Professional Documents
Culture Documents
Exceeded targeted gross margins and met required lead times annually for capital
projects of $500,000 to $4MM.
Increased pilot plant operating capacity by directing the design and construction of a
new facility; managed engineering, $1.5MM budget, schedule, and
contractors/subcontractors.
Contributed to $11MM gross profit by estimating cost, writing capital proposals, and
directing efficient engineering design and equipment manufacturing for a 4.3MM kg/year
soluble coffee plant.
Developed a process to recover amines and glycols from waste streams generated
in the oil and gas industry, leading to a $2MM purchase order. (Patent pending)
CANDIDATE INFO
20
Years In
Workforce
9
Years
At This Job
BS
Chemical Engineering
MS
Chemical Engineering
2
Engineering Manager
Managed Engineering and Maintenance departments of 25 people through
planning and execution of $15 million in projects.
Led a Maintenance team, reduced downtime by 20% and Maintenance costs by 15%
Designed customer Kan Ban system that reduced inventory levels by 30%
Managed $15M capital equipment budget and $2M operating expense budget
CANDIDATE INFO
19
Years In
Workforce
2
Years
At This Job
AS
Mechanical Engineering
BS
Mechanical Engineering
3
Engineering Manager
I managed 10+ exempt engineers and 5 nonexempt validation technicians in one
of Intel's most profitable divisions which created processor thermal solutions and
shipped more than 12 million units per quarter into the worldwide Channel.
Product launch schedules were met 100% of the time and frequently beat.
Generated thermal roadmaps and provided long-term vision and future direction to
the engineering team. Interfaced and collaborated with multi-disciplined and multi-divisional
organizations to create cohesive virtual teams.
26
Years In
Workforce
10
Years
At This Job
BA
Metallurgical Engineering
4
Engineering Manager
Expanded Engineering staff, which included Mechanical, Electrical, Software,
and Systems Engineers, from 40 to 120 in 3 months to support 4 concurrent
International programs valued between $60M and $200M each prior to facility
closure.
Reduced non-recurring engineering costs by 40% using innovative and agile design.
Utilized LSS methodology and DFSS principles to focus on high quality, low cost
products and services provided by Woodbridge Technical Center engineering staff.
CANDIDATE INFO
57
Years In
Workforce
4
Years
At This Job
AAS
Electrical Engineering Technology
BS
Electrical Engineering
MS
Management Information Systems
5
Sr Engineering Manager
Managed team responsible for facilitating and auditing all Requests for Quotes
(RFx: RFQs, RFIs, RFPs) on e-sourcing platform. Communicated with vendors
and buyers to identify capabilities and sourcing needs to determine the most cost
effective method of manufacturing for RFx events. Created Excel templates and
presented analyzed data of key metrics to Executive Leadership.
Managed project responsible for automating data and dimensions collection for
should cost model for custom manufactured parts
Formulated and continuously improved auditing process and procedure manual used
in all RFQ audit training
CANDIDATE INFO
12
Years In
Workforce
10
Years
At This Job
BS
Mechanical Engineering Technology
Lean Six Sigma Green Belt Certification
6
Engineering Manager
Oversaw defining and resolving of critical technical and program issues and ensured
engineering support to the manufacturing team.
Drove non-recurring labor cost estimation uncertainty down from 25-50% to less than
3%.
19
Years In
Workforce
6
Years
At This Job
BS
Mechanical Engineering
MA
Master Of Arts
7
Engineering Manager
Collaborated with Apple Inc. to address stock of Mura issue, and successfully
decreased defect rate of press bright point by 60%.
Defined product specifications with clients and provided defect solutions to ensure
smooth mass production.
Integral role on cross-functional teams that helped company pass Sony Ericssons
manufacturing audit at the first round and received 100% approval in quality and operations.
Provided solutions in circuit erosion, while phasing in new products, keeping defect
rate of MP products 100DPPM below clients tolerance standard.
Engineering Manager
Managed a team of engineers & designers for marine & distribution loading arm
(DLA) replacement and refurbishment at shipping, rail and truck terminals for
liquid & compressed gas product transfer.
Streamlined process & created standard tools which reduced engineering touch time
by 30%.
Designed "one" DLA vapor capturing mechanism for use on "all" rail & truck tank
inlets.
Instituted pipe flow analysis to reduce loading arm rework & stoppage in terminal
operations.
Specify pipe and seal material type for compatibility with end user product.
Created welding procedures, conducted root cause analysis & prepared failure
analysis reports.
Created business summaries and justifications for all major projects. Presented to
executive management, customer groups and board members.
Designed and implemented remote monitoring system for American Express global
authorization networks.
Engineering Manager
Responsible for supervision, development, and assigning of all projects within the
company from conception to completion.
Directly supervised 7 engineers and assigned all projects and timelines while
developing industry accepted policy and procedures for department.
Created and prepared product plans and system layouts with detailed drawings and
schematics in both 2D and 3D CAD.
Maintained control of project timelines and expenditures while working directly with
contractors and vendors.
Designed all products and performed monitoring activities in order to ensure that
products comply with ABYC and NMMA requirements and regulations.
Partnered jointly with outside agencies and stakeholders to reduce company O&M
and capital expenditures while improving public transportation services.
Administered railroad design and construction; while playing significant role in MetroNorth's strategic business plan and Vision 2013 goals.
Worked with sponsor and user departments to prepare capital project Master Plans
"cradle to grave" specifications.