You are on page 1of 122

DAFTAR KUANTITAS DAN HARGA

PROYEK : DESAIN, SUPLAI DAN PEMASANGAN GARDU INDUK 500 KV AMPEL DAN TRANSMISI INCOMER 500 KV

Harga Sistem 500 kV Harga Sistem 150 kV Total Harga


NO URAIAN
(Rupiah) (Rupiah) (Rupiah)

1 Pengadaan dan Pemasangan Pekerjaan Elektrikal Mekanikal Gardu Induk 500 kV dan 150 kV #REF! #REF! #REF!
2 Pengadaan dan Pemasangan Pekerjaan Sipil Gardu Induk 500 kV dan 150 kV Out of Scope

3 Pengadaan dan Pemasangan Pekerjaan Transmisi Incomer 1 CCT Ampel - Ungaran Jalur 1 Out of Scope

4 Pengadaan dan Pemasangan Pekerjaan Transmisi Incomer 1 CCT Ampel - Pedan Jalur 1 Out of Scope

5 Pengadaan dan Pemasangan Pekerjaan Transmisi Incomer 4 CCT Ampel - Bawen dan Ampel - Klaten Out of Scope

6 Pengadaan dan Pemasangan Pekerjaan Transmisi Incomer 4 CCT Ampel - Bringin dan Ampel - Mojosongo Out of Scope

TOTAL HARGA #REF!

PT Siemens Indonesia 1 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
DESAIN, SUPLAI DAN PEMASANGAN ELEKTRO MEKANIK GITET 500 KV AMPEL

GRAND
JASA
TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME TESTING & TOTAL TOTAL TOTAL
REPACKAGING TRANSPORTATION ERECTION TOTAL ERECTION
COMMISSIONING REPACKAGING TRANSPORTATION TESTCOMM ( Rp. )
(Rp) (Rp) (Rp) (Rp)
(Rp) (Rp) (Rp) (Rp)

(1) (2) (4) (5) (6) (7) (8) (9) (10)=(5X6) (11)=(5X7) (12)=(5X8) (13)=(5X9) (14) = (10+11+12+13)
I GITET 500 KV AMPEL
1. Dia-1 for T/L bay UNGARAN-1
2. Dia-2 for T/L bay UNGARAN-2 & T/R bay Interbus Transformer (IBT) No-1
3. Dia-3 for T/L bay PEDAN-2 & T/R bay Interbus Transformer (IBT) No-2
4. Dia-4 for T/L bay PEDAN-1

500 KV OUTDOOR EQUIPMENT for T/L bay UNGARAN-1


(DIAMETER No. 1)
(refer to single line diagram drawing)

CIRCUIT BREAKER, 3 POLE COMPLETE WITH OPERATING MECHANISM SUITABLE FOR SINGLE PHASE HIGH SPEED
AUTO-RECLOSURE AND DELAYED 3 POLE AUTO-RECLOSURE, COMPLETE WITH CONTROL CUBICLE AND ALL
1.1 LOCAL CONTROL APPARATUS, INCLUDING ANTI-CONDENSATION HEATERS, AUXILIARY SWITCHES, TERMINALS,
LABELS , SUPPORTING STEEL STRUCTURE AND ALL NECESSARY EQUIPMENT OF : (According to TPG.2.2.AIS.500KV-
E)

1.1.1 Circuit breaker with closing resistance set 2 Supplied By SIEMENS Supplied By SIEMENS - - -
BUSBAR SELECTOR DISCONNECTOR PANTOGRAPH DESIGN, 3 POLE MOTOR OPERATED WITH OPERATING
MECHANISM AND LOCAL CONTROL APPARATUS COMPLETE WITH ANTI-CONDENSATION HEATERS, AUXILIARY
1.2 set 2 Supplied By SIEMENS Supplied By SIEMENS - - -
SWITCHES, TERMINALS, LABELS, INTERLOCKS, SUPPORTING STEEL STRUCTURE AND ALL NECESSARY
EQUIPMENT. (According to TPG.3.AIS.500KV-E)

DISCONNECTOR, 3 POLE MOTOR OPERATED WITH OPERATING MECHANISM AND LOCAL CONTROL APPARATUS
COMPLETE WITH ANTI-CONDENSATION HEATERS, AUXILIARY SWITCHES, TERMINALS, LABELS, INTERLOCKS,
1.3 set 3 Supplied By SIEMENS Supplied By SIEMENS - - -
SUPPORTING STEEL STRUCTURE AND ALL NECESSARY EQUIPMENT. (According to TPG.3.AIS.500KV-E) ( for
Diameter)

DISCONNECTOR, 3 POLE MOTOR OPERATED AND ASSOCIATED MANUALLY OPERATED EARTH SWITCH WITH
OPERATING MECHANISM AND LOCAL CONTROL APPARATUS COMPLETE WITH ANTI-CONDENSATION HEATERS,
1.4 set 1 - - - - -
AUXILIARY SWITCHES, TERMINALS, LABELS, INTERLOCKS SUPPORTING STEEL STRUCTURE AND ALL
NECESSARY EQUIPMENT.(According to TPG.3.AIS.500KV-E) ( for Line & IBT)

CAPACITOR VOLTAGE TRANSFORMER FOR INSTRUMENTATION. INCLUDED SUPPORTING STEEL STRUCTURE


1.5 single phase 3 - - - - -
(According toTPG.5.B.AIS.500KV-E)

CAPACITOR VOLTAGE TRANSFORMER FOR INSTRUMENTATION. INCLUDED SUPPORTING STEEL STRUCTURE


1.6 single phase 3 - - - - -
(According toTPG.5.B.AIS.500KV-E)
1.
POST TYPE CURRENT TRANSFORMER COMPLETE WITH SUPPORTING STEEL STRUCTURE SECONDARY WINDINGS OF
1.7 REQUIRED RATIO AND ACCURACY '(SEE APPROPRIATE CLAUSES AND PLATE DRAWINGS) FOR LINE. (According to single phase 3 - - - - -
TPG.4.A3.1.AIS.500KV-E)

POST TYPE CURRENT TRANSFORMER COMPLETE WITH SUPPORTING STEEL STRUCTURE, SECONDARY WINDINGS
1.8 OF REQUIRED RATIO AND ACCURACY (SEE APPROPRIATE CLAUSES AND PLATE DRAWINGS) FOR DIAMETER single phase 6 - - - - -
((According to TPG.4.A4.AIS.500KV-E)

LINE TRAP COMPLETE WITH SUPPORTING STEEL STRUCTUREPOST , INSULATORS, SUPPORTING STEEL STRUCTURE
1.9 unit 1 Supplied By SIEMENS Supplied By SIEMENS - - -
AND ALL NECESSARY FIXINGS AND ANCILLIARY ITEMS OF EQUIPMENT 0.5 Mh

CONNECTIONS, POST INSULATORS, SUSPENSION AND TENSION INSULATOR SETS, FITTINGS, CLAMPS AND ALL
1.10 - - - - -
NECESSARY ITEMS, TO EQUIP ONE COMPLETE SWITCHBAY (According to TPG.7.B2.AIS.500KV-E)

1.10.1 500 KV POST INSULATOR, COMPLETE WITH FITTINGS, SUPPORTING STEEL STRUCTURE, CLAMPS AND ALL
NECESSARY ITEMS EQUIPMENT set 15 Supplied By SIEMENS Supplied By SIEMENS - - -

1.10.2 BARE ALUMINIUM CONDUCTOR OF 2 X TAL WITH CAPACITY ≥ 4000 A FOR 3-PHASE BAY LINE & DIAMETER lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -
1.10.3 500 KV DOUBLE TENSION STRING INSULATOR SET COMPLETE WITH FITTINGS FOR INSTALLATION OF DIAMETER AS
SPECIFIED. set 6 Supplied By SIEMENS Supplied By SIEMENS - - -

1.10.4 500 KV SINGLE SUSPENSION STRING INSULATOR SET COMPLETE WITH FITTINGS FOR INSTALLATION OF DIAMETER
AS SPECIFIED. set 6 Supplied By SIEMENS Supplied By SIEMENS - - -

1.10.5 SET OF CLAMPS, CONNECTORS, SHIELD WIRE AND ACCESSORIES FOR INSTALLATION OF DIAMETER AS SPECIFIED. lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -

OUTDOOR SWITCHBAY MARSHALLING CUBICLE COMPLETE WITH TERMINAL BOARDS, WEATHERPROOF


SWITCHED SOCKET OUTLET, ANTI-CONDENSATION HEATER, TELEPHONE JACK, WIRING, GLANDS, LABELS, AND Supplied By SIEMENS By SIEMENS Supplied By SIEMENS By SIEMENS
1.11 set 3 - -
ACCOMMODATION FOR ALL NECESSARY MULTICORE AND AUXILIARY CABLES.AND AUXILIARY CABLES.
(According to TPG.9.C.AIS.500KV-E)

SURGE ARRESTER MOUNTED ON INSULATING BASE, COMPLETE WITH SUPPORTING STEEL STRUCTURE , SURGE
1.12 single phase 3 - - - - -
COUNTER AND LEAKAGE CURRENT METER (According to TPG.6.AIS.500KV-E)

LV power cable, control cable and accesorries and necessary equipment (cable ladder, clamp, cable lug, terminal, etc.) to complete the Supplied By SIEMENS Supplied By SIEMENS
1.13 lot 1 - - -
specified scope of work.
TOTAL PRICE ITEM-1

PT Siemens Indonesia 2 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
DESAIN, SUPLAI DAN PEMASANGAN ELEKTRO MEKANIK GITET 500 KV AMPEL

GRAND
JASA
TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME TESTING & TOTAL TOTAL TOTAL
REPACKAGING TRANSPORTATION ERECTION TOTAL ERECTION
COMMISSIONING REPACKAGING TRANSPORTATION TESTCOMM ( Rp. )
(Rp) (Rp) (Rp) (Rp)
(Rp) (Rp) (Rp) (Rp)

(1) (2) (4) (5) (6) (7) (8) (9) (10)=(5X6) (11)=(5X7) (12)=(5X8) (13)=(5X9) (14) = (10+11+12+13)
500 KV OUTDOOR EQUIPMENT for T/L bay UNGARAN-2 & T/R bay Interbus Transformer (IBT) No-1
(DIAMETER No. 2)
(refer to single line diagram drawing)
CIRCUIT BREAKER, 3 POLE COMPLETE WITH OPERATING MECHANISM SUITABLE FOR SINGLE PHASE HIGH SPEED
AUTO-RECLOSURE AND DELAYED 3 POLE AUTO-RECLOSURE, COMPLETE WITH CONTROL CUBICLE AND ALL
2.1 LOCAL CONTROL APPARATUS, INCLUDING ANTI-CONDENSATION HEATERS, AUXILIARY SWITCHES, TERMINALS,
LABELS , SUPPORTING STEEL STRUCTURE AND ALL NECESSARY EQUIPMENT OF : (According to TPG.2.1.AIS.500KV-
E & TPG.2.2.AIS.500KV-E)
2.1.1 Circuit breaker with closing resistance set 1 Supplied By SIEMENS Supplied By SIEMENS - - -
2.1.2 Circuit breaker without closing resistance set 1 - - - - -

BUSBAR SELECTOR DISCONNECTOR PANTOGRAPH DESIGN, 3 POLE MOTOR OPERATED WITH OPERATING
MECHANISM AND LOCAL CONTROL APPARATUS COMPLETE WITH ANTI-CONDENSATION HEATERS, AUXILIARY
2.2 set 2 - - - - -
SWITCHES, TERMINALS, LABELS, INTERLOCKS, SUPPORTING STEEL STRUCTURE AND ALL NECESSARY
EQUIPMENT. (According to TPG.3.AIS.500KV-E)

DISCONNECTOR, 3 POLE MOTOR OPERATED WITH OPERATING MECHANISM AND LOCAL CONTROL APPARATUS
COMPLETE WITH ANTI-CONDENSATION HEATERS, AUXILIARY SWITCHES, TERMINALS, LABELS, INTERLOCKS,
2.3 set 4 - - - - -
SUPPORTING STEEL STRUCTURE AND ALL NECESSARY EQUIPMENT. (According to TPG.3.AIS.500KV-E) ( for
Diameter)

DISCONNECTOR, 3 POLE MOTOR OPERATED AND ASSOCIATED MANUALLY OPERATED EARTH SWITCH WITH
OPERATING MECHANISM AND LOCAL CONTROL APPARATUS COMPLETE WITH ANTI-CONDENSATION HEATERS,
2.4 set 1 - - - - -
AUXILIARY SWITCHES, TERMINALS, LABELS, INTERLOCKS SUPPORTING STEEL STRUCTURE AND ALL
NECESSARY EQUIPMENT. (According to TPG.3.AIS.500KV-E) ( for Line & IBT )
2.

POST TYPE CURRENT TRANSFORMER COMPLETE WITH SUPPORTING STEEL STRUCTURE, SECONDARY WINDINGS
2.8 OF REQUIRED RATIO AND ACCURACY (SEE APPROPRIATE CLAUSES AND PLATE DRAWINGS) FOR DIAMETER single phase 6 - - - - -
(According to TPG.4.A4.AIS.500KV-E)

CONNECTIONS, POST INSULATORS, SUSPENSION AND TENSION INSULATOR SETS, FITTINGS, CLAMPS AND ALL
2.10 - - - - -
NECESSARY ITEMS, TO EQUIP ONE COMPLETE SWITCHBAY (According to TPG.7.B2.AIS.500KV-E)
2.10.1 500 KV POST INSULATOR, COMPLETE WITH FITTINGS, SUPPORTING STEEL STRUCTURE, CLAMPS AND ALL
NECESSARY ITEMS EQUIPMENT
set 15 Supplied By SIEMENS Supplied By SIEMENS - - -

2.10.2 BARE ALUMINIUM CONDUCTOR OF 2 X TAL 660 mm2 WITH CAPACITY ≥ 3150 A FOR 3-PHASE BAY LINE & DIAMETER lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -

2.10.3 500 KV DOUBLE TENSION STRING INSULATOR SET COMPLETE WITH FITTINGS FOR INSTALLATION OF DIAMETER AS
SPECIFIED. set 12 Supplied By SIEMENS Supplied By SIEMENS - - -

2.10.4 500 KV SINGLE SUSPENSION STRING INSULATOR SET COMPLETE WITH FITTINGS FOR INSTALLATION OF DIAMETER
AS SPECIFIED. set 12 Supplied By SIEMENS Supplied By SIEMENS - - -

2.10.5 SET OF CLAMPS, CONNECTORS, SHIELD WIRE AND ACCESSORIES FOR INSTALLATION OF DIAMETER AS SPECIFIED. lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -

OUTDOOR SWITCHBAY MARSHALLING CUBICLE COMPLETE WITH TERMINAL BOARDS, WEATHERPROOF


SWITCHED SOCKET OUTLET, ANTI-CONDENSATION HEATER, TELEPHONE JACK, WIRING, GLANDS, LABELS, AND Supplied By SIEMENS By SIEMENS Supplied By SIEMENS By SIEMENS
2.11 set 3 - -
ACCOMMODATION FOR ALL NECESSARY MULTICORE AND AUXILIARY CABLES.AND AUXILIARY CABLES.
(According to TPG.9.C.AIS.500KV-E)

SURGE ARRESTER MOUNTED ON INSULATING BASE, COMPLETE WITH SUPPORTING STEEL STRUCTURE , SURGE
2.12 single phase 3 - - - - -
COUNTER AND LEAKAGE CURRENT METER (According to TPG.6.AIS.500KV-E)

LV power cable, control cable and accesorries and necessary equipment (cable ladder, clamp, cable lug, terminal, etc.) to complete the
2.13 lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -
specified scope of work.
TOTAL PRICE ITEM-2

PT Siemens Indonesia 3 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
DESAIN, SUPLAI DAN PEMASANGAN ELEKTRO MEKANIK GITET 500 KV AMPEL

GRAND
JASA
TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME TESTING & TOTAL TOTAL TOTAL
REPACKAGING TRANSPORTATION ERECTION TOTAL ERECTION
COMMISSIONING REPACKAGING TRANSPORTATION TESTCOMM ( Rp. )
(Rp) (Rp) (Rp) (Rp)
(Rp) (Rp) (Rp) (Rp)

(1) (2) (4) (5) (6) (7) (8) (9) (10)=(5X6) (11)=(5X7) (12)=(5X8) (13)=(5X9) (14) = (10+11+12+13)
500 KV OUTDOOR EQUIPMENT for T/L bay PEDAN-2 & T/R bay Interbus Transformer (IBT) No-2
(DIAMETER No. 3)
(refer to single line diagram drawing)

CIRCUIT BREAKER, 3 POLE COMPLETE WITH OPERATING MECHANISM SUITABLE FOR SINGLE PHASE HIGH SPEED
AUTO-RECLOSURE AND DELAYED 3 POLE AUTO-RECLOSURE, COMPLETE WITH CONTROL CUBICLE AND ALL
3.1 LOCAL CONTROL APPARATUS, INCLUDING ANTI-CONDENSATION HEATERS, AUXILIARY SWITCHES, TERMINALS,
LABELS , SUPPORTING STEEL STRUCTURE AND ALL NECESSARY EQUIPMENT OF : (According to TPG.2.1.AIS.500KV-
E & TPG.2.2.AIS.500KV-E)

3.1.1 Circuit breaker with closing resistance set 1 - - - - -


3.1.2 Circuit breaker without closing resistance set 1 - - - - -
BUSBAR SELECTOR DISCONNECTOR PANTOGRAPH DESIGN, 3 POLE MOTOR OPERATED WITH OPERATING
MECHANISM AND LOCAL CONTROL APPARATUS COMPLETE WITH ANTI-CONDENSATION HEATERS, AUXILIARY
3.2 set 2 - - - - -
SWITCHES, TERMINALS, LABELS, INTERLOCKS, SUPPORTING STEEL STRUCTURE AND ALL NECESSARY
EQUIPMENT. (According to TPG.3.AIS.500KV-E)

DISCONNECTOR, 3 POLE MOTOR OPERATED WITH OPERATING MECHANISM AND LOCAL CONTROL APPARATUS
COMPLETE WITH ANTI-CONDENSATION HEATERS, AUXILIARY SWITCHES, TERMINALS, LABELS, INTERLOCKS,
3.3 set 4 - - - - -
SUPPORTING STEEL STRUCTURE AND ALL NECESSARY EQUIPMENT. (According to TPG.3.AIS.500KV-E) ( for
Diameter)

DISCONNECTOR, 3 POLE MOTOR OPERATED AND ASSOCIATED MANUALLY OPERATED EARTH SWITCH WITH
OPERATING MECHANISM AND LOCAL CONTROL APPARATUS COMPLETE WITH ANTI-CONDENSATION HEATERS,
3.4 set 1 - - - - -
AUXILIARY SWITCHES, TERMINALS, LABELS, INTERLOCKS SUPPORTING STEEL STRUCTURE AND ALL
3 NECESSARY EQUIPMENT. (According to TPG.3.AIS.500KV-E) ( for Line & IBT )

POST TYPE CURRENT TRANSFORMER COMPLETE WITH SUPPORTING STEEL STRUCTURE, SECONDARY WINDINGS
3.8 OF REQUIRED RATIO AND ACCURACY (SEE APPROPRIATE CLAUSES AND PLATE DRAWINGS) FOR DIAMETER single phase 6 - - - - -
(According to TPG.4.A4.AIS.500KV-E)

CONNECTIONS, POST INSULATORS, SUSPENSION AND TENSION INSULATOR SETS, FITTINGS, CLAMPS AND ALL
3.10 - - - - -
NECESSARY ITEMS, TO EQUIP ONE COMPLETE SWITCHBAY (According to TPG.7.B2.AIS.500KV-E)

3.10.1 500 KV POST INSULATOR, COMPLETE WITH FITTINGS, SUPPORTING STEEL STRUCTURE, CLAMPS AND ALL
NECESSARY ITEMS EQUIPMENT
set 15 Supplied By SIEMENS Supplied By SIEMENS - - -
3.10.2 BARE ALUMINIUM CONDUCTOR OF 2 X TAL WITH CAPACITY ≥ 4000 A FOR 3-PHASE BAY LINE & DIAMETER lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -
3.10.3 500 KV DOUBLE TENSION STRING INSULATOR SET COMPLETE WITH FITTINGS FOR INSTALLATION OF DIAMETER AS
SPECIFIED. set 12 Supplied By SIEMENS Supplied By SIEMENS - - -
3.10.4 500 KV SINGLE SUSPENSION STRING INSULATOR SET COMPLETE WITH FITTINGS FOR INSTALLATION OF DIAMETER
AS SPECIFIED. set 12 Supplied By SIEMENS Supplied By SIEMENS - - -

3.10.5 SET OF CLAMPS, CONNECTORS, SHIELD WIRE AND ACCESSORIES FOR INSTALLATION OF DIAMETER AS SPECIFIED. lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -
OUTDOOR SWITCHBAY MARSHALLING CUBICLE COMPLETE WITH TERMINAL BOARDS, WEATHERPROOF
SWITCHED SOCKET OUTLET, ANTI-CONDENSATION HEATER, TELEPHONE JACK, WIRING, GLANDS, LABELS, AND Supplied By SIEMENS By SIEMENS Supplied By SIEMENS By SIEMENS
3.11 set 3 - -
ACCOMMODATION FOR ALL NECESSARY MULTICORE AND AUXILIARY CABLES.AND AUXILIARY CABLES.
(According to TPG.9.C.AIS.500KV-E)
SURGE ARRESTER MOUNTED ON INSULATING BASE, COMPLETE WITH SUPPORTING STEEL STRUCTURE , SURGE
3.12 single phase 3 - - - - -
COUNTER AND LEAKAGE CURRENT METER (According to TPG.6.AIS.500KV-E)
LV power cable, control cable and accesorries and necessary equipment (cable ladder, clamp, cable lug, terminal, etc.) to complete the
3.13 lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -
specified scope of work.
TOTAL PRICE ITEM-3

PT Siemens Indonesia 4 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
DESAIN, SUPLAI DAN PEMASANGAN ELEKTRO MEKANIK GITET 500 KV AMPEL

GRAND
JASA
TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME TESTING & TOTAL TOTAL TOTAL
REPACKAGING TRANSPORTATION ERECTION TOTAL ERECTION
COMMISSIONING REPACKAGING TRANSPORTATION TESTCOMM ( Rp. )
(Rp) (Rp) (Rp) (Rp)
(Rp) (Rp) (Rp) (Rp)

(1) (2) (4) (5) (6) (7) (8) (9) (10)=(5X6) (11)=(5X7) (12)=(5X8) (13)=(5X9) (14) = (10+11+12+13)
500 KV OUTDOOR EQUIPMENT for T/L bay PEDAN-1
(DIAMETER No. 4)
(refer to single line diagram drawing)
CIRCUIT BREAKER, 3 POLE COMPLETE WITH OPERATING MECHANISM SUITABLE FOR SINGLE PHASE HIGH SPEED
AUTO-RECLOSURE AND DELAYED 3 POLE AUTO-RECLOSURE, COMPLETE WITH CONTROL CUBICLE AND ALL
4.1 LOCAL CONTROL APPARATUS, INCLUDING ANTI-CONDENSATION HEATERS, AUXILIARY SWITCHES, TERMINALS,
LABELS , SUPPORTING STEEL STRUCTURE AND ALL NECESSARY EQUIPMENT OF : (According to TPG.2.2.AIS.500KV-
E)
4.1.1.a Circuit breaker with closing resistance set 1 Supplied By SIEMENS Supplied By SIEMENS - - -
4.1.1.b Circuit breaker with closing resistance set 1 - - - - -
BUSBAR SELECTOR DISCONNECTOR PANTOGRAPH DESIGN, 3 POLE MOTOR OPERATED WITH OPERATING
MECHANISM AND LOCAL CONTROL APPARATUS COMPLETE WITH ANTI-CONDENSATION HEATERS, AUXILIARY
4.2 set 2 Supplied By SIEMENS Supplied By SIEMENS - - -
SWITCHES, TERMINALS, LABELS, INTERLOCKS, SUPPORTING STEEL STRUCTURE AND ALL NECESSARY
EQUIPMENT. (According to TPG.3.AIS.500KV-E)

DISCONNECTOR, 3 POLE MOTOR OPERATED WITH OPERATING MECHANISM AND LOCAL CONTROL APPARATUS
COMPLETE WITH ANTI-CONDENSATION HEATERS, AUXILIARY SWITCHES, TERMINALS, LABELS, INTERLOCKS, Supplied By SIEMENS Supplied By SIEMENS
4.3 set 3 - - -
SUPPORTING STEEL STRUCTURE AND ALL NECESSARY EQUIPMENT. (According to TPG.3.AIS.500KV-E) ( for
Diameter)

DISCONNECTOR, 3 POLE MOTOR OPERATED AND ASSOCIATED MANUALLY OPERATED EARTH SWITCH WITH
OPERATING MECHANISM AND LOCAL CONTROL APPARATUS COMPLETE WITH ANTI-CONDENSATION HEATERS,
4.4 set 1 - - - - -
AUXILIARY SWITCHES, TERMINALS, LABELS, INTERLOCKS SUPPORTING STEEL STRUCTURE AND ALL
NECESSARY EQUIPMENT. (According to TPG.TPG.3.AIS.500KV-E) ( for Line )

4.5 CAPACITOR VOLTAGE TRANSFORMER FOR INSTRUMENTATION. SUPPORTING STEEL STRUCTURE (According toTPG.5.B.AIS.500KV-E)
single phase 3 - - - - -
CAPACITOR VOLTAGE TRANSFORMER FOR LINE PROTECTION . SUPPORTING STEEL STRUCTURE (According to
4.6 single phase 3 - - - - -
TPG.5.B.AIS.500KV-E)
4.
POST TYPE CURRENT TRANSFORMER COMPLETE WITH SUPPORTING STEEL STRUCTURE, SECONDARY WINDINGS
4.7 OF REQUIRED RATIO AND ACCURACY '(SEE APPROPRIATE CLAUSES AND PLATE DRAWINGS) FOR LINE. (According single phase 3 - - - - -
to TPG.4.A3.1.AIS.500KV-E)

POST TYPE CURRENT TRANSFORMER COMPLETE WITH SUPPORTING STEEL STRUCTURE, SECONDARY WINDINGS
4.8 OF REQUIRED RATIO AND ACCURACY (SEE APPROPRIATE CLAUSES AND PLATE DRAWINGS) FOR DIAMETER single phase 6 - - - - -
(According to TPG.4.A4.AIS.500KV-E)
LINE TRAP COMPLETE WITH SUPPORTING POST INSULATORS, SUPPORTING STEEL STRUCTURE, AND ALL
4.9 unit 1 Supplied By SIEMENS Supplied By SIEMENS - - -
NECESSARY FIXINGS AND ANCILLIARY ITEMS OF EQUIPMENT 0.5 Mh

CONNECTIONS, POST INSULATORS, SUSPENSION AND TENSION INSULATOR SETS, FITTINGS, CLAMPS AND ALL
4.10 - - - - -
NECESSARY ITEMS, TO EQUIP ONE COMPLETE SWITCHBAY (According to TPG.7.B2.AIS.500KV-E)

4.10.1 500 KV POST INSULATOR, COMPLETE WITH FITTINGS, SUPPORTING STEEL STRUCTURE, CLAMPS AND ALL
NECESSARY ITEMS EQUIPMENT set 15 Supplied By SIEMENS Supplied By SIEMENS - - -

4.10.2 BARE ALUMINIUM CONDUCTOR OF 2 X TAL WITH CAPACITY ≥ 4000 A FOR 3-PHASE BAY LINE & DIAMETER lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -
4.10.3 500 KV DOUBLE TENSION STRING INSULATOR SET COMPLETE WITH FITTINGS FOR INSTALLATION OF DIAMETER AS
SPECIFIED. set 6 Supplied By SIEMENS Supplied By SIEMENS - - -
4.10.4 500 KV SINGLE SUSPENSION STRING INSULATOR SET COMPLETE WITH FITTINGS FOR INSTALLATION OF DIAMETER
AS SPECIFIED. set 6 Supplied By SIEMENS Supplied By SIEMENS - - -

4.10.5 SET OF CLAMPS, CONNECTORS, SHIELD WIRE AND ACCESSORIES FOR INSTALLATION OF DIAMETER AS SPECIFIED. lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -

OUTDOOR SWITCHBAY MARSHALLING CUBICLE COMPLETE WITH TERMINAL BOARDS, WEATHERPROOF


SWITCHED SOCKET OUTLET, ANTI-CONDENSATION HEATER, TELEPHONE JACK, WIRING, GLANDS, LABELS, AND Supplied By SIEMENS By SIEMENS Supplied By SIEMENS By SIEMENS
4.11 set 3 - -
ACCOMMODATION FOR ALL NECESSARY MULTICORE AND AUXILIARY CABLES.AND AUXILIARY CABLES.
(According to TPG.9.C.AIS.500KV-E)

SURGE ARRESTER MOUNTED ON INSULATING BASE, COMPLETE WITH SUPPORTING STEEL STRUCTURE , SURGE
4.12 single phase 3 Supplied By SIEMENS Supplied By SIEMENS - - -
COUNTER AND LEAKAGE CURRENT METER (According to TPG.6.AIS.500KV-E)

LV power cable, control cable and accesorries and necessary equipment (cable ladder, clamp, cable lug, terminal, etc.) to complete the
4.13 lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -
specified scope of work.
TOTAL PRICE ITEM-4

PT Siemens Indonesia 5 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
DESAIN, SUPLAI DAN PEMASANGAN ELEKTRO MEKANIK GITET 500 KV AMPEL

GRAND
JASA
TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME TESTING & TOTAL TOTAL TOTAL
REPACKAGING TRANSPORTATION ERECTION TOTAL ERECTION
COMMISSIONING REPACKAGING TRANSPORTATION TESTCOMM ( Rp. )
(Rp) (Rp) (Rp) (Rp)
(Rp) (Rp) (Rp) (Rp)

(1) (2) (4) (5) (6) (7) (8) (9) (10)=(5X6) (11)=(5X7) (12)=(5X8) (13)=(5X9) (14) = (10+11+12+13)
500 KV BUSBARS AND CONNECTIONS (According to TPG.8.B.AIS.500KV)
CAPACITOR VOLTAGE TRANSFORMER FOR SYNCHRONIZING PURPOSES COMPLETE WITH CONNECTIONS, FITTING
5.1 single phase 2 - - - - -
AND CLAMPS. (According to TPG.5.B.AIS.500KV-E)
CONDUCTORS , SUSPENSION AND TENSION INSULATOR SETS, POST INSULATOR SETS, CLAMPS, FITTINGS AND ALL
5 5.2 NECESSARY ITEMS TO EQUIP BUSBAR FOR 4 (four) SWITCHBAYS. (According to TPG.8.B.AIS.500KV lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -
&TPG.7.B2.AIS.500KV-E)
3 POLE MANUALLY OPERATED EARTH SWITCH WITH OPERATING MECHANISM COMPLETE WITH AUXILIARY
5.3 SWITCHES, SUPPORTING STEEL STRUCTURE , TERMINALS LABELS, INTERLOCKS AND ALL NECESSARY set 2 Supplied By SIEMENS Supplied By SIEMENS - - -
EQUIPMENT. (According to TPG.3.AIS.500KV-E)
TOTAL PRICE ITEM-5
6.1 Shield wire and accessories (According to TPG.16.AIS.500KV-E)
Aluminium-Clad Steel Wires(AS) 95 mm2 for shield wire for installation of main busbar shield wire as specified (According to
6,1.1 m' 1,230 Supplied By SIEMENS Supplied By SIEMENS - - -
TPG.30.AIS.500KV-CSTM)
6,1.2 Set of clamps, connectors and accessories for installation of the main busbar shield wire as specified set 44 Supplied By SIEMENS Supplied By SIEMENS - - -
500 KV SUBSTATION EARTING SYSTEM SUBSTATION EARTIN SYSTEM ON AREA OF ​160 M x 187 M AND 37 M x 32 M (depth
6.2 - - - -
80 cm, distance 5 m x 5 m, Cu 150 mm2) (According to TPG.16.AIS.500KV-E)

6 COPPER STRIP OR FLEXIBLE CONDUCTORS OF THE CROSS SECTION SPECIFIED, INSTALLED SO AS TO FORM A GRID
6,2.1 SYSTEM LAID DIRECTLY IN THE GROUND ENCLOSING THE COMPLETE SUBSTATION TOGETHER WITH ALL Meter 9,014 Supplied By SIEMENS Supplied By SIEMENS - - -
ELECTRODES FOR SURGE ARRESTER AND PLC SIGNALLING EQUIPMENT DIRECT EARTHING.

COPPER STRIP OF FLEXIBLE CONDUCTORS TO CONNECT METALCLAD PARTS OF ALL EQUIPMENT AND Supplied By SIEMENS Supplied By SIEMENS
6,2.2 lot 1 - - -
STRUCTURES TO MAIN EARTH SYSTEM.
COPPER STRIP OR FLEXIBLE CONDUCTORS TO BOND ALL OVERHEAD LINE TOWERS DIRECT TO THE SUBSTATION Supplied By SIEMENS Supplied By SIEMENS
6,2.3 Lot 1 - - -
EARTH SYSTEM.
TOTAL PRICE ITEM-6
500 KV SUBSTATIONS MULTICORE AND AUXILIARY CABLES (According to TPG.15.B.AIS.150KV)

7 TRUNK MULTICORE CABLES INCLUDING TERMINATIONS, GLANDS, SUPPORTS, RACKS CLEATS AND ALL
7.1 NECESSARY ITEMS OF EQUIPMENT TO INTERCONNECT ALL ITEMS OF CONTROL PROTECTIVE DEVICES ALARMS, set 1 Supplied By SIEMENS Supplied By SIEMENS - - -
AC AND DC SUPPLIES EQUIPMENT ON THE 500 KV SUBSTATION SITE AND BUILDINGS.

TOTAL PRICE ITEM-7

PT Siemens Indonesia 6 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
DESAIN, SUPLAI DAN PEMASANGAN ELEKTRO MEKANIK GITET 500 KV AMPEL

GRAND
JASA
TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME TESTING & TOTAL TOTAL TOTAL
REPACKAGING TRANSPORTATION ERECTION TOTAL ERECTION
COMMISSIONING REPACKAGING TRANSPORTATION TESTCOMM ( Rp. )
(Rp) (Rp) (Rp) (Rp)
(Rp) (Rp) (Rp) (Rp)

(1) (2) (4) (5) (6) (7) (8) (9) (10)=(5X6) (11)=(5X7) (12)=(5X8) (13)=(5X9) (14) = (10+11+12+13)
8 500 KV SUBSTATION STRUCTURES (According to TPG.1.B.AIS.500KV-E)
8.1 SUPPORTING STRUCTURES FOR BUSBARS SUFFICIENT TO EQUIP FOUR DIAMETER SWITCHBAYS.
8.1,2 Post steel Structure Type-3, high 16,5 m' (TW-3) sets 6 Supplied By SIEMENS Supplied By SIEMENS - - -
8.1,3 Beam steel Structure Type-1, for Busbar, 30 m' sets 6 Supplied By SIEMENS Supplied By SIEMENS - - -

SUPPORTING STRUCTURES SUITABLE FOR THE TERMINATION OF ALL OVERHEAD LINE CIRCUIT CONNECTIONS
8.2
TOGETHER WITH SUPPORTS FOR CONNECTIONS WITHIN BAYS TO EQUIP FOUR DIAMETER SWITCHBAYS.

8.2,1 Post steel structure Type-1, high 27,0 m' + steel structure for earth wires high 7,5 m' (TW-1) sets 12 Supplied By SIEMENS Supplied By SIEMENS - - -
8.2,2 Post steel Structure Type-2, high 27,0 m' (TW-2) sets 8 Supplied By SIEMENS Supplied By SIEMENS - - -
8.2,3 Beam steel Structure Type-2, for Fly Bus, 32 m' sets 16 Supplied By SIEMENS Supplied By SIEMENS - - -
8.2,4 Post steel Structure Type-4, high 16,5 m' + steel stricture for earthing wires high 7,5 m' (TW-4) for gantry connection to IBT (sisi 150 kV) sets 6 Supplied By SIEMENS Supplied By SIEMENS - - -
8.2,5 Beam steel Structure Type-2, high 32 m' for gantry connection to IBT (sisi 150 kV) sets 4 Supplied By SIEMENS Supplied By SIEMENS - - -
8,3 SUPPORTING STRUCTURE FOR SINGLE PHASE POST TYPE CURRENT TRANSFORMERS. set 30 Supplied By SIEMENS Supplied By SIEMENS - - -

8,4 SUPPORTING STRUCTURE FOR SINGLE PHASE CAPACITOR VOLTAGE TRANSFORMER. set 14 Supplied By SIEMENS Supplied By SIEMENS - - -

8,5 SUPPORTING STRUCTURE FOR SINGLE PHASE SURGE ARRESTER set 12 Supplied By SIEMENS Supplied By SIEMENS - - -

TOTAL PRICE ITEM-8


9 PROTECTION, MONITORING, METERING AND CONTROL / SUBSTATION
AUTOMATION (FOR 4 DIAMETER + OHL FEEDERS + 2 IBT FEEDER )
(Refer to Substation Automation Substation-Typical Panel Arrangement) (According to TPG.9.C.AIS.500KV-E)
9.1.1 BAY CONTROL UNIT CUBICLE FOR DIAMETERS (D1 and D4) COMPRISING: set 2 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
- ETHERNET SWITCH FOR INTER-BAY SYSTEM
- LOCAL MIMIC PANEL
- 2 SETS IED BAY CONTROL UNIT (For CB A, and CB AB)
9.1.2 BAY CONTROL UNIT CUBICLE FOR DIAMETERS ( D2 and D3 ) COMPRISING: set 2 - - - - -
- ETHERNET SWITCH FOR INTER-BAY SYSTEM
- LOCAL MIMIC PANEL
- 3 SETS IED BAY CONTROL UNIT (For CB A , CB AB AND CB B )

9.2.1 BREAKER FAILURE AND SHORT ZONE PROTECTION UNIT CUBICLE set 2 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
FOR DIAMETERS (D1 and D4), COMPRISING:
- ETHERNET SWITCH FOR INTER-BAY SYSTEM
- 2 SETS CIRCUIT BREAKER FAILURE AND SHORT ZONE PROTECTION (FOR For CB A, and CB AB )
INCLUDING MISCELLANEOUS EQUIPMENT AND MATERIAL, RACK CABINET, CABLES, CLAMPS,
CONNECTIONS, COMPRESSION TERMINAL, CONNECTION TO INDIVIDUAL ITEMS OF EQUIPMENT, TEST
TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER……. ETC, TO COMPLETE THE SCOPE OF WORKS.
9.2.2 BREAKER FAILURE AND SHORT ZONE PROTECTION UNIT CUBICLE set 2 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
FOR DIAMETERS ( D2 and D3 ), COMPRISING:
- ETHERNET SWITCH FOR INTER-BAY SYSTEM
- 3 SETS CIRCUIT BREAKER FAILURE AND SHORT ZONE PROTECTION (For CB A AND CB AB )
INCLUDING MISCELLANEOUS EQUIPMENT AND MATERIAL, RACK CABINET, CABLES, CLAMPS,
CONNECTIONS, COMPRESSION TERMINAL, CONNECTION TO INDIVIDUAL ITEMS OF EQUIPMENT, TEST
TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER……. ETC, TO COMPLETE THE SCOPE OF WORKS.

9.3.1 PROTECTION CUBICLE # 1 FOR OHL FEEDER ( PEDAN 1, UNGARAN 1 ) COMPRISING: set 2 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
(FOR SHORT TRANSMISION LINE)
- ETHERNET SWITCH FOR INTER-BAY SYSTEM
- IED MAIN PROTECTION 1 (Current Diff, Distance, DEF, Autoreclose, Synch. check, etc.)
- CIRCULATING CURRENT PROTECTION 1
- AUTO RECLOSER RELAY

INCLUDING MISCELLANEOUS EQUIPMENT AND MATERIAL, RACK CABINET, CABLES, CLAMPS,


CONNECTIONS, COMPRESSION TERMINAL, CONNECTION TO INDIVIDUAL ITEMS OF EQUIPMENT, TEST
TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER……. ETC, TO COMPLETE THE SCOPE OF WORKS.

PT Siemens Indonesia 7 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
DESAIN, SUPLAI DAN PEMASANGAN ELEKTRO MEKANIK GITET 500 KV AMPEL

GRAND
JASA
TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME TESTING & TOTAL TOTAL TOTAL
REPACKAGING TRANSPORTATION ERECTION TOTAL ERECTION
COMMISSIONING REPACKAGING TRANSPORTATION TESTCOMM ( Rp. )
(Rp) (Rp) (Rp) (Rp)
(Rp) (Rp) (Rp) (Rp)

(1) (2) (4) (5) (6) (7) (8) (9) (10)=(5X6) (11)=(5X7) (12)=(5X8) (13)=(5X9) (14) = (10+11+12+13)
9.3.2 PROTECTION CUBICLE # 1 FOR OHL FEEDER ( PEDAN 2, UNGARAN 2 ) COMPRISING: set 2 - - - - -
(FOR SHORT TRANSMISION LINE)
- ETHERNET SWITCH FOR INTER-BAY SYSTEM
- IED MAIN PROTECTION 1 (Current Diff, Distance, DEF, Autoreclose, Synch. check, etc.)
- CIRCULATING CURRENT PROTECTION 1

INCLUDING MISCELLANEOUS EQUIPMENT AND MATERIAL, RACK CABINET, CABLES, CLAMPS,


CONNECTIONS, COMPRESSION TERMINAL, CONNECTION TO INDIVIDUAL ITEMS OF EQUIPMENT, TEST
TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER……. ETC, TO COMPLETE THE SCOPE OF WORKS.

MAIN PROTECTION # 1 FOR OHL FEEDER , COMPRISING:


9.3.3 Unit 2 Supplied By SIEMENS Supplied By SIEMENS - - -
( 1 UNIT : INSTAL TO UNGARAN S/S OHL AMPEL SIRKIT- 1 & 1 UNIT : INSTAL TO PEDAN S/S OHL AMPEL SIRKIT- 1 )
(FOR SHORT TRANSMISION LINE)
- IED MAIN PROTECTION 1 (Current Diff, Distance, DEF, Autoreclose, Synch. check, etc.) :

INCLUDING MISCELLANEOUS EQUIPMENT AND MATERIAL, RACK CABINET, CABLES, CLAMPS,


CONNECTIONS, COMPRESSION TERMINAL, CONNECTION TO INDIVIDUAL ITEMS OF EQUIPMENT, TEST
TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER……. ETC, TO COMPLETE THE SCOPE OF WORKS.

9.4.1 PROTECTION CUBICLE # 2 FOR OHL FEEDER ( PEDAN 1, UNGARAN 1 ) COMPRISING: set 2 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
(FOR SHORT TRANSMISION LINE)
- ETHERNET SWITCH FOR INTER-BAY SYSTEM
- IED MAIN PROTECTION 2 (Current Diff, DEF, Autoreclose, Synch. check, etc.)
- CIRCULATING CURRENT PROTECTION 2

INCLUDING MISCELLANEOUS EQUIPMENT AND MATERIAL, RACK CABINET, CABLES, CLAMPS,


CONNECTIONS, COMPRESSION TERMINAL, CONNECTION TO INDIVIDUAL ITEMS OF EQUIPMENT, TEST
TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER……. ETC, TO COMPLETE THE SCOPE OF WORKS.

9.4.2 PROTECTION CUBICLE # 2 FOR OHL FEEDER ( PEDAN 2, UNGARAN 2 ) COMPRISING: set 2 - - - - -
(FOR SHORT TRANSMISION LINE)
- ETHERNET SWITCH FOR INTER-BAY SYSTEM
- IED MAIN PROTECTION 1 (Current Diff, Distance, DEF, Autoreclose, Synch. check, etc.)
- CIRCULATING CURRENT PROTECTION 1

INCLUDING MISCELLANEOUS EQUIPMENT AND MATERIAL, RACK CABINET, CABLES, CLAMPS,


CONNECTIONS, COMPRESSION TERMINAL, CONNECTION TO INDIVIDUAL ITEMS OF EQUIPMENT, TEST
TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER……. ETC, TO COMPLETE THE SCOPE OF WORKS.

MAIN PROTECTION # 2 FOR OHL FEEDER , COMPRISING: Supplied By SIEMENS Supplied By SIEMENS
9.4.3 Unit 2 - - -
( 1 UNIT : INSTAL TO UNGARAN S/S OHL AMPEL SIRKIT- 1 & 1 UNIT : INSTAL TO PEDAN S/S OHL AMPEL SIRKIT- 1 )

(FOR SHORT TRANSMISION LINE)


- IED MAIN PROTECTION 2 (Current Diff, Distance, DEF, Autoreclose, Synch. check, etc.) :

INCLUDING MISCELLANEOUS EQUIPMENT AND MATERIAL, RACK CABINET, CABLES, CLAMPS,


CONNECTIONS, COMPRESSION TERMINAL, CONNECTION TO INDIVIDUAL ITEMS OF EQUIPMENT, TEST
TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER……. ETC, TO COMPLETE THE SCOPE OF WORKS.

9,5 PROTECTION CUBICLE # 1 FOR 500/150 KV IBT (IBT 1 AND IBT 2) COMPRISING: set 2 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
- ETHERNET SWITCH FOR INTER-BAY SYSTEM
- IED MAIN PROTECTION 1 (Diff., REF EHV & HV side, DEF)
- CIRCULATING CURRENT PROTECTION 1
- IED BACK UP PROTECTION 1 (OC, EF, Fault & Event Rec, etc..for 500 kV side)

INCLUDING MISCELLANEOUS EQUIPMENT AND MATERIAL, RACK CABINET, CABLES, CLAMPS,


CONNECTIONS, COMPRESSION TERMINAL, CONNECTION TO INDIVIDUAL ITEMS OF EQUIPMENT, TEST
TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER……. ETC, TO COMPLETE THE SCOPE OF WORKS.

9,6 PROTECTION CUBICLE # 2 FOR 500/150 KV IBT (IBT-1 AND IBT-2) COMPRISING: set 2 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
- ETHERNET SWITCH FOR INTER-BAY SYSTEM
- IED MAIN PROTECTION 2 (Diff., REF EHV & HV side, DEF)
- CIRCULATING CURRENT PROTECTION 2
- IED BACK UP PROTECTION 2 (OC, EF, Fault & Event Rec, etc..for 150 kV side)
- IED BACK UP PROTECTION 3 (NVDR 70 kV side)

INCLUDING MISCELLANEOUS EQUIPMENT AND MATERIAL, RACK CABINET, CABLES, CLAMPS,


CONNECTIONS, COMPRESSION TERMINAL, CONNECTION TO INDIVIDUAL ITEMS OF EQUIPMENT, TEST
TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER……. ETC, TO COMPLETE THE SCOPE OF WORKS.

PT Siemens Indonesia 8 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
DESAIN, SUPLAI DAN PEMASANGAN ELEKTRO MEKANIK GITET 500 KV AMPEL

GRAND
JASA
TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME TESTING & TOTAL TOTAL TOTAL
REPACKAGING TRANSPORTATION ERECTION TOTAL ERECTION
COMMISSIONING REPACKAGING TRANSPORTATION TESTCOMM ( Rp. )
(Rp) (Rp) (Rp) (Rp)
(Rp) (Rp) (Rp) (Rp)

(1) (2) (4) (5) (6) (7) (8) (9) (10)=(5X6) (11)=(5X7) (12)=(5X8) (13)=(5X9) (14) = (10+11+12+13)
9,7 AVR CUBICLE FOR 500/150 KV IBT (IBT-1 & IBT 2) FOR THREE PHASE AND BCU FOR 150 kV SIDE COMPRISING : set 2 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
- ETHERNET SWITCH FOR INTER-BAY SYSTEM
- AUTOMATIC VOLTAGE REGULATOR
- IED BAY CONTROL UNIT

INCLUDING MISCELLANEOUS EQUIPMENT AND MATERIAL, RACK CABINET, CABLES, CLAMPS,


CONNECTIONS, COMPRESSION TERMINAL, CONNECTION TO INDIVIDUAL ITEMS OF EQUIPMENT, TEST
TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER……. ETC, TO COMPLETE THE SCOPE OF WORKS.

9,8 PROTECTION CUBICLE FOR BUSBAR PROTECTION-A, COMPRISING: set 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
- ETHERNET SWITCH FOR INTER-BAY SYSTEM
- IED MAIN-1 BUSBAR PROTECTION FOR BUSBAR A
- IED MAIN-2 BUSBAR PROTECTION FOR BUSBAR A
- IED CHECK ZONE BUSBAR PROTECTION FOR BUSBAR A
HAVING MINIMUM FUNCTIONAL CAPABILITY FOR:
- RESET TRIP FACILITY.
- TRIP CIRCUIT SUPERVISION FACILITIES.
FACILITY TO ACCOMMODATE THREE PHASE DELAYED AUTO RECLOSURE AND SINGLE PHASE HIGH
- SPEED RECLOSURE FOLLOWED BY THREE PHASE DELAYED AUTO RECLOSURE AND DEAD LINE
CHARGING OR DEAD BUS CHARGING AS SPECIFIED.
- CHECK SYNCHRONIZING EQUIPMENT COMPLETE WITH AUTOMATIC VOLTAGE SELECTION.
- OTHER BUSBAR PROTECTION FUNCTION.

INCLUDING MISCELLANEOUS EQUIPMENT AND MATERIAL, RACK CABINET, CABLES, CLAMPS,


CONNECTIONS, COMPRESSION TERMINAL, CONNECTION TO INDIVIDUAL ITEMS OF EQUIPMENT, TEST
TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER……. ETC, TO COMPLETE THE SCOPE OF WORKS.

9,9 PROTECTION CUBICLE FOR BUSBAR PROTECTION-B, COMPRISING: set 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
- ETHERNET SWITCH FOR INTER-BAY SYSTEM
- IED MAIN-1 BUSBAR PROTECTION FOR BUSBAR B
- IED MAIN-2 BUSBAR PROTECTION FOR BUSBAR B
- IED CHECK ZONE BUSBAR PROTECTION FOR BUSBAR B
HAVING MINIMUM FUNCTIONAL CAPABILITY FOR:
- RESET TRIP FACILITY.
- TRIP CIRCUIT SUPERVISION FACILITIES.
FACILITY TO ACCOMMODATE THREE PHASE DELAYED AUTO RECLOSURE AND SINGLE PHASE HIGH
- SPEED RECLOSURE FOLLOWED BY THREE PHASE DELAYED AUTO RECLOSURE AND DEAD LINE
CHARGING OR DEAD BUS CHARGING AS SPECIFIED.
- CHECK SYNCHRONIZING EQUIPMENT COMPLETE WITH AUTOMATIC VOLTAGE SELECTION.
- OTHER BUSBAR PROTECTION FUNCTION.

INCLUDING MISCELLANEOUS EQUIPMENT AND MATERIAL, RACK CABINET, CABLES, CLAMPS,


CONNECTIONS, COMPRESSION TERMINAL, CONNECTION TO INDIVIDUAL ITEMS OF EQUIPMENT, TEST
TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER……. ETC, TO COMPLETE THE SCOPE OF WORKS.

9,10 COMMON SYSTEM CUBICLE : set 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
- ETHERNET SWITCH FOR INTER-BAY SYSTEM .
- IED I/O (INPUT / OUTPUT) - COMMON SYSTEM
INCLUDING MISCELLANEOUS EQUIPMENT, TEST BLOCK, RACK CABINET, OPTICAL CORDS, CONTROL
- CABLES, CLAMPS, CONNECTORS, CONNECTION TO INDIVIDUAL ITEM OF EQUIPMENT, TERMINALS,
AUXILIARY RELAY, INTERIOR LAMP, HEATER,.. ETC TO COMPLETE THE SCOPE OF WORKS.

TOTAL PRICE ITEM-9

PT Siemens Indonesia 9 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
DESAIN, SUPLAI DAN PEMASANGAN ELEKTRO MEKANIK GITET 500 KV AMPEL

GRAND
JASA
TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME TESTING & TOTAL TOTAL TOTAL
REPACKAGING TRANSPORTATION ERECTION TOTAL ERECTION
COMMISSIONING REPACKAGING TRANSPORTATION TESTCOMM ( Rp. )
(Rp) (Rp) (Rp) (Rp)
(Rp) (Rp) (Rp) (Rp)

(1) (2) (4) (5) (6) (7) (8) (9) (10)=(5X6) (11)=(5X7) (12)=(5X8) (13)=(5X9) (14) = (10+11+12+13)

SUBSTATION AUTOMATION HARDWARE ( FOR 500 kV & 150 kV S/S ) (According to TPG.9.B.AIS.500 kV)
lot 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
(refer to SAS Network Drawing)

10.1 HMI-Operator Work Station consist of :


- CPU
- Keyboard, Video & Mouse (KVM extender)
- 2 Set HMI 500 kV
- 2 Set HMI 150 kV
10.2 Redundace Server consist of:
- CPU
- Keyboard, Mouse, VDU Unit
10.3 Colour Laser Printer
10. 10.4 GPS Time reference clock complete with Antenna
10.5 Gate Way (independence gateway for communication to interregional control center)
a. 1 Set Independence Gateway direction IRCC
b.1 Set Independence Gateway direction RCC
10,7 Ethernet Switch for station level (manageable)
a. 2 Set Ethetnet Switch for SAS 500KV Substation Level
b. 2 Set Ethetnet Switch for SAS 150KV Substation Level
10.8 Rack/Cubicle for Work Station, Gate Way, GPS, Modem, Router, Ethernet Switch, etc
10.9 Mapping SAS, mapping gateway IRCC & RCC, commisioning, point to point test beetwen substation and control centre
10.10 Integration between SAS 500KV and 150KV
10.11 Furniture for HMI 500KV and 150KV

Miscelaneous equipment and material including cables, optical cable, STP cable and cord, clamps, connectors, compression terminal,
10.12
connection to individual items of equipment ….etc, to complete the scope of works.

TOTAL PRICE ITEM-10


SUBSTATION AUTOMATION SOFTWARE lot 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
11.1 Operating System
11.2 Basic SA Software and Licences for 500 kV & 150 kV
11. 11.3 HMI and IED Software 500KV & 150 kV
Communication Protocol with Control Center Consist of IEC 60870 - 5 - 101, IEC 60870 - 5 - 104 and existing proprietary protocol (if
11.4
any).
11.5 SAS Software complete system for configuration and operation/maintenance and associated ICD File
TOTAL PRICE ITEM-11
AC SUPPLY EQUIPMENT FOR SUBSTATION AUTOMATION ( according to TPG.11.AIS.500KV-E) set 2 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
12.
12.1 Inverter (for SAS and CCTV) including AC Distribution Board.cubicle (Capacity subject to calculation result)
TOTAL PRICE ITEM-12

PT Siemens Indonesia 10 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
DESAIN, SUPLAI DAN PEMASANGAN ELEKTRO MEKANIK GITET 500 KV AMPEL

GRAND
JASA
TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME TESTING & TOTAL TOTAL TOTAL
REPACKAGING TRANSPORTATION ERECTION TOTAL ERECTION
COMMISSIONING REPACKAGING TRANSPORTATION TESTCOMM ( Rp. )
(Rp) (Rp) (Rp) (Rp)
(Rp) (Rp) (Rp) (Rp)

(1) (2) (4) (5) (6) (7) (8) (9) (10)=(5X6) (11)=(5X7) (12)=(5X8) (13)=(5X9) (14) = (10+11+12+13)
TELECOMMUNICATION EQUIPMENT ( according to TPG.13.AIS.500KV-E )
(refer to telecommunication network drawing)
13.1 GITET 500 KV AMPEL

13.1.1 FIBER OPTIC TELECOMMINICATION EQUIPMENT ( according to TPG.13.1.AIS.500KV-E ) Set 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -

- Node SDH For STM 4/1 ( 2 Set SDH difungsikan Redundace) :


- Subrack ( 2 x 1Unit)
- Power Supply ( 2 x 1 Unit )
- Central Procesor Unit ( 2 x 1 Unit )
- SDH Optical Interface STM-4/1 & SFP (2 x 4 Port)
- Ethernet 10/100/1000 Base T ( 2 x4 Port)
- E1 (2 Mbps) (2 x 8 Port)
- Router (2 x 1 Unit)
- 64 Kbps codirectional G.703 Interface N/A
- Panel 220 x 80 x 60 cm & MDF (2X1 Unit)

13.1. 2 Installation, interface, commissioning, activate, integrate, adapt, integrate with: lot 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -

Paired substation (5 Link for 2 SDH)


Control Center (1 Link )
Netwok Management System (NMS) eksisting 2 Link
*) Integration 2 SDH in GITET Ampel ( Redundance )
Link GITET.Ampel - GITET.Ungaran redundant link, SDH, proteksi, dan teleproteksi melalui 2(dua) link OPGW
yang berbeda
Link GITET.Ampel - GITET.Pedan redundant link, SDH, proteksi, dan teleproteksi melalui 2(dua) link OPGW
yang berbeda
Fiber Optic Armoured (FA) single mode Cable 24 cores to connect OPGW (GB) to ODF in telecommunication
-
room / substation building, approx. 200 m length ( 5 set)
- Joint Box ( 5 Set)
- Optical Distribution Frame ( 5 set )
- Kabel data, patch cord, connector ( 5 set)
- Cisco IP Phone 8865 (1 set) - Integration With Existing
13. - Switch 24-port PoE+, Network Essentials (1 set )

Independence Digital Teleprotection


13.1.3 - 2 set direction GI 500 KV UNGARAN set 4 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
- 2 set direction GI 500 KV PEDAN

13.1.4 PLC TELECOMMUNICATION EQUIPMENT Link 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -

LINE MATCHING UNIT/COUPLING DEVICES (PHASE TO PHASE)


13.1.4.1
- 1 set direction GI 500 KV PEDAN

COAXIAL CABLE (between LMU to PLC in Telecommunication room/substation building, approcx 200m
13.1.4.2 length)
- 1 set direction GI 500 KV PEDAN

PLC TERMINAL 2 CH.


13.1.4.3
- 1 set direction GI 500 KV PEDAN

Independence AF TELEPROTECTION ( according to TPG.13.3.AIS.500KV-E )


13.1.4.4
- 1 set direction GI 500 KV PEDAN

13.1.5 COMMON TELECOMMUNICATION EQUIPMENT

13.1.5.1 MDF (Main Distribution Frame), for Fiber Optic Equipment, PAX, etc ( according to TPG.13.1.AIS.500KV-E) set 4 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -

Rack/Cabinet , for Fiber Optic Equipment SDH, PDH, PAX, ODF, MDF etc ( according to Supplied By SIEMENS By SIEMENS Supplied By SIEMENS By SIEMENS
13.1.5.2 Set 4 - -
TPG.13.1.AIS.500KV-E)
Miscellaneous equipment and material including cables, patch cord, pig tail, telephone cable, connectors,
13.1.5.4 compression terminal, connection to individual items of equipment, etc, to complete the scope of works. Lot 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
( according to TPG.13.1.AIS.500KV-E)

PT Siemens Indonesia 11 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
DESAIN, SUPLAI DAN PEMASANGAN ELEKTRO MEKANIK GITET 500 KV AMPEL

GRAND
JASA
TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME TESTING & TOTAL TOTAL TOTAL
REPACKAGING TRANSPORTATION ERECTION TOTAL ERECTION
COMMISSIONING REPACKAGING TRANSPORTATION TESTCOMM ( Rp. )
(Rp) (Rp) (Rp) (Rp)
(Rp) (Rp) (Rp) (Rp)

(1) (2) (4) (5) (6) (7) (8) (9) (10)=(5X6) (11)=(5X7) (12)=(5X8) (13)=(5X9) (14) = (10+11+12+13)
13.2 GITET 500 KV UNGARAN

13.2.1 FIBER OPTIC TELECOMMINICATION EQUIPMENT ( according to TPG.13.1.AIS.500KV-E ) Set 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -

- Node SDH For STM 4/1 ( 2 Set SDH difungsikan Redundace) :


- Subrack ( 2 x 1Unit)
- Power Supply ( 2 x 1 Unit )
- Central Procesor Unit ( 2 x 1 Unit )
- SDH Optical Interface STM-4/1 & SFP (2 x 4 Port)
- Ethernet 10/100/1000 Base T ( 2 x4 Port)
- E1 (2 Mbps) (2 x 8 Port)
- Router (2 x 1 Unit)
- 64 Kbps codirectional G.703 Interface N/A
- Panel 220 x 80 x 60 cm & MDF (2X1 Unit)
13.2. 2 Installation, interface, commissioning, activate, integrate, adapt, integrate with: lot 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -

- Paired substation (3 Link for 2 SDH)


- Control Center (N/A )
- Netwok Management System (NMS) eksisting 2 Link
*) Integration 2 SDH in GITET Ungaran ( Redundance )
Link GITET.Ungaran - GITET.Batang Single link, proteksi, dan teleproteksi melalui 1(satu) link OPGW yang
berbeda
Link GITET.Ungaran- dengan SDH Eksisting single link.
Fiber Optic Armoured (FA) single mode Cable 24 cores to connect OPGW (GB) to ODF in telecommunication
-
room / substation building, approx. 200 m length (2 set)
- Joint Box ( 2 Set)
- Optical Distribution Frame ( 2 set )
- Kabel data, patch cord, connector ( 2 set)
- Cisco IP Phone 8865 (1 set) - Integration With Existing
- Switch 24-port PoE+, Network Essentials (1 set )

Independence Digital Teleprotection Supplied By SIEMENS By SIEMENS Supplied By SIEMENS By SIEMENS


13.2.3 set 1 - -
- 1 set direction GI 500 KV Ampel

13.2.5 COMMON TELECOMMUNICATION EQUIPMENT

13.2.5.1 MDF (Main Distribution Frame), for Fiber Optic Equipment, PAX, etc ( according to TPG.13.1.AIS.500KV-E ) set 4 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -

Rack/Cabinet , for Fiber Optic Equipment SDH, PDH, PAX, ODF, MDF etc ( according to TPG.13.1.AIS.500KV- Supplied By SIEMENS By SIEMENS Supplied By SIEMENS By SIEMENS
13.2.5.2 Set 4 - -
E)

Miscellaneous equipment and material including cables, patch cord, pig tail, telephone cable, connectors,
13.2.5.4 compression terminal, connection to individual items of equipment, etc, to complete the scope of works. Lot 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
( according to TPG.13.1.AIS.500KV-E )

PT Siemens Indonesia 12 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
DESAIN, SUPLAI DAN PEMASANGAN ELEKTRO MEKANIK GITET 500 KV AMPEL

GRAND
JASA
TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME TESTING & TOTAL TOTAL TOTAL
REPACKAGING TRANSPORTATION ERECTION TOTAL ERECTION
COMMISSIONING REPACKAGING TRANSPORTATION TESTCOMM ( Rp. )
(Rp) (Rp) (Rp) (Rp)
(Rp) (Rp) (Rp) (Rp)

(1) (2) (4) (5) (6) (7) (8) (9) (10)=(5X6) (11)=(5X7) (12)=(5X8) (13)=(5X9) (14) = (10+11+12+13)
13.3 GITET 500 KV PEDAN

13.3.1 FIBER OPTIC TELECOMMINICATION EQUIPMENT ( according to TPG.13.1.AIS.500KV-E ) Set 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -

- Node SDH For STM 4/1 ( 2 Set SDH difungsikan Redundace) :


- Subrack ( 2 x 1Unit)
- Power Supply ( 2 x 1 Unit )
- Central Procesor Unit ( 2 x Unit )
- SDH Optical Interface STM-4/1 & SFP (2 x 4 Port)
- Ethernet 10/100/1000 Base T ( 2 x4 Port)
- E1 (2 Mbps) (2 x 8 Port)
- Router (2 x 1 Unit)
- 64 Kbps codirectional G.703 Interface N/A
- Panel 220 x 80 x 60 cm & MDF (2X1 Unit)

13.3.2 Installation, interface, commissioning, activate, integrate, adapt, integrate with: lot 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -

- Paired substation (1 Link for 2 SDH)


- Control Center (N/A )
- Netwok Management System (NMS) eksisting 2 Link
*) Integration 2 SDH Connect to GITET Ampel ( Redundance )
Link GITET. Pedan- dengan SDH Eksisting single link.
Fiber Optic Armoured (FA) single mode Cable 24 cores to connect OPGW (GB) to ODF in telecommunication
-
room / substation building, approx. 200 m length ( 1 set)
- Joint Box ( 1 Set)
- Optical Distribution Frame ( 1 set )
- Kabel data, patch cord, connector ( 1 set)
- Cisco IP Phone 8865 (1 set) - Integration With Existing
- Switch 24-port PoE+, Network Essentials (1 set )

Independence Digital Teleprotection


13.3.3 set 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
- 1 set direction GI 500 KV Ampel

13.3.5 COMMON TELECOMMUNICATION EQUIPMENT

13.3.5.1 MDF (Main Distribution Frame), for Fiber Optic Equipment, PAX, etc ( according to TPG.13.1.AIS.500KV-E ) set 4 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -

Rack/Cabinet , for Fiber Optic Equipment SDH, PDH, PAX, ODF, MDF etc ( according to TPG.13.1.AIS.500KV- Supplied By SIEMENS By SIEMENS Supplied By SIEMENS By SIEMENS
13.3.5.2 Set 4 - -
E)

Miscellaneous equipment and material including cables, patch cord, pig tail, telephone cable, connectors,
13.3.5.4 compression terminal, connection to individual items of equipment, etc, to complete the scope of works. Lot 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
( according to TPG.13.1.AIS.500KV-E )

13.3.6 PLC RELOCATION AND INSTAL :


PEDAN SUBSTATION DIRECTION UNGARAN SUBSTATION to AMPEL SUBSTATION DIRECTION
UMGARAN SUBSTATION link 1 - - - - -

TOTAL PRICE ITEM-13

PT Siemens Indonesia 13 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
DESAIN, SUPLAI DAN PEMASANGAN ELEKTRO MEKANIK GITET 500 KV AMPEL

GRAND
JASA
TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME TESTING & TOTAL TOTAL TOTAL
REPACKAGING TRANSPORTATION ERECTION TOTAL ERECTION
COMMISSIONING REPACKAGING TRANSPORTATION TESTCOMM ( Rp. )
(Rp) (Rp) (Rp) (Rp)
(Rp) (Rp) (Rp) (Rp)

(1) (2) (4) (5) (6) (7) (8) (9) (10)=(5X6) (11)=(5X7) (12)=(5X8) (13)=(5X9) (14) = (10+11+12+13)
110 VOLT DC EQUIPMENT
BATTERY COMPLETE WITH STAND, WITH REQUIRED CAPACITY FOR MIN. 4 DIAMETERS 500 KV ALL CONNECTIONS
18.1 AND INSULATORS INCLUDING LVAC CONNECTION FROM BATTERY CHARGER TO BATTERY. (According to set 2 Supplied By SIEMENS Supplied By SIEMENS - - -
TPG.10.A.AIS.500KV-E)
18.2 BATTERY FUSE BOX. set 2 Supplied By SIEMENS Supplied By SIEMENS - - -
18.3 MAIN CONNECTION BETWEEN BATTERY FUSE BOX AND DISTRIBUTION PANEL. set 2 Supplied By SIEMENS Supplied By SIEMENS - - -
AUTOMATIC CONSTANT VOLTAGE BATTERY CHARGER FOR FLOAT OPERATION WITH REQUIRED CAPACITY FOR MIN. 6 DIA.
18.4 set 2 Supplied By SIEMENS Supplied By SIEMENS - - -
500 KV AND EQUIPPED WITH THE FOLLOWING : (According to TPG.10.C.AIS.500KV-E)
- CIRCUIT BREAKER TO CONTROL CHARGER AC OUTPUT-ON/OFF.
- NEON TYPE INDICATION LAMP FOR AC SUPPLY ON.
- AMMETER TO INDICATE CHARGER OUTPUT WITH A RANGE TO -
- SUITE CHARGER RATING.
- VOLTMETER TO INDICATE CHARGER OUTPUT SCALED
- 0-150 V WITH 125 V CALIBRATION MARKED IN RED.
- CIRCUIT BREAKER TO CONTROL CHARGER AC OUTPUT.
18. - BATTERY 1/OFF/BATTERY 2.
- CHARGER FAIL ALARM CONTACTS FOR REMOTE ALARM.
- TIMER, HIGH-RATE CHARGE, MANUAL RESET.
110 V DC DISTRIBUTION PANEL EQUIPPED WITH SUFFICIENT OUTPUT CITCUITS OF REQUIRED RATING. EACH WITH FUSE AND
18.5 LINK TO SUPPLY EACH RELAY PANEL PROTECTION EQUIPMENT AND ALSO EQUIPPED WITH THE FOLLOWING. (According to set 2 Supplied By SIEMENS Supplied By SIEMENS - - -
TPG.10.E.AIS.500KV-E)
- 8 SPARE OUTPUT CIRCUITS OF EACH RATING
- AMMETER TO INDICATE BATTERY OUTPUT WITH A RANGE TO -
- SUIT BATTERY RATING.
- VOLTMETER TO INDICATE BUSBAR VOLTAGE SCALED
- 75-150 V WITH 125 V CALIBRATION MARKED IN RED.
- BATTERY EARTHED ALARM RELAY WITH CONTACTS FOR REMOTE ALARMS
- BATTERY LOW VOLT ALARM RELAY WITH CONTACTS FOR REMOTE ALARMS
- BATTERY HIGH VOLT ALARM RELAY WITH CONTACTS FOR REMOTE ALARMS
- AMBER INDICATING LAMP FOR BATTERY EARTHED FAULT.
- AMBER INDICATING LAMP FOR BATTERY LOW VOLT.
TOTAL PRICE ITEM-18

PT Siemens Indonesia 14 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
DESAIN, SUPLAI DAN PEMASANGAN ELEKTRO MEKANIK GITET 500 KV AMPEL

GRAND
JASA
TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME TESTING & TOTAL TOTAL TOTAL
REPACKAGING TRANSPORTATION ERECTION TOTAL ERECTION
COMMISSIONING REPACKAGING TRANSPORTATION TESTCOMM ( Rp. )
(Rp) (Rp) (Rp) (Rp)
(Rp) (Rp) (Rp) (Rp)

(1) (2) (4) (5) (6) (7) (8) (9) (10)=(5X6) (11)=(5X7) (12)=(5X8) (13)=(5X9) (14) = (10+11+12+13)
48 VOLT DC EQUIPMENT
BATTERY COMPLETE WITH STAND, WITH REQUIRED CAPACITY TO SUPPLY TELECOM & SCADA EQUIPMENT AS Supplied By SIEMENS Supplied By SIEMENS
19.1 set 2 - - -
REQUIRED.(According to TPG.10.B.AIS.500KV-E)
19.2 BATTERY FUSE BOX. set 2 Supplied By SIEMENS Supplied By SIEMENS - - -
19.3 MAIN CONNECTION BETWEEN BATTERY FUSE BOX AND DISTRIBUTION PANEL. set 2 Supplied By SIEMENS Supplied By SIEMENS - - -

AUTOMATIC CONSTANT VOLTAGE BATTERY CHARGER FOR FLOAT OPERATION WITH REQUIRED CAPACITY FOR
19.4 set 2 Supplied By SIEMENS Supplied By SIEMENS - - -
MINIMUM 4 DIAMETER 500 KV AND EQUIPPED WITH THE FOLLOWING : (According to TPG.10.D.AIS.500KV-E)
- CIRCUIT BREAKER TO CONTROL CHARGER AC OUTPUT-ON/OFF.
- NEON TYPE INDICATION LAMP FOR AC SUPPLY ON.
- AMMETER TO INDICATE CHARGER OUTPUT WITH A RANGE TO -
SUITE CHARGER RATING.
- VOLTMETER TO INDICATE CHARGER OUTPUT SCALED
0-80 V WITH 54.24 V CALIBRATION MARKED IN RED.
- CIRCUIT BREAKER TO CONTROL CHARGER AC OUTPUT.
19 BATTERY 1 / OFF / BATTERY 2.
- CHARGER FAIL ALARM CONTACTS FOR REMOTE ALARM.
TIMER, HIGH-RATE CHARGE, MANUAL RESET.
48 V DC DISTRIBUTION PANEL EQUIPPED WITH SUFFICIENT OUTPUT CITCUITS OF REQUIRED RATING. EACH WITH FUSE AND
19.5 LINK TO SUPPLY EACH TELECOMUNICATION EQUIPMENT AND ALSO EQUIPPED WITH THE FOLLOWING.(According to set 2 Supplied By SIEMENS Supplied By SIEMENS - - -
TPG.10.F.AIS.500KV-E)
- 8 SPARE OUTPUT CIRCUITS OF EACH RATING.
- AMMETER TO INDICATE BATTERY OUTPUT WITH A RANGE TO -
SUIT BATTERY RATING.
- VOLTMETER TO INDICATE BUSBAR VOLTAGE SCALED
40-60 V WITH 52 V CALIBRATION MARKED IN RED.
- BATTERY EARTHED ALARM RELAY WITH CONTACTS FOR REMOTE ALARMS
- BATTERY LOW VOLT ALARM RELAY WITH CONTACTS FOR REMOTE ALARMS
- BATTERY HIGH VOLT ALARM RELAY WITH CONTACTS FOR REMOTE ALARMS
- AMBER INDICATING LAMP FOR BATTERY EARTHED FAULT.
- AMBER INDICATING LAMP FOR BATTERY LOW VOLT.
TOTAL PRICE ITEM-19
LVAC EQUIPMENT (According to TPG.11.AIS.500KV-E)
20.1 3 PHASE 4 WIRE 230/400 VOLT INDOOR METALCLAD COMMON SERVICES set 1 Supplied By SIEMENS Supplied By SIEMENS - - -
SWITCHBOARD COMPRISING :
- 3 POLE AND NEUTRAL MAIN BUSBAR CHAMBER 1200 AMPS RATING.
- 3 POLE CIRCUIT BREAKER WITH NEUTRAL LINK 1200 AMPS RATING.
- 3 POLE AND NEUTRAL CIRCUIT BREAKER 400 AMPS RATING.
- 3 POLE AND NEUTRAL SWITCH-FUSE 200 AMPS RATING.
- 3 POLE AND NEUTRAL SWITCH-FUSE 100 AMPS RATING.
- 3 POLE AND NEUTRAL SWITCH-FUSE 60 AMPS RATING.
- AMMETER SCALED 0-1200 AMPS
20
- VOLTMETER SCALED 0-500 VOLTS
20.2 3 PHASE 4 WIRE 230/400 VOLT INDOOR METALCLAD ESSENTIAL SERVICES set 2 Supplied By SIEMENS Supplied By SIEMENS - - -
SWITCHBOARD COMPRISING :
- 3 POLE AND NEUTRAL MAIN BUSBAR CHAMBER 600 AMPS RATING.
- 3 POLE CIRCUIT BREAKER WITH NEUTRAL LINK 600 AMPS RATING.
- 3 POLE FUSE UNIT NEUTRAL LINK 600 AMPS RATING.
- 3 POLE AND NEUTRAL SWITCH-FUSE 100 AMPS RATING.
- 3 POLE AND NEUTRAL SWITCH-FUSE 60 AMPS RATING.
- AMMETER SCALED 0-600 AMPS
- VOLTMETER SCALED 0-500 VOLTS
20.3 Standby Diesel Generator unit 315 kW including accessories set 1 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
LV power cable, control cable and accesorries and necessary equipment (cable ladder, clamp, cable lug, terminal, etc.) to complete the specified scope Supplied By SIEMENS Supplied By SIEMENS
20.4 Lot 1 - - -
of work.
TOTAL PRICE ITEM-20

PT Siemens Indonesia 15 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
DESAIN, SUPLAI DAN PEMASANGAN ELEKTRO MEKANIK GITET 500 KV AMPEL

GRAND
JASA
TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME TESTING & TOTAL TOTAL TOTAL
REPACKAGING TRANSPORTATION ERECTION TOTAL ERECTION
COMMISSIONING REPACKAGING TRANSPORTATION TESTCOMM ( Rp. )
(Rp) (Rp) (Rp) (Rp)
(Rp) (Rp) (Rp) (Rp)

(1) (2) (4) (5) (6) (7) (8) (9) (10)=(5X6) (11)=(5X7) (12)=(5X8) (13)=(5X9) (14) = (10+11+12+13)
150 KV GANTRY AND 500/150 KV TRANSFORMER
21.3 500/150 KV 500 MVA POWER TRANSFORMER
21.3.2 RING TYPE CT's FOR MOUNTING IN THE PRIMARY BUSHING set 6 Supplied By SIEMENS Supplied By SIEMENS - - -
TURRETS OF ITEM 23.3.1 5 CORES PER-PHASE COMPRISING :
- 1000/1 A, CLASS X.
- 1000/1 A, CLASS 5P21, 30 VA.
- 1000/1 A, CLASS X.
- 4000 - 2000/1 A, CLASS TPX.
- 4000 - 2000/1 A, CLASS TPX.
PRIMARY NEUTRAL CT WITH RATIO 1000/1 A, 2 (TWO) CORE CLASS X with Supporting Steel Structure, connector and Supplied By SIEMENS Supplied By SIEMENS
21.3.3 Unit 2 - - -
accessories
SECOND NEUTRAL CT (BUSHING) WITH RATIO 2000/1 A, 2 (TWO) CORE CLASS X with Supporting Steel Structure, connector
21.3.4 Unit 2 Supplied By SIEMENS Supplied By SIEMENS - - -
and accessories
21.3.5 Conductor 1xTAL660 mm² for Y Connection of 2 x IBT Primary Winding Lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -
21 21.3.6 Conductor 2xTAL660 mm² for Y Connection of 2 x IBT Secondary Winding Lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -
21.3.7 Conductor 1 xTAL 660 mm² for CVT 70 Connection to 2 x IBT Tersiery Winding Lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -

21.3.7 Supporting Steel Structure Included Insulator for Y connection to neutral 500 kV and 150 kV Unit 12 Supplied By SIEMENS Supplied By SIEMENS - - -

CVT 70 kV / 100 V class 3P, 30 VA for Delta Connection of IBT Tersiery winding complete with Supporting Steel Structure, connector Supplied By SIEMENS Supplied By SIEMENS
21.3.9 set 6 - - -
and accessories
21.3.10 FREE STANDING TRANSFORMER MARSHALLING KIOSK. (According to TPG.29.AIS.500KV-E) set 2 Subject to Deduction Subject to Deduction
21.3.11 PARALLEL OPERATION DEVICE (1 PANEL). set 1 Subject to Deduction Subject to Deduction
21.3.12 DELTA STARPOINT CONNECTIONS INCLUDING 70 KV XLPE Cu 1000 sqmm set 2 Supplied By SIEMENS Supplied By SIEMENS - - -
CABLE, SEALING END. SUPPORTING STRUCTURE, ETC. - - - - -
CONTROL CABLES AND ALL ACCESSORIES FOR PROPER OPERATION OF THE THREE UNIT POWER TRANSFORMER 500
21.3.13 Lot 1 Supplied By SIEMENS Supplied By SIEMENS - - -
MVA, 500 / 168 / 71.5 KV. (According to TPG.15.B.AIS.150KV)
21.3.14 TRANSFORMER EXPLOSION AND FIRE PREVENTION (by request according SPLN T5.009 : 2115) Unit 6 Supplied By SIEMENS By SIEMENS Supplied By SIEMENS - By SIEMENS -
TOTAL PRICE ITEM-21
GRAND TOTAL ITEMS 1 - 21

PT Siemens Indonesia 16 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
PROYEK GARDU INDUK 150 KV AMPEL

HARGA TESTING &


JASA PEMBONGKARAN HARGA JASA PEMASANGAN
COMMISSIONING GRAND TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
(1) (2) (4) (5) (8) (9 = 5 x 8) (10) (11 = 5 x 10) (12) (13 = 5 x 12) (14 = 9+11+13)
1 STEEL STRUCTURES, BUSBAR, EARTHING
1.1 STEEL STRUCTURES ( according to TPG.1.AIS.150KV )
1.1.1 Galvanised steel structure (gantries) to complete the specified scope of work for outdoor switcyard :
8 x 150 kV Line Bay (s)
2 x 150 kV Bus Coupler Bay
2 x 150 kV Transformer Bay (s)
0 x 150 kV Spare Transformer Bay
1 x 150/20 kV Transformer(s)
2 x 150 KV Bus Section

Consist of :
a. Post Steel Structure Type P1, high 18 meter sets 17 - -
sets 6 - -
sets 9 - -
b. Post Steel Structure Type P2, high 13 meter sets 8 - -
sets 6 - -
sets 2 Supply By SIEMENS -
c. Post Steel Structure Type P3, high 9 meter sets 3 - -
sets 3 - -
sets 2 Supply By SIEMENS -
d. Post Steel Structure Type P4, high 14 meter sets
e. Beam Steel Structure length 14 meter sets 30 -
sets 28 - -
1.2 BUSBAR ( according to TPG.8.A.AIS.150KV-E & TPG.8.B.AIS.150KV-E )
All aluminium conductor (TAL 850 mm2) of 4000 amp/ph for the installation of 3-ph double main-busbar to
1.2.1 bays 15 Supply By SIEMENS -
complete the specified scope of work
1.2.2 Set of clamps, connectors and accessories for installation of the main busbar as specified bays 15 Supply By SIEMENS -
Set of conductor for shield wire and accessories for installation of the main busbar as specified (According to Supply By SIEMENS -
1.2.3 bays 15
TPG.30.AIS.150KV-CSTM)
1.3 INSULATOR ( according to TPG.7.AIS.150KV )

1.4.1 150 kV double tension string insulator set complete with fittings for installation of the main busbar as specified. sets 36 Supply By SIEMENS -

1.4.2 150 kV Single suspension string insulator set complete with fittings for installation of the main busbar as specified. sets 18 Supply By SIEMENS -

1.4 EARTHING & Miscellaneous (depth 80 cm, distance 6 m x 6 m, Cu 150 mm2) ( according to TPG.16.AIS.150KV-E )

Substation earthing grid to 40 kA level comprising equipment and material to complete the scope of work for
1.4.1 substation earthing grid and earthing circuit required such as copper conductors, rods, clamps and connectors for m' 3610 Supply By SIEMENS -
connection to main substation earthing circuit and to individual item of equipment and structures

Cooper strip or flexible cable conductor to connect metal clad part of all equipment and structure to main Earth
1.4.2 System copper strip of flexible coductors to connect metalclad parts of all equipment and structur to main Earth lot 1 Supply By SIEMENS -
System

1.4.3 Cooper strip or flexible cable conductor to bond all overhead line tower direct to the sun station Earth System lot 1 Supply By SIEMENS

TOTAL PRICE ITEMS 1.1 - 1.4 ###

PT Siemens Indonesia 17 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
PROYEK GARDU INDUK 150 KV AMPEL

HARGA TESTING &


JASA PEMBONGKARAN HARGA JASA PEMASANGAN
COMMISSIONING GRAND TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
(1) (2) (4) (5) (8) (9 = 5 x 8) (10) (11 = 5 x 10) (12) (13 = 5 x 12) (14 = 9+11+13)
2 150 kV LINE BAY : 4 BAYS (to KLATEN-1, KLATEN-2, BAWEN-1 & BAWEN-2)
2.1 CONDUCTOR ( according to TPG.8.A.AIS.150KV-E & TPG.8.B.AIS.150KV-E )
2.1.1 All aluminium conductor (2 x TAL 660 mm2) of 3500 amp/ph for 3-phase fly bus and conductor of line bay sets 4 Supply By SIEMENS -
2.1.2 Set of clamps, connectors and accessories for installation of the line bay as specified sets 4 Supply By SIEMENS -
2.1.3 Set of conductor for shield wire and accessories for installation of the line bay shield wire as specified for line bays 1 lot Supply By SIEMENS G
I
2.2 INSULATOR ( according to TPG.7.AIS.150KV )
2.2.1 150 kV single tension string insulator set complete with fittings for installation of the line bay as specified. sets 0 G
P
Ia
2.2.2 150 kV double tension string insulator set complete with fittings for installation of the line bay as specified. sets 24 Supply By SIEMENS -
n
2.2.3 150 kV single suspension string insulator set complete with fittings for installation of the line bay as specified. sets 12 Supply By SIEMENS - P
d
G
a
e
2.2.4 150 kV post insulator complete with clamps and supporting structure for dropper to bus disconnector sets 8 Supply By SIEMENS - In
a
2.3 DISCONNECTOR SWITCH d
n
P
e
150 kV 3 Phase Disconnecting switch motor operated 40 kA, ≥ 3150 A without earthing switch complete with - -
2.3.1 sets 8 a
L
clamps and supporting structure for Line Bay.
n
a
150 kV 3 Phase Disconnecting switch motor operated 40 kA, ≥ 3150 A with earthing switch complete with clamps d
m
2.3.2 sets 4 - - eLp
and supporting structure for Line Bay.
a
e
2.4 CIRCUIT BREAKER n
m
r
150 kV 3 Phase SF6 Circuit Breaker 40 kA , ≥ 3150 A rms complete with clamps and supporting structure for line bay (up - - p
sets 4 LeI
to twin conductors)
a
rI
2.5 CURRENT TRANSFORMER
m
2.5.1 150 kV Current transformer 4000 A for line bay complete with clamps and supporting structure comprising: units 12 - - p
I
CORE 1 : 2000 - 4000 /1 A, PX for main distance / line differential protection *) eI
r
CORE 2 : 2000 - 4000 /1 A, 30 VA 5P20 for backup protection B
(OCR,GFR), instrument and measurement devices *) a
I
n
I
CORE 3 : 2000 - 4000/1 A, PX for check bus zone protection.
d
CORE 4 : 2000 - 4000/1 A, PX for main bus zone protection . u
B
CORE 5 : 2000 - 4000 / 1 A, 30 VA 0.2S for energy metering. *) n
a
g
n
2.6 CAPACITOR VOLTAGE TRANSFORMER
d
150kV Capacitor Voltage Transformer with 2 secondary winding, ratio 150kV:√3 / 100V : √3, Burden 15 VA ( for S
u
2.6.1 protection and instrument and metering), CL 0.2S , rated capacitance 4000 up to 10000 pF, complete with clamps, units 12 - - e
n
supporting structure. l
g
a
2.7 LIGHTNING ARRESTER tS
2.7.1 150 kV Lightning arrester, 10 kA complete with supporting structure, clamp, surge counter and leakage current. units 12 - - ea
ln
2.8 PROTECTION & CONTROL CUBICLE ( according to TPG.24.AIS.150KV ) a
Supply By SIEMENS - It
2.8.1 PROTECTION & CONTROL CUBICLE FOR OHL COMPRISING : sets 4 I
IED Main line protection (MPU) -Line differential relay (Included Distance, Autorecloser,
a
-
Synchrocheck, etc)
n
- IED Back-up line protection (BPU) - Over Current, DFR,GFR, Metering, etc I
- IED Bay control (BCU) I
- Ethernet switch for inter-bay level system
Miscellaneous equipment, local mimic, test block, rack cabinet, optical cables and cord, control
- control cables, clamps, connectors, connection to individual item of equipment, terminals, auxiliary
relay, interior lamp, heater,.. etc to complte the scope of works.

For ( GI BRINGIN : 2 Unit , GI. BAWEN : 2 Unit ) IED Main line protection (MPU) -Line differential relay Supply By SIEMENS -
2.8.2 units 4
(Included Distance, Autorecloser, Synchrocheck, etc)
2.8.3 Marshalling kiosk for 150 kV Line Bay. sets 4 Supply By SIEMENS -
LV power cable, control cable and accesorries and necessary equipment (cable ladder, clamp, cable lug, terminal, Supply By SIEMENS -
2.8.4 lot 1
etc.) for line bay to complete the specified scope of work
TOTAL PRICE ITEMS 2.1 - 2.8 -

PT Siemens Indonesia 18 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
PROYEK GARDU INDUK 150 KV AMPEL

HARGA TESTING &


JASA PEMBONGKARAN HARGA JASA PEMASANGAN
COMMISSIONING GRAND TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
(1) (2) (4) (5) (8) (9 = 5 x 8) (10) (11 = 5 x 10) (12) (13 = 5 x 12) (14 = 9+11+13)
3 150 kV LINE BAY : 4 BAYS (to BRINGIN-1, BRINGIN-2, MOJOSONGO-1, MOJOSONGO-2)
3.1 CONDUCTOR ( according to TPG.8.A.AIS.150KV-E & TPG.8.B.AIS.150KV-E )
3.1.1 All aluminium conductor (2 x TAL 660 mm2) of 3500 amp/ph for 3-phase fly bus and conductor of line bay sets 4 Supply By SIEMENS -
3.1.2 Set of clamps, connectors and accessories for installation of the line bay as specified sets 4 Supply By SIEMENS -

3.1.3 Set of conductor for shield wire and accessories for installation of the line bay shield wire as specified for line bays 1 lot Supply By SIEMENS
3.2 INSULATOR ( according to TPG.7.AIS.150KV )
3.2.1 150 kV single tension string insulator set complete with fittings for installation of the line bay as specified. sets 0
3.2.2 150 kV double tension string insulator set complete with fittings for installation of the line bay as specified. sets 24 Supply By SIEMENS -
3.2.3 150 kV single suspension string insulator set complete with fittings for installation of the line bay as specified. sets 12 Supply By SIEMENS -
3.2.4 150 kV post insulator complete with clamps and supporting structure for dropper to bus disconnector sets 8 Supply By SIEMENS - T
u
3.3 DISCONNECTOR SWITCH k
150 kV 3 Phase Disconnecting switch motor operated 40 kA, ≥ 3150 A without earthing switch complete with Ts
3.3.1 sets 8 - - u
clamps and supporting structure for Line Bay. o
kn
150 kV 3 Phase Disconnecting switch motor operated 40 kA, ≥ 3150 A with earthing switch complete with clamps so
3.3.2 sets 4 - -
and supporting structure for Line Bay. To
n
u
3.4 CIRCUIT BREAKER ko
150 kV 3 Phase SF6 Circuit Breaker 40 kA , ≥ 3150 A rms complete with clamps and supporting structure for line bay (up - - s
sets 4 o
to twin conductors)
n
3.5 CURRENT TRANSFORMER
o
3.5.1 150 kV Current transformer 4000 A for line bay complete with clamps and supporting structure comprising: units 12 - -
CORE 1 : 2000 - 4000 /1 A, PX for main distance / line differential protection *)
CORE 2 : 2000 - 4000 /1 A, 30 VA 5P20 for backup protection
(OCR,GFR), instrument and measurement devices *)
CORE 3 : 2000 - 4000/1 A, PX for check bus zone protection.
CORE 4 : 2000 - 4000/1 A, PX for main bus zone protection .
CORE 5 : 2000 - 4000 / 1 A, 30 VA 0.2S for energy metering. *) T
3.6 CAPACITOR VOLTAGE TRANSFORMER u
k
150kV Capacitor Voltage Transformer with 2 secondary winding, ratio 150kV:√3 / 100V : √3, Burden 15 VA ( for s
3.6.1 protection and instrument and metering), CL 0.2S , rated capacitance 4000 up to 10000 pF, complete with clamps, units 12 - -
o
supporting structure. n
3.7 LIGHTNING ARRESTER o
3.7.1 150 kV Lightning arrester, 10 kA complete with supporting structure, clamp, surge counter and leakage current. units 12 - -
3.8 PROTECTION & CONTROL CUBICLE ( according to TPG.24.AIS.150KV )
3.8.1 PROTECTION & CONTROL CUBICLE FOR OHL COMPRISING : sets 4 Supply By SIEMENS -
IED Main line protection (MPU) -Line differential relay (Included Distance, Autorecloser,
-
Synchrocheck, etc)
- IED Back-up line protection (BPU) - Over Current, DFR,GFR, Metering, etc
- IED Bay control (BCU)
- Ethernet switch for inter-bay level system
Miscellaneous equipment, local mimic, test block, rack cabinet, optical cables and cord, control
- control cables, clamps, connectors, connection to individual item of equipment, terminals, auxiliary
relay, interior lamp, heater,.. etc to complte the scope of works.
For Remote Station IED Main line protection (MPU) -Line differential relay (Included Distance, Autorecloser, Supplied By SIEMENS -
3.8.2 units 4
Synchrocheck, etc)
3.8.3 Marshalling kiosk for 150 kV Line Bay. sets 4 Supplied By SIEMENS -
LV power cable, control cable and accesorries and necessary equipment (cable ladder, clamp, cable lug, terminal, Supplied By SIEMENS -
3.8.4 Lot 1
etc.) for Diameter & line bay to complete the specified scope of work
TOTAL PRICE ITEMS 3.1 - 3.8 -

PT Siemens Indonesia 19 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
PROYEK GARDU INDUK 150 KV AMPEL

HARGA TESTING &


JASA PEMBONGKARAN HARGA JASA PEMASANGAN
COMMISSIONING GRAND TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
(1) (2) (4) (5) (8) (9 = 5 x 8) (10) (11 = 5 x 10) (12) (13 = 5 x 12) (14 = 9+11+13)
4 150 kV BUS COUPLER BAY : 2 BAY
4.1 CONDUCTOR ( according to TPG.8.A.AIS.150KV-E & TPG.8.B.AIS.150KV-E )
All aluminium conductor ( 2 x TAL 850 mm2) of ≥ 4000 amp/phase for 3-phase fly bus and conductor of bus
sets 2 Supplied By SIEMENS -
coupler bay
4.2 INSULATOR ( according to TPG.7.AIS.150KV )

4.2.1 150 kV double tension string insulator set complete with fittings for installation of the bus coupler bay as specified. sets 24 Supplied By SIEMENS -

4.2.2 150 kV single suspension string insulator set complete with fittings for installation of the line bay as specified. sets 12 Supplied By SIEMENS -

150 kV Single phase post insulator set complete with clamps and supporting structure for dropper to bus Supplied By SIEMENS -
4.2.3 sets 2
disconnector
4.2.4 Set of clamps, connectors and accessories for the installation of the bus-coupler bay as specified set 2 Supplied By SIEMENS -
4.2.5 Set of conductor for shield wire and accessories for installation of bus coupler bay shield wire as specified lot 1 Supplied By SIEMENS
4.3 DISCONNECTOR SWITCH
150 kV, 3 phase disconnecting switch motor operated ≥ 4000 A without earthing switch, complete with clamps and - -
sets 4
supporting structure for bus coupler bay.
4.4 CIRCUIT BREAKER
150 kV, 3 phase SF6 Circuit Breaker 40 kA, 4000 A complete with clamps and supporting structure for bus coupler - -
4.4.2 set 2
bay.
4.5 CURRENT TRANSFORMER
150 kV single phase current transformer for bus-coupler bay complete with clamps and supporting structure -
4.5.1 units 6
comprising :

Core 1 : 2000 - 4000 / 1A, 5P20 for overcurrent protection, earth fault protection and instrument
Core 2 : 2000 - 4000 / 1A, PX for Main low impedance Busbar Protection 1

4.5.2 150 kV single phase current transformer for bus coupler bay complete with supporting structure comprising : units 6 - -
Core 1 : 2000 - 4000/1 A, 5P20 for overcurrent protection, earth fault protection and instrument

Core 2 : 2000 - 4000/1 A, PX for Main low impedance Busbar Protection 2


4.6 CAPACITOR VOLTAGE TRANSFORMER
150kV Capacitor Voltage Transformer with 2 secondary winding, ratio 150kV:√3 / 100V : √3, Burden 15 VA ( for
4.6.1 protection and instrument and metering), CL 0.2S , rated capacitance 4000 up to 10000 pF, complete with clamps, units 12 - -
supporting structure.
4.7 PROTECTION & CONTROL CUBICLE ( according to TPG.24.AIS.150KV )
4.7.1 PROTECTION & CONTROL CUBICLE FOR BUS COUPLER COMPRISING : set 2 Supplied By SIEMENS -
- IED Back-up protection (BPU) - Over Current, DFR,GFR, Metering, etc
- IED Bay control (BCU)
- Ethernet switch for inter-bay level system
Miscellaneous equipment, test block, rack cabinet, optical cables and cord, control cables, clamps,
- connectors, connection to individual item of equipment, terminals, auxiliary relays, interior lamp,
heater,.. etc to complte the scope of works
4.7.2 BUSBAR PROTECTION CUBICLE COMPRISING : set 2 Supplied By SIEMENS -
- IED busbar protection (MPU) - Busbar low imp - for ≥ 12 bays., CBF, etc
- Ethernet switch for inter-bay level system
Miscellaneous equipment, test block, rack cabinet, optical cables and cord, control cables, clamps,
- connectors, connection to individual item of equipment, terminals, auxiliary relays, interior lamp,
heater,.. etc to complte the scope of works
4.7.3 Common System Cubicle : set 1 Supplied By SIEMENS -
- Ethernet Switch for Inter-bay system .
- IED I/O (Input / Output) - common system
Miscellaneous equipment, test block, rack cabinet, optical cords, control cables, clamps, connectors,
- connection to individual item of equipment, terminals, auxiliary relay, interior lamp, heater,.. etc to complete
the scope of works.
4.7.4 Marshalling kiosk for 150 kV bus-coupler bay. set 2 Supplied By SIEMENS -
LV power cable, control cable and accesorries and necessary equipment (cable ladder, clamp, cable lug, terminal,
4.7.5 Lot 1 Supplied By SIEMENS -
etc.) for all bay to complete the specified scope of work.
TOTAL PRICE ITEMS 4.1 - 4.7 -

PT Siemens Indonesia 20 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
PROYEK GARDU INDUK 150 KV AMPEL

HARGA TESTING &


JASA PEMBONGKARAN HARGA JASA PEMASANGAN
COMMISSIONING GRAND TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
(1) (2) (4) (5) (8) (9 = 5 x 8) (10) (11 = 5 x 10) (12) (13 = 5 x 12) (14 = 9+11+13)
5 150 kV TRANSFORMER BAY (s) : 2 BAYS IBT 150 KV side ( IBT 1 & IBT 2 )
5.1 CONDUCTOR ( according to TPG.8.A.AIS.150KV-E & TPG.8.B.AIS.150KV-E )

5.1.1 All aluminium conductor (2 x TAL 660 mm2) of 3500 amp/ph for 3-phase fly bus and conductor of transformer bay sets 2 Supplied By SIEMENS -

5.1.2 Set of clamps, connectors and accessories for installation of the line bay as specified sets 2 Supplied By SIEMENS -
5.1.3 Set of conductor for shield wire and accessories for installation of the line bay shield wire as specified for line bays lot 1 Supplied By SIEMENS
5.2 INSULATOR ( according to TPG.7.AIS.150KV )
5.2.1 150 kV single tension string insulator set complete with fittings for installation of the line bay as specified. sets 0

5.2.2 150 kV double tension string insulator set complete with fittings for installation of the line bay as specified. sets 12 Supplied By SIEMENS -

5.2.3 150 kV single suspension string insulator set complete with fittings for installation of the line bay as specified. sets 6 Supplied By SIEMENS -

5.2.4 150 kV post insulator complete with clamps and supporting structure for dropper to bus disconnector sets 4 Supplied By SIEMENS -
5.3 DISCONNECTOR SWITCH
150 kV 3 Phase Disconnecting switch motor operated 40 kA, ≥ 3150 A without earthing switch complete with -
5.3.1.a sets 2
clamps and supporting structure for Line Bay.
150 kV 3 Phase Disconnecting switch motor operated 40 kA, ≥ 3150 A without earthing switch complete with -
5.3.1.b sets 2
clamps and supporting structure for Line Bay.
150 kV 3 Phase Disconnecting switch motor operated 40 kA, ≥ 3150 A with earthing switch complete with clamps - -
5.3.2 sets 2
and supporting structure for Line Bay.
5.4 CIRCUIT BREAKER
150 kV 3 Phase SF6 Circuit Breaker 40 kA , 3150 A rms complete with clamps and supporting structure for line bay (up to Supplied By SIEMENS -
sets 2
twin conductors)
5.5 CURRENT TRANSFORMER
5.5.1 150 kV Current transformer 4000 A for line bay complete with clamps and supporting structure comprising: units 6 - -
CORE 1 : 2000 - 4000 /1 A, PX for main Transformer differential protection *)
2000 - 4000 /1 A, 30 VA 5P20 for backup protection
CORE 2 :
(OCR,GFR), instrument and measurement devices *)
CORE 3 : 2000 - 4000/1 A, PX for check bus zone protection.
CORE 4 : 2000 - 4000/1 A, PX for main bus zone protection .
CORE 5 : 2000 - 4000 / 1 A, 30 VA 0.2S for energy metering. *)
5.6 CAPACITOR VOLTAGE TRANSFORMER
150kV Capacitor Voltage Transformer with 2 secondary winding, ratio 150kV:√3 / 100V : √3, Burden 15 VA ( for
5.6.1 protection and instrument and metering), CL 0.2S , rated capacitance 4000 up to 10000 pF, complete with clamps, units 6 - -
supporting structure.
5.7 LIGHTNING ARRESTER
5.7.1 150 kV Lightning arrester, 10 kA complete with supporting structure, clamp, surge counter and leakage current. units 6 - -
5.8 PROTECTION & CONTROL CUBICLE ( according to TPG.24.AIS.150KV )
5.8.1 PROTECTION & CONTROL CUBICLE FOR OHL COMPRISING : lot 1 Supplied By SIEMENS -
- IED Back-up protection (BPU) - Over Current, DFR,GFR, Metering, etc
- IED Bay control (BCU)
- Ethernet switch for inter-bay level system
Miscellaneous equipment, local mimic, test block, rack cabinet, optical cables and cord, control
- control cables, clamps, connectors, connection to individual item of equipment, terminals, auxiliary
relay, interior lamp, heater,.. etc to complte the scope of works.
5.8.2 Marshalling kiosk for 150 kV Line Bay. sets 1 Supplied By SIEMENS -
LV power cable, control cable and accesorries and necessary equipment (cable ladder, clamp, cable lug, terminal, Supplied By SIEMENS -
5.8.3 sets 1
etc.) for line bay to complete the specified scope of work
TOTAL PRICE ITEMS 5.1 - 5.8 -

PT Siemens Indonesia 21 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
PROYEK GARDU INDUK 150 KV AMPEL

HARGA TESTING &


JASA PEMBONGKARAN HARGA JASA PEMASANGAN
COMMISSIONING GRAND TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
(1) (2) (4) (5) (8) (9 = 5 x 8) (10) (11 = 5 x 10) (12) (13 = 5 x 12) (14 = 9+11+13)
6 150/20 kV TRANSFORMER BAY : 1 BAY(S)
6.1 CONDUCTOR ( according to TPG.8.A.AIS.150KV-E & TPG.8.B.AIS.150KV-E )
All aluminium conductor ( 1 x TAL 660 mm2) of ≥ 1250 amp/phase for 3-phase fly bus and conductor of Supplied By SIEMENS -
6.1.1 sets 1
transformer bay
6.1.2 Set of clamps, connectors and accessories for installation of the transformer bay as specified sets 1 Supplied By SIEMENS -
Set of conductor for shield wire and accessories for installation of the transformer bay shield wire as specified for 1 Supplied By SIEMENS
6.1.3 lot
transformer bays
6.2 INSULATOR ( according to TPG.7.AIS.150KV )

6.2.1 150 kV single tension string insulator set complete with fittings for installation of the transformer bay as specified. sets 6 Supplied By SIEMENS -

150 kV single suspension string insulator set complete with fittings for installation of the transformer bay as Supplied By SIEMENS -
6.2.2 sets 3
specified.
150 kV Single phase post insulator for support jumper conductor from busbar complete with clamps and
6.2.3 sets NA
supporting structure
6.3 DISCONNECTOR SWITCH
150 kV 3 Phase Disconnecting switch motor operated 50 kA, ≥ 1250 A without earthing switch Complete with - -
6.3.1 sets 2
clamps and supporting structure for 150/20 kV Transformer Bay.
6.4 CIRCUIT BREAKER
150 kV 3 Phase SF6 Circuit Breaker 40 kA, ≥ 1250 A complete with clamps and supporting structure for 150/20
6.4.1 set 1 - -
kV Transformer Bay.
6.5 CURRENT TRANSFORMER
150 kV Single Phase Current Transformer for 150/20 kV Transformer Bay complete with clamps and supporting - -
6.5.1 units 3
structure comprising :
Core 1 : 150 - 300 / 1 A, PX for Main Transformer Protection and Restricted Earth Fault Protection
Core 2 : 150 - 300 / 1 A, 30 VA 5P20 for Backup Protection, Earth fault Protection, Instrument,
metering and control devices.
Core 3 : 2000-4000/1 A, PX for Check Bus Zone Protection
Core 4 : 2000-4000/1 A, PX for Main Bus Zone Protection
Core 5 : 150 - 300 /1 A, 30 VA 0.2S for energy metering
6.6 LIGHTNING ARRESTER
6.6.1 150 kV Lightning arrester, 10 kA complete with supporting structure, clamp, surge counter and leakage current. units 3 - -
6.7 PROTECTION & CONTROL CUBICLE ( according to TPG.24.AIS.150KV )
6.7.1 PROTECTION CUBICLE FOR 150/20 kV TRANSFORMER BAY COMPRISING : sets 1 Supplied By SIEMENS -
- Ethernet Switch for Inter-bay system .
- IED Main protection (MPU) - Transformer differential, REF HV/LV side, etc
IED Back Up Protection - BPU 1 for HV Side (Over Current, Earth Fault, Circuit Breaker Failure, DFR,
-
Instrument, etc.).
- IED Back Up Protection - BPU 2 for LV Side ( Over Current, Earth Fault, etc).
Miscellaneous equipment, local mimic ,test block, rack cabinet, optical cables and cord, control
- control cables, clamps, connectors, connection to individual item of equipment, terminals, auxiliary
relay, interior lamp, heater,.. etc to complte the scope of works.
6.7.2 CONTROL CUBICLE FOR 150/20 kV TRANSFORMER BAY COMPRISING : sets 1 Supplied By SIEMENS
- Ethernet Switch for Inter-bay system .
- IED Bay control (BCU) Ethernet switch for inter-bay level system
- IED AVR
Miscellaneous equipment, local mimic ,test block, rack cabinet, optical cables and cord, control
- control cables, clamps, connectors, connection to individual item of equipment, terminals, auxiliary
relay, interior lamp, heater,.. etc to complte the scope of works.
6.7.3 Marshalling Kiosk for 150/20 kV Transformer Bay sets 1 Supplied By SIEMENS -
LV power cable, control cable and accesorries and necessary equipment (cable ladder, clamp, cable lug, terminal, Supplied By SIEMENS -
6.7.4 lot 1
etc.) for transformer bay to complete the specified scope of work.
TOTAL PRICE ITEMS 6.1 - 6.7 -

PT Siemens Indonesia 22 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
PROYEK GARDU INDUK 150 KV AMPEL

HARGA TESTING &


JASA PEMBONGKARAN HARGA JASA PEMASANGAN
COMMISSIONING GRAND TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
(1) (2) (4) (5) (8) (9 = 5 x 8) (10) (11 = 5 x 10) (12) (13 = 5 x 12) (14 = 9+11+13)
7 150 kV BUS SECTION BAY : 2 BAY
7.1 CONDUCTOR ( according to TPG.8.A.AIS.150KV-E & TPG.8.B.AIS.150KV-E )
All aluminium conductor (2 x TAL 850 mm2) of 4000 amp/phase for 3-phase for Connect to (Busbar A-DS-CT-CB-CT-DS-
sets 2 Supplied By SIEMENS -
Busbar B) of Bus Section bay
7.2 INSULATOR ( according to TPG.7.AIS.150KV)
7.2.2 150 kV single suspension string insulator set complete with fittings for installation of the line bay as specified. sets 12 Supplied By SIEMENS -
7.2.4 Set of clamps, connectors and accessories for the installation of the bus-section bay as specified set 2 Supplied By SIEMENS -
7.2.5 Set of conductor for shield wire and accessories for installation of bus section bay shield wire as specified lot 1 Supplied By SIEMENS
7.3 DISCONNECTOR SWITCH
150 kV, 3 phase disconnecting switch motor operated 4000 A without earthing switch, complete with clamps and - -
sets 4
supporting structure for bus coupler bay.
7.4 CIRCUIT BREAKER
150 kV, 3 phase SF6 Circuit Breaker 40 kA, 4000 A complete with clamps and supporting structure for - -
set 2
bus Section bay.
7.5 CURRENT TRANSFORMER
150 kV single phase current transformer for bus-coupler bay complete with clamps and supporting structure
7.5.1 units 6 -
comprising :
Core 1 : 2000 - 4000 / 1 A, PX for Main low impedance Busbar Protection 1
7.5.2 150 kV single phase current transformer for bus coupler bay complete with supporting structure comprising : units 6 - -
Core 1 : 2000 - 4000/1 A, 5P20 for overcurrent protection, earth fault protection and instrument
Core 2 : 2000 - 4000/1 A, PX for Main low impedance Busbar Protection 2
7.6 CAPACITOR VOLTAGE TRANSFORMER
150kV capacitor voltage transformer with 2 secondary winding, ratio 150kV : √3 or 154V : √3 / 100V : √3 or 110V :
7.6.1 √3, Burden 15 VA ( for protection and instrument and metering), CL 0.2S or 0.5, rated capacitance 4000 up to units N/A
10000 pF, complete with clamps, supporting structure
7.7 PROTECTION & CONTROL CUBICLE ( according to TPG.24.AIS.150KV )
7.7.1 PROTECTION & CONTROL CUBICLE FOR BUS Section COMPRISING : set 2 Supplied By SIEMENS -
- IED Back-up protection (BPU) - Over Current, DFR,GFR, Metering, etc
- IED Bay control (BCU)
- Ethernet switch for inter-bay level system
Miscellaneous equipment, test block, rack cabinet, optical cables and cord, control cables, clamps,
- connectors, connection to individual item of equipment, terminals, auxiliary relays, interior lamp,
heater,.. etc to complte the scope of works
7.7.2 Marshalling kiosk for 150 kV bus-Section bay. set 2 Supplied By SIEMENS -
LV power cable, control cable and accesorries and necessary equipment (cable ladder, clamp, cable lug, terminal, Supplied By SIEMENS -
7.7.3 set 1
etc.) for all bay to complete the specified scope of work.
TOTAL PRICE ITEMS 7.1 - 7.7 -

PT Siemens Indonesia 23 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
PROYEK GARDU INDUK 150 KV AMPEL

HARGA TESTING &


JASA PEMBONGKARAN HARGA JASA PEMASANGAN
COMMISSIONING GRAND TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
(1) (2) (4) (5) (8) (9 = 5 x 8) (10) (11 = 5 x 10) (12) (13 = 5 x 12) (14 = 9+11+13)
8 150/20 KV POWER TRANSFORMERS AND AUXILIARIES
8.2 NEUTRAL CURRENT TRANSFORMERS

Single phase neutral CT for 20 kV side Class X, 2000-1000/5 A complete with clamps for Restricted Earth Fault
8.2.1 (REF) protection suitable for mounting outdoor on transformer tank or can be put inside the 20 kV neutral units 1
earthing resistor cubicle.

Single phase neutral CT for 150 kV side Class X 150-300/1A complete with clamps for Restricted Earth Fault
8.2.3 units 1
(REF) protection suitable for mounting outdoor on transformer tank.

TOTAL PRICE ITEM 8.1 - 8.4 -


9 20 kV SWITCHGEARS AND POWER CABLES
9.1 20 kV POWER CABLE ( according to TPG.19.AIS.150KV )
4 x 3 x 1 core x 630 SQMM CU 20 kV XLPE power cable/phase between 150/20 kV power transformer and 20 kV
9.1.1 incoming cubicle, including cable support, 20 kV post insulators, metal bars, cable terminations and accessories, sets 1 Supplied By SIEMENS -
cable rack etc.. to complete scope of work. (Total cable lenght 4x3x75 m)
3 core 95 SQMM copper 20 kV XLPE power cable/phase between 20 kV auxiliary transformer cubicle and the
9.1.2 auxiliary transformer, including cable support, cable termination and accessories, cable rack, etc.. to complete sets 2 Supplied By SIEMENS -
scope of work (total cable length is approx 1 x 3 core x 25 m)
9.2 20 kV SWITCHGEARS
9.2.1 20 kV Indoor Metalclad Switchgear Single-Busbar Scheme with IED meter and protection Comprising :
- Incoming Cubicle sets 2 - -
- Busbar PT + Earthing Switch Cubicle sets 2 - -
- Auxiliary Transformer Cubicle set 2 - -
- Outgoing Feeder Cubicle sets 16 - -
- Bus Section set 1 - -
- Interface Cubicle set 1 - -
- Bus Riser Cubicle set 1 - -
- Integrated with station level 150 kV and DCC
a. RTU / Gateway Set 1 Supplied By SIEMENS
b. Router bh 1 Supplied By SIEMENS
c. Ethernet Switch Set 3 Supplied By SIEMENS
d. Panel, MDF & Dummy Set 1 Supplied By SIEMENS
e. I/O untuk kubikel 20 kV, kabel LV, kabel data Set 16 Supplied By SIEMENS
f. Mengintergrasikan dengan relay proteksi 20 kV, power meter Set 16 Supplied By SIEMENS
Including single rate tariff metering kwh-meter for incoming & outgoing feeders, and Ethernet switch for SAS 20
kV, 1 (one) ethernet switch for maximum 6 (six) cubicles.
9.3 LV POWER CABLE ( according to TPG.15.A.AIS.150KV )
4 x 3 x 1 core 20 kV XLPE 630 SQMM CU power cable/phase between bus-section cubicle and bus riser cubicle,
9.3.1 including cable terminations and accessories for connection between sets of 20 kV switchgear to complete the set 1 Supplied By SIEMENS -
specified scope of work (total cable length is approx 4 x 3 x 25 m
9.4 20/0.4 KV Station Auxiliary Transformer
20/0.4 kV 315 kVA 3-phase station auxiliary transformer complete with necessary accessories (vector group DYn
9.4.1 sets 2 - -
5)
TOTAL PRICE ITEMS 9.1 - 9.4 -

PT Siemens Indonesia 24 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
PROYEK GARDU INDUK 150 KV AMPEL

HARGA TESTING &


JASA PEMBONGKARAN HARGA JASA PEMASANGAN
COMMISSIONING GRAND TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
(1) (2) (4) (5) (8) (9 = 5 x 8) (10) (11 = 5 x 10) (12) (13 = 5 x 12) (14 = 9+11+13)
10 TELECOMMUNICATION EQUIPMENT ( according to TPG.13.1.AIS.500KV-E )
(refer to telecommunication network drawing)
GI 150 KV AMPEL
10.1 FIBER OPTIC TELECOMMINICATION EQUIPMENT ( according to TPG.13.1.AIS.500KV-E ) Set 1 Supplied By SIEMENS

- Subrack ( 1 x 1Unit)
- Power Supply ( 1 x 1 Unit )
- Central Procesor Unit ( 1 x 1 Unit )
- SDH Optical Interface STM-4/1 & SFP (1 x 6 Port)
- Ethernet 10/100/1000 Base T ( 1 x4 Port)
- E1 (2 Mbps) (2 x 8 Port)
- Router (1 x 1 Unit)
- 64 Kbps codirectional G.703 Interface (1 x 8 Port)
- Panel 220 x 80 x 60 cm & MDF ( 1 x 1 Unit )
Installation, interface, commissioning, activate, integrate, adapt, integrate with:
- Paired substation (5 Link for 1 SDH)
- Control Center (1 Link )
- Netwok Management System (NMS) eksisting 1 Link
*) Integration 1 SDH in GI 150 KV Ampel
Link GI 150 kV .Ampel - GI 150 kV ( Klaten, Mojosongo, Bawen, Bringin, GITET Ampel) 5 link, SDH, proteksi,
dan teleproteksi melalui 1(satu) link OPGW yang berbeda
Fiber Optic Armoured (FA) single mode Cable 24 cores to connect OPGW (GB) to ODF in telecommunication
-
room / substation building, approx. 200 m length ( 5 set)
- Joint Box ( 5 Set)
- Optical Distribution Frame ( 5 set )
- Kabel data, patch cord, connector ( 5 set)
- Cisco IP Phone 8865 (1 set) - Integration With Existing
- Switch 24-port PoE+, Network Essentials (1 set )
10.2 COMMON TELECOMMUNICATION EQUIPMENT
MDF (Main Distribution Frame), for Fiber Optic Equipment, PAX, etc (( according to TPG.13.1.AIS.500KV-E
10.2.1 set 1 Supplied By SIEMENS
)
Rack/Cabinet , for Fiber Optic Equipment SDH, PDH, PAX, ODF, MDF etc ( according to Supplied By SIEMENS
10.2.2 Set 1
TPG.13.1.AIS.500KV-E )
Miscellaneous equipment and material including cables, patch cord, pig tail, telephone cable, connectors,
10.2.4 compression terminal, connection to individual items of equipment, etc, to complete the scope of works. Lot 1 Supplied By SIEMENS
( according to TPG.13.1.AIS.500KV-E )

PT Siemens Indonesia 25 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
PROYEK GARDU INDUK 150 KV AMPEL

HARGA TESTING &


JASA PEMBONGKARAN HARGA JASA PEMASANGAN
COMMISSIONING GRAND TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
(1) (2) (4) (5) (8) (9 = 5 x 8) (10) (11 = 5 x 10) (12) (13 = 5 x 12) (14 = 9+11+13)
10.3 FIBER OPTIC TELECOMMINICATION EQUIPMENT ( according to TPG.13.1.AIS.500KV-E )

GI 150 KV MOJOSONGO, KLATEN, BRINGIN DAN BAWEN (COMPATIBLE WITH EXISTING) Set 4 Supplied By SIEMENS

- Subrack ( 1 x 1Unit)
- Power Supply ( 1 x 1 Unit )
- Central Procesor Unit ( 1 x Unit )
- SDH Optical Interface STM-4/1 & SFP (1 x 4 Port)
- Ethernet 10/100/1000 Base T ( 1 x 8 Port)
- E1 (2 Mbps) (1 x 8 Port)
- Router (1 x 1 Unit) N/A
- 64 Kbps codirectional G.703 Interface ( 1 x 8 Port)
- Panel 220 x 80 x 60 cm & MDF ( 1 x 1 Unit )
Installation, interface, commissioning, activate, integrate, adapt, integrate with:
- Paired substation (4 Link for 1 SDH)
- Control Center (1 Link ) N/A
- Netwok Management System (NMS) eksisting 1 Link N/A
*) Integration 1 SDH in GI 150 KV Ampel to 4 GI 150 kV
Link GI 150 kV Ampel to Klaten, Mojosongo, Bawen, Bringin 4 link, SDH, proteksi, dan teleproteksi melalui
1(satu) link OPGW yang berbeda
Fiber Optic Armoured (FA) single mode Cable 24 cores to connect OPGW (GB) to ODF in telecommunication
-
room / substation building, approx. 200 m length ( 4 set)
- Joint Box ( 1 x 1 Set)
- Optical Distribution Frame ( 1 x 1 set )
- Kabel data, patch cord, connector ( 1 x 1 set)
- Cisco IP Phone 8865 (1 x 1 set) - Integration With Existing
- Switch 24-port PoE+, Network Essentials (1 x 1 set )
Independence Digital Teleprotection
- 8 set direction GI 150 kV Ampel to ( Klaten : 2 Set ,Mojosongo : 2 Set , Bawen : 2 Set , Bringin : 2 Set ) Supplied By SIEMENS -
10.4 set 16
- 8 set direction GI 150 kV Klaten to Ampel : 2 set, Bawen to Ampel : 2 set, Bringin to Ampel : 2 set dan Mojosongo to
Ampel : 2 set

TOTAL PRICE ITEMS 10.1 - 10.5 - -

PT Siemens Indonesia 26 of 122


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ No. 1 : PEKERJAAN ELEKTROMEKANIKAL
PROYEK GARDU INDUK 150 KV AMPEL

HARGA TESTING &


JASA PEMBONGKARAN HARGA JASA PEMASANGAN
COMMISSIONING GRAND TOTAL
ITEM URAIAN PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
(1) (2) (4) (5) (8) (9 = 5 x 8) (10) (11 = 5 x 10) (12) (13 = 5 x 12) (14 = 9+11+13)
11 150 kV SUBSTATION AUXILIARIES EQUIPMENT
11.1 110 V DC Battery ( according to TPG.10.A.AIS.150KV-E )
110 V DC Battery suitable for supplying all 110 V DC load for 8 hours discharge. (minimum capacity is 110V DC, Supplied By SIEMENS -
11.1.1 set 2
92 cell, 240 AH subject to calculation for minimum of 10 bays and emergency lamp).
11.2 110 V DC Battery charger ( according to TPG.10.C.AIS.150KV-E)
Battery charger 3 step voltage dropper, min. 60 A (subject to calculation) for 110V DC Battery complete with Supplied By SIEMENS -
11.2.1 set 2
Panel Board metering and indicators.
11.3 110 V DC Switch Board ( according to TPG.10.E.AIS.500KV-E )
110V DC Switch Board complete, incl. 2 MCB's incoming, 1 MCB section and 2 x 12 MCB outgoing MCB's Supplied By SIEMENS -
11.3.1 set 2
minimum for 10 bays and emergency lamp.
11.4 48 V DC Battery ( according to TPG.10.B.AIS.500KV-E )
48 V DC Battery suitable for supplying all 48 V DC load for 8 hours discharge. (minimum capacity is 48V DC, 40 set Supplied By SIEMENS -
11.4.1 1
cell, 200 AH subject to calculation for SCADATEL of substation complete).
11.5 48 V DC Battery charger ( according to TPG.10.D.AIS.500KV-E )
Battery charger 3 step voltage dropper, min. 60 A (subject to calculation) for 48V DC Battery complete with Panel set Supplied By SIEMENS -
1
Board metering and indicators.
11.6 48V DC Switch Board ( according to TPG.10.F.AIS.500KV-E )
11.6.1 48V DC Switch Board complete, incl. outgoing MCB's minimum for 10 bays. set 1 Supplied By SIEMENS -
11.7 400V AC Switch Board ( according to TPG.11.AIS.500KV-E )

400V AC Switch MCB's Distribution Board suitable for the 2 units station service transformer interchangeable to
11.7.1 supply the control building, yard lighting and HV equipment of minimum 10 bays, to complete the specified scope set 1 Supplied By SIEMENS -
of work, including necessary spare MCB.

LV power cable, control cable and accesorries and necessary equipment (cable ladder, clamp, cable lug, terminal, Supplied By SIEMENS -
11.8 sets 1
etc.) to complete the specified scope of work.

TOTAL PRICE ITEMS 11.1 - 11.8 ###


12 MISCELLANEOUS
(refer to CCTV drawing)
12.2 Disturbance Fault Recorder Cubicle ( IBT : 2, OHL : 8 ) sets 4 Supplied By SIEMENS
18 Analog input and 64 digital input completed with necessary equipment (Control cable, panel, printer, etc) to complete the scope
of works (for 10 Bay)
Miscellaneous equipment and material including power cables, fiber optic cable, video cable, network cable, patch cord,
12.3 pig tail, connectors, compression terminal, connection to individual items of equipment, etc, to complete the scope of lot 1 Supplied By SIEMENS
works.
TOTAL PRICE ITEMS 12.1 - 12.3 ###
GRAND TOTAL FOR ELECTROMECHANICAL WORKS ( 1 - 12) ###

PT Siemens Indonesia 27 of 122


KUANTITAS DAN HAR
PENGADAAN, PEMASANGAN DAN P

Poncol Baru
No.
DESKRIPSI Satuan

1 2 3

Terintegrasi dengan GI yang berhadapan


A Multiplexer untuk jarak antar GI Max 10-160 km
Port Multiplexer dapat dikonfigurasi 622 Mbps ADM
atau 155.2 Mbps ADM atau 2 Mbps PDH

a Central Procesor Unit Buah

b FO Interface, 622 Mbps ADM / 155.2 Mbps ADM Port


c FO Interface, 155.2 Mbps ADM Port

d FO Interface, 2 Mbps (merk sama GI yang berhadapan) Port

e 2 Mbps Interface / Digital Branching (2 M x 4 x 63) Port

1 Interface
a 2 Mbps Interface G 703 Port

Data interface
b 64Kbps codirectional G.703 Interface Port

c Nx64Interface Port

d Low Rate Data Interface (V24) Port

e VF E/M Interface Port

f FXS Interface Port

g FXO Interface Port

h LAN-ETH + Router Port

i Network Element interface Port

j MDF (Main Distribution Frame) Lot

k Kubikel 19" (untuk MUX & MDF) Lot


l Subscriber telephone set Set

Instalasi, interface, commisioning, mengaktifkan,integrasi dan adaptasi


2 dengan Gardu Induk yang berhadapan dan Control Center Lot

3 Terintegrasi dengan NMS eksisting Protokol SNMP V-2 Lot

4 TP Independent Digital (64 kbps / 2 Mbps) bh


a 8 command ( 2 Poncol Baru II, 1 Poncol Baru, 1 Tambun II )
Terintegrasi dengan MUX di GI - GI yang berpasangan

5 Pelengkap
a Kabel FO armoured Lot

b Gentry Box Lot

c Optical Telecomunication Box (OTB) Lot

d Kabel data, patch cord, connector Lot

e MCB, ELCB, kabel power, overvoltage protection Lot

6 Dokumentasi Lot

Termasuk dalam kontrak


a Commissioning
b Material interface : terminal, kabel, patch cord dll
c Factory Acceptance Test : 14 HO / Lokasi
d Training lokal : 14 HO / Lokasi
e Site Acceptance Test : 14 HO / Lokasi
f Ditanggung vendor : transportasi, hotel, konsumsi, uang saku.

B PABX
1 Software PABX dan Fitur
- 32 Pesawat cabang lot

2 Kapasitas PABX terpasang


- Analog port

- Digital port

3 Perangkat lunak :
- User Interface PC Telepon Console lot

- Pemeliharaan (Diganostic, Update database dan Simulasi) lot


4 Komponen utama :
- Processor, memori, catudaya bh

5 Trunk line :
- E-1 line

- 4 Wire E&M line

- 2 Wire Rep ( LD ) line

- 2 Wire CO line

6 Kubikel :
- PABX lengkap dengan instalasi lot

- MDF lengkap dengan instalasi

- Kabel power, MCB, ELCB lot

- Kabel telepon indoor, outdoor lot

- Kubikel PABX ke Kubikel MDF lot

- Box MDF eksisting ke Box MDF baru s/d Pesawat lot

- Over voltage protection sisi tegangan AC, DC,data, pesawat telepon lot

7 Pesawat telepon terpasang :


- Analog bh

- Digital bh

- Cordless bh

8 Tools telepon test lot

9 Instalasi
- Instalasi, interface, commisioning, mengaktifkan,integrasi dan adaptasi
1
dengan sistem eksisting antar Gardu Induk dan Control Center

10 Dokumentasi Lot

Termasuk dalam kontrak


a Commissioning
b Material interface : terminal, kabel, patch cord dll
c Factory Acceptance Test : 14 HO / Lokasi
d Training lokal : 14 HO / Lokasi
e Site Acceptance Test : 14 HO / Lokasi
f Ditanggung vendor : transportasi, hotel, konsumsi, uang saku.

Jumlah
PPN 10 %
TOTAL
KUANTITAS DAN HARGA (BIL OF QUANTITY)
PEMASANGAN DAN PENGUJIAN MULTIPLEXER DAN PABX

LOKASI HARGA SATUAN JUMLAH


GIS 150 KV TOT
BARANG JASA BARANG
PCLRU II
4 5 6 7 8=5x6

1 1 Included in price of A.b


4 4 Err:504 Err:504 Err:504
0 0
2 2 Included in price of A.b

4 4 Included in price of A.b

4 4 Included in price of A.b

4 4 Included in price of A.b

4 4 Included in price of A.b

4 4 Included in price of A.b

4 4 Included in price of A.b

12 12 Included in price of A.b

12 12 Included in price of A.b

4 4 Included in price of A.b

2 2 Included in price of A.b

1 1 Included in price of A.b

1 1 Included in price of A.b


1 1 Included in price of A.b

1 1 Included in price of A.b

1 1 Included in price of A.b

0 0

1 1 Included in price of A.b

1 1 Included in price of A.b

1 1 Included in price of A.b

1 1 Included in price of A.b

1 1 Included in price of A.b

1 1 Included in price of A.b

1 1 Err:504 Err:504 Err:504

8 8 Included in price of B.2


4 4

1 1 Included in price of B.2

1 1 Included in price of B.2


1 1 Included in price of B.2

2 2 Included in price of B.2

4 4 Included in price of B.2


0 0
4 4 Included in price of B.2

1 1 Included in price of B.2

1 1 Included in price of B.2

1 1 Included in price of B.2

1 1 Included in price of B.2

1 1 Included in price of B.2

1 1 Included in price of B.2

6 6 Included in price of B.2

2 2 Included in price of B.2


0 0

1 1 Included in price of B.2

1 1 Included in price of B.2

1 1 Included in price of B.2


Err:504
Err:504
Err:504
JUMLAH
HARGA TOTAL
JASA

9=5x7 10=8+9

Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
Err:504 Err:504
PEMBANGUNAN GIS 150 KV PONCOL BARU II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS

TOTAL PRICE
NO. DESCRIPTION
(IDR)
1 2 3
150 KV PONCOL BARU II S/S
1 Bill No 1 : Switchyard 5,120,107,721.90
2 Bill No 2 : GIS Building 150 KV 8,848,133,398.01
3 Bill No 3 : Miscellaneous 2,353,490,000.00
4 Bill No 4 : Security Post 181,022,460.80

Total Price Schedule 1 for Civil work 16,502,753,580.71

Date :
Total Civil work 40 of 1
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
PEMBANGUNAN GIS 150 KV PONCOL BARU II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 1 : SWITCHYARD FOR CIVIL WORKS

150 KV PONCOL BARU II S/S

NO DESCRIPTION UNIT QTY

1 2 3 4

I PREPARATORY WORK
1 Mobilization & Demobilization ls 1.00
2 Plank name project unit 1.00
3 Bouwplank m' 440.20
4 Fence security of project 2 m high m' 296.27
5 Site office ( 4m x 6 m ) m 2
24.00
6 Site storage ( 4 m x 15 m ) m 2
60.00
7 Soil and Geotechnical Investigation :
a. DCPT (Sondir) Pcs 3.00
b. Core Drilling Pcs 2.00
c. Test Lab and Report Sets 5.00

TOTAL I

II GENERAL EARTHWORKS AND SITE WORKS

1 Earthworks:
a. Site Clearing & grubbing m2 -
b. Common Excavation m 3
-
c. Soil Disposal m 3
-
3
d. Backfill filling with selected material m -

2 Embankment Construction :
a. Construction of common fill embankment with selected m3 -
material from import fill (compaction in layer of 20 cm)
b. Test Sand Cone (per-layer of 20 cm) ttk -

3 Concrete works (slope stability):


a. Retaining wall (stone masonry) m3 -
b. Gabion m3 -
c. Sodding (gebalan rumput) m3 -
d. Concrete frame (concrete f'c = 14,5 MPa (K 175), m 3
-
Fe: 150 kg/m3; BJTD-35, formwork)

4 Road works (new):

Date :
Switchyard-GIS PCL2 41 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
a. Prepare compacted subgrade m2 1,488.00
b. Base structure m 2
1,488.00
c. 50 mm Asphalt hot mix m 2
1,488.00
d. 50 mm Asphalt penetration m 2
1,488.00

5 Kerbing & Edging (Concrete f'c = 14,5 MPa (K 175)):


a. Precast Concrete Kerbs for switchyard (10 x 20 x 60 cm) m' 74.40
b. Precast Concrete Kerbs for road (25 x 30 x 50 cm) m' 456.00

6 Fence complete with barbed wire,accessories and foundation


a. BRC Fence 1.50 m height m' 74.40
b. BRC Fence 1.90 m height m' 204.49
c. Fence brick wall 2.40 m height (lower part) & barbed wire 0.60
m' -
m height (upper part)

7 Gate complete with pole, accessories and foundation


a. Single gate BRC 1.90 m height, 1.1 m width unit 4.00
b. Sliding gate BRC 1.50 m height, 6.3 m width (include column unit 2.00
brick)
c. Double gate BRC 1.90 m height, 3,30 m width unit 1.00

8 Landscaping m2 200.00
9 Gravelling :
a. Gravel (dia 3 - 5 cm); thickness = 20 cm m2 1,669.60
b. Sand layer below gravel (compacted sand); thickness = 5 cm m3 -

U- Ditch cable trench for 150 kV (f'c = 31,2 MPa (K 350) include
10
cover, galvanized L 50.50.5 and PVC pipe)
a. Type 1 (large, 100 x 100 x 120 cm ) m' 196.47
b. Type 2 (medium, 60 x 60 x 120 cm ) m' -
c. Type 3 (small, 40 x 40 x 120 cm ) m' 20.00
d. Type 4 Box Culvert (crossing road, 100 x 100 x 100 cm LD) m' 40.00

11 Drainage switchyard :
a. Open Drainage (stone masonry)= 40 x 70 cm2 m' 456.00
b. Open Drainage (brick) 30 x 40 cm 2
m' -
c. Sub soil Drainage dia 30 cm including gravel & Palm fibre m' 112.00
d. Control Box (Brick 60x60 cm2 ) height = 70 cm with cover unit 30.00

12 Station earthing system:


a. Excavation and backfill m3 50.00
b. 100 mm diameter asbestos cement pipe ducts m
c. PVC flexible pipe m

TOTAL II
III FOUNDATION FOR 150 kV

1 Surge Arrester Unit 12.00


2 Capacitor Transformer Unit 12.00
3 Line Trap Unit -
4 Post For Gantries TW1 Unit 5.00
5 Power Transformer 60 MVA Set 4.00
6 Fire Wall Unit 5.00
Date :
Switchyard-GIS PCL2 42 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
7 Marshalling Kiosk Unit 4.00
8 Neutral Grounding Resistors (NGR) Unit 2.00
9 Support 20 kV Unit 2.00
10 Cable Sealing end Unit 12.00
11 Oil Pit ( Cap 30 m3 ) Unit 2.00
12 Service transformers (include roofing and fence BRC 1.2 m) Set 2.00

TOTAL III
IV SITE AND ROAD LIGHTING

1 Mercury Vapour Flouresent light 1 x 250 W complete with lighting


column 9 m high, fuse box, grounding system and installation of
cable conduit and wiring and all accessories and foundation of NO 5.00
column (each 15 m length)

2 Mercury Vapour Flouresent light 1 x 250 W complete with support,


fuse box, grounding system and installation of cable conduit and NO 6.00
wiring and all accessories for Switchyard
3 Mercury Vapour Flouresent light 1 x 80 W complete with lighting
column 2 m high, fuse box, grounding system and installation of
cable conduit and wiring and all accessories and foundation of NO 5.00
column

4 Lighting panel outdoor complete with foto cell switch fuse, mcb,
grounding system indicator wiring and all accessories (foto cell) and Set 2.00
foundation of panel
TOTAL IV

TOTAL PRICE SIPIL SWITCHYARD (I+II+III+IV)

Date :
Switchyard-GIS PCL2 43 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
OL BARU II
N AND OTHER SERVICES

IL WORKS

UNIT PRICE TOTAL PRICE


LOCAL CURRENCY LOCAL
PORTION
(RUPIAH) (RUPIAH)
5 6=4x5

25,000,000.00 25,000,000.00
3,000,000.00 3,000,000.00
29,580.00 13,021,116.00
190,700.00 56,498,689.00
1,500,000.00 36,000,000.00
900,000.00 54,000,000.00
-
2,500,000.00 7,500,000.00
24,000,000.00 48,000,000.00
1,500,000.00 7,500,000.00

250,519,805.00

-
-
-
-

Date :
Switchyard-GIS PCL2 44 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
9,000.00 13,392,000.00
226,250.00 336,660,000.00
340,900.00 507,259,200.00
137,500.00 204,600,000.00

90,000.00 6,696,000.00
185,000.00 84,360,000.00

967,060.00 71,949,264.00
1,220,800.00 249,641,392.00

2,800,000.00 11,200,000.00
9,500,000.00 19,000,000.00
14,000,000.00 14,000,000.00

150,000.00 30,000,000.00

113,650.00 189,750,040.00
272,900.00 -

3,024,300.00 594,184,221.00
-
1,718,800.00 34,376,000.00
2,820,000.00 112,800,000.00

609,302.00 277,841,712.00
-
667,140.00 74,719,680.00
504,000.00 15,120,000.00

29,250.00 1,462,500.00

2,849,012,009.00

12,758,276.00 153,099,312.00
12,758,276.00 153,099,312.00

58,578,103.00 292,890,515.00
187,544,462.00 750,177,848.00
37,712,573.00 188,562,865.00
Date :
Switchyard-GIS PCL2 45 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
4,713,548.00 18,854,192.00
8,973,629.00 17,947,258.00
4,713,548.00 9,427,096.00
12,758,276.00 153,099,312.00
34,543,275.85 69,086,551.70
7,915,823.10 15,831,646.20

1,822,075,907.90

16,000,000.00 80,000,000.00

9,500,000.00 57,000,000.00

7,500,000.00 37,500,000.00

12,000,000.00 24,000,000.00

198,500,000.00

5,120,107,721.90

Date :
Switchyard-GIS PCL2 46 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
PEMBANGUNAN GIS 150 KV PONCOL BARU II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER
CIVIL WORKS
BILL NO 2 : GIS BUILDING 150 KV

150 KV PONCOL BARU II S/S

NO DESCRIPTION UNIT

1 2 3
GIS BUILDING 150 KV

I EARTHWORKS
1 Excavation work m3
2 Backfill filling with selected material m3
3 Soil Disposal m3
4 Sand layer ( compacted sand ) m3
5 Import Filling with selected Material m3

II CONCRETE REINFORCEMENT AND INSTALATION WORK

1 m3
Lean concrete f'c = 7.4 MPa (K-100) (for foundation and plain thickness 5 cm)
2 m3
Foundation work (concrete f'c = 26.4 MPa (K 300), Fe : 150 kg/m3, Formwork)
3 Sloof work ( concrete f'c = 26.4 MPa (K 300), Fe : 250 kg/m3, Formwork ) m3
4 m3
Column work ( concrete f'c = 26.4 MPa (K 300), Fe : 350 kg/m3, Formwork )
5 Beam work (concrete f'c = 26.4 MPa (K 300), Fe : 300 kg/m3, Formwork) m3
6 m3
Basement wall work (concrete f'c = 26.4 MPa (K 300), Fe : 200 kg/m3, Formwork)
7 Roof work ( concrete f'c = 26.4 MPa (K 300), Fe : 150 kg/m3, Formwork ) m3
8 m3
Cannopy work ( concrete f'c = 26.4 MPa (K 300), Fe : 125 kg/m3, Formwork )
9 m3
Slab floor work ( concrete f'c = 26.4 MPa (K 300), Fe : 250 kg/m3, Formwork )
10 Stair work ( concrete f'c = 26.4 MPa (K 300), Fe : 125 kg/m3, Formwork ) m3
Column, sloof and beam practical work (concrete f'c = 14,5 MPa (K 175), Fe :120
11 m3
kg/m3, Formwork)
12 Stone masonry ad 1 pc : 3 sand m3
13 A half brick wall ad 1 pc : 4 sand m2
14 A half brick wall ad 1 pc : 2 sand m2
15 Plaster ad 1 pc : 4 sand m2
16 Plaster ad 1 pc : 2 sand m2
17 Acian m2

Date :
GIS-150kV 47 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
18 Concrete f'c = 7.4 MPa (K-100), slump (12±2) (rabat) m3

IIIROOF AND CELLING WORK


1 Steel trusses complete with welding or bolting and steel painting kg
2 Purlin complete with plat simpul and steel painting kg
3 Wind bracing and tie rod kg
4 Klip-lock Hi-Ten metal sheet complete with accessories m2
5 Nok standard Hi-Ten m'
Thermal Insulation Glasswool t=10 cm, aluminium foil (single sided) with 2 (two)
6 m2
layer and roof-mesh
7 Ceilling Gypsum board 1200 x 2400 x 9 mm m2
8 Ceilling Frame (Hollow steel 40x40x2 mm) m2
9 List profil gypsum m'
10 Listplank super sheet (GRC) m'
11 PVC pipe vertical dia 3 inc (include bends, tees, albows, reducers, adaptors, roof m'
drain)
12 Aluminium flashing t=0.50 mm including filler in both side m'
13 Steel angle include welding or bolting kg
14 Water proofing membran type t= 3 mm and mortar screed m2

IV DOOR AND WINDOWS WORK


1 Glass door complete with aluminium frame and accessories:
- Type P1 (double door) 2100 x 2700 mm unit
- Type P4 (double door) 1775 x 2100 mm unit
- Type P6 (Single door) 800 x 2100 mm unit
- Type P2 (Single door) 1000 x 2100 mm unit
- Type P5 (Single door) 800 x 2100 mm unit
- Type P7 (Single door & 12 fixed windows) 2100 x 9900 mm unit

2 Glass windows & ventilation complete with aluminium frame and accessories:
- Type V1 (4 fixed ) 3650 x 1500 mm unit
- Type V2 (5 fixed ) 4800 x 1500 mm unit
- Type V3 (19 fixed ) 9500 x 1000 mm unit
- Type V4 (2 fixed ) 1775 x 700 mm unit
- Type V5 (1 fixed) 475 x 700 mm unit
- Type V6 (1 fixed) dia 1500 mm unit
- Type J1 (3 fixed) 3300 x 1300 mm unit

3 Steel sliding door (P3) complete with frame, accessories and steel painting unit

V SANITARY AND PLUMBING WORK

Supply and fix the following including all jointing, materials for fixing and plugging
and making good on competion sanitary appliances are to be of high quality

1 Bath basin complete No


Date :
GIS-150kV 48 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
2 Close-coupled with eco washer equal to merk TOTO complete No
3 Wash basin stainless steel equal to merk TOTO complete (kitchen) No
4 Lavatory basin equal to merk TOTO complete with spectacle (toilet) No
5 Ceramic bowl urinal equal to merk TOTO complete No
6 Chromium plate toiled roll holder No
7 Chromium plate soap dish No
8 Chromium plated hat and coat hook No

Installation of water supply GIP medium pipe class SNI (include for all pipes, bends,
9 ls
tees, albows, reducers, adaptors, taps and connections to fittings, appliances, etc.)

Installation of water waste pipe PVC dia 3 inc AW (include for all pipes, bends, tees,
10 ls
albows, reducers, adaptors, metal grill and connections to fittings, appliances, etc.)

Water tank stainless steel 2 x1000 liter and pressure tank 100 liter and steel structures
11 unit
tower ( cap : 2 m3 ) and installation of pipe
12 Deepwell including submersible water pump 150 lt/m capacity and accessories set
Septictank cap 3 m included infiltrate cap 2 m complete with PVC, palm fibre and
3 3
13 unit
sand stone
14 Open Drainage (brick) 30/40 cm2 for GIS building m'

VI FLOOR AND WALL TILING


All material floor and wall tiling must be of high quality
1 Granite floor tiles 600 x 600 mm (meeting, hall, terace room) m2
2 Non glazed ceramic floor tiles 400 x 400 mm (battery, AC/DC room) m2
3 Granite floor tiles 300 x 300 mm (toilet, kitchen) - anti-slip m2
4 Granite floor tiles 300 x 600 mm (stairs)- anti-slip m2
5 Granite wall tiles 400 x 400 mm (toilet, kitchen) m2
6 Glazed plint tiles 100 x 400 mm m'
7 Granite plint tile 100 x 600 mm m'
8 Stepnosing 100 x 400 mm (stairs, terrace) m'
9 Natural stone (terace) m2
10 Metal raised floor 50 mm thick, including vinil finishing (control, SAS) m2
11 Floor hardener finished (GIS, 20 kV room) m2
12 Expansion joint and sealing m
13 Raised floor (complete with support and accessorries) m2

VII PAINTING WORK


Apply two coasts red lead primer, one coat alkyd based undercoat and one coats
1 m2
alkyd gloss paint on metal works
Prepare and apply one coat alkali resistant primer and three coats vinyl acrylic
2 m2
emulsion (interior & celling)
Prepared and apply two coats alkali resistant primer and three coats exterior grade
3 m2
weathershield
4 Prepare as speciffied and apply two coats epoxy based coloured floor paint m2

Date :
GIS-150kV 49 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
VIII FINISHING WORK
All material finishing work must be of high quality
1 Door closer No
2 Hinge for window (1 set= 2 pcs) set
3 Hinge for door (1 set= 3 pcs) set
4 Grendel for window (1 set= 2 pcs) No
5 Grendel for door double swing No
6 Wind hook of window (1 set = 2 pcs) set
7 Door lock No
8 Door Holder (1 set= 2 pcs) No

IX METAL WORKS
Rates for steel and metal works to included for all neccesary, bolts, welded,
connections , apliances, etc.
1 Handrail of stainless steel pipe ø 2" m'
2 Plat bordes/ checker plate t= 6 mm complete with steel painting kg
3 Cable Rack thickness 2 mm m'
4 Emergency spiral staircase of stainless steel include foundation set
5 Stainless steel of fence m'
6 Steel angle include welding or bolting kg

X CABLE DUCT
1 Concrete cable duct ( f'c = 14,5 MPa (K 175); Fe : 100 kg /m3 )
included galvanized cable tray steel anggle 50.50.5 and plate bordes 6 mm m
for type cable duct I
2 Concrete cable duct ( f'c = 14,5 MPa (K 175); Fe : 100 kg/ m3 )
included galvanized cable tray steel anggle 50.50.5 and plate bordes 6 mm m
for type cable duct II
3 Concrete cable duct ( f'c = 14,5 MPa (K 175); Fe : 100 kg/ m3 )
included galvanized cable tray steel anggle 50.50.5 and plate bordes 6 mm m
for type cable duct III
4 Concrete cable duct ( f'c = 14,5 MPa (K 175); Fe : 100 kg/ m3 )
included galvanized cable tray steel anggle 50.50.5 and plate bordes 6 mm m
for type cable duct IV
5 Concrete cable duct ( f'c = 14,5 MPa (K 175); Fe : 100 kg/ m3 )
included galvanized cable tray steel anggle 50.50.5 and plate bordes 6 mm m
for type cable duct V

XI INSTALATION OF ELECTRICAL AND MECANICAL WORK


Installation of electric lighting to included for all neccesary (cabling plugs, fittings,
lights, exhaust fans, air conditioning, etc.)
1 AC split 2PK No
2 AC split 1 PK No
3 Exhaus fan wall 200 W/220 Volt (16") industrial No

Date :
GIS-150kV 50 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
4 Exhaus fan ceiling 40 W/220 Volt (10") very low noice No
5 Panel Box MCB complete with R.S.T lamp indicator and contactor grounding No
6 Price for capacity electrical ls
7 Emergency lighting lamp 40 watt No
8 Indoor luminaires type flourescent fitting 2 x 36 watt included armature No
9 Indoor luminaires type flourescent fitting 1 x 36 watt included armature No
10 Downlight No
11 Clear lamp ceiling 60 watt No
12 Stop contact No
13 Wall lamp IDWL 194 Milk Glass dia 300 mm Mercury 125 W No

XII LIGHTNING PROTECTION


1 Arder/ground rod icluded pipa and cable BC 25 mm2 and all accessories clamps steel Lot
plate, material support and pole, grounding system for controle building

XIII FIRE ALARM


Rates for fire alarm works to included for all neccesary - cable enclosed in steel
conduit above ceiling level, including junction boxes, bends, clamps and the like and
complete with all fittings and accessories
1 Alarm bell 6'' ( 150 mm ) diameter to approval surface mounted in Lobby No
2 Smoke detector No
3 Fixed and rate of rice temperature detector No
MCFA ( Master control fire alarm ) included indication lamp, battery rectifier and all
4 No
accessories

XIV FIRE FIGHTING EQUIPMENT


1 Portable fire extinghuister type dry chemical ( 5 kg hallon ) No
2 Mobile unit powder fire extinghuister ( 50 kg hallon ) No
3 Portable type 6 kg CO2 c/w wall bracket No
4 Hydrant and accessories included installation of pipe Lot
- Fortable Pump for Fire Hidrant complete = 1 unit
- Hydrant Box Type C (Out Door) = 3 unit
- Gate valve dia 2 1/2" kitz + Control box ( for Pipa Distribusi Hidrant ) = 3 pieces
5 Lot
Underground Water tank (cap : 100 m3) and jet pump included installation of pipe

XV SUNDRIES

1 Flagpole Stainless Steel ø 3" with acc + Foundation No


Name plate "GIS 150 kV PONCOL BARU II" work complete with stainless steel pipe
2 ø 2", stainless steel plate 1.2 mm, PLN's logo & block letter and foundation of No
column
3 Key box No

Date :
GIS-150kV 51 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
TOTAL PRICE GIS BUILDING 150 KV

Date :
GIS-150kV 52 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
ONCOL BARU II
ATION AND OTHER SERVICES

G 150 KV

UNIT PRICE TOTAL PRICE


LOCAL CURRENCY LOCAL
QTY
PORTION
(RUPIAH) (RUPIAH)
4 5 6=4X5

1,495.50 88,300.00 132,052,650.00


279.29 29,250.00 8,169,174.00
1,216.21 41,050.00 49,925,502.60
10.56 272,900.00 2,881,824.00
-

5.28 977,010.00 5,158,612.80

55.44 4,452,720.00 246,858,796.80

25.04 6,754,870.00 169,141,944.80


125.49 9,012,210.00 1,130,924,208.48
74.10 8,246,410.00 611,042,488.18
52.80 5,372,630.00 283,674,864.00
66.88 5,949,010.00 397,881,686.82
5.60 5,566,110.00 31,170,216.00

273.47 6,754,870.00 1,847,220,524.55


11.70 5,566,110.00 65,123,487.00
7.87 4,157,840.00 32,730,516.48
-
1,856.51 126,570.00 234,978,470.70
72.00 133,950.00 9,644,400.00
3,713.02 91,328.00 339,102,690.56
190.00 98,616.00 18,737,040.00
3,903.02 20,000.00 78,060,400.00

Date :
GIS-150kV 53 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
121.60 977,010.00 118,804,416.00

-
-
-
-
-
-

481.44 63,050.00 30,354,792.00


481.44 119,282.00 57,427,126.08
529.00 15,000.00 7,935,000.00
-

512.00 65,000.00 33,280,000.00

-
-
590.00 150,000.00 88,500,000.00

2.00 11,340,000.00 22,680,000.00


1.00 6,336,750.00 6,336,750.00
4.00 2,520,000.00 10,080,000.00
8.00 3,360,000.00 26,880,000.00
2.00 2,688,000.00 5,376,000.00
1.00 30,240,000.00 30,240,000.00

20.00 7,665,000.00 153,300,000.00


10.00 9,720,000.00 97,200,000.00
1.00 11,400,000.00 11,400,000.00
1.00 1,118,250.00 1,118,250.00
1.00 332,500.00 332,500.00
2.00 600,000.00 1,200,000.00
2.00 5,791,500.00 11,583,000.00

1.00 12,000,000.00 12,000,000.00

2.00 900,000.00 1,800,000.00


Date :
GIS-150kV 54 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
2.00 2,750,000.00 5,500,000.00
1.00 1,200,000.00 1,200,000.00
2.00 1,700,000.00 3,400,000.00
2.00 2,200,000.00 4,400,000.00
2.00 250,000.00 500,000.00
2.00 200,000.00 400,000.00
2.00 2,750,000.00 5,500,000.00

1.00 2,000,000.00 2,000,000.00

1.00 12,000,000.00 12,000,000.00

1.00 26,000,000.00 26,000,000.00

1.00 120,000,000.00 120,000,000.00

1.00 16,000,000.00 16,000,000.00

130.00 425,000.00 55,250,000.00

161.75 320,716.00 51,874,850.85


77.45 215,716.00 16,708,067.06
16.00 208,841.00 3,341,456.00
76.72 320,716.00 24,605,331.52
36.75 320,716.00 11,786,313.00
38.94 64,715.00 2,520,002.10
86.00 96,215.00 8,274,490.00
159.00 64,715.00 10,289,685.00
-
195.27 721,875.00 140,961,253.13
409.60 220,000.00 90,111,780.00
-
-

143.10 92,375.00 13,218,862.50

3,406.86 58,750.00 200,153,025.00

1,122.00 76,175.00 85,468,350.00

Date :
GIS-150kV 55 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
21.00 450,000.00 9,450,000.00
- -
21.00 125,000.00 2,625,000.00
- -
3.00 80,000.00 240,000.00
- -
18.00 350,000.00 6,300,000.00
21.00 150,000.00 3,150,000.00

70.00 400,000.00 28,000,000.00


1,080.00 25,345.00 27,372,600.00
500.00 90,000.00 45,000,000.00
1.00 7,500,000.00 7,500,000.00
30.00 650,000.00 19,500,000.00
500.00 22,850.00 11,425,000.00

6.00 14,500,000.00 87,000,000.00


2.00 9,000,000.00 18,000,000.00
5.00 1,450,000.00 7,250,000.00

Date :
GIS-150kV 56 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
4.00 1,200,000.00 4,800,000.00
2.00 6,500,000.00 13,000,000.00
1.00 60,000,000.00 60,000,000.00
15.00 1,500,000.00 22,500,000.00
55.00 350,000.00 19,250,000.00
23.00 300,000.00 6,900,000.00
10.00 425,000.00 4,250,000.00
10.00 75,000.00 750,000.00
26.00 275,000.00 7,150,000.00
12.00 700,000.00 8,400,000.00

1.00 18,000,000.00 18,000,000.00

3.00 1,700,000.00 5,100,000.00


42.00 1,500,000.00 63,000,000.00
20.00 750,000.00 15,000,000.00
1.00 45,000,000.00 45,000,000.00

4.00 6,500,000.00 26,000,000.00


2.00 19,000,000.00 38,000,000.00
5.00 8,000,000.00 40,000,000.00
1.00 520,000,000.00 520,000,000.00

1.00 324,000,000.00 324,000,000.00

1.00 450,000.00 450,000.00

Date :
GIS-150kV 57 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
8,848,133,398.01

Date :
GIS-150kV 58 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
150 KV PONCOL BARU II S/S
UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)
1 2 3 4 5

1 Concrete Work
1.1 Concrete f'c = 14,5 MPa (K 175) m3
1.2 Concrete f'c = 26.4 MPa (K 300) m3
1.3 Concrete f'c = 19,3 MPa (K 225) m3

2 Reinforcement Work
2.1 Reinforcement steel U 24/ BJTP - 24 kg
2.2 Reinforcement steel U 32/ BJTD - 40 kg

3 Excavation Work
3.1 Excavation of Soil m3
3.2 Excavation of Rock m3

4 Filling Work
4.1 Back Filling m3
4.2 Import Filling m3

5 Steel Work
5.1 Steel trusses comply with connection kg
5.2 Wind Bracing and Tic Rod kg
5.3 Steel Structure for Gantry ton

6 Piling
6.1 Driven Pile 20 x 20 cm m' - 480,000.00
6.2 Driven Pile 30 x 30 cm m' 1,980.00 810,000.00
6.3 Wooden Pile dia 8- 10 cm m'

7 Demolishing Work
7.1 Demolishing Stone Masonry m3
7.2 Demolishing Brick Wall m3 50.00 250,000.00
7.3 Demolishing Concrete m 3
100.00 1,196,400.00
7.4 Demolishing Reinforced Concrete m 3
100.00 1,495,500.00
7.5 Demolishing existing warehouse m 2
225.00 480,000.00
7.6 Reinstall warehouse complete with foundation m 2
225.00 1,600,000.00

U-Ditch Type 1A cable trench from T/L Bay 150 kV


8
(Poncol Baru I,II) to out of substation
8.1 Supply and placing of concrete cable channel complete
with cover including excavation, backfiling up to 500 mm
onl over covers concrete, including asphalt pavement on the
m' -
road and cable's hanger for 2cct x 3 phase x 2 x single core
150 kV CU XLPE power cable (U- ditch 1600 x 1600 x
1200 mm)

Date :
Miscellaneous 59 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
TOTAL MISCELLANEOUS

Date :
Miscellaneous 60 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
TOTAL PRICE
LOCAL

(RUPIAH)
6=4x5

-
1,603,800,000.00

12,500,000.00
119,640,000.00
149,550,000.00
108,000,000.00
360,000,000.00

Date :
Miscellaneous 61 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
2,353,490,000.00

Date :
Miscellaneous 62 of 122
Name of Bidder : GIS 150 KV PONCOL BARU II
Signature of Bidder :
PEMBANGUNAN GIS 150 KV PONCOL BARU II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO. 4 : SECURITY POST

NO. DESCRIPTION UNIT QTY

A. EARTHWORK
1 Excavation work m3 19.20
2 Backfill filling with selected material m 3
14.70
3 Sand layer ( compacted sand ) m 3
52.00
4 Import Filling with selected Material m 3
3.60

B. CONCRETE REINFORCEMENT AND INSTALATION WORK


1 Stone masonry ad 1 : 3 m3 9.60
2 A half brick wall ad 1 pc : 4 sand m 2
84.00
3 Plaster ad 1 pc : 4 sand m 2
168.00
4 Plaster ad 1 pc : 2 sand m 2
32.00
5 Acian m 2
200.00
6 Sloof work f'c = 14,5 MPa (K 175) 15/20 m 3
0.90
7 Column work f'c = 14,5 MPa (K 175) 15/15 m 3
0.63
8 Ring balk work f'c = 14,5 MPa (K 175) 15/20 m 3
0.90
9 Concrete for Table f'c = 14,5 MPa (K 175) (Meja Jaga) m 3
0.32
10 Steel work 120 kg /m3 concrete kg 330.00
11 Concrete 1 pc : 3 sand : 5 split (selasar, carport, terrace) t=7cm m 3
2.40

C. FLOOR AND WALL TILING


1 Glazed ceramic floor tiles 400 x 400 mm m2 21.00
2 Non glazed ceramic floor tiles 200 x 200 mm (toilet) m 2
3.00
3 Glazed ceramic wall tiles 200 x 250 mm (toilet, table) m 2
18.50
4 Glazed ceramic plint tiles 100 x 400 mm m' 30.00

D. SANITARY AND PLUMBING WORK

Supply and fix the following including all jointing, materials for fixing and plugging and
making good on competion sanitary appliances are to be of high quality

1 Wash basin complete unit 1.00


2 Bath basin complete unit 1.00
3 Squatting water closed complete unit 1.00
Installation of water supply pipe PVC dia 1/2 inc and fittings (include for all pipes,
4 bends, tees, albows, reducers, adaptors, taps and connections to fittings, appliances, ls 1.00
etc.)
Installation of water waste pipe PVC dia 3 inc and fittings (include for all pipes,
5 bends, tees, albows, reducers, adaptors, metal grill and connections to fittings, ls 1.00
appliances, etc.)
Name of Bidder :
63 dari 122
GIS 150 KV PONCOL BARU II
Signature :
6 Septictank cap 1.5 m3 included infiltrate cap 2 m3 complete with ls 1.00
palm fibre and sand stone
7 Control Box include cover unit 2.00

E. DOOR AND WINDOWS WORK


1 Glass door complete with aluminium frame and accessories:
- Type P2 (Single door) 800 x 2100 mm unit 1.00
- Type P1 (Single door) 1000 x 2100 mm unit 2.00

2 Glass windows & ventilation complete with aluminium frame and accessories:
- Type J1 (2 hole ) 1250 x 1150 mm unit 1.00
- Type V1 (1 fixed) 550 x 500 mm unit 2.00

F. ROOF AND CELLING WORK


1 Atap Spandek Colorbond m2 85.80
2 Nok Atap Spandek Colorbond m' 10.00
3 Listplank super sheet (GRC) m' 26.00
4 Talang Jurai Dalam Colorbond m' 15.00
5 Rangka atap baja ringan m 2
55.00
6 Ceilling Gypsum board 1200 x 2400 x 9 mm m 2
44.00
7 Ceilling Frame (Hollow steel 40x40x2 mm) m 2
44.00
8 List profil gypsum m' 50.00

G. PAINTING WORK
Prepare and apply one coat alkali resistant primer and three coats vinyl acrylic
1 m2 165.00
emulsion (wall & celling)

Prepared and apply two coats alkali resistant primer and three coats exterior grade
2 m2 -
weathershield

H. FINISHING WORK
All material finishing work must be of high quality
1 Hinge for door (1 set= 2 pcs) Set 3.00
2 Hinge for window (1 set= 2 pcs) Set 3.00
3 Door lock No 3.00
4 Grendel for door double swing No -
5 Grendel for window (1 set= 2 pcs) No 3.00
6 Wind hook of window (1 set = 2 pcs) Set 3.00

I. INSTALATION OF ELECTRICAL AND MECANICAL WORK


Installation of electric lighting to included for all neccesary (cabling plugs, fittings,
lights, exhaust fans, air conditioning, etc.)
1 Indoor luminaires type flourescent fitting CDL E27 (1 x 8 W) No 4.00
2 Indoor luminaires type flourescent fitting CDL E27 (1 x 23 W) No 2.00
3 Price for capacity electrical ls 1.00
4 Stop contact No 2.00

Name of Bidder :
64 dari 122
GIS 150 KV PONCOL BARU II
Signature :
5 Panel Box MCB No 1.00
6 Exhaus fan ceiling 40 W/220 Volt (10") very low noice No 2.00

TOTAL PRICE SECURITY POST

Name of Bidder :
65 dari 122
GIS 150 KV PONCOL BARU II
Signature :
RU II
D OTHER SERVICES

UNIT PRICE TOTAL PRICE


LOCAL CURRENCY LOCAL
PORTION
(RUPIAH) (RUPIAH)

73,000.00 1,401,600.00
29,250.00 429,975.00
272,900.00 14,190,800.00
170,000.00 612,000.00

927,170.00 8,900,832.00
126,570.00 10,631,880.00
91,328.00 15,343,104.00
98,616.00 3,155,712.00
20,000.00 4,000,000.00
4,327,120.00 3,894,408.00
4,939,760.00 3,112,048.80
4,939,760.00 4,445,784.00
4,018,900.00 1,286,048.00
15,316.00 5,054,280.00
977,010.00 2,344,824.00

215,716.00 4,530,036.00
218,316.00 654,948.00
218,316.00 4,038,846.00
64,715.00 1,941,450.00

1,200,000.00 1,200,000.00
900,000.00 900,000.00
350,000.00 350,000.00

1,500,000.00 1,500,000.00

900,000.00 900,000.00

Name of Bidder :
66 dari 122
GIS 150 KV PONCOL BARU II
Signature :
6,000,000.00 6,000,000.00

750,000.00 1,500,000.00

2,016,000.00 2,016,000.00
2,520,000.00 5,040,000.00

1,437,500.00 1,437,500.00
275,000.00 550,000.00

259,065.00 22,227,777.00
70,000.00 700,000.00
65,000.00 1,690,000.00
50,000.00 750,000.00
350,000.00 19,250,000.00
63,050.00 2,774,200.00
119,282.00 5,248,408.00
15,000.00 750,000.00

47,000.00 7,755,000.00

125,000.00 375,000.00
100,000.00 300,000.00
350,000.00 1,050,000.00
-
70,000.00 210,000.00
60,000.00 180,000.00

150,000.00 600,000.00
200,000.00 400,000.00
1,750,000.00 1,750,000.00
250,000.00 500,000.00

Name of Bidder :
67 dari 122
GIS 150 KV PONCOL BARU II
Signature :
750,000.00 750,000.00
1,200,000.00 2,400,000.00

181,022,460.80

Name of Bidder :
68 dari 122
GIS 150 KV PONCOL BARU II
Signature :
Unit Price Analysis
Budget

No Description Quantity

1 Asphalt / m2 ( 4 kg / m2 )
A Material
- Aspal kg 4.000
- Batu Kacang m3 0.012
- Kayu Api m3 0.008

B Manpower
- Foreman md 0.010
- Asphalt supv md 0.020
- Labor md 0.040

C Tools & Equipment


- Compacted ls 1.000

2 Asphalt / m2 ( 2,5 kg / m2 )
A Material
- Aspal kg 2.500
- Batu Kacang m3 0.012
- Kayu Api m3 0.008

B Manpower
- Foreman md 0.010
- Asphalt supv md 0.020
- Labor md 0.040

C Tools & Equipment


- Compacted ls 1.000

3 Bouwplank / m1
A Material
- Wood beam 5/7 m3 0.004
- Wood board 2/20 m3 0.002
- Nail kg 0.060

B Manpower
- Foreman md 0.010
- Carpenter md 0.020
- Labor md 0.020

C Tools & Equipment


- Hand tools ls 1.000

4 Backfill / m3
A Manpower
- Foreman md 0.025
- Labor md 0.250
B Tools & Equipment
- Hand tools ls 1.000

5 Concrete K-175 / m3
A Material
- Portland cement zak 7.000
- Split / Crushed Stone 2/3 m3 0.875
- Concrete sand m3 0.613

B Manpower
- Foreman md 0.050
- Mason md 0.200
- Labor md 1.200

C Tools & Equipment


- Concrete mixer u.day 0.200
- Concrete vibrator u.day 0.050
- Hand tools ls 1.000
- Fuel ltr 1.000

6 Concrete K-300 / m3 ( height < 4 mtr )


A Material
- Portland cement zak 9.000
- Split / Crushed Stone 2/3 m3 0.938
- Concrete sand m3 0.591

B Manpower
- Foreman md 0.020
- Mason md 0.250
- Labor md 2.500

C Tools & Equipment


- Concrete mixer u.day 0.250
- Concrete vibrator u.day 0.050
- Hand tools ls 1.000
- Fuel ltr 1.000

7 Concrete K-300 / m3 ( height > 4 mtr )


A Material
- Portland cement zak 9.000
- Split / Crushed Stone 2/3 m3 0.938
- Concrete sand m3 0.591

B Manpower
- Foreman md 0.022
- Mason md 0.275
- Labor md 3.300

C Tools & Equipment


- Concrete mixer u.day 0.250
- Concrete vibrator u.day 0.050
- Hand tools ls 1.000
- Fuel ltr 1.000
8 Concrete K-225 / m3 ( height < 4 mtr )
A Material
- Portland cement zak 7.400
- Split / Crushed Stone 2/3 m3 0.925
- Concrete sand m3 0.648

B Manpower
- Foreman md 0.050
- Mason md 0.250
- Labor md 2.500

C Tools & Equipment


- Concrete mixer u.day 0.250
- Concrete vibrator u.day 0.050
- Hand tools ls 1.000
- Fuel ltr 1.000

9 Concrete K-225 / m3 ( height > 4 mtr )


A Material
- Portland cement zak 7.400
- Split / Crushed Stone 2/3 m3 0.925
- Concrete sand m3 0.648

B Manpower
- Foreman md 0.050
- Mason md 0.275
- Labor md 3.300

C Tools & Equipment


- Concrete mixer u.day 0.275
- Concrete vibrator u.day 0.050
- Hand tools ls 1.000
- Fuel ltr 1.000

10 Concrete Extraction / m3
A Manpower
- Mason md 0.500
- Labor md 1.500

B Tools & Equipment


- Jack Hammer u.day 1.000
- Fuel ltr 8.000

11 Ceramic tile 400 X 400 w/ mortar 1 PC : 4 Sand / m2


A Material
- Ceramic 400 X 400 mm box 1.050
- Portland cement zak 0.264
- Sand mortar m3 0.042

B Manpower
- Foreman md 0.050
- Mason md 0.250
- Labor md 0.250

C Tools & Equipment


- Concrete mixer u.day 0.050
- Fuel ltr 0.500

12 Ceramic tile 300 X 300 w/ mortar 1 PC : 4 Sand / m2


A Material
- Ceramic 300 X 300 mm box 1.050
- Portland cement zak 0.264
- Sand mortar m3 0.042

B Manpower
- Foreman md 0.050
- Mason md 0.275
- Labor md 0.275

C Tools & Equipment


- Concrete mixer u.day 0.050
- Fuel ltr 1.000

13 Ceramic wall tile 200 X 200 & 200 X 250 mm w/ mortar 1 PC : 4 Sand / m2
A Material
- Ceramic 200 X 200 mm box 1.050
- Portland cement zak 0.264
- Sand mortar m3 0.042

B Manpower
- Foreman md 0.050
- Mason md 0.400
- Labor md 0.400

C Tools & Equipment


- Concrete mixer u.day 0.050
- Fuel ltr 1.000

14 Granit tile 600 X 600 w/ mortar 1 PC : 4 Sand / m2


A Material
- Ceramic 400 X 400 mm box 1.050
- Portland cement zak 0.264
- Sand mortar m3 0.042

B Manpower
- Foreman md 0.050
- Mason md 0.250
- Labor md 0.250

C Tools & Equipment


- Concrete mixer u.day 0.050
- Fuel ltr 0.500
15 Crush Stone 3/5 - 100 mm thick / m2
A Material
- Crush stone m3 0.220

B Manpower
- Foreman md 0.030
- Labor md 0.330

C Tools & Equipment


- Hand tools ls 1.000

16 Crush Stone 3/5 - 100 mm thick / m3


A Material
- Crush stone m3 1.200

B Manpower
- Foreman md 0.025
- Labor md 1.200

C Tools & Equipment


- Hand tools ls 1.000

17 Excavation in rock / m3
A Manpower
- Foreman md 0.200
- Digger md 0.750
- Labor md 0.750

B Tools & Equipment


- Hand tools ls 1.000

18 Formwork / m2 ( f/ foundation and tie beam )


A Material
- Plywood 16 mm thick sheet 0.179
- Wood beam m3 0.015
- Nail kg 0.400

B Manpower
- Foreman md 0.050
- Carpenter md 0.200
- Labor md 0.200

C Tools & Equipment


- Hand tools ls 1.000

19 Formwork / m2 ( f/ column and beam )


A Material
- Plywood 16 mm thick sheet 0.179
- Wood beam m3 0.020
- Nail kg 0.400

B Manpower
- Foreman md 0.100
- Carpenter md 0.300
- Labor md 0.300

C Tools & Equipment


- Hand tools / Scaffolding ls 1.000

20 Formwork / m2 ( f/ floor h > 4 mtr and wall )


A Material
- Plywood 16 mm thick sheet 0.179
- Wood beam m3 0.025
- Nail kg 0.600

B Manpower
- Foreman md 0.100
- Carpenter md 0.330
- Labor md 0.330

C Tools & Equipment


- Hand tools / Scaffolding ls 1.000

21 Fence BRC / m1, height 1.90 m


A Material
- BRC height 1.90 m m 1.000
- Steel pipe dia 2 inc and clamp m 1.330
Foundation 1,00 x 1,00 m² reinforced concrete K 175 ; m3 0.170
Fe: 100 kg/m3
Sloof 20/30 reinforced concrete K 175; m3 0.030
- Fe: 100 kg/m3

B Manpower
- Foreman md 0.050
- Carpenter md 0.200
- Labor md 0.400

C Tools & Equipment


- Hand tools ls 1.000

22 Fence BRC / m1, height 1.20 m


A Material
- BRC height 1.20 m m 1.000
- Steel pipe dia 2 inc and clamp m 1.170
Foundation 1,00 x 1,00 m² reinforced concrete K 175 ; m3 0.120
Fe: 100 kg/m3
Sloof 20/30 reinforced concrete K 175; m3 0.030
- Fe: 100 kg/m3

B Manpower
- Foreman md 0.050
- Carpenter md 0.200
- Labor md 0.400

C Tools & Equipment


- Hand tools ls 1.000

23 Lean Concrete / m3
A Material
- Portland cement zak 5.400
- Crush stone 2/3 m3 1.031
- Concrete sand m3 0.608

B Manpower
- Foreman md 0.025
- Mason md 0.125
- Labor md 0.750

C Tools & Equipment


- Concrete mixer u.day 0.125
- Hand tools ls 1.000
- Fuel ltr 0.400

24 Load Surflus / m3 ( inside location )


A Manpower
- Foreman md 0.050
- Labor md 0.100

B Tools & Equipment


- Dump truck u.day 0.005
- Excavator u.day 0.005

25 Ondelaag Layer / m2 ( 15 cm thick )


A Material
- River stone 15-20 cm m3 0.180
- Sandfill m3 0.050

B Manpower
- Foreman md 0.020
- Labor md 0.200

C Tools & Equipment


- Compacted ls 1.000

26 Open Drainage / m ( stone masonry 40 X 70 cm )


- Excavation of soil m3 0.680
- Compacted sand layer m3 0.050
- Stone masonry 1:3 m3 0.440
Plaster finished m2 1.400

27 Plafond Plywood / m2
A Material
- Plywood 4 mm sheet 0.380
- Wood beam 5/7 m3 0.020
- Nail kg 0.125

B Manpower
- Foreman md 0.050
- Carpenter md 0.250
- Labor md 0.250

C Tools & Equipment


- Scaffolding ls 1.000
- Hand tools ls 1.000

28 Plafond Gypsum / m2
A Material
- Gyspsum 9 mm sheet 0.380
- Compound kg 0.500
Steel hollow m 2.000
Round bar kg 2.000
Dyna bolt ls 1.000
- Rivet kg 0.250

B Manpower
- Foreman md 0.050
- Carpenter md 0.250
- Labor md 0.250

C Tools & Equipment


- Scaffolding ls 1.000
- Hand tools ls 1.000

29 Painting ( interior ) / m2
A Material
- Prime coat kg 0.100
- Sand paper sheet 0.200
- Paint kg 0.125

B Manpower
- Foreman md 0.050
- Painter md 0.200
- Labor md 0.200

C Tools & Equipment


- Hand tools / Scaffolding ls 1.000

30 Painting ( exterior/weather shield ) / m2


A Material
- Paint kg 0.125
- Sealer kg 0.100
- Sand paper sheet 0.200

B Manpower
- Foreman md 0.050
- Painter md 0.250
- Labor md 0.250

C Tools & Equipment


- Hand tools / Scaffolding ls 1.000
31 Painting ( steel ) / m2
A Material
- Paint kg 0.125
- Base kg 0.125
- Sand paper sheet 0.250

B Manpower
- Foreman md 0.050
- Painter md 0.330
- Labor md 0.330

C Tools & Equipment


- Hand tools ls 1.000

32 Painting ( wood ) / m2
A Material
- Prime coat kg 0.010
- Sand paper sheet 0.200
- Paint kg 0.125

B Manpower
- Foreman md 0.050
- Painter md 0.167
- Labor md 0.167

C Tools & Equipment


- Hand tools ls 1.000

33 Plaster 1 PC : 4 Sand / m2, w/ smooth finish


A Material
- Portland cement zak 0.192
- Sand mortar m3 0.024

B Manpower
- Foreman md 0.050
- Mason md 0.250
- Labor md 0.250

C Tools & Equipment


- Scaffolding ls 1.000
- Concrete mixer u.day 0.050
- Fuel ltr 0.500

34 Plaster 1 PC : 2 Sand / m2, w/ smooth finish


A Material
- Portland cement zak 0.384
- Sand mortar m3 0.024

B Manpower
- Foreman md 0.050
- Mason md 0.250
- Labor md 0.250
C Tools & Equipment
- Tools ls 1.000
- Concrete mixer u.day 0.050
- Fuel ltr 0.500

35 Reinforcement / kg ( dia <= 13 mm )


A Material
- Round bar kg 1.100
- Concrete wire kg 0.029

B Manpower
- Foreman md 0.002
- Rebarmen md 0.020
- Labor md 0.020

C Tools & Equipment


- Hand tools ls 1.000

36 Reinforcement / kg ( dia > 13 mm )


A Material
- Deformed bar kg 1.100
- Concrete wire kg 0.029

B Manpower
- Foreman md 0.002
- Rebarmen md 0.015
- Labor md 0.015

C Tools & Equipment


- Bar bender u.day 0.002
- Bar cutter u.day 0.002

37 Roofing ( Alum Corr ) / m2


A Material
- Alum corr L= 0.6 m sheet 2.000
- Nail pcs 6.000

B Manpower
- Foreman md 0.050
- Carpenter md 0.167
- Labor md 0.167

C Tools & Equipment


- Hand tools ls 1.000

38 Redbrick wall 1 PC : 4 Sand / m2


A Material
- Portland cement zak 0.220
- Redbrick pcs 55.000
- Sand m3 0.044
B Manpower
- Foreman md 0.050
- Mason md 0.200
- Labor md 0.200

C Tools & Equipment


- Hand Tools / Scaffolding ls 1.000
- Concrete mixer u.day 0.050
- Fuel ltr 0.500

39 Redbrick wall 1 PC : 5 Sand / m2


A Material
- Portland cement zak 0.180
- Redbrick pcs 55.000
- Sand m3 0.045

B Manpower
- Foreman md 0.050
- Mason md 0.200
- Labor md 0.200

C Tools & Equipment


- Hand Tools / Scaffolding ls 1.000
- Concrete mixer u.day 0.050
- Fuel ltr 0.500

40 Redbrick wall 1 PC : 2 Sand / m2


A Material
- Portland cement zak 0.420
- Redbrick pcs 55.000
- Sand m3 0.042

B Manpower
- Foreman md 0.050
- Mason md 0.200
- Labor md 0.200

C Tools & Equipment


- Hand Tools / Scaffolding ls 1.000
- Concrete mixer u.day 0.050
- Fuel ltr 0.500

41 Redbrick wall 1 PC : 5 Sand / m2 ( 1 brick )


A Material
- Portland cement zak 0.360
- Redbrick pcs 110.000
- Sand m3 0.090

B Manpower
- Foreman md 0.050
- Mason md 0.250
- Labor md 0.250

C Tools & Equipment


- Hand Tools / Scaffolding ls 1.000
- Concrete mixer u.day 0.050
- Fuel ltr 0.500

42 Soil Excavation / m3, not exceed 1,5 m depth


A Manpower
- Foreman md 0.050
- Digger md 0.500
- Labor md 0.200

B Tools & Equipment


- Hand tools ls 1.000

43 Soil Excavation / m3, ( 1.51 m to 3 m depth )


A Manpower
- Foreman md 0.050
- Digger md 0.670
- Labor md 0.200

B Tools & Equipment


- Hand tools ls 1.000

44 Soil Excavation / m3, ( 1.51 m to 3 m depth ) by Equipment


A Manpower
- Foreman md 0.020
- Labor md 0.050

B Tools & Equipment


- Excavator ud 0.005
- Fuel ltr 1.000
- Operator md 0.005

45 Sand fill / m3
A Material
- Sand fill m3 1.200

B Manpower
- Foreman md 0.020
- Labor md 0.400

C Tools & Equipment


- Hand tools ls 1.000

46 Secondary concrete / m2
A Material
- Portland cement zak 0.720
- Crush stone 1/2 m3 0.050
- Sand m3 0.100

B Manpower
- Foreman md 0.050
- Mason md 0.500
- Labor md 0.500

C Tools & Equipment


- Hand tools ls 1.000

47 Stone Masonry 1 PC : 3 Sand / m3


A Material
- Portland cement zak 4.500
- Crush ( River ) stone m3 1.200
- Sand mortar m3 0.527

B Manpower
- Foreman md 0.200
- Mason md 0.750
- Labor md 0.750

C Tools & Equipment


- Concrete mixer u.day 0.050
- Fuel ltr 0.500

48 Stone Masonry 1 PC : 4 Sand / m3


A Material
- Portland cement zak 4.000
- Crush ( River ) stone m3 1.200
- Sand mortar m3 0.600

B Manpower
- Foreman md 0.200
- Mason md 0.750
- Labor md 0.750

C Tools & Equipment


- Concrete mixer u.day 0.050
- Fuel ltr 0.500

49 Stone Masonry 1 PC : 5 Sand / m3


A Material
- Portland cement zak 3.500
- Crush stone m3 1.200
- Sand m3 0.656

B Manpower
- Foreman md 0.200
- Mason md 0.750
- Labor md 0.750

C Tools & Equipment


- Concrete mixer u.day 0.050
- Fuel ltr 0.500

50 Stone Masonry 1 PC : 6 Sand / m3


A Material
- Portland cement zak 3.000
- Crush stone m3 1.200
- Sand m3 0.675

B Manpower
- Foreman md 0.200
- Mason md 0.750
- Labor md 0.750

C Tools & Equipment


- Concrete mixer u.day 0.050
- Fuel ltr 0.500

51 Steenslag Layer / m2 ( 6 cm thick )


A Material
- Crush stone 2/3 m3 0.080
- Sandfill m3 0.020

B Manpower
- Foreman md 0.025
- Labor md 0.100

C Tools & Equipment


- Compacted ls 1.000

52 Steel profile ( WF ) / kg
A Material
- WF kg 1.100
- Zinchromate kg 0.250

B Manpower
- Foreman md 0.005
- Welder md 0.025
- Labor md 0.025

C Tools & Equipment


- Crane u.day 0.001
- Welding machine u.day 0.002
- Drill machine u.day 0.002
- Cutting torch u.day 0.002

53 Steel profile ( H-beam ) / kg


A Material
- H-beam kg 1.100
- Zinchromate kg 0.250

B Manpower
- Foreman md 0.005
- Welder md 0.025
- Labor md 0.025
C Tools & Equipment
- Crane u.day 0.001
- Welding machine u.day 0.002
- Drill machine u.day 0.002
- Cutting torch u.day 0.002

54 Steel angle, channal & plate / kg


A Material
- L / Channal kg 1.100
- Zinchromate kg 1.000

B Manpower
- Foreman md 0.010
- Welder md 0.030
- Labor md 0.030

C Tools & Equipment


- Welding machine u.day 0.012
- Drill machine u.day 0.012
- Cutting torch u.day 0.012

55 Steel (Checker) plate / kg


A Material
- Checker plate kg 1.100
- Zinchromate kg 0.500

B Manpower
- Foreman md 0.006
- Welder md 0.015
- Labor md 0.015

C Tools & Equipment


- Welding machine u.day 0.008
- Drill machine u.day 0.008
- Cutting torch u.day 0.008

56 Sub Soil Drainage / m


-
Excavation of soil m3 1.000
- Backfilling m3 0.200
- Compacted sand layer m3 0.100
- Pipe Concrete ø 30 cm m1 1.000
- Palm Fibre kg 5.000
- Gravel m3 0.700

57 1 (one) m fence security of project 2 m hight


A Material
Dolken stick 1.000
Plank meranti 2/20 sheet 0.070
Zinc sheet 1.200
Nail kg 0.500

B Manpower
Carpenter md 0.500
Foreman md 0.050

58 Cable Trench 1,000 X 1,050 per m1


- Bouwplank m1 0.500
- Excavation m3 2.320
- Sand fill, t = 10 cm m3 0.120
- Lean concrete, t = 10 cm m3 0.120
- Concrete K-300 m3 0.470
- Formworks m2 4.400
- Cable tray (galv) L.50.50.5 unit 2.000
- Reinforcement ( round bar ) kg 56.817

59 Cable Trench 600 X 600 per m1


- Bouwplank m1 0.500
- Excavation m3 1.740
- Sand fill, t = 10 cm m3 0.080
- Lean concrete, t = 10 cm m3 0.080
- Concrete K-300 m3 0.300
- Formworks m2 2.600
- Cable tray (galv) L.50.50.5 unit 2.000
- Reinforcement ( round bar ) kg 33.735

60 Cable Trench 500 X 500 per m1


- Bouwplank m1 0.100
- Excavation m3 1.595
- Sand fill, t = 10 cm m3 0.070
- Lean concrete, t = 10 cm m3 0.070
- Concrete K-300 m3 0.260
- Formworks m2 2.200
- Cable tray (galv) L.50.50.5 unit 2.000
- Reinforcement ( round bar ) kg 28.408

61 Cable Trench 300 X 300 per m1


- Bouwplank m1 0.100
- Excavation m3 1.305
- Sand fill, t = 10 cm m3 0.050
- Lean concrete, t = 10 cm m3 0.050
- Concrete K-300 m3 0.180
- Formworks m2 1.400
- Reinforcement ( round bar ) kg 17.755

62 Cable Trench 1,000 X 1,050 per m1 f/ CB


- Bouwplank m1 0.500
- Excavation m3 2.320
- Sand fill, t = 10 cm m3 0.120
- Lean concrete, t = 10 cm m3 0.060
- Concrete K-175 m3 0.350
- Formworks m2 3.250
- L 50.50.5 kg 7.560
- Plat Strip 50.50 kg 3.925
- Checker Plate 5 mm kg 52.340
- Cable tray (galv) L.50.50.5 unit 2.000
- Reinforcement ( round bar ) kg 39.456

63 Cable Trench 800 X 800 per m1 f/ CB


- Bouwplank m1 0.500
- Excavation m3 2.030
- Sand fill, t = 10 cm m3 0.100
- Lean concrete, t = 10 cm m3 0.050
- Concrete K-175 m3 0.280
- Formworks m2 2.500
- L 50.50.5 kg 7.560
- Plat Strip 50.50 kg 3.925
- Checker Plate 5 mm kg 44.140
- Cable tray (galv) L.50.50.5 unit 2.000
- Reinforcement ( round bar ) kg 30.825

64 Cable Trench 500 X 500 per m1 f/ CB


- Bouwplank m1 0.500
- Excavation m3 1.595
- Sand fill, t = 10 cm m3 0.070
- Lean concrete, t = 10 cm m3 0.035
- Concrete K-175 m3 0.190
- Formworks m2 1.600
- L 50.50.5 kg 7.560
- Plat Strip 50.50 kg 3.925
- Checker Plate 5 mm kg 31.840
- Cable tray (galv) L.50.50.5 unit 1.000
- Reinforcement ( round bar ) kg 19.728

65 Cable Tray / kg
- Steel angle kg 1.000
- Galvanized kg 1.000

66 Grating steel / m2
- Plat strip 40.4 kg 32.656
- Round bar dia 10 mm kg 16.029
- Galvanized kg 48.685

67 Checkered plate cover 5 mm / m2


- Checkered plate m2 1.100
- Steel angle 50.50.5 kg 15.120

68 Checkered plate cover 10 mm / m2


- Checkered plate m2 1.100
- Steel angle 50.50.5 kg 15.120

1 m2 Road (New)
69 Base Structure / m2
Soil works
- Common Excavation m3 0.500
- Compacted fill m2 1.000
Sub Base Coarce
- Comp.Sand gravel (sirtu) 300 mm thk m3 0.330
Base Coarce
- Crush stone 3 - 5, 250 mm thick m3 0.275

Manpower
- Worker md 0.200
- Stomwalls/Roller hr 0.050

70 Penetration thickness 5 cm / m2
A Material
- Aspalt hot 60/70 kg 4.000
- Crushed stone 2 - 3 cm m3 0.050
- Dust split m3 0.010
- Split m3 0.020
- Firewood m3 0.005

B Manpower
- Worker md 0.200
- Worker Aspalt md 0.200
- Stomwalls hour 0.100

71 Wearing surface Hotmix 5 cm / m2


A Material
- Prime/Teak coat m2 1.000
- Hot mix kg 132.000

B Manpower
- Worker md 0.100
- Worker Aspalt md 0.100
- Stomwalls operator hour 0.100

72 Mixture 1 PC : 10 Sand / m3
A Material
- Portland cement zak 2.700
- Sand concrete m3 1.181

B Manpower
- Foreman md 0.050
- Mason md 0.500
- Labor md 0.500

C Tools & Equipment


- Concrete mixer u.day 0.250
- Fuel ltr 1.000

73 Mixture 1 PC : 4 Sand / m3
A Material
- Portland cement zak 6.400
- Sand concrete m3 1.120
B Manpower
- Foreman md 0.050
- Mason md 0.500
- Labor md 0.500

C Tools & Equipment


- Concrete mixer u.day 0.250
- Fuel ltr 1.000

74 1 m2 Site Clearing
- Remuneration
- Foreman md 0.010
- Labor md 0.100
U. Price Amount
(IDR) (IDR) (IDR)

14,500 58,000.00
300,000 3,600.00
900,000 7,200.00
sub total 68,800.00

120,000 1,200.00
100,000 2,000.00
85,000 3,400.00
sub total 6,600.00

9,000 9,000.00
sub total 9,000.00
Total 84,400.00

14,500 36,250.00
300,000 3,600.00
900,000 7,200.00
sub total 47,050.00

120,000 1,200.00
100,000 2,000.00
85,000 3,400.00
sub total 6,600.00

9,000 9,000.00
sub total 9,000.00
Total 62,650.00

3,000,000 12,000.00
3,200,000 6,400.00
18,000 1,080.00
sub total 19,480.00

120,000 1,200.00
110,000 2,200.00
85,000 1,700.00
sub total 5,100.00

5,000 5,000.00
sub total 5,000.00
Total 29,580.00

120,000 3,000.00
85,000 21,250.00
sub total 24,250.00

5,000 5,000.00
sub total 5,000.00
Total 29,250.00

64,000 448,000.00
350,000 306,250.00
270,000 165,510.00
sub total 919,760.00

120,000 6,000.00
100,000 20,000.00
85,000 102,000.00
sub total 128,000.00

150,000 30,000.00
100,000 5,000.00
10,000 10,000.00
8,500 8,500.00
sub total 53,500.00
Total 1,101,260.00

64,000 576,000.00
350,000 328,300.00
270,000 159,570.00
sub total 1,063,870.00

120,000 2,400.00
100,000 25,000.00
85,000 212,500.00
sub total 239,900.00

150,000 37,500.00
100,000 5,000.00
30,000 30,000.00
8,500 8,500.00
sub total 81,000.00
Total 1,384,770.00

64,000 576,000.00
350,000 328,300.00
270,000 159,570.00
sub total 1,063,870.00

120,000 2,640.00
100,000 27,500.00
85,000 280,500.00
sub total 310,640.00

150,000 37,500.00
100,000 5,000.00
30,000 30,000.00
8,500 8,500.00
sub total 81,000.00
Total 1,455,510.00

64,000 473,600.00
350,000 323,750.00
270,000 174,960.00
sub total 972,310.00

120,000 6,000.00
100,000 25,000.00
85,000 212,500.00
sub total 243,500.00

150,000 37,500.00
100,000 5,000.00
30,000 30,000.00
8,500 8,500.00
sub total 81,000.00
Total 1,296,810.00

64,000 473,600.00
350,000 323,750.00
270,000 174,960.00
sub total 972,310.00

120,000 6,000.00
100,000 27,500.00
85,000 280,500.00
sub total 314,000.00

150,000 41,250.00
100,000 5,000.00
45,000 45,000.00
8,500 8,500.00
sub total 99,750.00
Total 1,386,060.00

100,000 50,000.00
85,000 127,500.00
sub total 177,500.00

1,250,000 1,250,000.00
8,500 68,000.00
sub total 1,318,000.00
Total 1,495,500.00

120,000 126,000.00
64,000 16,896.00
210,000 8,820.00
sub total 151,716.00

120,000 6,000.00
100,000 25,000.00
85,000 21,250.00
sub total 52,250.00

150,000 7,500.00
8,500 4,250.00
sub total 11,750.00
Total 215,716.00

105,000 110,250.00
64,000 16,896.00
210,000 8,820.00
sub total 135,966.00

120,000 6,000.00
100,000 27,500.00
85,000 23,375.00
sub total 56,875.00

150,000 7,500.00
8,500 8,500.00
sub total 16,000.00
Total 208,841.00

92,000 96,600.00
64,000 16,896.00
210,000 8,820.00
sub total 122,316.00

120,000 6,000.00
100,000 40,000.00
85,000 34,000.00
sub total 80,000.00

150,000 7,500.00
8,500 8,500.00
sub total 16,000.00
Total 218,316.00

220,000 231,000.00
64,000 16,896.00
210,000 8,820.00
sub total 256,716.00

120,000 6,000.00
100,000 25,000.00
85,000 21,250.00
sub total 52,250.00

150,000 7,500.00
8,500 4,250.00
sub total 11,750.00
Total 320,716.00
350,000 77,000.00
sub total 77,000.00

120,000 3,600.00
85,000 28,050.00
sub total 31,650.00

5,000 5,000.00
sub total 5,000.00
Total 113,650.00

350,000 420,000.00
sub total 420,000.00

120,000 3,000.00
85,000 102,000.00
sub total 105,000.00

5,000 5,000.00
sub total 5,000.00
Total 530,000.00

120,000 24,000.00
90,000 67,500.00
85,000 63,750.00
sub total 155,250.00

7,500 7,500.00
sub total 7,500.00
Total 162,750.00

290,000 51,910.00
3,000,000 45,000.00
18,000 7,200.00
sub total 104,110.00

120,000 6,000.00
110,000 22,000.00
85,000 17,000.00
sub total 45,000.00

5,000 5,000.00
sub total 5,000.00
Total 154,110.00

290,000 51,910.00
3,000,000 60,000.00
18,000 7,200.00
sub total 119,110.00
120,000 12,000.00
110,000 33,000.00
85,000 25,500.00
sub total 70,500.00

30,000 30,000.00
sub total 30,000.00
Total 219,610.00

290,000 51,910.00
3,000,000 75,000.00
18,000 10,800.00
sub total 137,710.00

120,000 12,000.00
110,000 36,300.00
85,000 28,050.00
sub total 76,350.00

45,000 45,000.00
sub total 45,000.00
Total 259,060.00

240,000 240,000.00
190,000 252,700.00
3,166,800 538,356.00

4,091,460 122,744.00

sub total 1,153,800.00

120,000 6,000.00
110,000 22,000.00
85,000 34,000.00
sub total 62,000.00

5,000 5,000.00
sub total 5,000.00
Total 1,220,800.00

175,000 175,000.00
190,000 222,300.00
3,166,800 380,016.00

4,091,460 122,744.00

sub total 900,060.00

120,000 6,000.00
110,000 22,000.00
85,000 34,000.00
sub total 62,000.00
5,000 5,000.00
sub total 5,000.00
Total 967,060.00

64,000 345,600.00
350,000 360,850.00
270,000 164,160.00
sub total 870,610.00

120,000 3,000.00
100,000 12,500.00
85,000 63,750.00
sub total 79,250.00

150,000 18,750.00
5,000 5,000.00
8,500 3,400.00
sub total 27,150.00
Total 977,010.00

120,000 6,000.00
85,000 8,500.00
sub total 14,500.00

900,000 4,500.00
4,410,000 22,050.00
sub total 26,550.00
Total 41,050.00

275,000 49,500.00
195,000 9,750.00
sub total 59,250.00

120,000 2,400.00
85,000 17,000.00
sub total 19,400.00

12,500 12,500.00
sub total 12,500.00
Total 91,150.00

73,000 49,640.00
272,900 13,645.00
927,170 407,955.00
98,616 138,062.00
Total 609,302.00

120,000 45,600.00
3,500,000 70,000.00
18,000 2,250.00
sub total 117,850.00
120,000 6,000.00
110,000 27,500.00
85,000 21,250.00
sub total 54,750.00

10,000 10,000.00
5,000 5,000.00
sub total 15,000.00
Total 187,600.00

110,000 41,800.00
27,500 13,750.00
9,000 18,000.00
14,391 28,782.00
7,500 7,500.00
11,000 2,750.00
sub total 112,582.00

120,000 6,000.00
110,000 27,500.00
85,000 21,250.00
sub total 54,750.00

10,000 10,000.00
5,000 5,000.00
sub total 15,000.00
Total 182,332.00

26,000 2,600.00
12,000 2,400.00
62,000 7,750.00
sub total 12,750.00

120,000 6,000.00
90,000 18,000.00
85,000 17,000.00
sub total 41,000.00

5,000 5,000.00
sub total 5,000.00
Total 58,750.00

85,000 10,625.00
34,000 3,400.00
12,000 2,400.00
sub total 16,425.00

120,000 6,000.00
90,000 22,500.00
85,000 21,250.00
sub total 49,750.00

10,000 10,000.00
sub total 10,000.00
Total 76,175.00

90,000 11,250.00
35,000 4,375.00
12,000 3,000.00
sub total 18,625.00

120,000 6,000.00
90,000 29,700.00
85,000 28,050.00
sub total 63,750.00

10,000 10,000.00
sub total 10,000.00
Total 92,375.00

24,000 240.00
12,000 2,400.00
42,500 5,312.50
sub total 7,952.50

120,000 6,000.00
90,000 15,030.00
85,000 14,195.00
sub total 35,225.00

5,000 5,000.00
sub total 5,000.00
Total 48,177.50

64,000 12,288.00
210,000 5,040.00
sub total 17,328.00

120,000 6,000.00
100,000 25,000.00
85,000 21,250.00
sub total 52,250.00

10,000 10,000.00
150,000 7,500.00
8,500 4,250.00
sub total 21,750.00
Total 91,328.00

64,000 24,576.00
210,000 5,040.00
sub total 29,616.00

120,000 6,000.00
100,000 25,000.00
85,000 21,250.00
sub total 52,250.00

5,000 5,000.00
150,000 7,500.00
8,500 4,250.00
sub total 16,750.00
Total 98,616.00

9,000 9,900.00
19,000 551.00
sub total 10,451.00

120,000 240.00
100,000 2,000.00
85,000 1,700.00
sub total 3,940.00

100 100.00
sub total 100.00
Total 14,491.00

9,500 10,450.00
19,000 551.00
sub total 11,001.00

120,000 240.00
100,000 1,500.00
85,000 1,275.00
sub total 3,015.00

400,000 800.00
250,000 500.00
sub total 1,300.00
Total 15,316.00

102,000 204,000.00
1,500 9,000.00
sub total 213,000.00

120,000 6,000.00
110,000 18,370.00
85,000 14,195.00
sub total 38,565.00

7,500 7,500.00
sub total 7,500.00
Total 259,065.00

64,000 14,080.00
700 38,500.00
210,000 9,240.00
sub total 61,820.00
120,000 6,000.00
100,000 20,000.00
85,000 17,000.00
sub total 43,000.00

10,000 10,000.00
150,000 7,500.00
8,500 4,250.00
sub total 21,750.00
Total 126,570.00

64,000 11,520.00
700 38,500.00
210,000 9,450.00
sub total 59,470.00

120,000 6,000.00
100,000 20,000.00
85,000 17,000.00
sub total 43,000.00

10,000 10,000.00
150,000 7,500.00
8,500 4,250.00
sub total 21,750.00
Total 124,220.00

64,000 26,880.00
700 38,500.00
210,000 8,820.00
sub total 74,200.00

120,000 6,000.00
100,000 20,000.00
85,000 17,000.00
sub total 43,000.00

5,000 5,000.00
150,000 7,500.00
8,500 4,250.00
sub total 16,750.00
Total 133,950.00

64,000 23,040.00
700 77,000.00
210,000 18,900.00
sub total 118,940.00

120,000 6,000.00
100,000 25,000.00
85,000 21,250.00
sub total 52,250.00
5,000 5,000.00
150,000 7,500.00
8,500 4,250.00
sub total 16,750.00
Total 187,940.00

120,000 6,000.00
90,000 45,000.00
85,000 17,000.00
sub total 68,000.00

5,000 5,000.00
sub total 5,000.00
Total 73,000.00

120,000 6,000.00
90,000 60,300.00
85,000 17,000.00
sub total 83,300.00

5,000 5,000.00
sub total 5,000.00
Total 88,300.00

120,000 2,400.00
85,000 4,250.00
sub total 6,650.00

2,880,000 14,400.00
8,500 8,500.00
150,000 750.00
sub total 23,650.00
Total 30,300.00

195,000 234,000.00
sub total 234,000.00

120,000 2,400.00
85,000 34,000.00
sub total 36,400.00

2,500 2,500.00
sub total 2,500.00
Total 272,900.00

64,000 46,080.00
425,000 21,250.00
210,000 21,000.00
sub total 88,330.00

120,000 6,000.00
100,000 50,000.00
85,000 42,500.00
sub total 98,500.00

2,500 2,500.00
sub total 2,500.00
Total 189,330.00

64,000 288,000.00
295,000 354,000.00
210,000 110,670.00
sub total 752,670.00

120,000 24,000.00
100,000 75,000.00
85,000 63,750.00
sub total 162,750.00

150,000 7,500.00
8,500 4,250.00
sub total 11,750.00
Total 927,170.00

64,000 256,000.00
295,000 354,000.00
210,000 126,000.00
sub total 736,000.00

120,000 24,000.00
100,000 75,000.00
85,000 63,750.00
sub total 162,750.00

150,000 7,500.00
8,500 4,250.00
sub total 11,750.00
Total 910,500.00

64,000 224,000.00
295,000 354,000.00
210,000 137,760.00
sub total 715,760.00

120,000 24,000.00
100,000 75,000.00
85,000 63,750.00
sub total 162,750.00

150,000 7,500.00
8,500 4,250.00
sub total 11,750.00
Total 890,260.00
64,000 192,000.00
295,000 354,000.00
210,000 141,750.00
sub total 687,750.00

120,000 24,000.00
100,000 75,000.00
85,000 63,750.00
sub total 162,750.00

150,000 7,500.00
8,500 4,250.00
sub total 11,750.00
Total 862,250.00

350,000 28,000.00
195,000 3,900.00
sub total 31,900.00

120,000 3,000.00
85,000 8,500.00
sub total 11,500.00

9,000 9,000.00
sub total 9,000.00
Total 52,400.00
Rounded 52,400.00

12,500 13,750.00
250 62.50
sub total 13,812.50

120,000 600.00
95,000 2,375.00
85,000 2,125.00
sub total 5,100.00

4,500,000 4,500.00
150,000 300.00
100,000 200.00
75,000 150.00
sub total 5,150.00
Total 24,062.50

14,000 15,400.00
250 62.50
sub total 15,462.50

120,000 600.00
95,000 2,375.00
85,000 2,125.00
sub total 5,100.00
4,500,000 4,500.00
150,000 300.00
100,000 200.00
75,000 150.00
sub total 5,150.00
Total 25,712.50
Rounded 25,700.00

11,000 12,100.00
250 250.00
sub total 12,350.00

120,000 1,200.00
95,000 2,850.00
85,000 2,550.00
sub total 6,600.00

150,000 1,800.00
100,000 1,200.00
75,000 900.00
sub total 3,900.00
Total 22,850.00

12,000 13,200.00
250 125.00
sub total 13,325.00

120,000 720.00
95,000 1,425.00
85,000 1,275.00
sub total 3,420.00

150,000 1,200.00
100,000 800.00
75,000 600.00
sub total 2,600.00
Total 19,345.00

73,000 73,000.00
29,250 5,850.00
272,900 27,290.00
80,000 80,000.00
22,000 110,000.00
530,000 371,000.00
Total 667,140.00

12,000 12,000.00
96,000 6,720.00
85,000 102,000.00
18,000 9,000.00
sub total 129,720.00
110,000 55,000.00
120,000 6,000.00
sub total 61,000.00
Total 190,720.00
Rounded 190,700.00

29,580 14,790.00
88,300 204,856.00
272,900 32,748.00
977,010 117,241.20
1,384,770 650,841.90
154,110 678,084.00
251,200 502,400.00
14,491 823,335.15
Total 3,024,296.25
Rounded 3,024,300.00

29,580 14,790.00
88,300 153,642.00
272,900 21,832.00
977,010 78,160.80
1,384,770 415,431.00
154,110 400,686.00
188,400 376,800.00
14,491 488,853.89
Total 1,950,195.69
Rounded 1,950,200.00

29,580 2,958.00
88,300 140,838.50
272,900 19,103.00
977,010 68,390.70
1,384,770 360,040.20
154,110 339,042.00
188,400 376,800.00
14,491 411,660.33
Total 1,718,832.73
Rounded 1,718,800.00

29,580 2,958.00
88,300 115,231.50
272,900 13,645.00
977,010 48,850.50
1,384,770 249,258.60
154,110 215,754.00
14,491 257,287.71
Total 902,985.31
Rounded 903,000.00

29,580 14,790.00
88,300 204,856.00
272,900 32,748.00
977,010 58,620.60
1,384,770 484,669.50
154,110 500,857.50
22,850 172,746.00
22,850 89,686.25
19,345 1,012,517.30
251,200 502,400.00
14,491 571,756.90
Total 3,645,648.05
Rounded 3,645,600.00

29,580 14,790.00
88,300 179,249.00
272,900 27,290.00
977,010 48,850.50
1,384,770 387,735.60
154,110 385,275.00
22,850 172,746.00
22,850 89,686.25
19,345 853,888.30
251,200 502,400.00
14,491 446,685.08
Total 3,108,595.73
Rounded 3,108,600.00

29,580 14,790.00
88,300 140,838.50
272,900 19,103.00
977,010 34,195.35
1,384,770 263,106.30
154,110 246,576.00
22,850 172,746.00
22,850 89,686.25
19,345 615,944.80
188,400 188,400.00
14,491 285,878.45
Total 2,071,264.65

22,850 22,850.00
8,500 8,500.00
Total 31,350.00
Rounded 31,400.00

10,700 349,419.20
14,491 232,276.24
8,500 413,822.50
Total 995,517.94

665,000 731,500.00
22,850 345,492.00
Total 1,076,992.00

1,235,000 1,358,500.00
22,850 345,492.00
Total 1,703,992.00

88,300 44,150.00
9,000 9,000.00

170,000 56,100.00

350,000 96,250.00
sub total 205,500.00

85,000 17,000.00
75,000 3,750.00
sub total 20,750.00
Total 226,250.00

14,500 58,000.00
350,000 17,500.00
150,000 1,500.00
300,000 6,000.00
900,000 4,500.00
sub total 87,500.00

85,000 17,000.00
90,000 18,000.00
150,000 15,000.00
sub total 50,000.00
Total 137,500.00

18,000 18,000.00
2,200 290,400.00
sub total 308,400.00

85,000 8,500.00
90,000 9,000.00
150,000 15,000.00
sub total 32,500.00
Total 340,900.00

64,000 172,800.00
270,000 318,870.00
sub total 491,670.00

120,000 6,000.00
100,000 50,000.00
85,000 42,500.00
sub total 98,500.00

150,000 37,500.00
8,500 8,500.00
sub total 46,000.00
Total 636,170.00

64,000 409,600.00
270,000 302,400.00
sub total 712,000.00

120,000 6,000.00
100,000 50,000.00
85,000 42,500.00
sub total 98,500.00

150,000 37,500.00
8,500 8,500.00
sub total 46,000.00
Total 856,500.00

120,000 1,200.00
85,000 8,500.00
Total 9,700.00
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
SCHEDULE NO.2 : Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear

Foundation 150 kV: Surge Arrester / unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 7.78 88,300.00


2 Back Filling m 3
5.08 29,250.00
3 Compacted sand t : 0.10 m m 3
0.48 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3
0.24 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m 3
1.97 1,296,810.00
7 Reinforced Concrete BJTD-35 kg 184.85 15,316.00
6 Formwork m 2
6.36 154,110.00
7 PVC Ø 2" for earthing cable m 0.67 60,000.00
8 PVC Ø 4" for cable trench m 1.33 90,000.00
9 Anchor bolt Ø 24 mm ls 4.00 647,000.00

TOTAL

Foundation 150 kV: Current Voltage Transformer / unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 11.35 88,300.00


2 Back Filling m 3
7.62 29,250.00
3 Compacted sand t : 0.10 m m 3
0.73 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3
0.37 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m 3
2.64 1,296,810.00
6 Reinforced Concrete BJTD-35 kg 243.49 15,316.00
7 Formwork m 2
6.96 154,110.00
8 PVC Ø 2" for earthing cable m 0.67 60,000.00
9 PVC Ø 4" for cable trench m 1.33 90,000.00
10 Anchor bolt Ø 24 mm ls 4.00 647,000.00

TOTAL

Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1

Foundation 150 kV: Line Trap / Unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 11.35 88,300.00


2 Back Filling m 3
7.62 29,250.00
3 Compacted sand t : 0.10 m m 3
0.73 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3
0.37 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m 3
2.64 1,296,810.00
6 Reinforced Concrete BJTD-35 kg 243.49 15,316.00
7 Formwork m 2
6.96 154,110.00
8 PVC Ø 2" for earthing cable m 2.00 60,000.00
9 PVC Ø 4" for cable trench m 4.00 90,000.00
10 Anchor bolt Ø 24 mm ls 4.00 647,000.00

TOTAL

Foundation 150 kV: Disconnecting /& Earthing Switches (DS/E) / set ( 1 set = 3 unit)
UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 22.32 88,300.00


2 Back Filling m 3
15.08 29,250.00
3 Compacted sand t : 0.10 m m 3
1.38 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3
0.69 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m 3
5.18 1,296,810.00
6 Reinforced Concrete BJTD-35 kg 626.12 15,316.00
7 Formwork m2 16.56 154,110.00
8 PVC Ø 2" for earthing cable m 3.00 60,000.00
9 PVC Ø 4" for cable trench m 6.00 90,000.00
10 Anchor bolt Ø 24 mm ls 12.00 647,000.00

TOTAL

Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1

Foundation 150 kV: Current Transformer / unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 11.35 88,300.00


2 Back Filling m3 7.62 29,250.00
3 Compacted sand t : 0.10 m m3 0.73 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3
0.37 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m 3
2.64 1,296,810.00
6 Reinforced Concrete BJTD-35 kg 243.49 15,316.00
7 Formwork m 2
6.96 154,110.00
8 PVC Ø 2" for earthing cable m 0.67 60,000.00
9 PVC Ø 4" for cable trench m 1.33 90,000.00
10 Anchor bolt Ø 24 mm ls 4.00 647,000.00

TOTAL

Foundation 150 kV: Circuit Breaker / set ( 1 set = 3 unit)


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 34.06 88,300.00


2 Back Filling m 3
22.85 29,250.00
3 Compacted sand t : 0.10 m m 3
2.19 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3
1.10 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m 3
7.93 1,296,810.00
6 Reinforced Concrete BJTD-35 kg 730.47 15,316.00
7 Formwork m 2
20.88 154,110.00
8 PVC Ø 2" for earthing cable m 2.00 60,000.00
9 PVC Ø 4" for cable trench m 4.00 90,000.00
10 Anchor bolt Ø 36 mm ls 12.00 647,000.00

TOTAL

Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1

Foundation 150 kV: Post for Gantry TW1 / Unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 52.22 88,300.00


2 Back Filling m 3
37.28 29,250.00
3 Compacted sand t : 0.10 m m 3
2.30 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3
1.15 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m 3
11.63 1,296,810.00
6 Reinforced Concrete BJTD-35 kg 1332.11 15,316.00
7 Formwork m 2
31.20 154,110.00
8 PVC Ø 2" for earthing cable m 2.00 60,000.00
9 PVC Ø 4" for cable trench m 4.00 90,000.00
10 Anchor bolt Ø 36 mm ls 16.00 647,000.00

TOTAL

Foundation 150 kV: Post for Gantry TW2 / Unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 42.11 88,300.00


2 Back Filling m3
29.53 29,250.00
3 Compacted sand t : 0.10 m m3
1.76 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3
0.88 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m3
9.93 1,296,810.00
6 Reinforced Concrete BJTD-35 kg 1332.11 15,316.00
7 Formwork m2
30.40 154,110.00
8 PVC Ø 2" for earthing cable m 2.00 60,000.00
9 PVC Ø 4" for cable trench m 4.00 90,000.00
10 Anchor bolt Ø 36 mm ls 16.00 647,000.00

TOTAL

Foundation 150 kV: Power Transformer 60 MVA/ Set


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 103.58 88,300.00


2 Back Filling m3
12.12 29,250.00
3 Compacted sand t : 0.10 m m3
7.00 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3
3.57 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m3
36.87 1,296,810.00
6 Reinforced Concrete BJTP-24 kg 2755.22 14,491.00
Reinforced Concrete BJTD-35 kg 2658.49 15,316.00
7 Formwork m2
65.36 154,110.00
8 Grille Oil Pit kg 1207.00 25,935.00
9 Steel Painting for grille oil pit m2
27.15
10 Gravel (dia 3 - 5 cm); t = 10 cm m2
20.05 113,650.00
11 PVC Ø 4" for open drainage m 6.00 90,000.00

TOTAL

Foundation 150 kV: Fire Wall / unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 31.50 88,300.00


2 Back Filling m 3
22.59 29,250.00
3 Compacted sand t : 0.10 m m 3
1.53 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3
1.53 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m 3
5.85 1,296,810.00
6 Reinforced Concrete BJTD-35 kg 555.75 15,316.00
7 Stone masonry 1 PC : 3 Sand m 3
7.92 530,000.00
8 Brick 1pc : 4 ps m 2
39.00 126,570.00
9 Plaster cement 1 pc : 4 ps thickness 10 mm m 2
78.00 91,328.00

TOTAL

Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1

Foundation 150 kV: Marshalling Kiosk / Unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 1.00 88,300.00


2 Back Filling m 3
0.00 29,250.00
3 Compacted sand layer m 3
0.10 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3
0.10 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m 3
0.15 1,296,810.00
6 Reinforced Concrete BJTD-35 kg 17.00 15,316.00
7 Formwork m 2
6.36 154,110.00
8 PVC Ø 2" for earthing cable m 2.00 60,000.00
9 PVC Ø 4" for cable trench m 4.00 90,000.00
10 Anchor bolt Ø 24 mm ls 4.00 647,000.00

TOTAL

Foundation 150 kV: NGR ( NER) / Unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 16.95 88,300.00


2 Back Filling m 3
10.75 29,250.00
3 Compacted sand t : 0.10 m m 3
0.83 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3 0.83 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m 3
2.05 1,296,810.00
6 Reinforced Concrete BJTD-35 kg 195.00 15,316.00
7 PVC Ø 2" for earthing cable m 2.00 60,000.00
8 PVC Ø 4" for cable trench m 4.00 90,000.00

TOTAL

Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1

Foundation 150 kV: Support 20 kV / Unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 3.52 88,300.00


2 Back Filling m 3
1.70 29,250.00
3 Compacted sand layer m 3
0.29 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3
0.14 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m 3
1.44 1,296,810.00
6 Reinforced Concrete BJTD-35 kg 136.80 15,316.00
7 Anchor bolt Ø 24 mm ls 4.00 647,000.00

TOTAL

Foundation 150 kV: Post Insulator / unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 7.78 88,300.00


2 Back Filling m 3
5.08 29,250.00
3 Compacted sand layer m 3
0.48 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3
0.24 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m 3
1.97 1,296,810.00
6 Reinforced Concrete BJTD-35 kg 184.85 15,316.00
7 Formwork m 2
6.36 154,110.00
8 PVC Ø 2" for earthing cable m 1.00 60,000.00
9 PVC Ø 4" for cable trench m 2.00 90,000.00
10 Anchor bolt Ø 24 mm ls 4.00 647,000.00

TOTAL
Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1

Foundation 150 kV: Cable Sealing End / unit


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 7.78 88,300.00


2 Back Filling m 3
5.08 29,250.00
3 Compacted sand t : 0.10 m m 3
0.48 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3
0.24 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m 3
1.97 1,296,810.00
6 Reinforced Concrete BJTD-35 kg 184.85 15,316.00
7 Formwork m2 6.36 154,110.00
8 PVC Ø 2" for earthing cable m 1.00 60,000.00
9 PVC Ø 4" for cable trench m 2.00 90,000.00
10 Anchor bolt Ø 24 mm ls 4.00 647,000.00

TOTAL

Foundation 150 kV: New Oil Pit / Set ( Cap 30 m3 )


UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 52.80 88,300.00


2 Back Filling m 3
19.91 29,250.00
3 Compacted sand t : 0.10 m m 3
1.93 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m 3
0.96 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m 3
4.98 1,296,810.00
6 Reinforced Concrete BJTD-35 kg 547.80 15,316.00
7 Stone masonry 1 PC : 3 Sand m 2
9.55 530,000
8 Brick 1pc : 2 ps m 3
32.00 133,950
9 Plaster cement 1 pc : 2 ps thickness 15 mm m 2
32.00 98,616
10 PVC Ø 2" for earthing cable m 2.00 60,000.00
11 PVC Ø 4" for cable trench m 4.00 90,000.00

TOTAL

Note:
1. Schedule 2 (only owner Reference)
2. Breakdown Price for Foundation and Steel Structure for 150 KV Switchgear
3. Shall be installed in Bill No 1
Foundation 150 kV: Service Transformers / Unit
UNIT PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY
PORTION
(RUPIAH)

1 Excavation of Soil m3 3.24 88,300.00


2 Back Filling m3
0.69 29,250.00
3 Compacted sand t : 0.10 m m3
0.29 272,900.00
4 Lean Concrete f'c = 7.4 MPa (K-100) t : 0.05 m m3
0.22 977,010.00
5 Concrete f'c = 26.4 MPa (K 300 ) m3
1.68 1,296,810.00
6 Reinforced Concrete BJTD-35 kg 160.00 15,316.00
7 Formwork m2
6.36 154,110.00
8 PVC Ø 2" for earthing cable m 2.00 60,000.00
9 PVC Ø 4" for cable trench m 4.00 90,000.00
10 Roofing and Fence BRC 1.2 m height ls 1.00 1,226,125.00

TOTAL
SERVICES
50 KV Switchgear

TOTAL PRICE

(RUPIAH)

686,620.80
148,648.50
132,083.60
236,436.42
2,552,122.08
2,831,162.60
980,139.60
40,000.00
120,000.00
2,588,000.00

10,315,213.60

TOTAL PRICE

(RUPIAH)

1,002,558.00
222,797.00
198,944.00
356,609.00
3,427,469.00
3,729,293.00
1,072,606.00
40,000.00
120,000.00
2,588,000.00

12,758,276.00
TOTAL PRICE

(RUPIAH)

1,002,558.00
222,797.00
198,944.00
356,609.00
3,427,469.00
3,729,293.00
1,072,606.00
120,000.00
360,000.00
2,588,000.00

13,078,276.00

TOTAL PRICE

(RUPIAH)

1,970,591.00
440,944.00
375,783.00
674,137.00
6,710,992.00
9,589,577.00
2,552,062.00
180,000.00
540,000.00
7,764,000.00

30,798,086.00

TOTAL PRICE

(RUPIAH)

1,002,558.00
222,797.00
198,944.00
356,609.00
3,427,469.00
3,729,293.00
1,072,606.00
40,000.00
120,000.00
2,588,000.00

12,758,276.00

TOTAL PRICE

(RUPIAH)

3,007,675.00
668,392.00
596,832.00
1,069,826.00
10,282,406.00
11,187,879.00
3,217,817.00
120,000.00
360,000.00
7,764,000.00

38,274,827.00

TOTAL PRICE

(RUPIAH)

4,611,203.00
1,090,440.00
628,762.00
1,125,516.00
15,079,307.00
20,402,643.00
4,808,232.00
120,000.00
360,000.00
10,352,000.00

58,578,103.00

TOTAL PRICE

(RUPIAH)

3,718,136.00
863,870.00
481,396.00
861,723.00
12,874,730.00
20,402,643.00
4,684,944.00
120,000.00
360,000.00
10,352,000.00

54,719,442.00

TOTAL PRICE

(RUPIAH)

9,145,761.00
354,393.00
1,910,300.00
3,486,949.00
47,809,494.00
39,925,922.00
40,717,402.00
10,072,013.00
31,303,545.00
-
2,278,683.00
540,000.00

187,544,462.00

TOTAL PRICE
(RUPIAH)

2,781,450.00
660,641.00
418,083.00
1,496,779.00
7,586,339.00
8,511,867.00
4,197,600.00
4,936,230.00
7,123,584.00

37,712,573.00

TOTAL PRICE

(RUPIAH)

88,300.00
-
27,290.00
97,701.00
191,720.00
260,397.00
980,140.00
120,000.00
360,000.00
2,588,000.00

4,713,548.00

TOTAL PRICE

(RUPIAH)

1,496,685.00
314,438.00
226,507.00
810,918.00
2,658,461.00
2,986,620.00
120,000.00
360,000.00

8,973,629.00

TOTAL PRICE

(RUPIAH)

310,622.00
49,784.00
79,141.00
139,712.00
1,864,813.00
2,095,229.00
2,588,000.00

7,127,301.00

TOTAL PRICE

(RUPIAH)

686,620.80
148,648.50
132,083.60
236,436.42
2,552,122.08
2,831,162.60
980,139.60
60,000.00
180,000.00
2,588,000.00

10,395,213.60
TOTAL PRICE

(RUPIAH)

686,620.80
148,648.50
132,083.60
236,436.42
2,552,122.08
2,831,162.60
980,139.60
60,000.00
180,000.00
2,588,000.00

10,395,214

TOTAL PRICE

(RUPIAH)

4,662,240.00
582,440.63
525,332.50
940,372.13
6,458,113.80
8,390,104.80
5,062,560.00
4,286,400.00
3,155,712.00
120,000.00
360,000.00

34,543,275.85
TOTAL PRICE

(RUPIAH)

286,092.00
20,182.50
79,141.00
214,942.20
2,178,640.80
2,450,560.00
980,139.60
120,000.00
360,000.00
1,226,125.00

7,915,823.10

You might also like