You are on page 1of 1

AUTO MAIN FAILURE (AMF)

MICROPROCESSOR BASED
AUTO-SYNCHRONIZATION SYSTEM

EARTHMAT EARTHMAT

UGC05 UGC05 UGC05 UGC05 UGC05 UGC05


SCOPE SCOPE SCOPE SCOPE SCOPE SCOPE

TVE-P1 STPT STPT TVE-P1 TVE-P1 STPT


SCOPE SCOPE SCOPE SCOPE SCOPE SCOPE

UGC05 UGC05
SCOPE SCOPE

STPT AFC
SCOPE SCOPE

MATCH LINE FOR CONTINUATION REFER


DRG. NO.- UGC05-MEP-SVN-1011-003

REFERENCE DRAWINGS General Consultant (GC) : Detailed Design Consultant : Contractor :


(DDC, ARCHITECTURAL, MEP) MUMBAI METRO RAIL CORPORATION LTD.
A8 23-11-2020 V.S. REVISED AS PER LDC COMMENT R.R. S.K. M.G. NaMTTRI Building, Plot No. R-13, 'E'- Block,
UGC-05-MEP-SVN-1011-001-A7(CRD) OMIKRON KAPPA - PSP - INDUS CONSULTRANS JV Bandra Kurla Complex, Bandra (East), Mumbai 400051.
A7 22-07-2020 V.S. ISSUED FOR CRD SUBMISSION R.R. S.K. M.G. A JOINT VENTURE OF
UGC-03-MEP-SML-1003-001-A4(CRD) A6 19-11-2019 S.K REVISE AS PER GC COMMENTS DTD.22.08.19 R.R. S.K. M.G.
OMIKRON KAPPA CONSULTING S. A (GREECE), PSP CONSULTING ENGINEERS GMBH
Drawing Title :
NOTIFICATION : (GERMANY) & INDUS CONSULTRANS PVT. LTD. (INDIA)

A B C A5 06-06-2019 M.K. REVISE AS PER GC COMMENTS DTD.14.05.19 R.R. S.K. M.G.


ARCHITECTURAL DESIGN - FOUNTAINHEAD
MEP DESIGN – INTERCONTINENTAL CONSULTANTS & TECHNOCRATS PVT LTD.
VIDYANAGRI STATION
A4 09-01-2019 M.K. REVISE AS PER LDC COMMENTS DTD.26.11.18 R.R. S.K. M.G. Project Title : ELECTRICAL SCHEMATIC DIAGRAM
As noted in the DSR No. _________________ MUMBAI METRO LINE 3 (COLABA-BANDRA-SEEPZ) (SHEET-2 OF 3)
dated ________ A3 26-10-2018 M.K. DEFINITIVE DESIGN SUBMISSION R.R. S.K. M.G. CONTRACT UGC-05
A : Objection. A complete resubmission is required. A2 21-08-2018 M.K. REVISED AS PER GC DSR-II COMMENTS R.R. S.K. M.G. DESIGN AND CONSTRUCTION OF UNDERGROUND STATIONS AT JKIL-CRTG JV
B : No Objection with comments. DHARAVI, B.K.C., VIDYANAGRI AND SANTACRUZ & MID VENTILATION Rev. Drg. Status
Drawing No. :
C : Notice of No objection. A1 07-06-2018 K.L. REVISED AS PER GC DSR COMMENTS R.R. S.K. M.G. SHAFT AT AGREEPADA HUTMENT AND ASSOCIATED TUNNELS
Discipline Contractor Address : UGC05-MEP-SVN-1011-002 A8 C
Assessor Engineer A0 15-12-2017 H.K. FIRST SUBMISSION J.G. S.K. M.G. Designed : Checked : Approved :
Leader P-Preliminary, D-Definitive, C-Construction Reference, W-Working Drawing, B-As Built
Rev. Date Drawn Description Designed Checked Approved Scale : N.T.S. Drawn : V.S. Date : 23-11-2020 CAD File Name : UGC05-MEP-SVN-1011-002-A8.DWG A1

You might also like