KERJA-KERJA MEMBEKAL, MENGHANTAR, MEMASANG, MENGUJI, MENTAULIAH DAN MENJAMIN SELAMA DUA
BELAS (12) BULAN UNTUK SISTEM MEKANIKAL.
Other works included in this section and/or Bills, but not shown in the drawings
and/or nessecary for the satisfactory completion of the installation works
(Please specify) :-
a)
b)
c)
KERJA-KERJA MEMBEKAL, MENGHANTAR, MEMASANG, MENGUJI, MENTAULIAH DAN MENJAMIN SELAMA DUA
BELAS (12) BULAN UNTUK SISTEM MEKANIKAL.
2. Filtration system c/w downpipe filter, first flush diverter and piping works. lot 1 2,500.00 2,500.00
1. To supply and install 1 no complete set of end suction centrifugal booster pump1 set 1 1,200.00 1,200.00
(suction pump) at capacity of 1.5 m3/hr @ 21 meters head c/w all others accessories.
2. To supply and install 1 no complete set of self priming end suction centrifugal booster set 1 1,350.00 1,350.00
pump2 at capacity of 1.5 m3/hr @ 20 meters head c/w all others accessories.
3. To supply and install complete set of pump control panel c/w MCCB, RCCB, starter, set 1 3,500.00 3,500.00
blinking light, cabling in trunking and all other accessories.
4. To supply and install complete set of pump control system c/w cablings, electrode and lot 1 3,000.00 3,000.00
2. To supply and install complete set of horizontal type of UV disinfection at flowrate of set 1 1,500.00 1,500.00
2.5m3/hr (US Public Health Standard) c/w all others accessories as per drawing to
complete the system.
3. To supply and install complete set of vertical type of media filter at flowrate of set 1 2,700.00 2,700.00
2.5m3/hr c/w all other accessories as per drawing to complete the system.
V TRANSFER PIPE
1. 25mm dia. HDPE PN16 pipes from existing tube well to suction tank
under staircase landing c/w gate valve, etc. as per drawing to complete
the system. lot 1 900.00 900.00
KERJA-KERJA MEMBEKAL, MENGHANTAR, MEMASANG, MENGUJI, MENTAULIAH DAN MENJAMIN SELAMA DUA
BELAS (12) BULAN UNTUK SISTEM MEKANIKAL.
2. 25mm dia. HDPE PN16 pipes from suction tank and to storage tank at
roof area c/w gate valve, etc. as per drawing to complete the system. lot 1 500.00 500.00
IX OTHER WORKS
Other works included in this section and/or Bills, but not shown in the drawings
and/or nessecary for the satisfactory completion of the installation works
(Please specify) :-
a)
b)
c)