PEKERJAAN
PEMBANGUNAN UGC 150 kV SEMANGGI BARAT - MAMPANG
DAN REKONDUKTORING SUTT 150 kV SEMANGGI BARAT - KARET
PEKERJAAN :
PEMBANGUNAN UGC 150 kV SEMANGGI BARAT - MAMPANG
DAN REKONDUKTORING SUTT 150 kV SEMANGGI BARAT - KARET Rp.
Jumlah Rp.
PPN. 10 % Rp.
TOTAL Rp.
T O T A L (Pembulatan) Rp.
Terbilang :
Tempat, Tgl/Bln/Thn
CV/PT/KSO
TOTAL PRICE
NO DESCRIPTION
(Rp)
PEMBANGUNAN UGC 150 kV SEMANGGI BARAT - MAMPANG
1
SUB TOTAL
1.1 Six single line conductors of High Temperature Low Sag (HTLS) Aluminum Conductor 2.2 Route km 1,819,800,000 4,003,560,000 14,820,000 32,604,000 85,490,000 188,078,000 4,224,242,000
(current carrying capacity is approx. twice current carrying capacity of double Hawk 240/40 mm2)
1.2 Set of three single High Temperature Low Sag (HTLS) Aluminum Conductor downleads to substation 4 Sets 108,300,000 433,200,000 780,000 3,120,000 1,250,000 5,000,000 441,320,000
gantry (100 m), excluding low duty inverse insulator sets 120 KN , including thermal high temperature tap
connectors for dropper to substation equipment, to do
1.3 Armour rod for line conductors of High Temperature Low Sag (HTLS) Aluminum Conductor 24 Sets 271,350 6,512,400 1,950 46,800 65,000 1,560,000 8,119,200
2.1 Line conductor vibration damper for High Temperature Low Sag (HTLS) Aluminum 16 Sets 483,000 7,728,000 4,160 66,560 125,000 2,000,000 9,794,560
Conductor
2.2 Line conductor spacer (span) 400 mm for High Temperature Low Sag (HTLS) Aluminum Conductor 0 Sets 462,000 120,950
0 1,560 0 0 0
2.3 Line conductor spacer (jumper) 200 mm for High Temperature Low Sag (HTLS) Aluminum Conductor 24 Sets 295,000 120,950
7,080,000 975 23,400 2,902,800 10,006,200
3.1 Clamp set for twin HTLS Aluminium Conductor at single suspension insulator existing 120 kN 0 Sets 1,935,000 0 2,860 0 90,389 0 0
3.2 Clamp set for twin HTLS Aluminium Conductor at double suspension insulator existing 120 kN 24 Sets 1,935,000 46,440,000 2,860 68,640 90,389 2,169,333 48,677,973
3.3 Clamp set for twin HTLS Aluminium Conductor at single tension insulator existing 120 kN 12 Sets 17,197,200 206,366,400 13,000 156,000 90,389 1,084,667 207,607,067
3.4 Clamp set for twin HTLS Aluminium Conductor at double tension insulator existing 120 kN 36 Sets 17,197,200 619,099,200 13,000 468,000 90,389 3,254,000 622,821,200
3.5 a. Pilot insulator for jumper insulator string set 120 kN min. 5,270 mm creepage distance 6 Sets 7,867,500 47,205,000 23,400 140,400 90,389 542,333 47,887,733
b. Clamp set for twin HTLS Aluminium Conductor at pilot insulator jumper existing 120 kN 6 Sets 1,935,000 11,610,000 2,600 15,600 90,389 542,333 12,167,933
3.6 Clamp set for twin HTLS Aluminium Conductor at single tension inverse insulator existing 120 kN 12 Sets 17,197,200 206,366,400 13,000 156,000 90,389 1,084,667 207,607,067
4.1 Check survey including checking of profiles and drawing, check for tower type and positions, 2.2 Route km 4,250,000 9,350,000 9,350,000
check for tower condition.
BILL OF QUANTITY
SUTT 150 KV KARET - SEMANGGI BARAT (REKONDUKTORING)
2-circuit OHL 1 x High Temperature Low Sag (HTLS) Aluminum Conductor
6.1 Dismantling existing 2 cct 2 x ACSR 240/40 mm2 (Hawk) 2.2 kmr 4,500,000 9,900,000 9,900,000
6.2 Dismantling disc insulator 1,152.0 Pcs 7,500 8,640,000 8,640,000
6.3 Dismantling hardware & fitting and accessories of conductors 8.0 Towers 1,850,000 14,800,000 14,800,000
Tower Tension 4
Tower Suspension 4
DAFTAR ISIAN DAN KUANTITAS (BILL OF QUANTITY)
### PEMBANGUNAN UGC 150 kV SEMANGGI BARAT - MAMPANG
No ITEM Unit
UNIT PRICE PRICE UNIT PRICE PRICE UNIT PRICE PRICE PRICE
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3=1x2 4 5=1 x 4 6 7= 1 x 6 8=3+5+7
(1 set sama dengan 3 phasa)
5 of 12
RAB PEKERJAAN PENGADAAN DAN PEMASANGAN UGC 150 KV SEMANGGI TIMUR - SEMANGGI BARAT
PEMASANGAN &
PENGADAAN TRANSPORTASI TOTAL
COMMISSIONING GRAND TOTAL
NO URAIAN VOLUME SATUAN HARGA SATUAN HARGA SATUAN HARGA SATUAN
HARGA SATUAN
(RP) (RP) (RP) (RP) (RP)
1 2 3 4 5 6 7 8 = 5+6+7 9=8x4
A LINGKUP PEKERJAAN DIFINITE
1 Pemasangan dan penempatan Pit Boring termasuk galian 2x3x5m, 3 Unit 45,973,517 45,973,517 137,920,550
timbunan sampai 500 mm diatas cover concrete, pipa PVC 4" dan 6"
untuk 2x2x3x150kV
2 Pengadaan dan pemasangan concrete cable bridge panjang 20 m 0 Unit 324,867,921 324,867,921 0
termasuk hanger kabel untuk 2x2x3x150 kV
3 Pemasangan dan penempatan cuble duct dengan sistem boring, 800 Meter 10,060,935 10,060,935 8,048,747,695
termasuk hanger kabel untuk 2x2x3x150kV
4 Micelanneeous Work
1, Pembongkaran Post Gantry 0 bh 0 0 0
2, Pembongkaran Beam 0 bh 0 0 0
3, Pembongkaran Steel Support HV equipment 0 bh 183,538 183,538 0
4, Pembongkaran Tower Laties 0 bh 0 0 0
5, Pembongkaran Tower Steel Pole 0 bh
5, Pembongkaran Tower Sisipan 0 bh 0 0 0
( NB: Material disimpan di Gudang PLN)
5 Pekerjaan Persiapan dan pendukung lainnya :
- Survey dan penyelidikan tanah 2 Ls 13,000,000 13,000,000 26,000,000
- Gudang sementara 1 Ls 46,542,800 46,542,800 46,542,800
- Papan Penanda Peringatan Kabel Tegangan Listrik 4 buah 481,976 481,976 1,927,904
(Plank)
- Perizinan 1 Ls 175,000,000 175,000,000 175,000,000
- Material Tanda Pengenal Jalur Kabel (Patok) 20 buah 674,698 674,698 13,493,968
3 Pemasangan dan penempatan cuble duct dengan sistem 5,000 Meter 10,060,935 10,060,935 50,304,673,095
boring, termasuk hanger kabel untuk 2x2x3x150kV
4 Micelanneeous Work
1, Pembongkaran Post Gantry 3 bh 3,670,756 3,670,756 7,341,512 22,024,537
2, Pembongkaran Beam 2 bh 2,936,605 2,936,605 5,873,210 11,746,420
3, Pembongkaran Steel Support HV equipment 18 bh 183,538 183,538 3,303,680
4, Pembongkaran Tower Laties 6 bh 99,110,415 99,110,415 99,110,415
5, Pembongkaran Tower Steel Pole 1 bh 18,360,627 41,516,251 59,876,878 59,876,878
5, Pembongkaran Tower Sisipan 1 bh 4,124,130 9,176,890 13,301,020 13,301,020
( NB: Material disimpan di Gudang PLN)
5 Pekerjaan Persiapan dan pendukung lainnya :
- Survey dan penyelidikan tanah 2 Ls 13,000,000 13,000,000 26,000,000
- Gudang sementara 1 Ls 46,542,800 46,542,800 46,542,800
- Papan Penanda Peringatan Kabel Tegangan Listrik 4 buah 481,976 481,976 1,927,904
(Plank)
- Perizinan 1 Ls 175,000,000 175,000,000 175,000,000
- Material Tanda Pengenal Jalur Kabel (Patok) 35 buah 674,698 674,698 23,614,444
1.1 Six twin line conductors of High Temperature Low Sag (HTLS) Aluminum Conductor 48.0 Route km 1,819,800,000 87,350,400,000 14,820,000 711,360,000 85,490,000 4,103,520,000 92,165,280,000
(current carrying capacity is approx. twice current carrying capacity of double Hawk 240/40 mm2)
1.2 Set of three single High Temperature Low Sag (HTLS) Aluminum Conductor downleads to substation 4 Sets 108,300,000 433,200,000 780,000 3,120,000 1,250,000 5,000,000 441,320,000
gantry (100 m), excluding low duty inverse insulator sets 120 KN , including thermal high temperature tap
connectors for dropper to substation equipment, to do
1.3 Armour rod for line conductors of High Temperature Low Sag (HTLS) Aluminum Conductor 1,344 Sets 271,350 364,694,400 1,950 2,620,800 65,000 87,360,000 454,675,200
2.1 Line conductor vibration damper for High Temperature Low Sag (HTLS) Aluminum 3,755 Sets 483,000 1,813,568,400 4,160 15,619,968 125,000 469,350,000 2,298,538,368
Conductor
2.2 Line conductor spacer (span) 400 mm for High Temperature Low Sag (HTLS) Aluminum Conductor 4,872 Sets 462,000 120,950
2,250,864,000 1,560 7,600,320 589,268,400 2,847,732,720
2.3 Line conductor spacer (jumper) 200 mm for High Temperature Low Sag (HTLS) Aluminum Conductor 444 Sets 295,000 120,950
130,980,000 975 432,900 53,701,800 185,114,700
3.1 Clamp set for twin HTLS Aluminium Conductor at single suspension insulator existing 120 kN 222 Sets 1,935,000 429,570,000 2,860 634,920 90,389 20,066,333 450,271,253
3.2 Clamp set for twin HTLS Aluminium Conductor at double suspension insulator existing 120 kN 450 Sets 1,935,000 870,750,000 2,860 1,287,000 90,389 40,675,000 912,712,000
3.3 Clamp set for twin HTLS Aluminium Conductor at single tension insulator existing 120 kN 156 Sets 17,197,200 2,682,763,200 13,000 2,028,000 90,389 14,100,667 2,698,891,867
3.4 Clamp set for twin HTLS Aluminium Conductor at double tension insulator existing 120 kN 288 Sets 17,197,200 4,952,793,600 13,000 3,744,000 90,389 26,032,000 4,982,569,600
3.5 a. Pilot insulator for jumper insulator string set 120 kN min. 5,270 mm creepage distance 18 Sets 7,867,500 141,615,000 23,400 421,200 90,389 1,627,000 143,663,200
b. Clamp set for twin HTLS Aluminium Conductor at pilot insulator jumper existing 120 kN 18 Sets 1,935,000 34,830,000 2,600 46,800 90,389 1,627,000 36,503,800
3.6 Clamp set for twin HTLS Aluminium Conductor at single tension inverse insulator existing 120 kN 12 Sets 17,197,200 206,366,400 13,000 156,000 90,389 1,084,667 207,607,067
4.1 Check survey including checking of profiles and drawing, check for tower type and positions, 48.0 Route km 4,250,000 204,000,000 204,000,000
check for tower condition.
5.1 Structural mid steel 18 Ton 17,500,000 312,900,000 1,300,000 23,244,000 2,183,500 39,040,980 375,184,980
5.2 Structural HT steel 27 Ton 17,500,000 469,350,000 1,300,000 34,866,000 2,183,500 58,561,470 562,777,470
5.3 Disc Insulator 120 kN min. 5,270 mm creepage distance 536 Pcs 205,000 109,962,000 10,400 5,578,560 7,500 4,023,000 119,563,560
6.1 Dismantling existing 2 cct 2 x ACSR 240/40 mm2 (Hawk) 48.0 kmr 4,500,000 216,000,000 216,000,000
6.2 Dismantling disc insulator 536.4 Pcs 7,500 4,023,000 4,023,000
6.3 Dismantling hardware & fitting and accessories of conductors 149.0 Towers 1,850,000 275,650,000 275,650,000
ACCESSORIES
3 Set of three GIS Sealing End set
4 Set of three Outdoor Sealing End set
5 Straight joint box for XLPE Cable pcs
6 Clamp and connector for six set
connection between Sealing End
and Switchgear bushing
7 Cross bonding equipment set
CABLE EQUIPMENT
8 Fiber Optic Armoured (FA) Cable mtr
9 Optical Terminal Box (OTB) set
10 Joint Box set
575,000 11,500,000
3160472 38,869,317,730
PT. TEMACOM KONTRAK UGC HARGA RATA-RATA
HARGA
MANUNGGAL + ROK 10%
(PRYSMIAN) TANAH TINGGI
(2010)
2,657,850 2,923,635 2,923,635
2,980,000 3,278,000 2,395,507 2,605,716