1st & 2nd FLANGE ALIGNMENT REPORT FOR ROTATING EQUIPMENT - A/G PIPING (IKPT -Piping)
Consortium of Final Alignment
P2B Job No. : TEC Job No.: Date : 1st Alignment
IKPT & PP
OWNER :
PMC : PRESSURE TEST PACKAGE NO. :
PROJECT :
Description :
Ref. Doc :
Ref. P& ID No. :
( ) mm
(C)
<Accpetance Criteria of Flange Clearance of ( C ) & ( D )>
Nozzle Size Acceptance Criteria
All Size Gasket Thickness + Max. 1.0mm
) mm
(B)
(
( ) mm
(A) <Accpetance Criteria of Flange Parallelism between ( C ) & ( D )>
( ) mm
Nozzle Size Acceptance Criteria
(D) 6" & Below ( D ) - ( C ) = Max. 0.2mm
8" & Above ( D ) - ( C ) = Max. 0.5mm
<Acceptance Criteria of Flange Offset>
All Size : 1.5mm ≧ ( A ) & ( B ) (as per API) Mesure the biggest part of the figure !
(* All the bolts can be inserted smoothly by hand)
( ) mm
(C)
<Accpetance Criteria of Flange Clearance of ( C ) & ( D )>
Nozzle Size Acceptance Criteria
All Size Gasket Thickness + Max. 1.0mm
) mm
(B)
(
( ) mm
(A) <Accpetance Criteria of Flange Parallelism between ( C ) & ( D )>
( ) mm
Nozzle Size Acceptance Criteria
(D) 6" & Below ( D ) - ( C ) = Max. 0.2mm
8" & Above ( D ) - ( C ) = Max. 0.5mm
<Acceptance Criteria of Flange Offset>
Mesure the biggest part of the figure !
All Size : 1.5mm ≧ ( A ) & ( B ) (as per API)
(* All the bolts can be inserted smoothly by hand)
Note
1) Before the alignment check, confirm the following point has completed.
a) Hand-over status of rotating equipment from Mechanical Group.
b) Assembling and installing of all of specified supports and hangers of the piping
c) Non-destructive test (PWHT)
d) Removal of all bolts and nuts from the flanges which connect the pipes with the equipment
e) Spring support should be "Cold Setting" condition (lock pin to be remained).
Inspector's name
Signature
Date