You are on page 1of 1

RITHALA STATION ROHINI SECTOR 25

EXISTING PLATFORM A

EXISTING RITHALA STATION

EXISTING PLATFORM B

PEB ROOF AS/DETAIL

TERRACE
DN
A
2700

PFE 2500 WIDE OPEN PLATFORM BELOW


2500 WIDE PLATFORM
1525

GUTTER AS / DETAIL
2435
13320

B
2435

SOLAR PANELS AS PER


VENDOR APPROVED BY DMRC
1525
2700

2500 WIDE PLATFORM 2500 WIDE OPEN PLATFORM BELOW


PFE

C
DN

RR ACE
Y TE RWP PIPE AS PER RWP PIPE AS PER

/ENTR
GUTTER AS / DETAIL
PLUMBING PLUMBING

EX IT A
I N G ROOF ENVELOPE TENTATIVE

XIST
TO BE APPROVED BY DMRC
E

LEGEND 20000 20000 20000 20000


200 MM ACC BLOCK WORK
80000
RCC WALL

PARAPET/ TOE WALL/BOUNDARY WALL


1 2 3 4 5
FILLED FLOORING
CL
X
SEC./ELEV.NAME
00000
DRAWING NUMBER

EARTHMAT ROOF LEVEL PLAN


NOTES- 1 SCALE : 1/200
1. ALL DIMENSIONS ARE IN MM, UNLESS OTHERWISE MENTIONED.
2. ALL DIMENSIONS ARE TO BE READ AND NOT MEASURED.
3. GROUND LEVELS ARE INDICATIVE, CONTRACTOR TO VERIFY EXISTING LEVELS AT SITE PRIOR TO COMMENCEMENT OF
CONSTRUCTION.
4. CONTRACTOR TO VERIFY THE LEVELS FOR STAIRCASE AND LIFT/ESCALATORS PRIOR TO COMMENCEMENT OF
CONSTRUCTION.
5. ALL LEVELS ARE IN METERS, INDICATING T.O.C. (TOP OF CONCRETE) WHEREVER APPLICABLE.
6. ABSOLUTE RAIL LEVEL SHALL BE TAKEN FROM DMRC ALIGNMENT DRAWING.
7. ALL MINIMUM INTERNAL CLEARANCES ARE MANDATORY AND SHALL BE PROVIDED.
8. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL, PLUMBING, FIRE
FIGHTING, ELECTRICAL AND TRAFFIC MANAGEMENT DRAWINGS.
9. ANY DISCREPANCIES MUST BE BROUGHT TO NOTICE OF THE ENGINEER BEFORE EXECUTION OF WORK AT SITE.
10. ALL DOOR'S/WINDOW'S SILL & LINTEL LEVELS ARE FROM MAIN FLOOR FINISH LEVEL.
11. COLUMN LOCATION AND STRUCTURAL ARRANGEMENT SHOWN ARE INDICATIVE ONLY.
12. ALL CUTOUTS AND FIRST FIX PROVISIONS FOR MEP/SYSTEMS REQUIREMENTS TO BE REFERRED FROM LATEST REVISION
OF DISCIPLINE DRAWINGS.
13. ROOM SIZES/MASONRY WORK AT THE STATION MAY VARY AS PER DETAILED ARCHITECTURAL LAYOUT OF THE STATION.
14. FOR LIGHTING ARRANGEMENT & ELECTRICAL DETAILS, PLEASE REFER SPECIFIC ELECTRICAL DRAWINGS.
15. EARTH MAT SIZE AND LOCATION TO BE GOT CONFIRMED FROM E&M (DMRC).
16. VENDOR SPECIFIC DRAWINGS FOR PIT SIZE AND STRUCTURAL ARRANGEMENT FOR LIFT / ESCALATOR,AS FINALIZED BY
DMRC, TO BE REFERRED.
17. ALL THE WORK ARE IN LUMPSUM SCOPE UNLESS OTHERWISE MENTIONED
FIRST DESIGN SUBMISSION
18. ALL THE COMPONENTS LIKE RAMPS,DROP OF ETC COMPLETE FOR MMI INTEGRATION UTTIPEC
GUIDELINES & APPLICABLE CODES TO BE CONSIDERED UNDER RELEVANT
This drawing must not be loaned, copied or otherwise reproduced in whole or in part or used for
BOQ OR DMRC AGREEMENT. any purpose without the prior written permission of DMRC.
CLIENT: DELHI METRO RAIL CORPORATION LTD. PROJECT: Certified that this document has been designed and checked in accordance with DDC Quality
Contract DC03- : Part Design and Construction of Elevated
APPROVAL BY DMRC OFFICIALS Assurance Plan.
NORTH DELHI METRO PROJECT - PHASE -4
Metro Bhawan
Fire Brigade Lane, Barakhamba Road, Viaduct from Rithala to Narela 14 Elevated Stations and 5 DESIGNATION NAME/ SIGNATURE DESIGNATION NAME/ SIGNATURE

ARCHITECTURE
New Delhi - 110001,India At-Grade Stations viz. Rithala Interchange, Rohini Sector 25, RITHLA-BAWANA-NARELA
Board No. - 23417910/12 26, 31, 32, 36, Barwala, Pooth Khurd, Bawana Ind-I, Bawana AM/MGR ARCH DY CA CA PM CPM APPROVED BY DESIGNED BY
Ind-II, Bawana, Bawana JJ Colony, Sanoth, New Sanoth, STATION:
Fax No. - 23417921
Depot Station, Bhorgarh, Anaj Mandi, Narela DDA Sports
PROJECT SENIOR RITHALA STATION
DY CEE/ E&M CEE/ E&M DY CE/ TRACK CE/ TRACK DIRECTOR V. RAJENDRAN ARCHITECT R.SHARMA
Complex and Narela (including Entry & Exit structures at
CONSULTANT: stations but excluding Architectural finishing, Pre-engineered CHECKED BY DRAWN BY TITLE : ROOF LEVEL PLAN
R1 REVISED AS PER DMRC COMMENTS A.KUMAR R.SHARMA A. SAINI 02/08/2021
egis rail steel roof structure and roof sheeting of stations) from
Chainage 0.0 M to 23449.287 M of Rithala - Bawana-Narela
DY CSTE/ TELE CSTE DGM/ DESIGN GM/ TECH
A.CHIEF
ARCHITECT A. SAINI ARCHITECT
A.KUMAR DRG NO: REVISION NO. : SCALE : SIZE : STATUS:
Corridor of Delhi Metrolite Phase-IV project" R0 FIRST ISSUE A.KUMAR R.SHARMA A. SAINI 28/04/2021
egis india DY CSTE/ SIG GM / IT DY CEE/TRACTION GM / TRACTION
MEPF
EXPERT
DATE
02/08/2021 EIRA1DE005-DMRC-FDS-AR-DC03- RIT-01217 R1 A1 FIRST DESIGN
DY CSTE/AFC DY CEE / L&E CEE/ PLANING AM/ CIVIL REV. PARTICULARS DRN. DGN. CHD. DATE A.KUMAR