Professional Documents
Culture Documents
UNIT:132
SUBSYSTEM :NPS-132U01-24
SYSTEM :NPS-132U01
AREA :132U01
RFI Nº :
132-CC-215-00022
132U01-WY-MH-029
EST PACKAGE -PO
NSH
GRAVITY TEST PACKAGE
TP-UG-NPS-132U01-25-035
NON-OILY SEWER (WY)
25
132
NPS-132U01-24
NPS-132U01
132U01
TP-UG-NPS-132U01-25-035 0
132U01-WY-MH-029
TEST PACKAGE - UNDERGROUND GRAVITY PIPING
NSH
GRAVITY TEST PACKAGE
TP-UG-NPS-131U03-24-075
ACCIDENTALLY OILY WASTE WATER (AY)
TEST PACKAGE - UNDERGROUND GRAVITY PIPING
SUB-CONTRACTOR ISOMETRICS
N/A
TEST PACKAGE - UNDERGROUND GRAVITY PIPING
TEST PACKAGE
Date
CTR DRAWING
CPY DRAWING
SUBCONTRACTOR
Signature
Rev.
From
To
SERVICE / FLUID
Welding Process
Weld No.
Date
Joint Type
Material 1 (pipe)
Materiale 2 (pipe or
component)
Batch No Mat. 1
Batch No Mat. 2
CONTRACTOR
Signature
Certificate Nr. Mat. 2
Diameter (mm)
Thickness (mm)
Procedure No
Pagina 1 di 1
DESCRIPTION
Welder Certificate
Welding Date
Date
Plate temperature
(˚C)
Welding Pressure
Conformity to
HDPE WELDING SUMMARY LIST [WSL]
Tables Yes/No
Start (hour)
Welding Cycle
End (hour)
Last (minutes)
COMPANY
WATCH
Cert. n°
Thermometer Certificate
Signature
No.
Weld
(mm)
extern
al width
Weld
Dimension
al
Weld
height
extern
(mm) % of
control
CALLIPER
Cert. n°
Material soundness
Yes/No
% of
control
Job No.
Rev No.
VISUAL
(DHWR)
Report n°
RESULT
Test
Type of
other)
250 or
Report
TEST
No (Form
(bar) if
Pressure
applicable
TEST PACKAGE - UNDERGROUND GRAVITY PIPING
UNIT: SYSTEM :
SUBSYSTEM : AREA :
TAG Nº : RFI Nº :
(1) Hydraulic [service] test on seal joints, connection to the pit and gate (if applicable)
Start
End
Result
Finishing of abutment with inerting (**)
Signaling Tapes
Ordinary backfilling (**)
Restoring existing gravel (**)
Note: In (**) For
according to TM 930.003 para 15, 18
filling refer to doc. TM 910.002 “Earthworks Site Inspection plan”.
DATE (dd-Mmm-YYYY) NAME SIGNATURE
SUBCONTRACTOR
CONTRACTOR
COMPANY
(Free)
This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent
TEST PACKAGE - UNDERGROUND GRAVITY PIPING
UNIT: SYSTEM :
SUBSYSTEM : AREA :
TAG Nº : RFI Nº :
LEVEL CHECK
PLANIMETRIC CHECK
OTHER
ATTACHEMENT: YES □ NO □
CONTRACTOR
COMPANY
TEST PACKAGE - UNDERGROUND GRAVITY PIPING
xxxxx (*)
UNIT: SYSTEM :
SUBSYSTEM : AREA :
TAG Nº : RFI Nº :
Foundation :
Underground pipes :
Road :
DRAWING :
Accepted Remarks
Activity Yes / No
Visual control of scraping and weeding, stockpiling on dedicated area of top soil suitable for final
landscaping
(Area )
Control of support / slopes of lateral side of excavation (refer to AFC drawing and
specification)]
Tolleance ±25mm levels / ±50mm coordinates / ±0.5% for slopes
Install and operate a water drainage system and water bailing if necessary
Formation level for structural fill At least 97% of MDD Formation level for general fill
by Modified AASHTO ◦for excavations up to At least 95% of MDD by Modified AASHTO. 1 test
50m²→1test ◦for excavations higher than every 500m². Minimum 1 test for formation level
50m²→1test
every 100m² with minimum 2 tests
Notes :
[*] Attach the list of items if various, mention total number of pages including this cover
CONTRACTOR
COMPANY
(Free)
This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent
TEST PACKAGE - UNDERGROUND GRAVITY PIPING
xxxxx
UNIT: SYSTEM :
SUBSYSTEM : AREA :
TAG Nº : RFI Nº :
Contractor Drawing no : Client Drawing no :
DRAWING :
Case :
(1) General filling and backfilling in areas where no road, paving or structures planned
(2) Structural filling below foundations, structures and where road or paving are planned
(3) Ordinary fill for backfilling of GPR and pipe lines
(4) Capping layer below roads and pave
Field Density Test. At least 95% At least 97% At least 95% At least 97%
Example of MDD. 1 of MDD. 1 of MDD. 1 of MDD. 1
test every 500 m² test every 100 m² test every 200 m² test every 200 m²
Note: MDD maximum dry density obtained by Modified AASHTO ASTM D1557
SUBCONTRACTOR
CONTRACTOR
COMPANY
(Free)
This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent