You are on page 1of 4

SUMMARY OF PRICE

THE CONSTRUCTION OF A TWO-STOREY INDIVIDUAL RESIDENTIAL UNIT ON LOT 443,


MUKIM BATANG KALI, DAERAH HULU SELANGOR, SELANGOR DARUL EHSAN.

KERJA-KERJA MEMBEKAL, MENGHANTAR, MEMASANG, MENGUJI, MENTAULIAH DAN MENJAMIN


SELAMA DUA BELAS (12) BULAN UNTUK PEMASANGAN SISTEM MEKANIKAL.

The following is a summary of our Tender Sum :-

Item Description Sub-Total Price(RM)

1 HVAC (Sub-Total Bill "A") RM 15,128.00

2 Cold Water Plumbing System ( Sub-Total Bill "B") RM 28,800.00

TOTAL FOR MECHANICAL WORKS RM 43,928.00

MECH STP_1 Perunding Azfar


THE CONSTRUCTION OF A TWO-STOREY INDIVIDUAL RESIDENTIAL UNIT ON LOT 443, MUKIM BATANG KALI,
DAERAH HULU SELANGOR, SELANGOR DARUL EHSAN.

KERJA-KERJA MEMBEKAL, MENGHANTAR, MEMASANG, MENGUJI, MENTAULIAH DAN MENJAMIN SELAMA DUA
BELAS (12) BULAN UNTUK SISTEM MEKANIKAL.

BILL "A" : HVAC INSTALLATION

Item Description Unit Qty Rate Total


(RM) Cost (RM)

I AIR CONDITIONING SYSTEM

Air Cooled Split Unit

1. Split Unit Direct Expansion Air Conditioners c/w starters, condenser


unit, indoor unit, refrigerant piping, pump for drain pipe, drain pipes,
wiring, brackets, support, and timers for refrigerant R410A.
a) 18,000 Btu/hr wall mounted type (Bedroom 1). no 1 3,657.00 3,657.00
b) 18,000 Btu/hr wall mounted type (Bedroom 2). no 1 3,657.00 3,657.00
c) 18,000 Btu/hr wall mounted type (Family Hall). nos 2 3,657.00 7,314.00

II COMPLETE TESTING AND COMMISSIONING FOR THE


ABOVE INSTALLATIONS. L.S L.S 500.00 500.00

III OTHER WORKS

Other works included in this section and/or Bills, but not shown in the drawings
and/or nessecary for the satisfactory completion of the installation works
(Please specify) :-

a)

b)

c)

Sub-Total Bill "A" 15,128.00

A_1 PERUNDING AZFAR


THE CONSTRUCTION OF A TWO-STOREY INDIVIDUAL RESIDENTIAL UNIT ON LOT 443, MUKIM BATANG KALI,
DAERAH HULU SELANGOR, SELANGOR DARUL EHSAN.

KERJA-KERJA MEMBEKAL, MENGHANTAR, MEMASANG, MENGUJI, MENTAULIAH DAN MENJAMIN SELAMA DUA
BELAS (12) BULAN UNTUK SISTEM MEKANIKAL.

BILL "B" : COLD WATER PLUMBING SYSTEM

Item Description Unit Qty Rate Total


(RM) Cost (RM)

I COLD WATER STORAGE TANK


1. Supply and install complete set cylindrical type Cold Water Storage Tank
(P.E tank) with effective capacity of 330 igallon c/w overflow, scour
pipe, vent pipe, access door, waterproof plinth, warning pipe, pipes
header and all other accessories as per drawing. set 1 1,250.00 1,250.00

II RAIN WATER HARVESTING SYSTEM


1. Supply and install complete set cylindrical type Rain Water Harvesting
Tank (P.E tank) with effective capacity of 330 igallon c/w overflow, scour
pipe, vent pipe, access door, waterproof plinth, warning pipe, pipes
header and all other accessories as per drawing. set 1 1,250.00 1,250.00

2. Filtration system c/w downpipe filter, first flush diverter and piping works. lot 1 2,500.00 2,500.00

3. Part fill valve DN25. set 1 250.00 250.00

III PUMPING SYSTEM

1. To supply and install 1 no complete set of end suction centrifugal booster pump1 set 1 1,200.00 1,200.00

(suction pump) at capacity of 1.5 m3/hr @ 21 meters head c/w all others accessories.

2. To supply and install 1 no complete set of self priming end suction centrifugal booster set 1 1,350.00 1,350.00

pump2 at capacity of 1.5 m3/hr @ 20 meters head c/w all others accessories.

3. To supply and install complete set of pump control panel c/w MCCB, RCCB, starter, set 1 3,500.00 3,500.00
blinking light, cabling in trunking and all other accessories.

4. To supply and install complete set of pump control system c/w cablings, electrode and lot 1 3,000.00 3,000.00

all others accessories as per drawings to complete the system.

IV WATER TREATMENT SYSTEM


1. To conduct lab test for sample of raw water (inside suction tank) c/w 3
copies of test report before and after treatment. lot 1 1,000.00 1,000.00

2. To supply and install complete set of horizontal type of UV disinfection at flowrate of set 1 1,500.00 1,500.00
2.5m3/hr (US Public Health Standard) c/w all others accessories as per drawing to
complete the system.

3. To supply and install complete set of vertical type of media filter at flowrate of set 1 2,700.00 2,700.00

2.5m3/hr c/w all other accessories as per drawing to complete the system.

V TRANSFER PIPE
1. 25mm dia. HDPE PN16 pipes from existing tube well to suction tank
under staircase landing c/w gate valve, etc. as per drawing to complete
the system. lot 1 900.00 900.00

C/f Sub-Total Bill "B" 20,400.00

B_1 PERUNDING AZFAR


THE CONSTRUCTION OF A TWO-STOREY INDIVIDUAL RESIDENTIAL UNIT ON LOT 443, MUKIM BATANG KALI,
DAERAH HULU SELANGOR, SELANGOR DARUL EHSAN.

KERJA-KERJA MEMBEKAL, MENGHANTAR, MEMASANG, MENGUJI, MENTAULIAH DAN MENJAMIN SELAMA DUA
BELAS (12) BULAN UNTUK SISTEM MEKANIKAL.

BILL "B" : COLD WATER PLUMBING SYSTEM

Item Description Unit Qty Rate Total


(RM) Cost (RM)

B/f Sub-Total Bill "B" 20,400.00

2. 25mm dia. HDPE PN16 pipes from suction tank and to storage tank at
roof area c/w gate valve, etc. as per drawing to complete the system. lot 1 500.00 500.00

VI EXCAVATE COMMENCING FROM PLATFORM LEVEL (FINISHED


GROUND FLOOR LEVEL) GET OUT, PART RETURN, FILL IN AND
RAM, DEPOSIT AND SPREAD IN MAKING UP LEVEL, REMAINDERS
LOAD CART AWAY OFF SITE:-
1. Trench, not exceeding 1m depth, average 600m depth for
underground transfer pipe. lot 1 400.00 400.00

VII DISTRIBUTION PIPE


1. To supply and install concealed UPVC Class D pipes for distribution from
storage tank to all fittings c/w hangers, bracket, support and all other
accessories as per drawing. lot 1 6,500.00 6,500.00

VIII COMPLETE TESTING AND COMMISSIONING FOR THE


ABOVE INSTALLATIONS. L.S L.S 1,000.00 1,000.00

IX OTHER WORKS

Other works included in this section and/or Bills, but not shown in the drawings
and/or nessecary for the satisfactory completion of the installation works
(Please specify) :-

a)

b)

c)

Sub-Total Bill "B" 28,800.00

B_2 PERUNDING AZFAR