New/Augmentation Proposals for MVS,SVS and (MVS+SVS) under Jal Jeevan Mission (JJM)

Proposed
Brief components Ultimated design
Type works Proposed amount
Existing / Present coverage Proposed New coverage supply for proposed
proposed in the In-Village design (Rs. In Lakhs)
of works in MLD
MVS (Intake Well, Propose LPCD
propos
Raw water d
ed
Pumpsets, Raw compone Existing rural
work in
Water Pumping nts Rural ULB Rural ULB habs / ULBs
referen
Sl. Name of the Mains, WTPs, Clear (OHSRs, from which Remar
ce to Justification for the proposal
No Proposed work Water Pumping Distributi segment / ks
JJM
Stations, Clear ons, scheme being
Guideli Indust Industr
water reservoirs, Househol District covered Rural ULB Rural ULB Rural ULB Total
nes ries ies
OHBRs, BPTs, d Populatio Ultimate Population Ultimate
(Categ No of Population House Population House No of House House
GLBRs, Gravity Connecti No District n (2011 Population to No (2011 Population to
ory-I/II/ habs benefitted holds benefitted holds habs holds holds
Transmission lines ons census) be benefitted census) be benefitted
III/V)
etc.,)

31=(28+2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 9+30) 32 33

Due of the frequent power outages in the


intermediate pumping stations and the
Clear water excessive turbidity of the ADA project
Pumping Station, throughout the monsoon season. as an
Adilabad
1. Improvements to “ OHBR, Clear water - 204 70000 94002 - - - - - KB-Asifabad 125.53 0.00 12.55 alternative, a proposal has been made to
(Khanapur)
Providing Drinking Pumping Main and supply water from Madegon 135MLD
Water to Khanapur Gravity Mains WTP to 3 Mandals of Khanapur
Constituency, Constituncy (Indervelly, Sirikonda and
Adialbad part of Utnoor mandals)
constituency
SRSP Adilabad
1 (Adilabad, II - 934763 233691 0 0 0 100 135 10500 1. Existing Pumping with 266meters static
Segment
Indervelly, Sirikonda head resulting in damage of Pump sets
and part of Utnoor regularly. By this Intermediate pumping
mandals) in station provision static head is bifurcated in
Adilabad district “ to two parts which results in higher eficiency
from Madegaon of working pumps. 2. PN-25 Valves for SRSP
WTP 1. Additional Segment Primary main to with stand 260
Pumpsets at Adilabad - - - - - - - - - SRSP Adilabad 0.00 - 0 meters of static head.
Madegom WTP 2.
Intermediate Pumping
station at Khandala
Hill station 3. Supply
and Fixing of PN -25
Butter fly valves

Category of proposed
development works as
of in-village per water
piped JJM supply
I: infrastructure to provide tap water connection
to every rural household
II: development of reliable drinking water sources and/ or augmentation of existing sources to provide long-term sustainability of water supply system
III: wherever necessary, bulk water transfer, treatment plants and distribution network to cater to every rural household
V: retrofitting of completed and ongoing schemes to provide FHTCs at minimum service level of 55 lpcd

Note: If the Scheme is covered in morethan 1 district, district-wise information shall be submitted and proposed amount shall be submitted for scheme as a whole.