GRAVITY TEST PAC

UNIT:132

SUBSYSTEM :NPS-132U01-24

TAG Nº :132U01-WY-MH-026 - 132U01-WY-MH-029

Contractor Drawing no :4300-AQ-DA-132U01022

SYSTEM :NPS-132U01

AREA :132U01

RFI Nº :

Client Drawing no :132-CC-215-00022


4300-AQ-DA-132U01022

132-CC-215-00022
132U01-WY-MH-029
EST PACKAGE -PO
NSH
GRAVITY TEST PACKAGE
TP-UG-NPS-132U01-25-035
NON-OILY SEWER (WY)
25

132

NPS-132U01-24

NPS-132U01

132U01

TAG Nº :132U01-WY-MH-026 - 132U01-WY-MH-029


Contractor Drawing no :

TP-UG-NPS-132U01-25-035 0

132U01-WY-MH-029
TEST PACKAGE - UNDERGROUND GRAVITY PIPING

LOCATION : RUWAIS - U.A.E. Borouge 4 - Overall EPC Project

Abu DHABI Polymers Co. Ltd. (Borouge)


(‫ةدودحمال ةيكيتسالبال نئادلل ىبظوبا ةكرش )جورب‬

NSH
GRAVITY TEST PACKAGE
TP-UG-NPS-131U03-24-075
ACCIDENTALLY OILY WASTE WATER (AY)
TEST PACKAGE - UNDERGROUND GRAVITY PIPING

LOCATION : RUWAIS - U.A.E. Borouge 4 - Overall EPC Project

Abu DHABI Polymers Co. Ltd. (Borouge)


(‫ةدودحمال ةيكيتسالبال نئادلل ىبظوبا ةكرش )جورب‬

LAYOUT RED MARKED UP DRAWING


TEST PACKAGE - UNDERGROUND GRAVITY PIPING

LOCATION : RUWAIS - U.A.E. Borouge 4 - Overall EPC Project

Abu DHABI Polymers Co. Ltd. (Borouge)


(‫ةدودحمال ةيكيتسالبال نئادلل ىبظوبا ةكرش )جورب‬

EWR OR FIELD CHANGE NOTIFICATION


N/A
TEST PACKAGE - UNDERGROUND GRAVITY PIPING

LOCATION : RUWAIS - U.A.E. Borouge 4 - Overall EPC Project

Abu DHABI Polymers Co. Ltd. (Borouge)


(‫ةدودحمال ةيكيتسالبال نئادلل ىبظوبا ةكرش )جورب‬

SUB-CONTRACTOR ISOMETRICS
N/A
TEST PACKAGE - UNDERGROUND GRAVITY PIPING

LOCATION : RUWAIS - U.A.E. Borouge 4 - Overall EPC Project

Abu DHABI Polymers Co. Ltd. (Borouge)


(‫ةدودحمال ةيكيتسالبال نئادلل ىبظوبا ةكرش )جورب‬

HDPE WELDING SUMMARY LIST (WSL) / WELDING AND NDE


SUMMARY
UNIT
SUBSYSTEM

TEST PACKAGE

Date
CTR DRAWING

CPY DRAWING

SUBCONTRACTOR

Signature
Rev.

From

To

SERVICE / FLUID

Welding Process

Weld No.

Date
Joint Type

Material 1 (pipe)

Materiale 2 (pipe or
component)

Batch No Mat. 1

Certificate Nr. Mat. 1

Batch No Mat. 2

CONTRACTOR

Signature
Certificate Nr. Mat. 2

Diameter (mm)

Thickness (mm)

Procedure No
Pagina 1 di 1
DESCRIPTION

Welder Certificate

Welding Date
Date

Plate temperature
(˚C)

Welding Pressure

Conformity to
HDPE WELDING SUMMARY LIST [WSL]

Tables Yes/No

Start (hour)
Welding Cycle

End (hour)

Last (minutes)

Cooling end (hour)


% of
control

COMPANY
WATCH

Cert. n°

Thermometer Certificate
Signature

No.
Weld

(mm)
extern
al width
Weld
Dimension

al
Weld

height
extern

(mm) % of
control
CALLIPER

Cert. n°

Material soundness
Yes/No
% of
control
Job No.
Rev No.

VISUAL

(DHWR)
Report n°
RESULT
Test
Type of
other)
250 or
Report
TEST

No (Form

(bar) if
Pressure

applicable
TEST PACKAGE - UNDERGROUND GRAVITY PIPING

LOCATION : RUWAIS - U.A.E. Borouge 4 - Overall EPC Project

Abu DHABI Polymers Co. Ltd. (Borouge)


(‫ةدودحمال ةيكيتسالبال نئادلل ىبظوبا ةكرش )جورب‬

Sewage system, water treatment, drinking water,electrical conduits network,


outdoor lighting network,LAN Report of inspection and testing
( MOD-ITP-AL_029 )
CONSTRUCTION CHECK LIST: TCM IDENTIFICATION CODE
Sewage system, water treatment, drinking water, electrical Job-EC-Type-N°
conduits network, outdoor lighting network, LAN MOD-ITP-AL_029
Report of inspection and testing

SHEET DOC.CLASS ISSUE


/ 1 01
CLIENT IDENTIFICATION CODE
Report N..:
X4-CC-474-00103

UNIT: SYSTEM :

SUBSYSTEM : AREA :

TAG Nº : RFI Nº :

Contractor Drawing no : Client Drawing no :

Sewage System DRAWING:


Water treatment
Potable water
Conduits network Segment:
Outdoor lighting network
LAN network
Activity Accepted Remarks
Yes/No
Planimetric inspection
Altimeter Inspection bottom of the excavation and slope if
applicable
Geotextile Laying if applicable
Laying of concrete pits
Laying of pipelines, manifolds, ducts
PVC HDPE PE OTHER
Joints between segments, insertion gates if applicable
Bedding and side concrete support if any
Grouting connection to pits
Partial or total abutment (1) (**)

(1) Hydraulic [service] test on seal joints, connection to the pit and gate (if applicable)
Start
End
Result
Finishing of abutment with inerting (**)
Signaling Tapes
Ordinary backfilling (**)
Restoring existing gravel (**)
Note: In (**) For
according to TM 930.003 para 15, 18
filling refer to doc. TM 910.002 “Earthworks Site Inspection plan”.
DATE (dd-Mmm-YYYY) NAME SIGNATURE
SUBCONTRACTOR
CONTRACTOR
COMPANY
(Free)

This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent
TEST PACKAGE - UNDERGROUND GRAVITY PIPING

LOCATION : RUWAIS - U.A.E. Borouge 4 - Overall EPC Project

Abu DHABI Polymers Co. Ltd. (Borouge)


(‫ةدودحمال ةيكيتسالبال نئادلل ىبظوبا ةكرش )جورب‬

CONSTRUCTION CHECK LIST TOPOGRAPHIC SURVEYS


( MOD-ITP-AL_064 )
TCM IDENTIFICATION CODE
Job-EC-Type-N°
MOD-ITP-AL_064
CONSTRUCTION CHECK LIST TOPOGRAPHIC
SURVEYS SHEET
DOC.CLASS 1 ISSUE 01
1/1

CLIENT IDENTIFICATION CODE


Report N..: X4-CC-474-00102

UNIT: SYSTEM :

SUBSYSTEM : AREA :

TAG Nº : RFI Nº :

Contractor Drawing no : Client Drawing no :

VENUE: (ZONE, AREA) EQUIPMENT USED No.


EQUIPMENT CALIBRATION CERTIFICATE No.

SUBJECT: REFERENCE DOCUMENT DRAWING

ATTENDANCE (full name and signature) ACTIVITIES PERFORMED

LEVEL CHECK

PLANIMETRIC CHECK

OTHER

RESULT OF SURVEY / NOTE CORRECTIVE ACTION REQUESTED (if any)

ATTACHEMENT: YES □ NO □

Notes: Legible Signature requested

DATE (DD-MM-YYYY} NAME SIGNATURE


SUBCONTRACTOR

CONTRACTOR

COMPANY
TEST PACKAGE - UNDERGROUND GRAVITY PIPING

LOCATION : RUWAIS - U.A.E. Borouge 4 - Overall EPC Project

Abu DHABI Polymers Co. Ltd. (Borouge)


(‫ةدودحمال ةيكيتسالبال نئادلل ىبظوبا ةكرش )جورب‬

LINE ALIGNMENT (COORDINATION ELEVATION SLOPE) CHECK /


TOPOGRAPHICAL SURVEY CHECK REPORT (MOD-ITP-AL_004)
CONSTRUCTION CHECK LIST TCM IDENTIFICATION CODE
Job-EC-Type-N°
Excavation checks MOD-ITP-AL_004
SHEET DOC.CLASS ISSUE
/ 1 01
Report N..: CLIENT IDENTIFICATION CODE
PU-CC-474-00102

xxxxx (*)
UNIT: SYSTEM :

SUBSYSTEM : AREA :

TAG Nº : RFI Nº :

Contractor Drawing no : Client Drawing no :

Foundation :
Underground pipes :
Road :

DRAWING :
Accepted Remarks
Activity Yes / No

Availability of authorized dumping area/stocking area Area

Set-out of bench marks and reference points

Visual control of scraping and weeding, stockpiling on dedicated area of top soil suitable for final
landscaping
(Area )

Control of support / slopes of lateral side of excavation (refer to AFC drawing and
specification)]
Tolleance ±25mm levels / ±50mm coordinates / ±0.5% for slopes

water table level

Install and operate a water drainage system and water bailing if necessary
Formation level for structural fill At least 97% of MDD Formation level for general fill
by Modified AASHTO ◦for excavations up to At least 95% of MDD by Modified AASHTO. 1 test
50m²→1test ◦for excavations higher than every 500m². Minimum 1 test for formation level
50m²→1test
every 100m² with minimum 2 tests

Notes :
[*] Attach the list of items if various, mention total number of pages including this cover

DATE (DD-MM-YYYY) NAME SIGNATURE


SUBCONTRACTOR

CONTRACTOR

COMPANY

(Free)

This document is Tecnimont’s property, and cannot be used by others for any purpose, without prior written consent
TEST PACKAGE - UNDERGROUND GRAVITY PIPING

LOCATION : RUWAIS - U.A.E. Borouge 4 - Overall EPC Project

Abu DHABI Polymers Co. Ltd. (Borouge)


(‫ةدودحمال ةيكيتسالبال نئادلل ىبظوبا ةكرش )جورب‬

PIPING TEST RECORD (MOD-ITP-XL_251)


TEST PACKAGE - UNDERGROUND GRAVITY PIPING

LOCATION : RUWAIS - U.A.E. Borouge 4 - Overall EPC Project

Abu DHABI Polymers Co. Ltd. (Borouge)


(‫ةدودحمال ةيكيتسالبال نئادلل ىبظوبا ةكرش )جورب‬

BACKFILLING CHECKS (MOD-ITP-AL_005)


CONSTRUCTION CHECK LIST TCM IDENTIFICATION CODE
Job-EC-Type-N°
Filling MOD-ITP-AL_005

SHEET DOC.CLASS ISSUE


/ 1 01
CLIENT IDENTIFICATION CODE
Report N..: PU-CC-474-00102

xxxxx
UNIT: SYSTEM :
SUBSYSTEM : AREA :
TAG Nº : RFI Nº :
Contractor Drawing no : Client Drawing no :

Foundation : Underground pipes : Road :

DRAWING :

Case :
(1) General filling and backfilling in areas where no road, paving or structures planned
(2) Structural filling below foundations, structures and where road or paving are planned
(3) Ordinary fill for backfilling of GPR and pipe lines
(4) Capping layer below roads and pave

General fill material


Structural fill mat
Ordinary fill material

Activity Accepted Remarks


Yes/No

Drainage layer [Only if shown on drawings]


Geo-textile
Activities Case 1 Case 2 Case 3 Case 4
Layer thickness ≤ 30 cm. [Independently from group]
Example
≤ 30 cm.

Tolerance of thickness ±5%


measurements

Frequency of thickness Every 1500 m² of platform, cases1 to 3 Every 20mof


measurements road

Field Density Test. At least 95% At least 97% At least 95% At least 97%
Example of MDD. 1 of MDD. 1 of MDD. 1 of MDD. 1
test every 500 m² test every 100 m² test every 200 m² test every 200 m²

Sampling for evaluation of dry


density (Proctor Mod.)

Note: MDD maximum dry density obtained by Modified AASHTO ASTM D1557

DATE (DD-MM-YYYY) NAME SIGNATURE

SUBCONTRACTOR

CONTRACTOR

COMPANY

(Free)