8 BILL OF QUANTITIES

1. Hydrogeology
2. Pumping unit including solar system
3. Elevated steel platforms

Item Description U Qty Amount(a*b)


ni (a)
GRAND SUMMARY PAGE

1 Borehole drilling, development & test pumping (2No. Boreholes) 6,058,000.00

2 Borehole equipping and installation 2,699,000.00

3 Rising main pipeline installation 5,943,500.00

4 Distribution pipeline installation 15,704,000.00

5 Construction of 150m3 elevated steel tank (1No.) 3,549,000.00

6 Construction of 100m3 elevated steel tank (1No.) 3,104,000.00

Sub Total 37,057,500.00

7 Allow 2% provisional sum for supervision fee by the project management team 741,150.00

Note: All rates are inclussive of all government taxes.


TOTAL COST OF PROJECT 37,798,650.00
A B C D F
N/1
KALOKOL WATER PROJECT TURKANA COUNTY
Item Description Unit Qty( Rate(b) Amount(a*b)
Bill No Preliminaries and Generals for drilling a)
1
1.1 Mobilization of all personnel and Equipment to site Erecting and LS 1 150,000 150,000.00
dismantling of whole equipment including drilling unit and
related equipment at the site
1.2 Allow sum for WRA, EIA & NEMA fees for both boreholes LS 1 150,000 150,000.00
1.3 Stationary, Communication & photocopying No 1 100,000 100,000.00
1.4 Supply and install project signboard as required by law and as No 1 65,000 65,000.00
directed by the P.E
Sub Totals for preliminaries and generals 465,000.00
Bill No Hydrogeological Survey
2
2.1 Hydrogeological Survey to determine potential points for LS 1 50,000 50,000.00
drilling
Sub Totals for hydrological surveys 50,000.00
Bill No Borehole drilling, Development & Test pumping
3
3.1 Drilling borehole of 8" minimum diameter through all types of strata LM 80 6,000 480,000.00
including disposal of excavated materials, taking any remedial mesure
to overcome caving in or over drilling to accommodate sloughed
material and keeping drilling records as specified between ground
level and 80 meters below
ground level.
3.2 As item 2.1 above but between 80m and 100 m below ground LM 20 6,500 130,000.00
level
3.3 Reaming and boring with 12" diameters bit if necessary LM 50 7,000 350,000.00
3.4 Insert and remove 10" diameter casing permanetly LM 50 6,000 300,000.00
3.5 Insert 8" diameter casings permanetly LM 50 6,000 300,000.00
3.6 Supply and install 4.5 mm thick, 6" diameter plain steel casings LM 56 6,000 336,000.00
3.7 Supply and install 4.5 mm thick, 6" diameter slotted steel LM 24 6,000 144,000.00
casings
3.8 Allow for taking samples of drill cuttings at two metersintervals No. 40 5,000 200,000.00

3.9 Supply and insert filter gravel pack material Bags 30 2,000 60,000.00
4.0 Borehole development of the borehole Hrs 3 5,500 16,500.00
4.1 Prepare well head, well cap serial number and cement slab around the LS 1 24,500 24,500.00
well head with dimensions of 1mx1mx1m (this should be reinforced
mass concrete round the borehole with a concrete cover and all be
submerged below the river bed to allow smooth floor of the river with
zero interuptions). This
should be done as designed and instructions from the P.E
4.2 Supply of water for drillling operations and field camp LS 1 35,000 35,000.00
4.3 Test pumping of boreholes including inserting and removal of Hrs 24 4,500 108,000.00
pump
4.4 Physical, Chemical and bacterialogical analysis of the water LS 1 30,000 30,000.00
obtained
Sub Totals for borehole drilling, development & test pumping 3,029,000.00
Sub Total for 1no. Borehole 3,029,000.00
Total for 2no. Borehole 6,058,000.00
Notes: Items in Bill No. 3.2-3.5 are provisional rates which shall only be sunctioned by the client or his
1 representative Items in Bill No. 3 are provisional rates dependant on the amount of water obtained after
2 drilling & test
A B C D E F
Item Description Unit Qty(a) Rate(b)
Amount(a*b)

Bill No. Electromechanical Works


2
INSTALLATION OF SOLAR POWER HYBRID SYSTEM, SOLAR
FLOOD LIGHT, AND SUBMERSIBLE PUMP
Supply and installation of a submersible pumping set 655,000 1,310,000.00
powered by a Hybrid solar pumping system and capable of
connection to the Generator Electricity Grid complete with
a Pumping Unit capable of discharging 35m3/hr with a
A Item 2
head not less than 100m. Rate to include all electro-
mechanical works and accompanying accessories. The solar
panels should be mounted on galvanized steel columns
solar structure 3M
Purchase, deliver and install a backup power generator 950,000.00
B (20KVA Item 1 950,000
system) and construct a pump house as desgned and
VALVE CHAMBER -
Provide all materials and construct a valve chamber with 85,000 85,000.00
internal dimensions of 950 mm x 950mm x1000mm deep.
Install lockable 2 flaps water tight chequered steel lid to fit
the chamber. It shall be in a GS frame c/w heavy duty
C stainless steel padlock with 3No. keys (Yale, Solex, Viro or No 1
equivalent ) Rate to include earthworks, in situ concrete,
block work and masonry,miscellaneous metal
works(connections, fittings, paint works) and making goods
of works use dressed stones of approved quality measuring
150mm x 200mm x 300mm.
D Supply and install lightening arrestor with all the Item 1 15,000 15,000.00
accessories.
METERS AND NON RETURN VALVE -
Supply and installation of 75mm Diameter Master meters 70,000 70,000.00
of KENT OR EQUIVALENT at the Sump Chamber the rate to
E Item 1
include supply and installation of all assorted connections
and
Supply and Installation 75mm Diameter Non return Valve at 15,000.00
F the Sump chamber the rate to include supply and Item 1 15,000
installation of all the necessary connections and fittings
FENCING -
Provide materials and construct a perimeter fence 40m 2,600 104,000.00
long. Materials to include barbed wire (14 gauge), chain link
G (14 gauge), bent arm slotted reinforced concrete poles M 40
100x115x2400mm, of mix 1:2:4) at 3m c/c. The chain link
to be
Supply and install 1no. Double Lockable steel gate(3m x 150,000 150,000.00
2.4m)heavy gauge 50x 50mm weld mesh on 50x 50x 4mm
H No 1
Thick RHS.The gate to be anchored on concrete columns of
mix
Sub Totals for borehole equipping and installation 2,699,000.00
A B C D E
Item Description Unit Qty(a) Rate(b) Amount(a*b)

Bill No RISING MAIN FROM KADOKORINYANG BOREHOLES TO


3 ELEVATED STEEL TANK (700M length) 110mm Dia
EARTH WORKS
TRENCH EXCAVATION
Excavate trench in ROCK & common material of the river bed 2,000 924,000
(The rate to include for joint holes, trimming sides and preparing
A trench bottom by use of an excavator. Surplus to be removed as M3 462
directed by the Project Engineer: depth of
excavation n.e. 1.5m
PIPEWORKS -
a ) Supply,transport to site,store ready for installation including -
jointing materials, bolts, gaskets packing jointing glue etc., as
B
applicable.Lay and joint the pipeline, include for Pressure
Testing as specified and to BS 3600
C PN 16 DN 110mm HDPE pipe with compression joints M 700 650 455,000
Backfill by placing gabions of size 1mx1mx1m well packed with 10,500 4,200,000
debries and rocks tied tight and laid on the rising main pipeline
D only for the river bed stretch and covered by the river sand and M 400
well compacted to allow smooth flow of the river with zero
interuption
FITTINGS -
Allow a provisinal sum for all fittings including HDPE Adaptors 85,000
E DN 110mm, HDPE Coupling DN 110, HDPE Elbows DN 110mm, Item 1 85,000
Brass Non-return valve 110mm (flap type)
F VALVE CHAMBER -
Provide all materials and construct Valve chamber internal 85,000 255,000
dimensions 800mm x 800 mm x 800mm deep Complete with
steel covers gauge 16, lock and key. Rate to include supply and
G No 3
installation of all fittings and gate valve, painting and making
goods of works use dressed stones of approved Quality
measuring 150mm x 200mm x 300mm
H Air Valves (AV) Dia 110mm No 1 24,500 24,500
Sub Totals for rising main pipeline 5,943,500
A B C D E F
Item Description Unit Qty( Rate(b) Amount(a*b)
a)
Bill No DISTRIBUTION LINES FROM ELEVATED STEEL TANK
4 NAREMAWOI-KALOKOL 13KM LENGTH
EARTH WORKS
TRENCH EXCAVATION
Excavate trench in common material (The rate to include 550 4,719,000.00
for joint holes, trimming sides and preparing trench
A bottom, backfill with selected fill material and compact. M3 8580
Surplus to be removed as directed by the Engineer: depth
of excavation n.e.
PIPEWORKS -
a ) Supply,transport to site,store ready for installation -
including jointing materials, bolts, gaskets packing jointing
B
glue etc., as applicable.Lay and joint the pipeline, include
for Pressure
C PN 16 DN 90mm HDPE pipe with compression joints M 13000 750 9,750,000.00
FITTINGS -
Allow a provisional sum for 90mm dia. Pegler Gate Valves, 250,000.00
E HDPE tees, HDPE Reducing adptors, HDPE Reducing tee, Item 1 250000
HDPE
VALVE CHAMBER -
Provide all materials and construct Valve chamber internal 85000 850,000.00
dimensions 800mm x 800 mm x 800mm deep Complete
with steel covers gauge 16, lock and key. Rate to include
F No 10
supply and installation of all fittings and gate valve,
painting and making goods of works use dressed stones of
approved Quality
G Air Valves (AV) Dia 32mm No 10 9000 90,000.00
H WASHOUT No 5 9000 45,000.00
Sub Totals for rising main pipeline 15,704,000.00
A B C D E F
Item Description Unit Qty(a) Rate(b) Amount(a*b)

Bill No. ELEVATED STEEL TANK (1No.)


5
Construction of 150m3 steel tank on 15m tower (5m x 5m x
6mP.S.ST)

3 2,500,000 2,500,000.00
Provide and install a 150m pressed mild steel panels of 6mm
thick, internal bracings, brackets and roof cover of minimum
1.5mm thick MS sheets, calibrated water-level indicator,
external and internal ladder and lockable manhole cover.Provide
A No. 1
all bolts and sealant as necessary. Inside of tank to be painted
with two coats of non-toxic bituminous black paint and outside
to be painted with two coats of silver aluminous paint.

Provide and erect (concrete pad foundation included) 15 m high 700,000 700,000.00
steel tower comprising of universal columns, angle bracings, cat-
ladders and platform comprising of UB beams, 3mm thick
chequered plate on 600mm wide walkway with 900mm high
B No. 1
guard rail. Provide all bolts necessary for erection. The steel
tower to be painted with one coat grey oxide zinc chromate
primer, two coats silver aluminium paint. Tower should include
provide cat ladder.
Supply and install the pipes to the ground level of the tanks all 182,000.00
C pipes and fittings to be 4" GI (rising as inlet and down No. 4 45,500
distribution pipe)
Sub Totals for elevated steel tank 3,382,000.00
Pipes and pipe Fittings: Meters, valves and Chambers
D 90mm Ø gate valve (peglur) complete with fittings No. 2 48,500 97,000
Junction chambers -
E Supply materials, transport to site and construct 1m x 1m x 1m No. 2
35,000
Junction/control chambers with locked steel cover 70,000
Sub totals for pipe and pipe fittings 167,000
Sub Totals for Pipes
Sub totals for elevated steel tank 3,382,000.00
Sub totals for pipes and pipe fittings 167,000
TOTAL FOR ELEVATED STEEL TANK 3,549,000.00
A B C D E F
Item Description Unit Qty(a) Rate(b)
Amount(a*b
Bill No 6 ELEVATED STEEL TANK (2No.)
Construction of 100m3 steel tank on 15m tower (5m x 5m x
4m P.S.ST)
3 2,100,000 2,100,000
Provide and install a 100m pressed mild steel panels of 6mm
thick, internal bracings, brackets and roof cover of minimum
1.5mm thick MS sheets, calibrated water-level indicator, external
A and internal ladder and lockable manhole cover. No. 1
Provide all bolts and sealant as necessary. Inside of tank to be
painted with two coats of non-toxic bituminous black paint and
outside to be painted with two coats of silver aluminous paint.
Provide and erect (concrete pad foundation included) 15 m high 655,000 655,000
steel tower comprising of universal columns, angle bracings, cat-
ladders and platform comprising of UB beams, 3mm thick
chequered plate on 600mm wide walkway with 900mm high
B No. 1
guard rail. Provide all bolts necessary for erection. The steel
tower to be painted with one coat grey oxide zinc chromate
primer, two coats silver aluminium paint. Tower
should include provide cat ladder.
Supply and install the pipes to the ground level of the tanks all 182,000
C pipes and fittings to be 4" GI (rising as inlet and down No. 4 45,500
distribution pipe)
Sub Totals for elevated steel tank 2,937,000
Pipes and pipe Fittings: Meters, valves and Chambers -
D 90mm Ø gate valve (peglur) complete with fittings No. 2 48,500 97,000
Junction chambers -
E Supply materials, transport to site and construct 1m x 1m x 1m No. 2 70,000
35,000
Junction/control chambers with locked steel cover
Sub totals for pipe and pipe fittings 167,000
Sub totals for elevated steel tank 2,937,000
Sub totals for pipes and pipe fittings 167,000
TOTAL FOR 1NO. ELEVATED STEEL TANK 3,104,000
TOTAL FOR 1NO. ELEVATED STEEL TANK 3,104,000