You are on page 1of 1

CL

1 2 3 5 6

80000

20000 20000 20000 20000

PEB ROOF AS/DETAIL

ROOF PORTAL AS ROOF PORTAL AS


PER ROOF VENDOR PER ROOF VENDOR
L1
SERVICE ROOF PORTAL AS
SHAFT PER ROOF VENDOR ROOF PORTAL AS ROOF PORTAL AS ROOF PORTAL AS
1400 HIGH RAILING WITH 1400 HIGH RAILING WITH
PER ROOF VENDOR PER ROOF VENDOR PER ROOF VENDOR
150MM HIGH TOE WALL 150MM HIGH TOE WALL

PLATFORM LEVEL
+228.873 M

1090
RAIL LEVEL
+227.783 M

6640
5550
UPS ROOM
CONCOURSE AREA
CONCOURSE
+222.233 M

TOILET IN

6775
5500 (MIN)
ELEVATION
FOOTPATH LEVEL
+215.458 M
ROAD LEVEL
6000MM WIDE +215.308 M
PROPOSED ROAD

1
SECTION 1-1
SCALE : 1/150

LEGEND

200 MM ACC BLOCK WORK

RCC WALL

PARAPET/ TOE WALL/BOUNDARY WALL

FILLED FLOORING

X
SEC./ELEV.NAME
00000
DRAWING NUMBER

EARTHMAT

NOTES-

1. ALL DIMENSIONS ARE IN MM, UNLESS OTHERWISE MENTIONED.


2. ALL DIMENSIONS ARE TO BE READ AND NOT MEASURED.
3. GROUND LEVELS ARE INDICATIVE, CONTRACTOR TO VERIFY EXISTING LEVELS AT SITE PRIOR TO COMMENCEMENT OF
CONSTRUCTION.
4. CONTRACTOR TO VERIFY THE LEVELS FOR STAIRCASE AND LIFT/ESCALATORS PRIOR TO COMMENCEMENT OF
CONSTRUCTION.
5. ALL LEVELS ARE IN METERS, INDICATING T.O.C. (TOP OF CONCRETE) WHEREVER APPLICABLE.
6. ABSOLUTE RAIL LEVEL SHALL BE TAKEN FROM DMRC ALIGNMENT DRAWING.
7. ALL MINIMUM INTERNAL CLEARANCES ARE MANDATORY AND SHALL BE PROVIDED.
8. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL, PLUMBING, FIRE
FIGHTING, ELECTRICAL AND TRAFFIC MANAGEMENT DRAWINGS.
9. ANY DISCREPANCIES MUST BE BROUGHT TO NOTICE OF THE ENGINEER BEFORE EXECUTION OF WORK AT SITE.
10. ALL DOOR'S/WINDOW'S SILL & LINTEL LEVELS ARE FROM MAIN FLOOR FINISH LEVEL.
11. COLUMN LOCATION AND STRUCTURAL ARRANGEMENT SHOWN ARE INDICATIVE ONLY.
12. ALL CUTOUTS AND FIRST FIX PROVISIONS FOR MEP/SYSTEMS REQUIREMENTS TO BE REFERRED FROM LATEST REVISION
OF DISCIPLINE DRAWINGS.
13. ROOM SIZES/MASONRY WORK AT THE STATION MAY VARY AS PER DETAILED ARCHITECTURAL LAYOUT OF THE STATION.
14. FOR LIGHTING ARRANGEMENT & ELECTRICAL DETAILS, PLEASE REFER SPECIFIC ELECTRICAL DRAWINGS.
15. EARTH MAT SIZE AND LOCATION TO BE GOT CONFIRMED FROM E&M (DMRC).
16. VENDOR SPECIFIC DRAWINGS FOR PIT SIZE AND STRUCTURAL ARRANGEMENT FOR LIFT / ESCALATOR,AS FINALIZED BY
DMRC, TO BE REFERRED.
17. ALL THE WORK ARE IN LUMPSUM SCOPE UNLESS OTHERWISE MENTIONED
FIRST DESIGN SUBMISSION
18. ALL THE COMPONENTS LIKE RAMPS,DROP OF ETC COMPLETE FOR MMI INTEGRATION UTTIPEC
GUIDELINES & APPLICABLE CODES TO BE CONSIDERED UNDER RELEVANT
This drawing must not be loaned, copied or otherwise reproduced in whole or in part or used for
BOQ OR DMRC AGREEMENT. any purpose without the prior written permission of DMRC.
CLIENT: DELHI METRO RAIL CORPORATION LTD. PROJECT: Certified that this document has been designed and checked in accordance with DDC Quality
Contract DC03- : Part Design and Construction of Elevated
APPROVAL BY DMRC OFFICIALS Assurance Plan.
NORTH DELHI METRO PROJECT - PHASE -4
Metro Bhawan
Fire Brigade Lane, Barakhamba Road, Viaduct from Rithala to Narela 14 Elevated Stations and 5

ARCHITECTURE
DESIGNATION NAME/ SIGNATURE DESIGNATION NAME/ SIGNATURE
New Delhi - 110001,India At-Grade Stations viz. Rithala Interchange, Rohini Sector 25, RITHLA-BAWANA-NARELA
AM/MGR ARCH DY CA CA PM CPM
Board No. - 23417910/12 26, 31, 32, 36, Barwala, Pooth Khurd, Bawana Ind-I, Bawana APPROVED BY DESIGNED BY
Ind-II, Bawana, Bawana JJ Colony, Sanoth, New Sanoth, STATION:
Fax No. - 23417921
Depot Station, Bhorgarh, Anaj Mandi, Narela DDA Sports
PROJECT SENIOR RITHALA STATION
DY CEE/ E&M CEE/ E&M DY CE/ TRACK CE/ TRACK DIRECTOR V. RAJENDRAN ARCHITECT R.SHARMA
Complex and Narela (including Entry & Exit structures at
CONSULTANT: stations but excluding Architectural finishing, Pre-engineered CHECKED BY DRAWN BY TITLE : LONG SECTION
R1 REVISED AS PER DMRC COMMENTS A.KUMAR R.SHARMA A. SAINI 02/08/2021
egis rail steel roof structure and roof sheeting of stations) from
Chainage 0.0 M to 23449.287 M of Rithala - Bawana-Narela
DY CSTE/ TELE CSTE DGM/ DESIGN GM/ TECH
A.CHIEF
ARCHITECT A. SAINI ARCHITECT
A.KUMAR DRG NO: REVISION NO. : SCALE : SIZE : STATUS:
Corridor of Delhi Metrolite Phase-IV project" R0 FIRST ISSUE A.KUMAR R.SHARMA A. SAINI 28/04/2021
egis india DY CSTE/ SIG GM / IT DY CEE/TRACTION GM / TRACTION
MEPF
EXPERT
DATE
02/08/2021 EIRA1DE005-DMRC-FDS-AR-DC03- RIT-01303 R1 A1 FIRST DESIGN
DY CSTE/AFC DY CEE / L&E CEE/ PLANING AM/ CIVIL REV. PARTICULARS DRN. DGN. CHD. DATE A.KUMAR

You might also like