1. GENERAL The mechanical works shall include the following services and systems :
The Fire Protection Services shall include the following systems, subject
2. FIRE PROTECTION SERVICES
to JBPM's final approval :
ER : Part C; Page 31 of 94, Page 79 -Hydrant System -To follow location as per approved drawing (passive)
of 94, Page 80 of 94, Page 81 of 94,
Page 82 of 94, Page 83 of 94. -Hose Reel System -Cover Parking, Office Tower and Ballroom.
-Analogue Adressable Fire Alarm and Detection System. -Prasarana request to submit Notifier system.
-Clean Agent Fire Extinguishing System -Design proposal using SR200 system. Prasarana request to submit
FM200 or Novec 1230.
-Portable Fire Extinguishing System -9kg dry powder and 4.5kg CO2
-Wet Riser System -Landing valve at Staicase 1, Staircase 2 and Fire Lift Lobby
-Automatic Sprinkler System -Double stage system. Cover only office Tower and Ballroom.
-Staircase & Lift Lobby Pressurization System -Pressurisation for Staircase 3 & 4, Fire Lift Lobby
-Other systems required by JBPM's -Wet chemical system for kitchen hood
-Smoke spill system for atrium & ballroom.
PAGE 1 of 5
ITEM SERVICES EMPLOYER REQUIREMENT (ER) REMARKS
The areas to be supplied with cold water shall include but not limited to
3. COLD WATER AND SANITARY
the following :
PLUMBING SERVICES
-Toilet and showers -Provided.
ER : Part C; Page 31 & 32 of 94 -Ablution area for surau -Provided.
Page 83, 84 & 85 of 94. -Pantry -Provided.
-Canteen, food and beverage café and kitchen -Provided
-Connection to Fire Protection Services Water Tank -Provided i.e Hose Reel Tank, Wet Riser Tank and Sprinkler Tank.
-Connection to Water Cooled Chiller Make Up Tank and Expansion Tank -Provided.
-External area for floor washing and watering of plants at landscape
-Provided. Rain water harvesting tank have backup water supply from
area/ terrace garden (if water supply from rain water harvesting is
SYABAS pipe.
shortage)
-Water Features -Provided i.e Aras 4 (Parking)
-AHU Room, Chiller Plant Room, connection to Rain Water Harvest
-Other necessary as required.
Tank.
-Separate water meter need to be provided for canteen if required. -Provided.
-All toilet within this scope of works shall be equipped with flush valve. -Provided.
The sanitary plumbing shall be design to carry soil and waste water from
the following areas :
PAGE 2 of 5
ITEM SERVICES EMPLOYER REQUIREMENT (ER) REMARKS
-All rooms which are not naturally and mechanically ventilated shall be
-Provided.
5. AIR CONDITIONING AND air conditioned.
MECHANICAL VENTILATION
-Depending on the total cooling load and floor layout, the following type
of Air Conditioning Equipment may be used :
-Child Care Center, Ballroom, Office Tower (GD's Room, Chairman's
ER : Part C; Page 33 & 35 of 94 , Page 77, Office, Meeting Room Level 12, UPS room, Surau, Gallery, Kedai
●Split System Air Conditioning
78 & 79 of 94 Serbaneka, Kitchen, SDF Room, MDF Room, BAS Room, Security
Room)
●Water Cooled Chiller System -Office Tower
PAGE 3 of 5
ITEM SERVICES EMPLOYER REQUIREMENT (ER) REMARKS
-Where standby Air Conditioning Units are provided for rooms housing
mission-critical equipment, a control panel shall be provided with suitable -Provided i.e BAS Room, SDF Room, MDF Room, Security Room, UPS
control to alternate the lead equipment in operation after an operation Room.
cycle of 12 hours.
-For DCS and Server Room, the contractor shall provide Precision Air
-Provided
Conditioning type with standby and duty functionally.
-Other rooms that require being operating 24 hrs, the contractor shall
-Provided i.e BAS Room, SDF Room, MDF Room, Security Room, UPS
provide air conditioning split unit type as standby unit during night
Room.
working time.
The passengers lift shall be designed to cater for an approximate 850 Base on analysis using 6 nos. lift (5 nos. 20 person + 1 no. 21 person) at
staff with an additional 300 staff for future expansion with the waiting speed of 1.75 m/s (each), the result is :
6. LIFT SERVICES
time of not more than 30s during peak hours with minimum handling
capacity in 5 min of 12% of the staff.
ER : Part C; Page 23 of 94 (item v & vi), ●Average Waiting Time per passenger : 18.8 s
Page 34 & 35 of 94 ●Min. Handling Cap. In 5 min. : 14.4%
-3 nos. with cap. 20 person @ speed 1.75 m/s, 1 no. with cap. 21 person
-Passenger Lift @ speed 1.75 m/s (OKU Lift), 2 nos. with cap. 15 person @ speed 1.0
m/s (parking)
-Observation Lift -2 nos. with cap. 20 person @ speed 1.75 m/s
-Bomba Lift -1 no. with cap. 20 person @ speed 1 m/s
-Goods Lift -Using bomba lift as a service lift.
PAGE 4 of 5
ITEM SERVICES EMPLOYER REQUIREMENT (ER) REMARKS
PAGE 5 of 5