TRANS RESOURCES CORPORATION SDN BHD

PROJECT : RETENDER OF PROPOSED DESIGN, CONSTRUCTION AND COMPLETION OF NEW PRASARANA’S


HEADQUARTERS BUILDING AT LOT PT 9579, LEMBAH SUBANG, MUKIM DAMANSARA, DAERAH
PETALING, SELANGOR DARUL EHSAN
CONTRACT NO.: PRASARANA/LGCD/CTT/2.0753/2019

CLIENT : PRASARANA MALAYSIA BERHAD


DATE : 22/09/2022
WORKSHOP : BUILDING AUTOMATION SYSTEM
DESCRIPTION - HUMAN-MACHINE INTERFACE

DISCUSSION NOTES

No. Prasarana's Comment TRC's Response Remarks

General

1 To provide full name for all unit/item Yes, noted.

2 To provide latest Prasarana logo Yes, noted.

To change from Prasarana HQ to Prasarana


3 Yes, noted.
Headquarters Building

4 To provide selection of wallpaper/background Yes, noted.

To provide latest render perspective drawing for


5 Yes, noted.
home page

6 Background to change to black color Yes, noted.

To change “chiller plant control” to “chiller plant


7 Yes, noted.
control summary status”

8 Modernize the interface of the software Yes, noted.

To add “reading” at the end of change chiller digital


9 Yes, noted.
power meter

10 To change CH-1 to “chiller No 1” Yes, noted.

11 To provide full name for exhaust fan (tagging) Yes, noted.

Technical

To include Auto Dosing System in HMI for reminder


1 Yes, noted.
purposes

2 To provide sensor for water leak detection

3 To add Taska ACMV IO point

Pleased to inform that BMS for lighting DB carpark


4 BMS for monitoring lighting DB at carpark level 4
Level 4 s not provided as per FDR approved.

Pleased to clarify that all Fire signal will back to


5 BMS for fire protection Main Fire Alarm Panel (MFAP) and BMS will be
directly linked to MFAP.

To include parameter for reading - Eg – if exceed/


6 Yes, noted.
less than

7 To provide indication on which button is clickable Yes, noted.

Pleased to confirm that no FAT will be provided for


8 FAT provided or not?
Building Automation System (BMS).

Pleased to inform that RAM provided as per MAF


9 Request to increase RAM approved complied to BMS System Hardware
requirements.

10 Any services related to GBI – Only for ACMV

Yes, noted.
11 To provide 1-day training for PMB
Training will be provided during handover stage.