d related Civil Works
Report No:
Date:
Location: Indane Bottling Plant Malanpur Dist. Bhind Near Gwalior (M.P)
PROGRESS REPORT
FIT-UP WELDING ERECTION
TOTAL REMARKS
NO. OF TOTAL NO. OF TOTAL
LENGTH INCH
JOINT INCH DIA JOINT INCH DIA
METER
0 0 0
PROJECT 1801 MABS
FLUIDLINE ENGINEERS & FABRICATORS (P) LTD.
C-51, Udyog Kunj, Road No. 12, Site V, Panki Industrial Area,
Kanpur-208022
CLIENT -
CONSULTANT-
PROJECT-
PO NO.-
REPORT NO.-
DATE:-
Legand : P: Pipe,E:Elbow,F:Flange,ER:Ecentric Reducer,CR:Concentric Reducer,T:Tee,WO'L: Weldolet,SO'L: Sockolet,V: Valve,STR: Strainer,RFP: Reinforced Pad,FE: Flow Element,WN; Weld Neck,SO:
Slipon,RF:Raised face,FF: Flat Face,BW: Butt weld,Br.W, Branch Weld,SW: Socket Weld,FW: Fillet Weld,FJ: Field Joint,LS Long Seam,ACC: Accepted,REJ: Rejected,N.A: Not Applicable
SIGNATURE
DATE
FORMAT NO. HTPL/IOCL/DPT/03
SURFACE CONDITION: AS WELDED/ GROUND /MACHINED GOVERNING CODE: ASME SEC V, ASME B31.3
NAME
SIGN.
DATE
FORMAT NO. HTPL/IOCL/ROR/04
Legand : G-Butt Weld Joint, SW-Socket Weld, F-Flange Joint, Acc-Accept, Rej-Reject
HTPL PDIL IOCL
NAME
SIGNATURE
DATE
7 of 16
NPS Thk
SI.No. Line No. Joint No Welder No. RT NO. History Segment Film Size Observation Result
(INCH) (mm)
RT Agency /
Description HTPL PDIL IOCL
Sub-contractor
Name
Signature
Date
Legend / Abbreviations:
8 of 16
AFJ : Accepted Full Joint, ACC : Accepted, REJ : Rejected, REP : Repair, RT : Retake, RS : Reshoot, R1, R2,.: Repair 1,2,. CS : Check Shot, C/S : Check Surface, CV : Clean &
Verify, DDP : Dress & DP, CRS : Clean & Reshoot, DRS : Dress & Reshoot, FMI : Foriegn Material Inside, NSD : No Significant Discontinuity, C : Crack, IP : Incomplete
Penetration, EP : Excess Penetration, LF : Lack of Fusion, RUC : Root Under Cut, Ox. : Oxidized, RC : Root Cocavity, M/M : Mis-Match, SD : Surface Depression, SI : Slag
inclusion, POR : Porosity, TI : Tungsten Inclusion,LL : Light Leakage, PFQ : Poor Film Quality, FM : Film Mark, SM : Scratch Mark, NS : Not Submited, DI : Doubtful Indication,
LD : Low Density, HD : High Density, SFJ : Submit Full Joint, IC : Improper Coverage, WP : Wrong Penetrameter used, PS : Poor Sensitivity, MW : Masking of Weld, WCM :
Water / Chemical Marks, PDM : Processing / Developing Marks, IT : Improper Technique, WI : Wrong Identification, UE : Un Exposed.
FORMAT NO. HTPL/IOCL/LHS/06
Name
Signature
Date
FORMATE NO.HTPL/IOCL/PAINT/07
NAME
SIGN.
DATE
FORMAT NO.HTPL/IOCL/WPQ/08
TEST COUPON/
WELDING PROCESS
PRODUCTION JOINT
CONSUMABLE INSERT
POSITION
VERTICAL PROGRESSION
SIGNATURE
DATE
FORMAT NO.HTPL/IOCL/WPQ/08
ED
Vessels & Machinery) and Fire
WELDER'S
PHOTO
RANGED QUALIFIED
IOCL
HI-TECHNOCRATS PRIVATE LIMITED
PROJECT:Supply, Fabrication, Erection, Testing & Commissioning of Mechanical (Piping, Vessels &
Machinery) and Fire Protection System & allied related Civil Works