General:
Contractor/vendor has not provided the resolution against the
comment resolution sheet which is submitted against earlier revision.
Therefore these comments are again being
repeated here.
These comments pertain to C02 system documents which pertain to
electrical only.
Vendor to submit the filled up, signed and stamped data sheet of the
dean agent system (A286-000-16-50-DS-0024) for manned station
1 Ok
(4019) and CO2 system for unmanned station (A286--000-16-50-DS-
0021) (other stations).
As per the fire alarm data sheets attached with the tender, FA cum
2 Confirm
CO2 panel shall be microprocessor based. Confirm the same.
Vendor to furnish the sizing calculations for arriving at the final Proposed detectors are having radius of 7.5 mtr. & considering
5
quantities of FA system components such as detectors etc. the room size the quantity is sufficient
Vendor has to submit the sizing of the battery as per the specification
6-51-0076 refer Clause D3 of the data-sheet for battery sizing. In
7 Already submitted
view of this note that duration for battery sizing shall be 24hrs
(Normal) +30min. (Alarm).
8 Refer clause 9.2 of EIL spec 6-51-0076 and note the following :
Selector switches for primary or secondary clean agent/ CO2 supply Selector switch for each room is not required. Common selector
for each protected area. switch is provided on panel
Manual push button for discharge of clean agent/ CO2 in each
As per GIGL MBPL Phase - I philosophy it is provided on panel
protected area. The actual release of clean agent/ CO2 shall
& guard room
however be delayed by 30sec after the alarm.
Sr. RESOLUTION/
COMMENT/ OBSERVATION
No. ACTION
For clean agent flooding will be done in any one room & for that
Clean agent/CO2 discharge inhibit push button for each protected abort is already porvided. Room wise abort not required.
area.
For CO2 flooding as per NFPA abort is not to be provided.
Please comply and indicate these in the GA.
Furnish the basis for selecting the no. of detector and no. of zones.
2
In view of this note the following:
One detector in electrical room and in telecom room is clubbed into It is as per 2/3 logic philosophy of GIGL MBPL Phase - I
the zone of trench and false ceiling which appears incorrect. Please
explain.
Sr. RESOLUTION/
COMMENT/ OBSERVATION
No. ACTION
In view of the above point and as per clause 7 .1.9 of Ell spec 6-51-
0076 if zone is protected with clean agenV C02 system, the
detectors and BGUs of the zone shall be wired in cross-zones by
3 providing minimum two signaling circuits in a zone. The last device in It is as per 2/3 logic philosophy of GIGL MBPL Phase - I
each circuit shall be provided with end of line resistor of suitable
value as per circuit design to facilitate cable open circuit and short
circuit detection. Please ensure and explain.
For detectors below false floor/trench, RI shall be installed at the
nearest wall and at 1200mm above the floor; while for detectors
4 Noted
above false ceiling, RI shall be installed at the nearest wall and at
300mm below the false ceiling.
For detectors in the closed room, response indicators shall be
5 Not applicable
installed above the door outside the room.
Refer clause 13.2 of EIL spec 6-51-0076. In view of this, note that for
6 battery room flameproof detectors suitable for gas group llC and It is as per philosophy of GIGL MBPL Phase - I
temp. Class T3 shall be provided for battery room.
7 Indicate the details of the cable used for FA devices. given in schematic diagram
Furnish the basis for selecting the no of detector and no. of zones. In
2 view of
this note the following:
It is as per 2/3 logic philosophy of GIGL MBPL Phase - I
One detector in electrical room and in telecom room is clubbed into
the zone of trench and false ceiling which appears incorrect. Please
explain.
In view of the above point and as per clause 7 .1.9 of Ell spec 6-51-
0076 if zone is protected with clean agenV C02 system, the
detectors and BGUs of the zone shall be wired in cross-zones by
3 providing minimum two signaling circuits in a zone. The last device in It is as per 2/3 logic philosophy of GIGL MBPL Phase - I
each circuit shall be provided with end of line resistor of suitable
value as per circuit design to facilitate cable open circuit and short
circuit detection. Please ensure and explain.