 NA 0.00 4554.87 NA SAFE
204 878 0 0 600 600 4.60 4.60 100 0.00 0.00 100 100 141 100 41 41 370 861 0 100 100 100 100 700 2.00 124 1385 644 0.07 0.14 12 125 2.00 124 1334 632 0.07 0.14 12 125 84 21 0.28 3.15 0.13 85 20 0.28 3.15 0.13 1.00 1.50 1.25 0.10 0.00 4366.50 NA 0.00 4366.50 NA SAFE
301 1309 0 0 600 600 4.60 4.60 120 0.00 0.00 120 120 141 100 62 62 370 861 0 120 120 120 120 700 2.00 186 1385 644 0.11 0.14 12 125 2.00 186 1334 632 0.11 0.14 12 125 126 21 0.28 3.15 0.20 127 20 0.28 3.15 0.20 1.00 1.50 1.25 0.15 0.00 5258.67 NA 0.00 5258.67 NA SAFE
302 1266 0 0 600 600 4.60 4.60 118 0.00 0.00 118 118 166 125 60 60 370 861 0 118 118 118 118 700 2.00 179 1385 644 0.10 0.14 12 125 2.00 179 1334 632 0.11 0.14 12 125 122 21 0.28 3.15 0.19 123 20 0.28 3.15 0.19 1.00 1.50 1.25 0.14 0.00 5169.66 NA 0.00 5169.66 NA SAFE
303 1299 0 0 600 600 4.60 4.60 120 0.00 0.00 120 120 166 125 61 61 370 861 0 120 120 120 120 700 2.00 184 1385 644 0.10 0.14 12 125 2.00 184 1334 632 0.11 0.14 12 125 125 21 0.28 3.15 0.19 126 20 0.28 3.15 0.20 1.00 1.50 1.25 0.15 0.00 5237.97 NA 0.00 5237.97 NA SAFE
304 1292 0 0 600 600 4.60 4.60 119 0.00 0.00 119 119 166 125 61 61 370 861 0 119 119 119 119 700 2.00 183 1385 644 0.10 0.14 12 125 2.00 183 1334 632 0.11 0.14 12 125 124 21 0.28 3.15 0.19 125 20 0.28 3.15 0.20 1.00 1.50 1.25 0.15 0.00 5223.48 NA 0.00 5223.48 NA SAFE
305 1273 0 0 600 600 4.60 4.60 118 0.00 0.00 118 118 166 125 60 60 370 861 0 118 118 118 118 700 2.00 180 1385 644 0.10 0.14 12 125 2.00 180 1334 632 0.11 0.14 12 125 122 21 0.28 3.15 0.19 123 20 0.28 3.15 0.20 1.00 1.50 1.25 0.14 0.00 5184.15 NA 0.00 5184.15 NA SAFE
306 496 0 0 600 600 4.60 4.60 82 0.00 0.00 82 82 166 125 23 23 370 861 0 82 82 82 82 700 2.00 70 1385 644 0.04 0.14 12 125 2.00 70 1334 632 0.04 0.14 12 125 48 21 0.28 3.15 0.07 48 20 0.28 3.15 0.08 1.00 1.50 1.25 0.06 0.00 3575.76 NA 0.00 3575.76 NA SAFE
307 529 0 0 600 600 4.60 4.60 83 0.00 0.00 83 83 166 125 25 25 370 861 0 83 83 83 83 700 2.00 75 1385 644 0.04 0.14 12 125 2.00 75 1334 632 0.04 0.14 12 125 51 21 0.28 3.15 0.08 51 20 0.28 3.15 0.08 1.00 1.50 1.25 0.06 0.00 3644.07 NA 0.00 3644.07 NA SAFE
308 522 0 0 600 600 4.60 4.60 83 0.00 0.00 83 83 166 125 25 25 370 861 0 83 83 83 83 700 2.00 74 1385 644 0.04 0.14 12 125 2.00 74 1334 632 0.04 0.14 12 125 50 21 0.28 3.15 0.08 51 20 0.28 3.15 0.08 1.00 1.50 1.25 0.06 0.00 3629.58 NA 0.00 3629.58 NA SAFE
309 503 0 0 600 600 4.60 4.60 82 0.00 0.00 82 82 166 125 24 24 370 861 0 82 82 82 82 700 2.00 71 1385 644 0.04 0.14 12 125 2.00 71 1334 632 0.04 0.14 12 125 48 21 0.28 3.15 0.07 49 20 0.28 3.15 0.08 1.00 1.50 1.25 0.06 0.00 3590.25 NA 0.00 3590.25 NA SAFE
310 505 0 0 600 600 4.60 4.60 82 0.00 0.00 82 82 166 125 24 24 370 861 0 82 82 82 82 700 2.00 72 1385 644 0.04 0.14 12 125 2.00 72 1334 632 0.04 0.14 12 125 49 21 0.28 3.15 0.08 49 20 0.28 3.15 0.08 1.00 1.50 1.25 0.06 0.00 3594.39 NA 0.00 3594.39 NA SAFE
311 520 0 0 600 600 4.60 4.60 83 0.00 0.00 83 83 166 125 25 25 370 861 0 83 83 83 83 700 2.00 74 1385 644 0.04 0.14 12 125 2.00 74 1334 632 0.04 0.14 12 125 50 21 0.28 3.15 0.08 50 20 0.28 3.15 0.08 1.00 1.50 1.25 0.06 0.00 3625.44 NA 0.00 3625.44 NA SAFE
312 517 0 0 600 600 4.60 4.60 83 0.00 0.00 83 83 166 125 24 24 370 861 0 83 83 83 83 700 2.00 73 1385 644 0.04 0.14 12 125 2.00 73 1334 632 0.04 0.14 12 125 50 21 0.28 3.15 0.08 50 20 0.28 3.15 0.08 1.00 1.50 1.25 0.06 0.00 3619.23 NA 0.00 3619.23 NA SAFE
313 508 0 0 600 600 4.60 4.60 82 0.00 0.00 82 82 166 125 24 24 370 861 0 82 82 82 82 700 2.00 72 1385 644 0.04 0.14 12 125 2.00 72 1334 632 0.04 0.14 12 125 49 21 0.28 3.15 0.08 49 20 0.28 3.15 0.08 1.00 1.50 1.25 0.06 0.00 3600.60 NA 0.00 3600.60 NA SAFE
qb,net kN/m2

100

SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE
SAFE

You might also like