REKAPITULASI HARGA
TOTAL PENGADAAN
TOTAL TERMASUK
ITEM URAIAN PEKERJAAN DAN JASA PPN 10 %
PPN
PEMASANGAN
1 PEMBANGUNAN GI 150 KV
HARGA PENGADAAN, PEMASANGAN DAN TRANSPORTASI PEKERJAAN 16,105,363,029 1,610,536,303 17,715,899,332
1.1
ELEKTROMEKANIKAL
2,545,005,810 254,500,581 2,799,506,391
1.2 HARGA PENGADAAN, PEMASANGAN DAN TRANSPORTASI PEKERJAAN SIPIL
PEMBULATAN TOTAL
1 dari 17
DAFTAR KUANTITAS (BILL OF QUANTITY)
PENGADAAN DAN PEMASANGAN PEKERJAAN ELEKTROMEKANIKAL GI 150 KV ITP EXT
PEMASANGAN &
PENGADAAN TRANSPORTASI GRAND
COMISSIONING
NO. URAIAN PEKERJAAN SATUAN VOLUME TOTAL
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 = 4x5 7 8 = 4x7 9 10 = 4x9 11=6+8+10
1.8 Miscellaneous equipment and material including additional substation lighting as specified lot 1 39,000,000 39,000,000 1,950,000 1,950,000 2,925,000 2,925,000 43,875,000
in technical specification to complete the scope of work
PEMASANGAN &
PENGADAAN TRANSPORTASI GRAND
COMISSIONING
NO. URAIAN PEKERJAAN SATUAN VOLUME TOTAL
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 = 4x5 7 8 = 4x7 9 10 = 4x9 11=6+8+10
2.10 150kV Capacitor Voltage Transformer with 2 secondary winding, ratio 150kV : √3 / 100V : units 6 97,645,000 585,870,000 4,882,250 29,293,500 7,323,375 43,940,250 659,103,750
√3 / 100V : √3, Burden 100 VA CL 0.2, 150 VA CL 3P, min. capacitance 5000 PF,
complete with clamps, supporting structure.
2.11 150 kV Lightning arrester, 20 kA complete with supporting structure, clamp, surge counter units 3 40,626,184 121,878,552 2,031,309 6,093,928 3,046,964 9,140,891 137,113,371
& transducer.
DAFTAR KUANTITAS (BILL OF QUANTITY)
PENGADAAN DAN PEMASANGAN PEKERJAAN ELEKTROMEKANIKAL GI 150 KV ITP EXT
PEMASANGAN &
PENGADAAN TRANSPORTASI GRAND
COMISSIONING
NO. URAIAN PEKERJAAN SATUAN VOLUME TOTAL
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 = 4x5 7 8 = 4x7 9 10 = 4x9 11=6+8+10
2.12 PROTECTION & CONTROL CUBICLE FOR OHL COMPRISING : sets 1 635,240,000 635,240,000 31,762,000 31,762,000 47,643,000 47,643,000 714,645,000
- IED Main Protection Unit (MPU) Distance relay, Autorecloser, Synchrocheck, etc
- IED Backup Protection Unit (BPU) Over Current, DFR, GFR, Metering, etc
- IED Bay Control Unit (BCU)
- Ethernet switch for inter-bay level system
Including miscellaneous equipment, local mimic and material, lock out contact, trip
circuit supervision, rack cabinet, cables, clamps, connectors, compression terminal,
connection to individual items of equipment, test terminal, auxiliary relay, interior lamp,
heater …etc, to complete the scope of works.
2.13 Marshalling kiosk for 150 kV Line Bay. sets 2 42,500,000 85,000,000 2,125,000 4,250,000 3,187,500 6,375,000 95,625,000
2.14 LV power cable, control cable and accesorries and necessary equipment (cable ladder, bays 2 344,500,000 689,000,000 17,225,000 34,450,000 25,837,500 51,675,000 775,125,000
clamp, cable lug, terminal, etc.) for line bay to complete the specified scope of work
3.9 150 kV Current transformer for coupler bay complete with clamps and supporting units 3 76,938,104 230,814,312 3,846,905 11,540,716 5,770,358 17,311,073 259,666,101
structure comprising :
CORE 1 : 2000-4000/1 A, Class 5P20+0.2 for backup line protection
(over current protection & earth fault protection), instrument & metering
CORE 2 : 2000-4000/1 A, Class X for main busbar protection
DAFTAR KUANTITAS (BILL OF QUANTITY)
PENGADAAN DAN PEMASANGAN PEKERJAAN ELEKTROMEKANIKAL GI 150 KV ITP EXT
PEMASANGAN &
PENGADAAN TRANSPORTASI GRAND
COMISSIONING
NO. URAIAN PEKERJAAN SATUAN VOLUME TOTAL
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 = 4x5 7 8 = 4x7 9 10 = 4x9 11=6+8+10
3.10 PROTECTION & CONTROL CUBICLE FOR OHL COMPRISING : sets 1 1,038,618,473 1,038,618,473 51,930,924 51,930,924 77,896,385 77,896,385 1,168,445,782
- IED MAIN BUS BAR PROTECTION (LOW IMPEDANCE PROTECTION RELAY).
- IED BACKUP PROTECTION (OC, BF, SZP, TRIP CIRCUIT SUPERVISION
- RELAY,
IED BAY...ETC).
CONTROL.
- ETHERNET SWITCH FOR INTER-BAY SYSTEM-1.
- ETHERNET SWITCH FOR INTER-BAY SYSTEM-2.
INCLUDING MISELLANEOUS EQUIPMENT, MIMIC DIAGRAM AND MATERIAL,
RACK
CABLESCABINET,
CLAMPS, CONNECTORS, COMPRESSION TERMINAL, CONNECTIN TO
INDIVIDUAL
ITEMS OF EQUIPMENT, TEST TERMINAL, AUXILIARY RELAY, INTERIOR LAMP, HEATER
ETC..., TO COMPLETE THE SCOPE OF WORKS.
3.11 Marshalling kiosk for 150 kV Coupler Bay. sets 1 40,881,958 40,881,958 2,044,098 2,044,098 3,066,147 3,066,147 45,992,203
3.12 LV power cable, control cable and accesorries and necessary equipment (cable ladder, bays 1 147,777,637 147,777,637 7,388,882 7,388,882 11,083,323 11,083,323 166,249,842
clamp, cable lug, terminal, etc.) for coupler bay to complete the specified scope of work
PEMASANGAN &
PENGADAAN TRANSPORTASI GRAND
COMISSIONING
NO. URAIAN PEKERJAAN SATUAN VOLUME TOTAL
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 = 4x5 7 8 = 4x7 9 10 = 4x9 11=6+8+10
1 1,328,650,000 1,328,650,000 66,432,500 66,432,500 99,648,750 99,648,750 1,494,731,250
5 SUBSTATION AUTOMATION HARDWARE lot
PEMASANGAN &
PENGADAAN TRANSPORTASI GRAND
COMISSIONING
NO. URAIAN PEKERJAAN SATUAN VOLUME TOTAL
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 = 4x5 7 8 = 4x7 9 10 = 4x9 11=6+8+10
SUB TOTAL ITEMS 7 360,399,375
DAFTAR KUANTITAS (BILL OF QUANTITY)
PENGADAAN DAN PEMASANGAN PEKERJAAN ELEKTROMEKANIKAL GI 150 KV ITP EXT
PEMASANGAN &
PENGADAAN TRANSPORTASI GRAND
COMISSIONING
NO. URAIAN PEKERJAAN SATUAN VOLUME TOTAL
SATUAN TOTAL SATUAN TOTAL SATUAN TOTAL
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 = 4x5 7 8 = 4x7 9 10 = 4x9 11=6+8+10
10 FAULT RECORDER
10.1 Fault Recorder equipment free standing steel sheet cubicle equipped with the followings : set 1 663,734,000 663,734,000 3,846,905 16,017,750 3,372,375 13,024,688 195,370,313
- Fault Recording equipment comprising necessary quantity of fault recorders equipped
with oscillograph printer to record the information of the 150 kV side as specified.
- The recorder shall provided with date and time indicators and time synchronizing
equipment clock via satelite.
11 MISCELLANEOUS
11.1 CCTV System complete as specified in the technical specification lot 1 426,000,000 426,000,000 21,300,000 21,300,000 31,950,000 31,950,000 479,250,000
TOTAL PRICE
NO. DESCRIPTION
(IDR)
1 2 3
- For 20 kV Room -
3 Bill No 3 : Miscellaneous
II Site Works
1 Earth Work
a. Site Clearing m2 7,056 13,475 95,079,600
b. Common Excavation m3 - -
c. Back fill with selected material m3 - -
d. Import fill with selected material m3 - -
e. Slope protection (stone masonry) m3 - -
f. Soil Disposal m3 - -
g. Plank name project unit 1 684,569 684,569
h. Fence security of project 2 m high m' 126 211,288 26,622,288
i. Bouwplank m' 364 27,632 10,058,048
-
2 Road (new) -
a. Prepare compacted subgrade m2 - -
b. Macadam surface course m2 - -
c. Base structure (Sub base & Base coarse) m2 728 149,084 108,533,152
d. 50 mm Asphalt hot mix m2 728 92,945 67,663,960
e. 50 mm Asphalt penetration m2 - -
-
3 a. Kerbs (15x30x50cm) m' 364 49,500 18,018,000
b. Kerbs (20x30x50cm) m' - -
-
4 Fence complete with barbed wire,accessories and foundation -
- BRC 1.20 m height m' -
- BRC 1.90 m height m' 364 1,534,618 558,600,952
- Fabricated concrete 1.00 m height (lower part) and BRC 1.20 m
height (upper part) m' -
- Galvanized wire mesh 1.65 m height m' -
- Fence Brick Wall 2.40 m height (lower part) and wire mesh 0.60
m height (upper part) m' -
-
5 Gate complete with pole, accessories and foundation -
- BRC 1.90 m height, 6 m width unit 2 6,180,033 12,360,066
- BRC 1.20 m height, 5 m width unit -
6 Landscaping m2 - -
7 Gravel (dia 3 - 5 cm); t = 15 cm m2 7,056 32,119 226,631,664
8 Cable trench (K175,BJTP40,incld cover, galvanized cable tray L
50.50.5 and PVC pipe) -
a. Cable trench type I (large) m' 223 1,407,147 313,793,781
b. Cable trench type 2 (medium) m' 231 1,085,887 250,839,897
c. Cable trench type 3 (small) m' 224 596,161 133,540,064
d. Cable trench (Crossing Road) m' 10 1,821,625 18,216,250
-
9 Soil investigation for switchyard : -
SPT, DCPT, Core Drilling and Test Lab ls 1 5,390,000 5,390,000
Report ls 3 6,737,500 20,212,500
10 Drainage m' - -
11 Sub soil Drainage dia 30 including gravel & Palm fibre m' 240 205,975 49,434,000
12 Post security (2m x 4 m) unit -
13 Loading test no -
TOTAL II 1,915,678,791
GARDU INDUK 150 KV CILEUNGSI II
PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES
CIVIL WORKS
BILL NO 2 : SWITCHYARD FOR CIVIL WORKS
4LB, 2TB, 1BC, 1 SB
4 Lighting panel outdoor complete with foto cell switch fuse, mcb,
grounding system indicator wiring and all accessories (foto cell)
and foundation of panel Set
0
UNIT PRICE TOTAL PRICE
NO DESCRIPTION UNIT QTY LOCAL CURRENCY LOCAL
PORTION
(RUPIAH) (RUPIAH)
1 2 3 4 5 6=4x5
1 Concrete Work
2 Reinforcement Work
3 Excavation Work
4 Filling Work
5 Steel Work
TOTAL
Bab VIII. Daftar Kuantitas, Harga dan Schedule
Halaman 14 dari 17
________________________________________________________________________________________________________________________________________________________________________________
GI Cileungsi II GI New Sanur GI Kapal Ext GI Lamongan Ext GI Lautan Steel GI Juishin GI Paciran RATA-RATA
NO. URAIAN PEKERJAAN SATUAN SATUAN SATUAN SATUAN SATUAN SATUAN SATUAN SATUAN
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 5 5 5 5 5 5 5 5
1.9 Miscellaneous equipment and material including additional substation lighting as specified 39,000,000 39,000,000
in technical specification to complete the scope of work
2.10 150kV Capacitor Voltage Transformer with 2 secondary winding, ratio 150kV : √3 / 100V : 73,504,934 69,182,800 97,645,000 64,902,000 70,115,000 75,069,947
√3 / 100V : √3, Burden 100 VA CL 0.2, 150 VA CL 3P, min. capacitance 5000 PF,
complete with clamps, supporting structure.
2.11 150 kV Lightning arrester, 20 kA complete with supporting structure, clamp, surge counter 40,626,184 31,997,900 34,900,000 34,023,000 26,748,000 33,659,017
& transducer.
BUKU C
Bab VIII. Daftar Kuantitas, Harga dan Schedule
Halaman 15 dari 17
________________________________________________________________________________________________________________________________________________________________________________
GI Cileungsi II GI New Sanur GI Kapal Ext GI Lamongan Ext GI Lautan Steel GI Juishin GI Paciran RATA-RATA
NO. URAIAN PEKERJAAN SATUAN SATUAN SATUAN SATUAN SATUAN SATUAN SATUAN SATUAN
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 5 5 5 5 5 5 5 5
2.12 PROTECTION & CONTROL CUBICLE FOR OHL COMPRISING : 384,522,478 361,881,600 635,240,000 278,708,000 437,817,000 419,633,816
- IED Main Protection Unit (MPU) Distance relay, Autorecloser, Synchrocheck, etc
- IED Backup Protection Unit (BPU) Over Current, DFR, GFR, Metering, etc
- IED Bay Control Unit (BCU)
- Ethernet switch for inter-bay level system
Including miscellaneous equipment, local mimic and material, lock out contact, trip
circuit supervision, rack cabinet, cables, clamps, connectors, compression terminal,
connection to individual items of equipment, test terminal, auxiliary relay, interior lamp,
heater …etc, to complete the scope of works.
2.13 Marshalling kiosk for 150 kV Line Bay. 36,630,234 34,313,300 42,500,000 27,080,000 23,935,000 32,891,707
2.14 LV power cable, control cable and accesorries and necessary equipment (cable ladder, 147,777,637 147,185,400 344,500,000 312,525,000 321,022,000 254,602,007
clamp, cable lug, terminal, etc.) for line bay to complete the specified scope of work
BUKU C
Bab VIII. Daftar Kuantitas, Harga dan Schedule
Halaman 16 dari 17
________________________________________________________________________________________________________________________________________________________________________________
GI Cileungsi II GI New Sanur GI Kapal Ext GI Lamongan Ext GI Lautan Steel GI Juishin GI Paciran RATA-RATA
NO. URAIAN PEKERJAAN SATUAN SATUAN SATUAN SATUAN SATUAN SATUAN SATUAN SATUAN
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 5 5 5 5 5 5 5 5
1,328,650,000 917,900,000 1,123,275,000
4 SUBSTATION AUTOMATION HARDWARE
4.1 Operator Work Station consist of : 961,084,000 961,084,000
1 units Station Server 4 core min 3.0 GHz, RAM min 8 GB, HD min 2x500 GB, KVM
extender
1 units HMI Workstation core min 3.0 GHz, RAM min 4 GB, HD min 2x500 GB, Keyboard,
Mouse, VDU LCD ( ≥ 24") & KVM extender
BUKU C
Bab VIII. Daftar Kuantitas, Harga dan Schedule
Halaman 17 dari 17
________________________________________________________________________________________________________________________________________________________________________________
GI Cileungsi II GI New Sanur GI Kapal Ext GI Lamongan Ext GI Lautan Steel GI Juishin GI Paciran RATA-RATA
NO. URAIAN PEKERJAAN SATUAN SATUAN SATUAN SATUAN SATUAN SATUAN SATUAN SATUAN
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 5 5 5 5 5 5 5 5
9 FAULT RECORDER
9.1 Fault Recorder equipment free standing steel sheet cubicle equipped with the followings :
- Fault Recording equipment comprising necessary quantity of fault recorders equipped
with oscillograph printer to record the information of the 150 kV side as specified. 639,627,400 645,326,000 663,734,000 649,562,467
- The recorder shall provided with date and time indicators and time synchronizing
equipment clock via satelite.
10 MISCELLANEOUS
10.1 CCTV System complete as specified in the technical specification 426,000,000
SUB TOTAL ITEMS 10
BUKU C