You are on page 1of 1

A.

GENERAL

1. ALL DIMENSIONS ELEVATIONS AND DISTANCES ARE IN METERS UNLESS OTHERWISE


SPECIFIED.
2. FIGURE SHALL GOVERN OVER SCALED DIMENSION IN CASE OF DISCREPANCIES SUMMARY OF QUANTITIES:
3. ALL ITEMS OF WORK HERE AND NOT INDICATED HERE ARE SUBJECT TO THE
CHECKING ACCORDING TO DPWH STANDARD SPECIFICATIONS 2013.
B. VERTICAL CONTROLS

1. THE DATUM USED IN THIS PROJECT WAS ASSUMED IT WAS REFERRED FROM BM NAMRIA
LOCATED AT THE WINGWALL DOWNSTREAM SIDE OF THE NASUGBU APPROACH.
ITEM
DESCRIPTION OF WORKS UNIT QUANTITY REMARKS
C. REINFORCED CONCRETE No.
1. CONCRETE:
1.10 UNLESS OTHERWISE SPECIFIED, THE MINIMUM COMPRESSIVE STREGTH SHALL BE FC' = 20.70 PART B. OTHER GENERAL REQUIREMENTS
MPA AT 14 DAYS, CLASS A WITH MAX WATER-CEMENT RATIO OF 0.53. SLUMP RANGE OF
50-100MM AND MAX. SIZE OF AGGREGATES SHALL BE 40MM B.5 PROJECT BILLBOARD / SIGNBOARD e.a 2.00 DPWH STANDARD
2. REINFORCEMENT: B.7(1) OCCUPATIONAL SAFETY & HEALTH PROGRAM Month 6.73
2.10 BARS SHALL BE OF INTERMEDIATE GRADE, FY = 276MPA (40,000 PSI),
2.20 REBARS SHALL CONFORM TO ASTM A615/AASHTO M31 OR EQUIVALENT PNS 49. L.S
2.30 CLEAR CONCRETE COVER BETWEEN REINFORCEMENT BARS AND B.9 MOBILIZATION / DEMOBILIZATION 1.00

D. WATER MIXING PART C. EARTHWORKS

1. WATER TO BE USED SHALL BE CLEAN AND FREE FROM INJURIOUS AMOUNTS OF OIL, ACID, 1700(1) CLEARING & GRUBBING Sq.m. 1,312.00
ALKALI, SALT, ORGANIC MATERIAL AND SUBSTANCES THAT MAY BE DELETERIOUS TO
CONCRETE AND REINFORCEMENTS. 101(1) REMOVAL OF STRUCTURE & OBSTRUCTION L.S. 1.00
E. HANDLAID ROCK EMBANKMENT (CLASS A) 1702(1)a STRUCTURE EXCAVATION (COMMON SOIL) 54.00
Cu.m.
1. STONES RANGING FROM A MINIMUM OF 15KG TO A MAXIMUM OF 25KG WITH AT LEAST 50
PERCENT OF THE STONES WEIGHING MORE THAN 20KGS. 804(1)b EMBANKMENT FROM BORROW Cu.m. 219.00

103(5)b SHORING,CRIBBING & RELATED WORKS L.S. 1.00


F. EMBANKMENT
PART G. BANK AND SLOPE PROTECTION STRUCTURES
1. PRIOR TO THE COMMENCEMENT OF EARTH FILL, THE CONTRACTOR SHALL CARRY OUT
UNDER THE SUPERVISION AND TO THE SATISFACTION OF THE ENGINEER. A SERIES OF FIELD 404(1)a REINFORCING STEEL BARS, GRADE-40 (MINOR STRUCTURES) Kgs. 2,532.14
TEST TO DETERMINE THE OPTIMUM CONDITION OF COMPACTION AND THE MINIMUM NUMBER
OF PASSES FOR EACH TYPE OF EQUIPMENT NECESSARY TO COMPACT TO THE REQUIRED
SPECIFICATION HEREAFTER STATED FOR EACH TYPE OF EQUIPMENT. 405(1)a3 STRUCTURAL CONCRETE , CLASS A (MINOR STRUCTURE) Cu.m. 61.00 fc' 20.70Mpa 28 days
2. THE FILL MATERIALS SHALL BE COMPACTED TO A DENSITY OF NOT LESS THAN 100% OF THE
MAXIMUM DRY DENSITY. NO MATERIAL SHALL BE PLACED ON ANY PORTION OF EMBANKMENT 1712(2) CONCRETE SLOPE PROTECTION CLASS A (MINOR STRUCTURE) Cu.m in place 105.00 fc' 20.70Mpa 28 days
FOUNDATION UNTIL SUCH FOUNDATION HAS BEEN CLEARED, APPROVED BY THE ENGINEER
FOR PLACING FILL. 1717(2)a1 STEEL SHEET PILE (SLOPE PROTECTION) Lin.M. 3,024.00
G. CONSTRUCTION 1710(2)a GROUTED RIPRAP "CLASS A" Cu.m. 70.00
1. SPECIFICATIONS 508(1) HANDLAID ROCK EMBANKMENT Cu.m. 342.00
1.10 ALL WORKS CONFORM WITH THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
(DPWH) STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS VOL. II
2013 401(1)a1 METAL RAILINGS Lin.M. 147.20
2. SETTING OUT
2.10 THE SETTING OUT AND THE ELEVATION OF THE DIFFERENT COMPONENTS OF THE
STRUCTURE SHALL BE APPROVED BY THE ENGINEER PRIOR TO THE START OF ANY
CONSTRUCTION WORKS.
3. REINFORCEMENT CONCRETE
3.10 CONCRETE MIX AND PLACING
(1) DESIGN OF CONCRETE MIX SHALL MEET THE DESIGN CONCRETE STRENGTH GIVEN
UNDER ITEM I OF REINFORCED CONCRTE.
(2) CONCRETE SHALL BE DEPOSITED VIBRATED AND CURED IN ACCORDANCE WITH THE
SPECIFICATIONS.
(3) FOR CONCRETE DEPOSITED AGAINST THE GROUND, LEAN CONCRETE WITH A MINIMUM I. TARPAULIN (4ft. X 8ft.):
THICKNESS OF 50MM SHALL BE LAID FIRST BEFORE INSTALLED THE REINFORCEMENT, - SHOULD ADHERE TO D.O. 21 SERIES OF 2017
THIS LEAN CONCRETE SHALL NOT BE CONSIDERED IN MEASURING THE STRUCTURAL - FOR EACH ROAD / BRIDGE / FLOOD CONTROL PROJECT, TWO (2) BILLBOARDS SHALL DESIGN PARAMETERS
DEPTH OF CONCRETE WORK. BE INSTALLED, IE., ONE AT THE BEGINNING AND ONE AT THE END. NO POLITICAL
(4) THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL PLACING BILLBOARDS SHALL BE ALLOWED TO BE INSTALLED 100 METERS BEFORE AND AFTER
SEQUENCES FOR ALL CONCRETE WORK. ALL DPWH PROJECTS AND IN BETWEEN THE PROJECT LIMITS OR WITHIN THE ROAD RIGHT 1. DRAINAGE AREA: -
3.20 CONSTRUCTION JOINT OF WAY. CONTRACTORS SHALL NOT BE ALLOWED TO PLACE NAMES OF POLITICIANS ON
(1) THE POSITION AND FORM OF ANY CONSTRUCTION JOINT SHALL BE AS SHOWN ON 2. DESIGN DISCHARGE (Q25) -
THEIR EQUIPMENT OR CARRY POLITICAL BILLBOARD ON THEIR EQUIPMENT.
DRAWING OR AS AGREED WITH THE ENGINEER. 3. VELOCITY -
(2) THE INTERFACE BETWEEN THE FIRST AND SECOND BE ROUGHENED WITH AN APLITUDE
OF 8MM MINIMUM. J. TRAFFIC SIGNBOARDS AND BARRICADES:
3.30 PROTECTION AND CURING OF CONCRETE 4. D50 -
- SHALL CONSISTS OF TRAFFIC SIGNAGES, BULLARD LIGHTS AND BARRICADES AND MUST BE VISIBLE
(1) CONCRETE SURFACE SHALL BE PROTECTED FROM HARMFUL EFFECTS OF SUN, WIND ALONG THE PROJECT SITE IN ORDER TO ENSURE THE SAFETY OF THE COMMUTERS. PROPER
AND RUNNING WATERS AND SHALL BE KEPT DAMP FOR AT LEAST 7 DAYS. 24 WORK
ILLUMINATION DURING NIGHT TIME IS ALSO REQUIRED. FLAGMEN ARE REQUIRED TO
4. FILTER CLOTH 7 TO
4.10 IT SHALL CONSIST OF 70%, POLYPROPYLENE AND 30% POLYETHYLENE, IT SHALL BE ASSIST IN THE PROPER FLOW OF TRAFFIC.
SUITABLY LEVELED AND SHALL BE SECURELY CONNECTED ALONG THE COMPLETE
LENGTH OF ALL CONTACT EDGE BY MEANS OF SPECIFIED TYING AND CONNECTING WIRE.
5. REMOVAL OF STRUCTURES AND OBSTRUCTIONS K. OCCUPATIONAL SAFETY AND HEALTH PROGRAM: DESIGN CRITERIA:
5.10 PORTIONS OF EXISTING STRUCTURES AND EXISTING FOUNDATIONS WITHIN THE LIMITS OF - THE CONTRACTOR SHALL EMPLOY PERMANENTLY ON THE SITE A FULLY TRAINED MEDICAL AIDE,
THE NEW STRUCTURES SHALL BE REMOVED TO ACCOMODATE THE CONSTRUCTION OF THE WHO SHALL BE ENGAGED SOLELY ON MEDICAL DUTIES.
HANDLAID ROCK EMBANKMENT=26.50 KN/M
PROPOSED STRUCTURE.
INTERNAL FRICTION= 33 DEGREEES
H. "AS-STAKED" PLAN OR PRE-CONSTRUCTION SURVEY SHOULD BE JOINTLY CONDUCTED BY THE L. THE IMPLEMENTING OFFICE SHALL IDENTIFY THE LOCATIONS OF AND PROVIDE SURCHARGE= 75 Kpa
IMPLEMENTING OFFICE CONCERED AND THE CONTRACTOR. THE CORRESPONDING ACCESSIBILITY FACILITIES FOR PERSONS WITH DISABILITY IN ACCORDANCE WITH
"AS-STAKED" PLAN SHOULD BE PREPARED FOR APPROVAL BY THE CONCERED OFFICE D.O. 37, SERIES OF 2009.

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES FRANCISCO L. MERILLES II
ORGANIZATIONAL OUTCOME 2:
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - ENGINEERING ASSISTANT
REGION V FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / REHABILITATION
SUMMARY OF QUANTITIES,
CAM. SUR 2ND DISTRICT ENG'G OFFICE OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & GENERAL NOTES, PREPARED: JOSE B. DERIS JR. CAESAR A.M. MORAL JR. RICHARD E.P. RAGRAGIO REBECCA J. ROCES 5
PRINCIPAL RIVERS- CONSTRUCTION / REHABILITATION / DESIGN PARAMETERS, ENGINEER II CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
G-5
BARAS, CANAMAN, CAMARINES SUR IMPROVEMENT OF BICOL RIVER FLOOD CONTROL , 11 18
DESIGN CRITERIA WINSON V. SALCEDO DATE: DATE: DATE: DATE:
BRGY. IQUIN, CANAMAN, CAMARINES SUR
ENGINEER II

You might also like