You are on page 1of 16

DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)

BoQ NO.1 : PEKERJAAN ELEKTROMEKANIKAL


PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

PENGADAAN TRANSPORTASI PEMASANGAN

HARGA SATUAN HARGA SATUAN


TECHNICAL NEGARA ASAL PERALATAN/MATERIAL GUDANG HARGA SATUAN GRAND TOTAL
VOLUME SATUAN TRANSPORTASI DARI
LOCAL JASA
NO. URAIAN PARTICULAR BARANG TOTAL PABRIK/GUDANG LOKAL KE TOTAL
PEMASANGAN /
TOTAL
GUARANTEE (TPG) LOKASI PEKERJAAN (Trmsk
KONSTRUKSI
Import Local Asuransi)

Rp Rp Rp Rp Rp Rp Rp
1 2 3 4 5 6 = (2x4)+(2x5) 7 8 = 2x7 9 10 = 2x9 11 = 6+8+10
I PEKERJAAN ELEKTROMEKANIKAL

I.1 CONDUCTORS, INCLUDING DOWNLEADS TO SUBSTATION GANTRY


I.1.1 Six Twin line conductors ACSR/AS 450-A1/SA1A-54/7 (from Cikande New to Indah Kiat-GMS) 0.77 kmr
I.1.1 Six Twin line conductors HTLS 553 mm2 (from Cikande New to Cikande) 0.67 kmr

OPTICAL GROUND WIRE (OPGW), INCLUDING DOWNLEADS TO


I.2 TPG.IV.4.5.TL.150KV
SUBSTATION GANTRY (refer to the related TPG)
I.2.1 Set of single OPGW 1.42 kmr
I.2.2 Set of Joint boxes of OPGW 2.00 Sets
I.2.3 Set of Gantry Boxes (GB) complete, installed on substation gantry 2.00 Sets

ALUMINIUM-CLAD STEEL (AS), INCLUDING DOWNLEADS TO SUBSTATION


I.3 TPG.IV.4.4.TL.150KV
GANTRY (refer to the related TPG)
I.3.1 One earth conductor, AS 75 1.42 kmr

Total Item I.1-I.3 :

I.4 INSULATOR SETS SYSTEM TPG.IV.4.7.9.TL.150KV

INSULATOR STRING SETS COMPLETE WITH ALL FITTINGS (refer to the related drawing and
I.4.1
TPG)
I.4.1.1 Medium Pollution
I.4.1.1.1 Tension set single string Sets
I.4.1.1.2 Suspension set single string Sets
I.4.1.1.3 Suspension set double string for specific locations as mentioned in TST 8 Sets
I.4.1.1.4 Inverted Single string for specific locations as mentioned in TST 8 Sets
I.4.1.1.5 Jumper Suspension Single Set Sets
Total Item I.4.1.1 :

Nama Calon Penyedia Barang/Jasa :..................


1 dari 16

Tanda Tangan Calon Penyedia Barang/Jasa :..................


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ NO.1 : PEKERJAAN ELEKTROMEKANIKAL
PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

PENGADAAN TRANSPORTASI PEMASANGAN

HARGA SATUAN HARGA SATUAN


TECHNICAL NEGARA ASAL PERALATAN/MATERIAL GUDANG HARGA SATUAN GRAND TOTAL
VOLUME SATUAN TRANSPORTASI DARI
LOCAL JASA
NO. URAIAN PARTICULAR BARANG TOTAL PABRIK/GUDANG LOKAL KE TOTAL
PEMASANGAN /
TOTAL
GUARANTEE (TPG) LOKASI PEKERJAAN (Trmsk
KONSTRUKSI
Import Local Asuransi)

Rp Rp Rp Rp Rp Rp Rp
1 2 3 4 5 6 = (2x4)+(2x5) 7 8 = 2x7 9 10 = 2x9 11 = 6+8+10
I.4.1.2 Heavy Pollution
I.4.1.2.1 Tension set single string 0.00 Sets
I.4.1.2.2 Suspension set single string 0.00 Sets
I.4.1.2.3 Tension set double string for specific locations as mentioned in TST 8 72.00 Sets
I.4.1.2.3 Suspension set double string for specific locations as mentioned in TST 8 0.00 Sets
I.4.1.2.4 Inverted Single string for specific locations as mentioned in TST 8 12.00 Sets
I.4.1.2.5 Jumper Suspension Single Set 36.00 Sets
Total Item I.4.1.2 :
I.4.1.3 Very Heavy Pollution
I.4.1.3.1 Tension set single string Sets
I.4.1.3.2 Suspension set single string Sets
I.4.1.3.3 Suspension set double string for specific locations as mentioned in TST 8 Sets
I.4.1.3.4 Inverted Single string for specific locations as mentioned in TST 8 Sets
I.4.1.3.5 Jumper Suspension Single Set Sets
Total Item I.4.1.3 :

CONDUCTOR FITTING AND ACCESSORIES SYSTEM TPG.IV.4.6.1.TL.150KV


I.5
(refer to the related drawing and TPG) TPG.IV.4.6.2.TL.150KV
I.5.1 dan I.5.2 harus dipilih salah satu
I.5.1 VIBRATION DAMPERS AND CONDUCTOR SPACERS
I.5.1.1 Line conductor vibration dampers Sets
I.5.1.2 Line span conductor spacers 400 mm Sets
I.5.1.3 Line jumper conductor spacers 200 mm Sets

I.5.2 CONDUCTOR SPACER DAMPERS AND JUMPER SPACERS (Optional)


I.5.2.1 Line conductor spacer dampers (span) 400 mm 48.00 Sets
I.5.2.2 Line jumper conductor spacers 200 mm 72.00 Sets

Nama Calon Penyedia Barang/Jasa :..................


2 dari 16

Tanda Tangan Calon Penyedia Barang/Jasa :..................


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ NO.1 : PEKERJAAN ELEKTROMEKANIKAL
PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

PENGADAAN TRANSPORTASI PEMASANGAN

HARGA SATUAN HARGA SATUAN


TECHNICAL NEGARA ASAL PERALATAN/MATERIAL GUDANG HARGA SATUAN GRAND TOTAL
VOLUME SATUAN TRANSPORTASI DARI
LOCAL JASA
NO. URAIAN PARTICULAR BARANG TOTAL PABRIK/GUDANG LOKAL KE TOTAL
PEMASANGAN /
TOTAL
GUARANTEE (TPG) LOKASI PEKERJAAN (Trmsk
KONSTRUKSI
Import Local Asuransi)

Rp Rp Rp Rp Rp Rp Rp
1 2 3 4 5 6 = (2x4)+(2x5) 7 8 = 2x7 9 10 = 2x9 11 = 6+8+10
I.5.3 JOINT SLEEVES
I.5.3.1 Mid span joint for ACSR/AS 450-A1/SA1A-54/7 Sets
I.5.3.2 Mid span joint for HTLS Hamburg 318 mm2 Sets

I.5.4 ACCESSORIES
I.5.4.1 Armour Rod for conductor ACSR/AS 250-A1/SA1A-26/7 Sets
I.5.4.2 Armour Rod for conductor HTLS Hamburg 318 mm2 Sets
I.5.4.3 Counterweight 50 kg (if necessary) Sets
I.5.4.4 Counterweight 100 kg (if necessary) 12.00 Sets
I.5.4.5 Counterweight 200 kg (if necessary) Sets
I.5.4.6 Aircraft warning system for tower (if neccessary) Sets
I.5.4.7 Aircraft warning system for conductor (if neccessary) Sets
I.5.4.8 Aircraft warning sphere for earth wire (if neccessary) Sets

OPTICAL GROUND WIRE (OPGW) FITTING AND ACCESSORIES SYSTEM


I.6 TPG.IV.4.5.TL.150KV
(refer to the related drawing and TPG)

I.6.1 GROUND WIRE DAMPERS


I.6.1.1 Ground Wire OPGW vibration dampers 12.00 Sets

I.6.2 FITTINGS
I.6.2.1 Ground wire suspension set (OPGW) including armour rod and paralel groove 0.00 Sets
I.6.2.2 Ground wire tension set (OPGW) including paralel groove 5.00 Sets

ALUMINIUM-CLAD STEEL (AS) FITTING AND ACCESSORIES SYSTEM


I.7 TPG.IV.4.4.TL.150KV
(refer to the related drawing and TPG)

I.7.1 GROUND WIRE DAMPERS


I.7.1.1 Ground Wire AS vibration dampers 12.00 Sets

I.7.2 FITTINGS
I.7.2.1 Ground wire suspension clamp (AS 75) include armor rod and paralel groove 0.00 Sets
I.7.2.2 Ground wire tension clamp (AS 75) include paralel groove 5.00 Sets
I.7.2.3 Mid span joint for AS 75 Sets

Total Item I.5 - I.7 :

I.8 SUPPORT WORKS (if necessary)


I.8.1 Pelaksanaan Pembukaan Ruang Bebas/ROW Ls

Total Item I.8 :

I.9 HEALTH SAFETY AND ENVIRONMENT


Total Item I.9 :
Total I.I - I.9 :

Note :

Nama Calon Penyedia Barang/Jasa :..................


3 dari 16

Tanda Tangan Calon Penyedia Barang/Jasa :..................


DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ NO. 2 : PEKERJAAN SIPIL
PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

PENGADAAN TRANSPORTASI PEMASANGAN

HARGA SATUAN HARGA SATUAN


PERALATAN/MATERIAL GUDANG TRANSPORTASI DARI HARGA SATUAN GRAND TOTAL
VOLUME SATUAN LOCAL
NO. URAIAN TOTAL PABRIK/GUDANG LOKAL TOTAL JASA PEMASANGAN / TOTAL
KE LOKASI PEKERJAAN KONSTRUKSI
Import Local (Trmsk Asuransi)
Rp Rp Rp Rp Rp Rp Rp
1 2 4 5 6 = (2x4)+(2x5) 7 8 = 2x7 9 10 = 2x9 11 = 6+8+10

II PEKERJAAN SIPIL

II.1 PEKERJAAN PEMBERSIHAN JALUR & PERSIAPAN

II.1.1 Check Survey & Re-Route

II.1.1.1 Check survey to provide tower schedule 1.39 kmr

Re-Route complete final survey including checking of profiles and drawing, pegging of tower
II.1.1.2 kmr
positions, diagonal profiles, etc.
II.1.1.3 Soil investigation in tower location
a. Dutch Cone Penetration Test (Sondir) including report 6.00 titik
b. Boring including Geotechnical Soil Lab Test and report 6.00 titik
Total IItem II.1.1 (II.1.1.1 - II.1.1.2) :

II.1.2 Preparation Works


II.1.2.1 Project name board as specified 0.00 Ls
II.1.2.2 Site Project Office (10 x 6 m2) complete with furniture 0.00 Ls
II.1.2.3 Outdoor warehouse with roof m2
II.1.2.4 Outdoor warehouse without roof m2
II.1.2.5 Cut and Fill m3
II.1.2.6 Site Clearing Tapak Tower 900.00 m2
Total IItem II.1.2 (II.1.2.1 - II.1.2.6) :
Total IItem II.1 (II.1.1 - II.1.2) :

II.2 TOWER & ACCESSORIES SYSTEM TERMASUK PEMERIKSAAN AKHIR

II.2.1 Tower Lattice Standard

150 KV DOUBLE CIRCUIT TWIN CONDUCTORS TOWERS AND EXTENDED TOWERS OF THE
II.2.1.1
SUSPENSION TYPE COMPLETE WITH ALL BOLT, NUTS, STUB AND CLEAT FOR TOWERS :

II.2.1.1.1 AA2.-03. 0.00 Sets Tower


II.2.1.1.2 AA2.+00. 0.00 Sets Tower
II.2.1.1.3 AA2.+03. 0.00 Sets Tower
II.2.1.1.4 AA2.+06. 0.00 Sets Tower
II.2.1.1.5 AA2.+09. 0.00 Sets Tower
II.2.1.1.6 AA2.+12. 0.00 Sets Tower
II.2.1.1.7 AA2.+15. 0.00 Sets Tower
Total IItem II.2.1.1 : (II.2.1.1.1 - II.2.1.1.7) :

Nama Calon Penyedia Barang/Jasa :..................


4 dari 16
Tanda Tangan Calon Penyedia Barang/Jasa :..................
DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ NO. 2 : PEKERJAAN SIPIL
PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

PENGADAAN TRANSPORTASI PEMASANGAN

HARGA SATUAN HARGA SATUAN


PERALATAN/MATERIAL GUDANG TRANSPORTASI DARI HARGA SATUAN GRAND TOTAL
VOLUME SATUAN LOCAL
NO. URAIAN TOTAL PABRIK/GUDANG LOKAL TOTAL JASA PEMASANGAN / TOTAL
KE LOKASI PEKERJAAN KONSTRUKSI
Import Local (Trmsk Asuransi)
Rp Rp Rp Rp Rp Rp Rp
1 2 4 5 6 = (2x4)+(2x5) 7 8 = 2x7 9 10 = 2x9 11 = 6+8+10

150 KV DOUBLE CIRCUIT TWIN CONDUCTORS TOWERS AND EXTENDED TOWERS OF THE
II.2.1.2
TENSION TYPE COMPLETE WITH ALL BOLT, NUTS, STUB AND CLEAT FOR TOWERS :
II.2.1.2.1 BB2.-03. 0.00 Sets Tower
II.2.1.2.2 BB2.+00. 0.00 Sets Tower
II.2.1.2.3 BB2.+03. 0.00 Sets Tower
II.2.1.2.4 BB2.+06. 0.00 Sets Tower
II.2.1.2.5 BB2.+09. 0.00 Sets Tower
II.2.1.2.6 BB2.+12. 0.00 Sets Tower
II.2.1.2.7 BB2.+15. 0.00 Sets Tower
Total IItem II.2.1.2 : (II.2.1.2.1 - II.2.1.2.7)
150 KV DOUBLE CIRCUIT TWIN CONDUCTORS TOWERS AND EXTENDED TOWERS OF THE
II.2.1.3
TENSION TYPE COMPLETE WITH ALL BOLT, NUTS, STUB AND CLEAT FOR TOWERS :
II.2.1.3.1 CC2.-03. 0.00 Sets Tower
II.2.1.3.2 CC2.+00. 0.00 Sets Tower
II.2.1.3.3 CC2.+03. 0.00 Sets Tower
II.2.1.3.4 CC2.+06. 0.00 Sets Tower
II.2.1.3.5 CC2.+09. 0.00 Sets Tower
II.2.1.3.6 CC2.+12. 0.00 Sets Tower
II.2.1.3.7 CC2.+15. 0.00 Sets Tower
Total IItem II.2.1.3 : (II.2.1.3.1 - II.2.1.3.7)
150 KV DOUBLE CIRCUIT TWIN CONDUCTORS TOWERS AND EXTENDED TOWERS OF THE
II.2.1.4
TENSION TYPE COMPLETE WITH ALL BOLT, NUTS, STUB AND CLEAT FOR TOWERS :
II.2.1.4.1 DD2.-03. 0.00 Sets Tower
II.2.1.4.2 DD2.+00. 0.00 Sets Tower
II.2.1.4.3 DD2.+03. 0.00 Sets Tower
II.2.1.4.4 DD2.+06. 0.00 Sets Tower
II.2.1.4.5 DD2.+09. 0.00 Sets Tower
II.2.1.4.6 DD2.+12. 1.00 Sets Tower
II.2.1.4.7 DD2.+15. 0.00 Sets Tower
Total IItem II.2.1.4 : (II.2.1.4.1 - II.2.1.4.7)

Nama Calon Penyedia Barang/Jasa :..................


5 dari 16
Tanda Tangan Calon Penyedia Barang/Jasa :..................
DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ NO. 2 : PEKERJAAN SIPIL
PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

PENGADAAN TRANSPORTASI PEMASANGAN

HARGA SATUAN HARGA SATUAN


PERALATAN/MATERIAL GUDANG TRANSPORTASI DARI HARGA SATUAN GRAND TOTAL
VOLUME SATUAN LOCAL
NO. URAIAN TOTAL PABRIK/GUDANG LOKAL TOTAL JASA PEMASANGAN / TOTAL
KE LOKASI PEKERJAAN KONSTRUKSI
Import Local (Trmsk Asuransi)
Rp Rp Rp Rp Rp Rp Rp
1 2 4 5 6 = (2x4)+(2x5) 7 8 = 2x7 9 10 = 2x9 11 = 6+8+10
150 KV DOUBLE CIRCUIT TWIN CONDUCTORS TOWERS AND EXTENDED TOWERS OF THE
II.2.1.5
TENSION TYPE COMPLETE WITH ALL BOLT, NUTS, STUB AND CLEAT FOR TOWERS :
II.2.1.5.1 DDR2.-03. 0.00 Sets Tower
II.2.1.5.2 DDR2.+00. 0.00 Sets Tower
II.2.1.5.3 DDR2.+03. 0.00 Sets Tower
II.2.1.5.4 DDR2.+06. 0.00 Sets Tower
II.2.1.5.5 DDR2.+09. 0.00 Sets Tower
II.2.1.5.6 DDR2.+12. 0.00 Sets Tower
II.2.1.5.7 DDR2.+15. 0.00 Sets Tower
Total IItem II.2.1.5 : (II.2.1.5.1 - II.2.1.5.7)
150 KV DOUBLE CIRCUIT TWIN CONDUCTORS TOWERS AND EXTENDED TOWERS OF THE
II.2.1.6
TENSION TYPE COMPLETE WITH ALL BOLT, NUTS, STUB AND CLEAT FOR TOWERS :
II.2.1.6.1 EE2.-03. 0.00 Sets Tower
II.2.1.6.2 EE2.+00. 2.00 Sets Tower
II.2.1.6.3 EE2.+03. 0.00 Sets Tower
II.2.1.6.4 EE2.+06. 1.00 Sets Tower
II.2.1.6.5 EE2.+09. 0.00 Sets Tower
II.2.1.6.6 EE2.+12. 0.00 Sets Tower
II.2.1.6.7 EE2.+15. 0.00 Sets Tower
Total IItem II.2.1.6 : (II.2.1.6.1 - II.2.1.6.7)
I.2.1.7 150 kV Temporary Tower
I.2.1.7.1 150 kV Temporary Tower erection, instalation, dismantling and storage 4.00 Sets Tower
Total Item I.2.1.7 : (I.2.1.7.1 - I.2.1.7.2)
Total IItem II.2.1 (II.2.1.1 - II.2.1.6) :

Nama Calon Penyedia Barang/Jasa :..................


6 dari 16
Tanda Tangan Calon Penyedia Barang/Jasa :..................
DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ NO. 2 : PEKERJAAN SIPIL
PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

PENGADAAN TRANSPORTASI PEMASANGAN

HARGA SATUAN HARGA SATUAN


PERALATAN/MATERIAL GUDANG TRANSPORTASI DARI HARGA SATUAN GRAND TOTAL
VOLUME SATUAN LOCAL
NO. URAIAN TOTAL PABRIK/GUDANG LOKAL TOTAL JASA PEMASANGAN / TOTAL
KE LOKASI PEKERJAAN KONSTRUKSI
Import Local (Trmsk Asuransi)
Rp Rp Rp Rp Rp Rp Rp
1 2 4 5 6 = (2x4)+(2x5) 7 8 = 2x7 9 10 = 2x9 11 = 6+8+10

II.2.2 Tower Accessories


II.2.2.1 Danger Plate with fixing facilities 2.00 sets
II.2.2.2 Number Plate & Phase Plate with fixing facilities 2.00 sets
II.2.2.3 Anti climbing guards 2.00 sets
Earthing angle compraising of galvanized steel angle, lead wire, including all clams (1 set per leg
II.2.2.4 8.00 sets
tower)
Continuous or cross-connected counterpoise cable, 50 m length, 450 mm depth, including
II.2.2.5 sets
galvanized steel angle 1000 mm length, all joints and clams (1 set per leg tower, if any)
II.2.2.6 Extra to items I.2.2.5 for laying in rock, 450 mm depth m
II.2.2.7 Extra to items I.2.2.5 for installing at 1000 mm depth m
II.2.2.8 Extra to items I.2.2.5 for 2 m earthing rod, including joints sets
Total IItem II.2.2 (II.2.2.1 - II.2.2.8) :

II.2.3 Tower, Leg Extension, Stub Extension dan Chimney Extension


II.2.3.1 Standard Tower
II.2.3.1.1 Leg Extension
II.2.3.1.1.1 Mild Tensile Steel ton
II.2.3.1.1.2 High Tensile Steel ton
II.2.3.1.2 Stub Extension (High Tensile Steel) ton
II.2.3.1.3 Chimney Extension m

II.2.3.2 Non-Standard Tower


II.2.3.2.1 Tower and Leg Extension
II.2.3.2.1.1 Mild Tensile Steel 10.23 ton
II.2.3.2.1.2 High Tensile Steel 40.90 ton
II.2.3.2.2 Stub Extension (High Tensile Steel) ton
II.2.3.2.3 Chimney Extension m
Total IItem II.2.3 (II.2.3.1 - II.2.3.2) :
II.2.4 Tower Accessories for Non StandardTower
II.2.4.1 Danger Plate with fixing facilities (set of two per tower) 2.00 sets
II.2.4.2 Number Plate & Phase Plate with fixing facilities 2.00 sets
II.2.4.3 Anti climbing guards (set of four per tower) 2.00 sets
Earthing angle compraising of galvanized steel angle, lead wire, including all clams (1 set per leg
II.2.4.4 8.00 sets
tower)
Continuous or cross-connected counterpoise cable, 50 m length, 450 mm depth, including
II.2.4.5 sets
galvanized steel angle 1000 mm length, all joints and clams (1 set per leg tower, if any)
II.2.4.6 Extra to items I.2.2.5 for laying in rock, 450 mm depth m
II.2.4.7 Extra to items I.2.2.5 for installing at 1000 mm depth m
II.2.4.8 Extra to items I.2.2.5 for 2 m earthing rod, including joints sets
Total IItem II.2.3 (II.2.4.1 - II.2.4.8) :
Total IItem II.2 (II.2.1 - II.2.4) :

Nama Calon Penyedia Barang/Jasa :..................


7 dari 16
Tanda Tangan Calon Penyedia Barang/Jasa :..................
DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ NO. 2 : PEKERJAAN SIPIL
PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

PENGADAAN TRANSPORTASI PEMASANGAN

HARGA SATUAN HARGA SATUAN


PERALATAN/MATERIAL GUDANG TRANSPORTASI DARI HARGA SATUAN GRAND TOTAL
VOLUME SATUAN LOCAL
NO. URAIAN TOTAL PABRIK/GUDANG LOKAL TOTAL JASA PEMASANGAN / TOTAL
KE LOKASI PEKERJAAN KONSTRUKSI
Import Local (Trmsk Asuransi)
Rp Rp Rp Rp Rp Rp Rp
1 2 4 5 6 = (2x4)+(2x5) 7 8 = 2x7 9 10 = 2x9 11 = 6+8+10

II.3 PEKERJAAN PONDASI TERMASUK PEMERIKSAAN AKHIR


A. Standard Foundation
II.3.1 Foundation of Tower (Lattice Tower)

Complete Suspension Tower Foundation (including stubs, cleats and setting) for standard
II.3.1.1 and extended AA2 +6 type towers (refer to attached drawings and foundation code number)
(typical for tower with body extension +6)
II.3.1.1.1 Class 1 Pad and Chimney (150.AA2.+6.250.1.a ; 150.AA2.+6.250.1.b) 0.00 sets
II.3.1.1.2 Class 2 Pad and Chimney (150.AA2.+6.250.2.a ; 150.AA2.+6.250.2.b) 0.00 sets
II.3.1.1.3 Class 3 Pad and Chimney ( (150.AA2.+6.250.3.a ; 150.AA2.+6.250.3.b) 0.00 sets
II.3.1.1.4 Class 4a Pad and Chimney Foundations (Rock) (150.AA2.+6.250.4a.a ; 150.AA2.+6.250.4a.b) 0.00 sets
Class 7 Pad and Chimney Foundations with Bouyancy (150.AA2.+6.250.7.a ; 150.AA2.+6.250.7.b ;
II.3.1.1.5 0.00 sets
150.AA2.+6.250.7.c ; 150.AA2.+6.250.7.d ; 150.AA2.+6.250.7.e ; 150.AA2.+6.250.7.f)
II.3.1.1.6 Class 1 Pad and Chimney (150.AA2.+9.250.1.a ; 150.AA2.+9.250.1.b) 0.00 sets
II.3.1.1.7 Class 2 Pad and Chimney (150.AA2.+9.250.2.a ; 150.AA2.+9.250.2.b) 0.00 sets
II.3.1.1.8 Class 3 Pad and Chimney ( (150.AA2.+9.250.3.a ; 150.AA2.+9.250.3.b) 0.00 sets
II.3.1.1.9 Class 4a Pad and Chimney Foundations (Rock) (150.AA2.+9.250.4a.a ; 150.AA2.+9.250.4a.b) 0.00 sets
Class 7 Pad and Chimney Foundations with Bouyancy (150.AA2.+9.250.7.a ; 150.AA2.+9.250.7.b ;
II.3.1.1.10 0.00 sets
150.AA2.+9.250.7.c ; 150.AA2.+9.250.7.d ; 150.AA2.+9.250.7.e ; 150.AA2.+9.250.7.f)
II.3.1.1.11 Class 1 Pad and Chimney (150.AA2.+15.250.1.a ; 150.AA2.+15.250.1.b) 0.00 sets
II.3.1.1.12 Class 2 Pad and Chimney (150.AA2.+15.250.2.a ; 150.AA2.+15.250.2.b) 0.00 sets
II.3.1.1.13 Class 3 Pad and Chimney ( (150.AA2.+15.250.3.a ; 150.AA2.+15.250.3.b) 0.00 sets
II.3.1.1.14 Class 4a Pad and Chimney Foundations (Rock) (150.AA2.+15.250.4a.a ; 150.AA2.+15.250.4a.b) 0.00 sets
Class 7 Pad and Chimney Foundations with Bouyancy (150.AA2.+15.250.7.a ;
II.3.1.1.15 150.AA2.+15.250.7.b ; 150.AA2.+15.250.7.c ; 150.AA2.+15.250.7.d ; 150.AA2.+15.250.7.e ; 0.00 sets
150.AA2.+15.250.7.f)
Total IItem II.3.1.1 : (II.3.1.1.1 - II.3.1.1.8)
Complete Tension Tower Foundation (including stubs, cleats and setting) for standard and
II.3.1.2 extended BB2 +6 type towers (refer to attached drawings and foundation code number)
(typical for tower with body extension +6)
II.3.1.2.1 Class 1 Pad and Chimney (150.BB2.+6.250.1.a ; 150.BB2.+6.250.1.b) 0.00 sets
II.3.1.2.2 Class 2 Pad and Chimney (150.BB2.+6.250.2.a ; 150.BB2.+6.250.2.b) 0.00 sets
II.3.1.2.3 Class 3 Pad and Chimney ( (150.BB2.+6.250.3.a ; 150.BB2.+6.250.3.b) 0.00 sets
II.3.1.2.4 Class 4a Pad and Chimney Foundations (Rock) (150.BB2.+6.250.4a.a ; 150.BB2.+6.250.4a.b) 0.00 sets
Class 7 Pad and Chimney Foundations with Bouyancy (150.BB2.+6.250.7.a ; 150.BB2.+6.250.7.b ;
II.3.1.2.5 0.00 sets
150.BB2.+6.250.7.c ; 150.BB2.+6.250.7.d ; 150.BB2.+6.250.7.e ; 150.BB2.+6.250.7.f)
II.3.1.2.6 Class 1 Pad and Chimney (150.BB2.+9.250.1.a ; 150.BB2.+9.250.1.b) 0.00 sets
II.3.1.2.7 Class 2 Pad and Chimney (150.BB2.+9.250.2.a ; 150.BB2.+9.250.2.b) 0.00 sets
II.3.1.2.8 Class 3 Pad and Chimney ( (150.BB2.+9.250.3.a ; 150.BB2.+9.250.3.b) 0.00 sets
II.3.1.2.9 Class 4a Pad and Chimney Foundations (Rock) (150.BB2.+9.250.4a.a ; 150.BB2.+9.250.4a.b) 0.00 sets
Class 7 Pad and Chimney Foundations with Bouyancy (150.BB2.+9.250.7.a ; 150.BB2.+9.250.7.b ;
II.3.1.2.10 0.00 sets
150.BB2.+9.250.7.c ; 150.BB2.+9.250.7.d ; 150.BB2.+9.250.7.e ; 150.BB2.+9.250.7.f)
II.3.1.2.11 Class 1 Pad and Chimney (150.BB2.+15.250.1.a ; 150.BB2.+15.250.1.b) 0.00 sets
II.3.1.2.12 Class 2 Pad and Chimney (150.BB2.+15.250.2.a ; 150.BB2.+15.250.2.b) 0.00 sets
II.3.1.2.13 Class 3 Pad and Chimney ( (150.BB2.+15.250.3.a ; 150.BB2.+15.250.3.b) 0.00 sets
II.3.1.2.14 Class 4a Pad and Chimney Foundations (Rock) (150.BB2.+15.250.4a.a ; 150.BB2.+15.250.4a.b) 0.00 sets
Class 7 Pad and Chimney Foundations with Bouyancy (150.BB2.+15.250.7.a ;
II.3.1.2.15 150.BB2.+15.250.7.b ; 150.BB2.+15.250.7.c ; 150.BB2.+15.250.7.d ; 150.BB2.+15.250.7.e ; 0.00 sets
150.BB2.+15.250.7.f)
Total IItem II.3.1.2 : (II.3.1.2.1 - II.3.1.2.8)
Complete Tension Tower Foundation (including stubs, cleats and setting) for standard and
II.3.1.3 extended CC2 +6 type towers (refer to attached drawings and foundation code number)
(typical for tower with body extension +6)
II.3.1.3.1 Class 1 Pad and Chimney (150.CC2.+6.250.1.a ; 150.CC2.+6.250.1.b) 0.00 sets
II.3.1.3.2 Class 2 Pad and Chimney (150.CC2.+6.250.2.a ; 150.CC2.+6.250.2.b) 0.00 sets
II.3.1.3.3 Class 3 Pad and Chimney ( (150.CC2.+6.250.3.a ; 150.CC2.+6.250.3.b) 0.00 sets
II.3.1.3.4 Class 4a Pad and Chimney Foundations (Rock) (150.CC2.+6.250.4a.a ; 150.CC2.+6.250.4a.b) 0.00 sets

Class 7 Pad and Chimney Foundations with Bouyancy (150.CC2.+6.250.7.a ; 150.CC2.+6.250.7.b ;


II.3.1.3.5 0.00 sets
150.CC2.+6.250.7.c ; 150.CC2.+6.250.7.d ; 150.CC2.+6.250.7.e ; 150.CC2.+6.250.7.f)

II.3.1.3.6 Class 1 Pad and Chimney (150.CC4.+9.250.1.a ; 150.CC4.+9.250.1.b) 0.00 sets


II.3.1.3.7 Class 2 Pad and Chimney (150.CC4.+9.250.2.a ; 150.CC4.+9.250.2.b) 0.00 sets
II.3.1.3.8 Class 3 Pad and Chimney ( (150.CC4.+9.250.3.a ; 150.CC4.+9.250.3.b) 0.00 sets
II.3.1.3.9 Class 4a Pad and Chimney Foundations (Rock) (150.CC4.+9.250.4a.a ; 150.CC4.+9.250.4a.b) 0.00 sets

Nama Calon Penyedia Barang/Jasa :..................


8 dari 16
Tanda Tangan Calon Penyedia Barang/Jasa :..................
DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ NO. 2 : PEKERJAAN SIPIL
PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

PENGADAAN TRANSPORTASI PEMASANGAN

HARGA SATUAN HARGA SATUAN


PERALATAN/MATERIAL GUDANG TRANSPORTASI DARI HARGA SATUAN GRAND TOTAL
VOLUME SATUAN LOCAL
NO. URAIAN TOTAL PABRIK/GUDANG LOKAL TOTAL JASA PEMASANGAN / TOTAL
KE LOKASI PEKERJAAN KONSTRUKSI
Import Local (Trmsk Asuransi)
Rp Rp Rp Rp Rp Rp Rp
1 2 4 5 6 = (2x4)+(2x5) 7 8 = 2x7 9 10 = 2x9 11 = 6+8+10

Class 7 Pad and Chimney Foundations with Bouyancy (150.CC4.+9.250.7.a ; 150.CC4.+9.250.7.b ;


II.3.1.3.10 0.00 sets
150.CC4.+9.250.7.c ; 150.CC4.+9.250.7.d ; 150.CC4.+9.250.7.e ; 150.CC4.+9.250.7.f)

II.3.1.3.11 Class 1 Pad and Chimney (150.CC4.+15.250.1.a ; 150.CC4.+15.250.1.b) 0.00 sets


II.3.1.3.12 Class 2 Pad and Chimney (150.CC4.+15.250.2.a ; 150.CC4.+15.250.2.b) 0.00 sets
II.3.1.3.13 Class 3 Pad and Chimney ( (150.CC4.+15.250.3.a ; 150.CC4.+15.250.3.b) 0.00 sets
II.3.1.3.14 Class 4a Pad and Chimney Foundations (Rock) (150.CC4.+15.250.4a.a ; 150.CC4.+15.250.4a.b) 0.00 sets
Class 7 Pad and Chimney Foundations with Bouyancy (150.CC4.+15.250.7.a ;
II.3.1.3.15 150.CC4.+15.250.7.b ; 150.CC4.+15.250.7.c ; 150.CC4.+15.250.7.d ; 150.CC4.+15.250.7.e ; 0.00 sets
150.CC4.+15.250.7.f)
Total IItem II.3.1.3 : (II.3.1.3.1 - II.3.1.3.8)

Nama Calon Penyedia Barang/Jasa :..................


9 dari 16
Tanda Tangan Calon Penyedia Barang/Jasa :..................
DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ NO. 2 : PEKERJAAN SIPIL
PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

PENGADAAN TRANSPORTASI PEMASANGAN

HARGA SATUAN HARGA SATUAN


PERALATAN/MATERIAL GUDANG TRANSPORTASI DARI HARGA SATUAN GRAND TOTAL
VOLUME SATUAN LOCAL
NO. URAIAN TOTAL PABRIK/GUDANG LOKAL TOTAL JASA PEMASANGAN / TOTAL
KE LOKASI PEKERJAAN KONSTRUKSI
Import Local (Trmsk Asuransi)
Rp Rp Rp Rp Rp Rp Rp
1 2 4 5 6 = (2x4)+(2x5) 7 8 = 2x7 9 10 = 2x9 11 = 6+8+10
Complete Tension Tower Foundation (including stubs, cleats and setting) for standard and
II.3.1.4 extended DD4 +6 type towers (refer to attached drawings and foundation code number)
(typical for tower with body extension +6)
II.3.1.4.1 Class 1 Pad and Chimney (150.DD4.+6.250.1.a ; 150.DD4.+6.250.1.b) 0.00 sets
II.3.1.4.2 Class 2 Pad and Chimney (150.DD4.+6.250.2.a ; 150.DD4.+6.250.2.b) 0.00 sets
II.3.1.4.3 Class 3 Pad and Chimney ( (150.DD4.+6.250.3.a ; 150.DD4.+6.250.3.b) 0.00 sets
II.3.1.4.4 Class 4a Pad and Chimney Foundations (Rock) (150.DD4.+6.250.4a.a ; 150.DD4.+6.250.4a.b) 0.00 sets
Class 7 Pad and Chimney Foundations with Bouyancy (150.DD4.+6.250.7.a ; 150.DD4.+6.250.7.b ;
II.3.1.4.5 0.00 sets
150.DD4.+6.250.7.c ; 150.DD4.+6.250.7.d ; 150.DD4.+6.250.7.e ; 150.DD4.+6.250.7.f)
II.3.1.4.6 Class 1 Pad and Chimney (150.DD4.+9.250.1.a ; 150.DD4.+9.250.1.b) 0.00 sets
II.3.1.4.7 Class 2 Pad and Chimney (150.DD4.+9.250.2.a ; 150.DD4.+9.250.2.b) 0.00 sets
II.3.1.4.8 Class 3 Pad and Chimney ( (150.DD4.+9.250.3.a ; 150.DD4.+9.250.3.b) 0.00 sets
II.3.1.4.9 Class 4a Pad and Chimney Foundations (Rock) (150.DD4.+9.250.4a.a ; 150.DD4.+9.250.4a.b) 0.00 sets
Class 7 Pad and Chimney Foundations with Bouyancy (150.DD4.+9.250.7.a ; 150.DD4.+9.250.7.b ;
II.3.1.4.10 0.00 sets
150.DD4.+9.250.7.c ; 150.DD4.+9.250.7.d ; 150.DD4.+9.250.7.e ; 150.DD4.+9.250.7.f)
II.3.1.4.11 Class 1 Pad and Chimney (150.DD4.+15.250.1.a ; 150.DD4.+15.250.1.b) 0.00 sets
II.3.1.4.12 Class 2 Pad and Chimney (150.DD4.+15.250.2.a ; 150.DD4.+15.250.2.b) 0.00 sets
II.3.1.4.13 Class 3 Pad and Chimney ( (150.DD4.+15.250.3.a ; 150.DD4.+15.250.3.b) 0.00 sets
II.3.1.4.14 Class 4a Pad and Chimney Foundations (Rock) (150.DD4.+15.250.4a.a ; 150.DD4.+15.250.4a.b) 0.00 sets
Class 7 Pad and Chimney Foundations with Bouyancy (150.DD4.+15.250.7.a ;
II.3.1.4.15 150.DD4.+15.250.7.b ; 150.DD4.+15.250.7.c ; 150.DD4.+15.250.7.d ; 150.DD4.+15.250.7.e ; 0.00 sets
150.DD4.+15.250.7.f)
Total IItem II.3.1.4 : (II.3.1.4.1 - II.3.1.4.8)
Complete Tension Tower Foundation (including stubs, cleats and setting) for standard and
II.3.1.5 extended EE4 +6 type towers (refer to attached drawings and foundation code number)
(typical for tower with body extension +6)
II.3.1.5.1 Class 1 Pad and Chimney (150.EE4.+6.250.1.a ; 150.EE4.+6.250.1.b) 0.00 sets
II.3.1.5.2 Class 2 Pad and Chimney (150.EE4.+6.250.2.a ; 150.EE4.+6.250.2.b) 0.00 sets
II.3.1.5.3 Class 3 Pad and Chimney ( (150.EE4.+6.250.3.a ; 150.EE4.+6.250.3.b) 0.00 sets
II.3.1.5.4 Class 4a Pad and Chimney Foundations (Rock) (150.EE4.+6.250.4a.a ; 150.EE4.+6.250.4a.b) 0.00 sets
Class 7 Pad and Chimney Foundations with Bouyancy (150.EE4.+6.250.7.a ; 150.EE4.+6.250.7.b ;
II.3.1.5.5 0.00 sets
150.EE4.+6.250.7.c ; 150.EE4.+6.250.7.d ; 150.EE4.+6.250.7.e ; 150.EE4.+6.250.7.f)
II.3.1.5.6 Class 1 Pad and Chimney (150.EE4.+9.250.1.a ; 150.EE4.+9.250.1.b) 0.00 sets
II.3.1.5.7 Class 2 Pad and Chimney (150.EE4.+9.250.2.a ; 150.EE4.+9.250.2.b) 0.00 sets
II.3.1.5.8 Class 3 Pad and Chimney ( (150.EE4.+9.250.3.a ; 150.EE4.+9.250.3.b) 0.00 sets
II.3.1.5.9 Class 4a Pad and Chimney Foundations (Rock) (150.EE4.+9.250.4a.a ; 150.EE4.+9.250.4a.b) 0.00 sets
Class 7 Pad and Chimney Foundations with Bouyancy (150.EE4.+9.250.7.a ; 150.EE4.+9.250.7.b ;
II.3.1.5.10 0.00 sets
150.EE4.+9.250.7.c ; 150.EE4.+9.250.7.d ; 150.EE4.+9.250.7.e ; 150.EE4.+9.250.7.f)
II.3.1.5.11 Class 1 Pad and Chimney (150.EE4.+15.250.1.a ; 150.EE4.+15.250.1.b) 0.00 sets
II.3.1.5.12 Class 2 Pad and Chimney (150.EE4.+15.250.2.a ; 150.EE4.+15.250.2.b) 0.00 sets
II.3.1.5.13 Class 3 Pad and Chimney ( (150.EE4.+15.250.3.a ; 150.EE4.+15.250.3.b) 0.00 sets
II.3.1.5.14 Class 4a Pad and Chimney Foundations (Rock) (150.EE4.+15.250.4a.a ; 150.EE4.+15.250.4a.b) 0.00 sets
Class 7 Pad and Chimney Foundations with Bouyancy (150.EE4.+15.250.7.a ;
II.3.1.5.15 150.EE4.+15.250.7.b ; 150.EE4.+15.250.7.c ; 150.EE4.+15.250.7.d ; 150.EE4.+15.250.7.e ; 0.00 sets
150.EE4.+15.250.7.f)
Total IItem II.3.1.5 : (II.3.1.5.1 - II.3.1.5.8)
Complete Tension Tower Foundation (including stubs, cleats and setting) for standard and
II.3.1.6 extended DDR4 +6 type towers (refer to attached drawings and foundation code number)
(typical for tower with body extension +6)
II.3.1.6.1 Class 1 Pad and Chimney (150.DDR4.+6.250.1.a ; 150.DDR4.+6.250.1.b) 0.00 sets
II.3.1.6.2 Class 2 Pad and Chimney (150.DDR4.+6.250.2.a ; 150.DDR4.+6.250.2.b) 0.00 sets
II.3.1.6.3 Class 3 Pad and Chimney ( (150.DDR4.+6.250.3.a ; 150.DDR4.+6.250.3.b) 0.00 sets
II.3.1.6.4 Class 4a Pad and Chimney Foundations (Rock) (150.DDR4.+6.250.4a.a ; 150.DDR4.+6.250.4a.b) 0.00 sets
Class 7 Pad and Chimney Foundations with Bouyancy (150.DDR4.+6.250.7.a ;
II.3.1.6.5 150.DDR4.+6.250.7.b ; 150.DDR4.+6.250.7.c ; 150.DDR4.+6.250.7.d ; 150.DDR4.+6.250.7.e ; 0.00 sets
150.DDR4.+6.250.7.f)
II.3.1.6.6 Class 1 Pad and Chimney (150.DDR4.+9.250.1.a ; 150.DDR4.+9.250.1.b) 0.00 sets
II.3.1.6.7 Class 2 Pad and Chimney (150.DDR4.+9.250.2.a ; 150.DDR4.+9.250.2.b) 0.00 sets
II.3.1.6.8 Class 3 Pad and Chimney ( (150.DDR4.+9.250.3.a ; 150.DDR4.+9.250.3.b) 0.00 sets
II.3.1.6.9 Class 4a Pad and Chimney Foundations (Rock) (150.DDR4.+9.250.4a.a ; 150.DDR4.+9.250.4a.b) 0.00 sets
Class 7 Pad and Chimney Foundations with Bouyancy (150.DDR4.+9.250.7.a ;
II.3.1.6.10 150.DDR4.+9.250.7.b ; 150.DDR4.+9.250.7.c ; 150.DDR4.+9.250.7.d ; 150.DDR4.+9.250.7.e ; 0.00 sets
150.DDR4.+9.250.7.f)
II.3.1.6.11 Class 1 Pad and Chimney (150.DDR4.+15.250.1.a ; 150.DDR4.+15.250.1.b) 0.00 sets
II.3.1.6.12 Class 2 Pad and Chimney (150.DDR4.+15.250.2.a ; 150.DDR4.+15.250.2.b) 0.00 sets
II.3.1.6.13 Class 3 Pad and Chimney ( (150.DDR4.+15.250.3.a ; 150.DDR4.+15.250.3.b) 0.00 sets

Nama Calon Penyedia Barang/Jasa :..................


10 dari 16
Tanda Tangan Calon Penyedia Barang/Jasa :..................
DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ NO. 2 : PEKERJAAN SIPIL
PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

PENGADAAN TRANSPORTASI PEMASANGAN

HARGA SATUAN HARGA SATUAN


PERALATAN/MATERIAL GUDANG TRANSPORTASI DARI HARGA SATUAN GRAND TOTAL
VOLUME SATUAN LOCAL
NO. URAIAN TOTAL PABRIK/GUDANG LOKAL TOTAL JASA PEMASANGAN / TOTAL
KE LOKASI PEKERJAAN KONSTRUKSI
Import Local (Trmsk Asuransi)
Rp Rp Rp Rp Rp Rp Rp
1 2 4 5 6 = (2x4)+(2x5) 7 8 = 2x7 9 10 = 2x9 11 = 6+8+10
Class 4a Pad and Chimney Foundations (Rock) (150.DDR4.+15.250.4a.a ;
II.3.1.6.14 0.00 sets
150.DDR4.+15.250.4a.b)
Class 7 Pad and Chimney Foundations with Bouyancy (150.DDR4.+15.250.7.a ;
II.3.1.6.15 150.DDR4.+15.250.7.b ; 150.DDR4.+15.250.7.c ; 150.DDR4.+15.250.7.d ; 150.DDR4.+15.250.7.e ; 0.00 sets
150.DDR4.+15.250.7.f)
Total IItem II.3.1.6 : (II.3.1.6.1 - II.3.1.6.8)

Nama Calon Penyedia Barang/Jasa :..................


11 dari 16
Tanda Tangan Calon Penyedia Barang/Jasa :..................
DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ NO. 2 : PEKERJAAN SIPIL
PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

PENGADAAN TRANSPORTASI PEMASANGAN

HARGA SATUAN HARGA SATUAN


PERALATAN/MATERIAL GUDANG TRANSPORTASI DARI HARGA SATUAN GRAND TOTAL
VOLUME SATUAN LOCAL
NO. URAIAN TOTAL PABRIK/GUDANG LOKAL TOTAL JASA PEMASANGAN / TOTAL
KE LOKASI PEKERJAAN KONSTRUKSI
Import Local (Trmsk Asuransi)
Rp Rp Rp Rp Rp Rp Rp
1 2 4 5 6 = (2x4)+(2x5) 7 8 = 2x7 9 10 = 2x9 11 = 6+8+10

B. Non-Standard and Pile Foundation *)


II.3.1.7 T.20 New, depth = 15 m; T.20A New, depth = 15 m; T.20B New, depth = 15 m; T.21 New, depth
= 15 m, T.21A New, depth = 15 m; T.21B New, depth = 13 m
Geometry and Bouwplank towers
II.3.1.7.1 6.00
(incl Stub Setting)
II.3.1.7.2 Test Concrete Cylinder (d : 15 & h : 30 cm) 12.00 no
II.3.1.7.3 Excavation of Soil 401.47 m3
II.3.1.7.4 Back Filling 177.48 m3
II.3.1.7.5 Compacted Sand, t=10cm 21.14 m3
II.3.1.7.6 Lean Concrete 1PC:3Sand:5Split, t=10cm 21.14 m3
II.3.1.7.7 Concrete K225 (for pad and chimney and pile cap) 223.98 m3
II.3.1.7.8 Reinforced Steel :
II.3.1.7.8.1 Screw U39-BJTD40 13799.08 kg
II.3.1.7.8.2 Plain U24-BJTP24 681.50 kg
II.3.1.7.9 Cleats 260.00 sets
II.3.1.7.10 Bolt and nuts 520.00 sets
II.3.1.7.11 Formwork 359.11 m2
II.3.1.7.12 PVC dia 2 inch for grounding tower 24.62 m
II.3.1.7.13 Installed stake of concrete for tower area 24.00 no
II.3.1.7.14 Dewatering 6.00 towers
Reiforced Concrete Bore pile K224 dia.40 cm (for boring pile and including necessary equipment to m'
II.3.1.7.15 1408.00
complete scope of work)
II.3.1.7.16 Anchor m3
II.3.1.7.17 Finishing and site clearing 6.00 towers

Total IItem II.3.1.7 : (II.3.1.7.1 - II.3.1.7.17)

Nama Calon Penyedia Barang/Jasa :..................


12 dari 16
Tanda Tangan Calon Penyedia Barang/Jasa :..................
DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ NO. 2 : PEKERJAAN SIPIL
PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

PENGADAAN TRANSPORTASI PEMASANGAN

HARGA SATUAN HARGA SATUAN


PERALATAN/MATERIAL GUDANG TRANSPORTASI DARI HARGA SATUAN GRAND TOTAL
VOLUME SATUAN LOCAL
NO. URAIAN TOTAL PABRIK/GUDANG LOKAL TOTAL JASA PEMASANGAN / TOTAL
KE LOKASI PEKERJAAN KONSTRUKSI
Import Local (Trmsk Asuransi)
Rp Rp Rp Rp Rp Rp Rp
1 2 4 5 6 = (2x4)+(2x5) 7 8 = 2x7 9 10 = 2x9 11 = 6+8+10

II.3.1.8 Foundations Test


II.3.1.8.1 Uplift test Foundation
II.3.1.8.1.1 Test Pile Foundation (single pile) sets
II.3.1.8.1.2 Test Pull out untuk foundation angkur sets
Total IItem II.3.1.8 : (II.3.1.8.1 - II.3.1.8.2)

II.3.1.9 Slope protection and Grade Beam


II.3.1.9.1 Stone Mansory 1 Sand : 3 PC for retaining wall 10.00 m3
II.3.1.9.2 Reinforced concrete for grade beam K-225 , Fe : 125 kg/m3 10.00 m3
II.3.1.9.3 Gabion m3
II.3.1.9.4 Vegetation slope protection m2
Total IItem II.3.1.9 : (II.3.1.9.1 - II.3.1.9.4)

I.3.1.11 Dismantling and storing in PLN storage of tower 150 kV


I.3.1.11.1 Conductor and accessories 0.63 kmr
I.3.1.11.2 Earthwire and OPGW accessories 0.63 kmr
I.3.1.11.3 Insulators and accesories 2.00 Tower
I.3.1.11.4 Steel Lattice tower 2.00 Tower
Total Item I.3.1.11 : (I.3.1.11.1 - I.3.1.11.4)
Total IItem II.3 (II.3.1.1 - II.3.1.9):
TOTAL II.1 - II.9
Note : *) Desain Pondasi Non-Standar dan/atau diluar Katalog Pondasi, akan dibuat oleh PLN Unit (UIP)
**) Perhitungan harga satuan pekerjaan dan pengangkutan dapat mengacu ke PermePUPR tentang Pedoman Analisis Harga Satuan Pekerjaan

Nama Calon Penyedia Barang/Jasa :..................


13 dari 16
Tanda Tangan Calon Penyedia Barang/Jasa :..................
DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ NO.3 : PEKERJAAN KOMISIONING

PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

KOMISIONING TOTAL
NO. URAIAN JUMLAH SATUAN
Rp. Rp.

III PEKERJAAN KOMISIONING

III.1 PEKERJAAN KOMISIONING

III.1.1 Test and Commisioning (until RLB Certificate issued) 1.00 Ls

Total Item III.1 :

III.2 COMPLETION DOCUMENTS

III.2.1 Technical specification and brochure/leaflet of transmission line materials 1.00 Ls


III.2.3 Test Report for Tower foundation, and Transmission Materials (including
Megger Test) 1.00 Ls

III.2.4 As built Drawing including documentation 1.00 Ls

Total Item III.2 :


TOTAL III

Nama Calon Penyedia Barang/Jasa :..................

14 dari 16
Tanda Tangan Calon Penyedia Barang/Jasa :..................
DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ NO.4 : PEKERJAAN ENJINIRING

PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

ENJINIRING TOTAL
NO URAIAN JUMLAH SATUAN
Rp. Rp.

IV PEKERJAAN ENJINIRING
(Desain Tower Nonstandar, Leg Extension, Stub Extension, 1.00 Ls
Chimney Extension dan Pondasi Non-standar)

Total Item IV:

Nama Calon Penyedia Barang/Jasa :..................

15 dari 16
Tanda Tangan Calon Penyedia Barang/Jasa :..................
DAFTAR KUANTITAS DAN HARGA (Bill of Quantity)
BoQ NO.5 : REKAPITULASI HARGA
PROYEK : SUTT 150 kV Cikande New - Inc (Cikande-Indah Kiat-GMS)

PENGADAAN BARANG TRANSPORTASI JASA PEMASANGAN TOTAL


NO URAIAN
Rp.

I BoQ 1 PEKERJAAN ELEKTROMEKANIKAL - -

II BoQ 2 PEKERJAAN SIPIL - -

III BoQ 3 PEKERJAAN KOMISIONING

IV BoQ 4 PEKERJAAN ENJINIRING

TOTAL HARGA
PPN 11%
TOTAL HARGA TERMASUK PPN

Nama Calon Penyedia Barang/Jasa :..................

16 dari 16
Tanda Tangan Calon Penyedia Barang/Jasa :..................